This Amendment #1 Questions and Answers document pertains to the GBNERR Mastication Project Invitation for Bids (IFB RFx #3160008075) issued by the Mississippi Department of Marine Resources in conjunction with the Mississippi Department of Finance and Administration Office of Statewide Strategic Sourcing. The project involves selective mastication of approximately 480 acres of woody vegetation in wet pine savanna and wet pine flatwoods habitat at the Grand Bay National Estuarine Research Reserve in Jackson County, Mississippi, along with the construction of approximately 8,900 linear feet of 30-foot-wide firelanes scraped to bare mineral soil. A voluntary site visit was held on Wednesday, June 17, 2026 at 10:00 a.m., with no additional site visits scheduled. Bids were due July 8, 2026 at 10:00 a.m. CST, with bids opening at 2:00 p.m. CST the same day. The notice of intent to award is anticipated for July 15, 2026. The contract term is 12 months from execution with an option to renew for one additional year, with work expected to begin within 30 business days of contract execution and anticipated completion within 30 business days of work commencement.
The amendment clarifies that contractors must calculate firelane acreage based on footage measurements and include such calculations in per-acre pricing. Equipment requirements specify tracked vehicles for primary work, with conventional skid steers equipped with tracks acceptable; wheeled equipment and side-by-sides or UTVs are limited to personnel transport only. Selective mastication must target woody vegetation species other than the exempted species (slash pine, longleaf pine, live oak, gum, pecan, and pond cypress), with all larger trees expected to be mulched in addition to being cut down. For the five exemptions without minimum diameter-at-breast-height (DBH) restrictions, contractors are primarily concerned with mature trees of 8 inches DBH or greater. Georeferenced PDF maps or shapefiles will be provided to the awarded vendor upon contract award. The project was re-bid after the previously selected contractor under the 2024 IFB #3160006606 was unable to complete the work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Invitation for Bids
GBNERR Mastication Project
IFB RFx #3160008075
Amendment #1 Questions and Answers
IFB
Section, Page No. Question/Request for Clarification MDMR Response
1. Do you happen to have any georeferenced PDF maps or shapefiles for the above project by chance?
Yes. Georeferenced PDF maps or shapefiles will be provided to the awarded vendor upon contract award.
2. 4, Page 3 Was the site visit held on Wednesday, July 17 at 10 a.m. ?
No. The site visit was held on Wednesday, June 17, 2026 at
10:00AM.
3. 4, Page 3 Will there be another opporutnity to meet with MDMR officials to review the site?
If so is there a date and time?
No. No additional site visits will be held.
4. Why was this project not completed under the 2024 IFB 3160006606?
The previously selected contractor was unable to complete the work.
5. 22 Can you Clarify the amount of days allotted for the length of the project?
The term of the contract is 12 months. Work is expected to begin within 30 days of an executed contract. The agency anticipates that work will be completed within 30 days of beginning work.
6. 22, Page 11 Can you clarify if there is only 30 days to complete the Project? Also, clarify if that is work days or calendar days!
The term of the contract is 12 months. Work is expected to begin within 30 business days of an executed contract. The agency anticipates that work will be completed within 30 business days of beginning work.
7. 7, Page 4 Can you provide clarity on the low ground pressure heavy equipment? Does this eliminate use of a conventional skid-steer?
MEMA is primarily seeking tracked vehicles for this project (no wheeled equipment). Side-by-sides or UTVs may be used for personnel transport.
Conventional skid steers equipped with tracks are acceptable.
Invitation for Bids
GBNERR Mastication Project
IFB RFx #3160008075
8. 7, Page 4 Are we expected to calculate the acreage of the firelanes based off the feet measurement and include into our per/acre price?
Yes.
9. 7, Page 4 Please provide clarity on mastification of the larger trees on site. Are they expected to be mulched also, or only cut down?
Mulched.
10. 7, Page 4 Is there a quantitative mastification target, or is "selective" left to field interpretation and coordination with NERR staff?
Selective refers to targeting any species of woody vegetation other than those mentioned in the SOW.
11. 7, Page 4 For the five exemptions without minimum DBH, are we expected to avoid all size classes, down to seedlings/saplings?
We are primarily concerned with mature trees in this category that are 8” DBH or greater.
Receipt of Amendment #1 Acknowledged:
Signature
Name (Print): Date: