Amendment #1 - Q&A - RFP PMAA 2027_0006.pdf

PDF 212 KB Posted

Attached to
CPW Pikes Peak Recreation Area Planning
Solicitation number
RFP PMAA 20270000000000000006 2
Issued by
El Paso County, Colorado

About this file

This Amendment #1 Q&A document addresses clarifications for RFP PMAA 2027_0006, a Pikes Peak Recreation Area Planning project involving Colorado Parks and Wildlife (CPW) and nine partnering land management entities across El Paso and Teller Counties. The project deliverables include two concurrent planning products of equal priority: the Pikes Peak Massif Vision Plan and the Recreation Area Management Plan, with supporting tasks including segment-by-segment trail assessments, GIS dataset compilation and standardization, carrying-capacity analysis synthesis, public and stakeholder engagement across two rounds, Benefits-Based and Place-Based customer surveys, and planning-level wayfinding strategy. The project timeline has been clarified as 30 to 36 months with an updated project end date of March 31, 2030 (originally stated as December 31, 2028). The proposal submission deadline was extended to December 10 at 12:00 PM MST. Monthly coordination meetings with nine-agency land managers are required, with CPW anticipating 60-day review periods for both draft and final plans and 60-day public review periods for draft materials.

The consultant bears primary responsibility for designing and executing the customer survey lifecycle, public and stakeholder engagement events, and GIS data compilation from multiple partner agencies, though no unified massif-wide dataset currently exists. Existing data will be provided by land managers and partner organizations, with the consultant responsible for gap analysis and field verification of priority segments. The scope does not mandate statistically valid surveys, though proposers should recommend rigorous, defensible methodologies. No new quantitative carrying-capacity models are required; the project requires planning-level synthesis of existing information and identification of future analysis needs. CPW will support survey hosting through its EngageCPW portal and will not draft legal language for the long-term cooperative management agreement. No resident bidder set-aside is established, though resident bidder preference applies per RFP section 5.10.1. No specific federal funding or OMB clearance requirements apply, though federal partners will review surveys conducted on federal lands.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment #1 - Questions & Answers (Q&A)

RFP PMAA 2027*0006

Pikes Peak Recreation Area Planning

A. The following questions, and the answer to each, were received:

1. Expected project start date is February 2027 with a performance time by

December 31, 2028, which is only 23 months. However, the Phased

Timeline in the Exhibit A scope of work outlines a 30-36 month timeline.

Which is the desired timeframe?

i. The desired timeline for the project is 30-36 months as stated in

Exhibit A, Scope of Work. See “Amendment #1 RFP PMAA

2027*0006 - Pikes Peak Recreation Area Planning” for the updated sections 4.2 and 2.6 reflecting a project end date of March 31, 2030 in order to align with the timeline in Exhibit A, Scope of Work.

ii. “Amendment #1 RFP PMAA 2027*0006 - Pikes Peak Recreation

Area Planning” has been posted with this Amendment #1 Q&A..

2. Is there existing data for the segment-by-segment assessment, or will this require a full inventory of the alignment?

i. Existing data will be provided by land managers and partner organizations

3. What is the level of inventory and analysis on existing versus conceptual segments/alignments, trailheads, interpretation and wayfinding, parking lots, etc.?

i. Local partner organizations and participating land managers maintain the most extensive baseline data and serve as the primary repository for current trail segments and previously considered future alignment options (such as those documented in the 2019

Ring the Peak Master Plan and 2025 OPPI Vision Plan).

ii. Identify feasible alignment alternatives, tradeoffs, planning-level cost ranges, and required approvals/NEPA pathways (without selecting final alignments or producing engineering/design-level plans).

4. Is a combined trail and resource dataset available for all land managers?

i. No single combined dataset is currently maintained across all nine partnering entities. Under the executed Memorandum of

Understanding, each participating land manager has agreed to share and validate existing GIS datasets and spatial information for the properties they oversee. Additionally, regional baseline GIS layers and prior planning maps (such as the 2019 Ring the Peak

Master Plan and 2025 OPPI Vision Plan) are available through the

Pikes Peak Outdoors Data Hub. The consultant will be responsible for compiling, standardizing, and integrating these agency datasets into editable GIS deliverables for the project.

