Amendment 1 - Hot Springs Canyon Project.pdf

PDF 65 KB Posted

Attached to
PKAA, 1000, Hot Springs Canyon Project
Solicitation number
DQ1 PKAA 2015001375 2
Issued by
Summit County, Colorado

About this file

This is Amendment No. 1 to a solicitation issued by the State of Colorado Division of Reclamation, Mining & Safety for the Hot Springs Canyon Project (PKA-15-1280). The amendment revises specifications and closure methods for mine remediation work at seven mining features (HS01 through HS07) located in Saguache County. The project scope includes mobilization/demobilization, Site Evaluation and Hazard Assessment Program (SHEAP) compliance, revegetation of two acres, and installation of various mine closures using hand backfill, Corrugated Steel Pipe (CSP) with bat ladder installations, grate closures, and Polyurethane Foam (PUF) closures. Key specification changes outlined in the amendment waive monument pipe requirements on backfill closures, omit mulch from revegetation specifications requiring hand rake seeding instead, and authorize temporary ATV access via BLM permit to five designated features with mandatory reclamation of disturbances. The revised bid schedule was distributed following a pre-bid meeting, with bids due by June 2, 2015 at 4:00 p.m.

The bid schedule requires contractors to provide unit prices for individual closure features and lump-sum pricing for mobilization/demobilization and SHEAP work, with detailed line-item pricing required for each of the seven mine closure features. The project is funded through Office of Surface Mining (OSM) and Bureau of Land Management (BLM) sources. Specific CSP sizing requirements are mandated: HS02 requires a 10-foot by 2-foot pipe with 4-foot backfill depth, while HS03 requires a 15-foot by 3-foot pipe with identical backfill specifications. HS04 PUF closure requires approximately 3 cubic yards of material and must be completed before HS03 and HS03a work to protect potential bat habitat. Contractors must acknowledge receipt of the amendment and submit the revised bid schedule electronically through Colorado VSS or by mail/fax to Teresa Ryan at the Division office in Denver.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us John W. Hickenlooper, Governor | Mike King, Executive Director | Virginia Brannon, Director

DATE: May 20, 2015

TO: All Bidders on the Hot Springs Canyon Project

FROM: Stephanie Mitchell, Division of Reclamation, Mining &

Safety

RE: Amendment No. 1 to PKA-15-1280

Thank you for your attendance at the Pre-Bid Meeting. NOTE that a REVISED Bid Schedule is attached to this Amendment. The REVISED Bid Schedule must be used to submit a bid.

The following clarifications and amendments should be noted and incorporated into the bid documents:

1. The requirement for a monument pipe on backfill closures is waived and the grouting of the monument (brass cap) in rock on site is allowed.

2. Mulch has been omitted from the Revegetation Specifications due to the rugged terrain and difficult site access. Hand rake seed at each site.

3. ATV’s are permissible by the BLM to access features HS02, HS03, HS03a, HS04 and HS05 on the Hot Springs Canyon Trail. A temporary ATV permit will be issued to the Contractor from the BLM. All disturbances from ATV’s must be re-seeded and reclaimed.

http://mining.state.co.us/

4. Bid Item 4 – The following changes have been made to closure methods for the following features.

BID ITEM 4 –Install Mine Closures

HS01- Closure method has been changed to Hand Backfill instead of Machine Backfill.

HS02- The size of the CSP must be ten foot (10’) by two foot, (24”), 12 gauge Corrugated Steel Pipe (CSP) with Bat Ladder. Corrugated Steel Pipe adit closure in accordance with Section 10 of the Standard Work Specifications, General Bid Specifications, 2009. Backfill space between CSP and walls with unclassified material from the face-up to a depth of four feet (4’).

HS03- The size of the CSP must be fifteen foot (15’) by three foot, (36”), 12 gauge Corrugated Steel Pipe (CSP) with Bat Ladder. Corrugated Steel Pipe adit closure in accordance with Section 10 of the Standard Work Specifications, General Bid Specifications, 2009. Backfill space between CSP and walls with unclassified material from the face-up to a depth of four feet (4’).