5. What data do land managers currently have, specifically related to the

Segment-by-Segment Assessment?

i. Individual land managers possess varying levels of baseline GIS data, trail alignments, jurisdictional boundaries, easement/access records, and resource/watershed constraint layers for their respective properties. Each land manager will provide or validate available data concerning the property it oversees, and the consultant will compile this existing information, conduct an existing information and gap analysis, and identify where additional field verification or future data collection is needed.

6. The Offeror Questionnaire asks if 100% of the work will be completed by the firm within the state of Colorado. If a firm chooses to utilize an employee who reports to a Colorado office but is physically located in another state, would we respond No?

i. “Yes” would be an acceptable response regarding this situation.

7. Are you expecting an equal level of effort/budget for each plan?

i. The Pikes Peak Massif Vision Plan and the Recreation Area

Management Plan are two core, equal-priority planning products that run concurrently and inform one another. While both deliverables carry equal priority, CPW does not prescribe a rigid

50/50 split in hours or budget; proposers should allocate level of effort and budget proportionally across tasks based on their proposed methodology, the depth of technical analysis required for each track (e.g., high-level landscape visioning vs. operational site-level protocols and RTP corridor alternatives), and the overall project budget.

8. What level of support will CPW or CPWs existing, contracted firms play in outreach, stakeholder/land managers collaboration and coordination, and the customer survey?

i. Planning, facilitating, and leading multi-phase public and stakeholder engagement (open houses, virtual meetings, online portals, user-group focus groups) and executing the customer survey work are core responsibilities of the selected technical consultant. CPW staff and the eight partner land managers will collaborate closely with the consultant to review materials, ensure adherence to CPW branding and agency policies, and assist in distributing outreach and survey communications through agency channels

9. Is a statistically-valid survey the expectation for the Benefits-Based &

Place-Based Customer Surveys? Is the consultant responsible for administering and compiling the results of the survey, or only for developing a design of the survey?

i. The consultant is responsible for the full lifecycle of the survey effort, including designing the survey instrument, administering/deploying the survey, and compiling and analyzing the results to inform both the Vision Plan and Management Plan.

While a statistically valid survey is not strictly mandated if cost-prohibitive within the project budget, proposers should outline a rigorous, defensible sampling methodology designed to capture representative feedback across diverse user groups and geographic areas of the massif.

10. Please clarify the contract timeframe: The RFP states that the contract must be completed by December 31, 2028; the Scope of Work specifies a

30–36-month timeline.

i. See response to question 1.

11. What does CPW expect for the frequency and nature of coordination meetings and check-ins with CPW staff and leadership?

i. The consultant is required to meet in person or virtually with the nine-agency Pikes Peak Public Land Managers Collaborative on a regular monthly basis. These sessions are used to report on outreach and engagement progress, review public comment trends, share GIS and mapping datasets, present draft concepts, and gather consensus feedback across agency leadership.

ii. In addition, the technical consultant will work closely with the Pikes

Peak Recreation Area Leadership, which includes the Park

Manager and Operations Manager.

12. How will CPW support this process with data and information? For example, wildlife and habitat data that is not publicly available, or typical capacity and revenues for camping and other CPW managed facilities.

i. The consultant will work directly with CPW and partner agency specialists, including biologists, researchers, policy and planning staff, and law enforcement. The Park Manager will support data gathering from subject matter experts.

ii. Agency planning/finance staff will provide relevant operational benchmarks, comparable park metrics, and existing site data to inform financial sustainability modeling, and planning-level cost and revenue estimates.

13. Would CPW support a website and public survey hosting?

i. Yes

14. Does CPW envision a working group to direct and inform the Vision Plan process? If so, would this be the same working group as the RTP group, or different?

i. Overall inter-agency direction, consensus alignment, and review for the Massif Vision Plan and the Recreation Area Management Plan are provided by the full nine-agency Land Managers Group during its regular monthly meetings.

15. Do commercial and non-commercial carrying capacity models already exist (which would be updated)? If so, will they be made available?

i. No unified, massif-wide commercial and non-commercial carrying capacity model currently exists across all nine participating land managers.

16. Please clarify the public and stakeholder outreach expectations; does

CPW envision two or three rounds of public outreach during the process?

Approximately how many public meetings/workshops and focus group meetings should be anticipated?

i. CPW and its partners envision two rounds of public and stakeholder engagement for this project. It is up to the proposer to suggest an appropriate number and format for these engagement opportunities, recognizing the geographic diversity across the region, ensuring a diversity of input through varied formats, and the high profile nature of the Pikes Peak Recreation Area.

17. Is a statistically valid survey required for community engagement?

i. No. A statistically valid survey is not required for general community engagement.

18. What is the anticipated number and frequency of advisory board/decision-maker presentations and approvals for individual land managers that is necessary to complete the plans?

i. Throughout the 30- to 36-month timeline, primary inter-agency review, draft concept presentation, and consensus alignment occur through the regular monthly meetings of the nine-agency Pikes

Peak Public Land Managers Collaborative.

ii. Because each of the nine partnering entities retains sole authority over its respective property, all proposed frameworks and management actions must undergo independent review and formal approval by each respective land manager. Rather than assigning a fixed, uniform number of board or council presentations across all nine agencies, CPW anticipates that individual land manager staff will lead internal briefings and formal approval processes with their own respective decision-makers (such as the Parks and Wildlife

Commission, City Councils, Boards of County Commissioners, Utilities Board, or Federal Chains of Command).

19. Since the responses to questions and clarifications to the scope may significantly affect the project approach, would it be possible to extend the proposal deadline by one week?

i. The “Proposal Submission Deadline” has been extended to

December 10th at 12:00 PM MST. See “Amendment #1 RFP

PMAA 2027*0006 - Pikes Peak Recreation Area Planning” for the updated Schedule of Activities.

20. Is the survey expected to produce statistically representative estimates of the visitor population, with a target margin of error? Or will it mainly be a descriptive input used alongside other engagement?

i. No. CPW is not requiring a statistically valid survey for the Benefits-

Based & Place-Based Customer Survey described in the RFP.

CPW encourages proposers to recommend a rigorous and defensible methodology for these surveys that will provide defensible data with which to make management decisions.

21. Will any federal agency sponsor or co-sponsor the survey that would require OMB clearance? If so, would Phase 1 timeline allow for it?

i. Federal partners on this project are not providing any funding for this effort. CPW and the successful contractor will work with those federal partners to ensure any survey implemented on federal lands is reviewed and acceptable.

22. Is there a preferred methodology for data collection for the survey?

i. CPW does not mandate a single prescribed data collection methodology; rather, the proposer is expected to recommend and justify a rigorous, defensible sampling and collection approach tailored to the project's scope

23. Can you provide access to the Management Plan Template Document referenced on page 2 of Exhibit A. Scope of Work?

i. “Amendment #1 RFP PMAA 2027*0006 - Pikes Peak Recreation

Area Planning” includes the link in section 1.2 to access

Management Plan Template Document referenced on page 2 of

Exhibit A. Scope of Work.

24. What is the anticipated period of time that the Pikes Peak Public Land

Managers will need to review the draft and final plans (e.g., 30 days, 60 days)?

i. CPW anticipates a 60 day review period for the Pikes Peak Public

Land Managers

25. Are there windows of time anticipated for public feedback on the draft and final plans (e.g., 30 days, 60 days)?

i. CPW anticipates a 60 day public review period for the draft plans.

26. Do you need to be a resident bidder to apply for this work?

i. No. See RFP section 4.6 for information regarding performance outside the State of Colorado and/or the United States.

27. If not, what % of the evaluation score /how many points extra do you receive if you are resident bidder versus a firm from out of state?

i. See RFP section 5.10.1 for information regarding Resident Bidder

Preference. Per section 3.1, all Respondents will receive fair and impartial treatment by the Evaluation Committee.

28. The Scope of Work references a project duration of 30–36 months, while the RFP indicates an anticipated start in February 2027 and a completion deadline of December 31, 2028. Please clarify which governs the period of performance. In addition, the memorandum identifies a target date of June

30, 2028 for a long-term agreement. Should the proposed schedule include interim decision milestones that support that target date?

i. See response to question 1.

ii. RFP section 2.6 states, “Provide an estimated project schedule for each phase and the project as a whole that demonstrates project completion by March 31, 2030 as part of the approach. “

29. The Management Plan Template referenced in Exhibit A requires access permission. Please provide an accessible copy for prospective proposers.

i. See response to question 23.