HS03a-Closure method has been changed to a Grate with a footer.

Footer must be six foot (6’) long. Grate will be at an angle to the shaft.

HS04- Closure method has been changed to Polyurethane Foam Closure (PUF). PUF in accordance with Section 9 of the Standard Work Specifications, General Bid Specifications, 2009. Estimated PUF needed is 3 cubic yards. This feature must be safeguarded before HS03 and HS03a to avoid potential bat habitat disturbance in features below.

HS06- Depth of Bottom form placement is 14 feet inside of shaft at a thickness of 5 feet.

Receipt and acceptance of this amendment shall be acknowledged on the bid form and by submitting the revised Bid Schedule.

Return by June 2, 2015 at 4:00 P.M. to: Receipt of Addenda Nos._______________ is hereby acknowledged Submit Bids Electronically at Colorado VSS (Vendor Self Service) https://codpa-vss.hostams.com/webapp/PRDVSS1X1/AltSelfService, or Mail; Fax to:

Teresa Ryan Division of Reclamation, Mining and Safety 1313 Sherman St., #215 Denver, CO 80203 Fax (303) 832-8106

HOT SPRINGS CANYON PROJECT

REVISED (5/20/15) Bid Schedule

PKA-15-1280

ITEM DESCRIPTION QTY UNIT UNIT PRICE AMOUNT

1. MOBILIZATION/DEMOBILIZATION 1 Job $ N/A $

2. SHEAP 1 Job $ N/A $

3. REVEGETATION 2 Acre $ _________ $

4. INSTALL OSM AND BLM FUNDED MINE

CLOSURES 1 Job $ N/A $

GRAND TOTAL $

Contractor_____________________________________ Date_________________________

Signature _____________________________ Phone___________________________

Address _______________________________________________________________

DO NOT AMEND ANY PART OF THIS BID SCHEDULE

ALL PAGES OF THIS BID SCHEDULE MUST BE RETURNED

ALL LINES ITEMS MUST BE COMPLETED

Page 1 of 2 Page(s) https://codpa-vss.hostams.com/webapp/PRDVSS1X1/AltSelfService

HOT SPRINGS CANYON PROJECT

REVISED (5/20/15) Bid Schedule

PKA-15-1280

Item 4 - Install Mine Closures:

ID

Feature

Closure Work

Bid Amount

County

Funding

HS01 Adit Hand Backfill

Saguache

OSM/BLM

HS02 Adit CSP w/Bat Ladder

Saguache

OSM/BLM

HS03 Adit CSP w/Bat Ladder

Saguache

OSM/BLM

HS03a Shaft Grate

Saguache

OSM/BLM

HS04 Shaft PUF

Saguache

OSM/BLM

HS05 Shaft Hand Backfill

Saguache

OSM/BLM

HS06 Shaft PUF

Saguache

OSM/BLM

HS07 Shaft Hand Backfill

Saguache

OSM/BLM

Total (Enter here and on Page 1 of Bid Schedule, Item 4) $______________________

DO NOT AMEND ANY PART OF THIS BID SCHEDULE

ALL PAGES OF THIS BID SCHEDULE MUST BE RETURNED

ALL LINES ITEMS MUST BE COMPLETED

Page 2 of 2 Page(s)

Amendment 1
Revised Bid Schedule
Contractor_____________________________________ Date_________________________
DO NOT AMEND ANY PART OF THIS BID SCHEDULE
ALL PAGES OF THIS BID SCHEDULE MUST BE RETURNED
Page 1 of 2 Page(s)
DO NOT AMEND ANY PART OF THIS BID SCHEDULE
ALL PAGES OF THIS BID SCHEDULE MUST BE RETURNED
Page 2 of 2 Page(s)