30. The 2025 OPPI Vision Plan identifies extensive GIS and mapping resources. Will CPW and participating land managers provide the selected consultant with available source GIS files, trail and recreation facility inventories, easement information, visitor-use data, and related studies, including any updates since publication of the earlier plans?

i. See responses to question 2, 4 & 5.

31. Since publication of the 2019 Ring the Peak Master Plan, have any proposed trail segments or access connections received additional environmental review, approval, or modification that should be reflected in this planning effort? For this scope of work, should the previously proposed alignments serve as the planning baseline, or does CPW anticipate further field verification, evaluation, and potential refinement of those alignments?

i. Previously proposed alignments and access connections, such as those documented in the 2019 Ring the Peak Master Plan and the

2025 OPPI Vision Plan, along with current data maintained by local partner organizations and participating land managers, should serve as the planning baseline. Any post-2019 portal additions, alignment modifications, easement acquisitions, or environmental reviews completed by individual land managers will be provided and validated by those agencies during the initial data compilation and gap analysis phase.

32. Does the scope anticipate field assessments of trail conditions for every trail segment and recreation facility? Alternatively, may the consultant assess a subset of priority or representative trail segments and incorporate information provided by land managers for other sites? Please also clarify the expected level of field assessment for the southwest gap.

i. The scope does not require a ground-up field inventory of every mile of existing trail or every recreation facility across the massif.

Local partner organizations and participating land managers hold extensive baseline condition and facility records and will provide or validate available data for the properties they oversee. The consultant should compile and synthesize the existing data first, then verify priority, complex, or data-deficient segments and key trailheads/facilities, particularly where physical sustainability, safety, user conflict, or resource/watershed constraints are present.

33. Does CPW require a statistically valid survey for the Benefits-Based &

Place-Based Customer Survey? Is a particular administration method required or preferred?

i. See responses to questions 17, 20, and 22.

34. Please clarify the expected design maturity of the wayfinding deliverable.

i. Address wayfinding, signage, and interpretation at a programmatic, planning-level strategy within the RTP Implementation &

Management Strategy rather than detailed site design. Ensuring a consistent model across the entire trail, regardless of land ownership. Land ownership will be represented on wayfinding signage, but in a streamlined design.

35. The RFP text states: Formulation of Purpose & Need statements, Proposed Actions, and Alternatives to feed into and inform subsequent

NEPA processes for actions on federal land. Please clarify the anticipated number of action alternatives to be developed by the consultant for the

Recreation Area Management Plan, and whether a formal 'No Action' alternative is expected at this stage.

i. Per the USFS: At this planning stage, the consultant is expected to develop a reasonable range of proposed actions and alternatives sufficient to inform the Recreation Area Management Plan and support subsequent NEPA analysis. The exact number of proposed actions and alternatives has not been predetermined and should be based on issues identified during plan development, stakeholder input, and resource considerations. Existing conditions and current management practices should be documented to support development of a ‘No Action’ alternative during subsequent NEPA processes, as appropriate.

36. Regarding the “Public & Stakeholder Engagement Opportunities” task, can the CPW clarify the anticipated number of events or rounds of engagement expected for each format (specifically: in-person open houses/workshops across El Paso and Teller Counties, virtual meetings/webinars, and targeted user-group focus groups), as well as whether the interactive online portal is expected to be built and hosted by the consultant or integrated into an existing CPW platform?

i. See response to question 16.

ii. CPW envisions utilizing its EngageCPW portal to support this project and engagement efforts.

37. Exhibit A references updated commercial and non-commercial carrying-capacity models, while Section 4.1 describes a planning-level synthesis of existing information and identification of future analysis needs. Please clarify whether new quantitative carrying-capacity models are required under this contract.

i. See response to question 15.

38. Is the consultant expected to prepare draft language for the long-term cooperative management agreement, or to provide technical planning and supporting documentation for agreements developed by the participating agencies?

i. The consultant is not expected to draft legal or governance language for the long-term cooperative management agreement;

the participating agencies in the Pikes Peak Public Land Managers

Collaborative are developing and negotiating that agreement directly among themselves.

B. All other terms and conditions of RFP PMAA 2027*0006 - Pikes Peak

Recreation Area Planning remain the same.

Amendment #1 - Questions & Answers (Q&A)
RFP PMAA 2027*0006
Pikes Peak Recreation Area Planning

File details come from the government source that posted it. Updated .