Amendment 1.pdf
PDF 203 KB Posted
- Attached to
- DESIGN BUILD RESEARCH PROJECT- PHASE II
- Solicitation number
- 5400022008
- Issued by
- Richland County, South Carolina
About this file
This is Amendment 1 to a Request for Proposal issued by the South Carolina Department of Transportation for a Design Build Research Project – Phase II. The original solicitation (No. 5400022008) was issued on October 20, 2021, with a questions deadline of October 18, 2021, at 12:00 p.m. Offerors must submit five copies of their proposals online at http://www.procurement.sc.gov by November 19, 2021. No pre-bid conference or site visit is required. Award notification is scheduled for November 23, 2021. Offerors must hold their offers open for a minimum of thirty calendar days following the opening date. The amendment addresses questions submitted by prospective offerors regarding the solicitation requirements, specifically regarding the integration of project scheduling systems (P2S) with agency applications such as ITMS, Primavera, CBES, Webtransport, and Sitemanager, and the availability of comparable data between Design Build (DB) and Design Bid Build (DBB) delivery methods at various Work Breakdown Structure (WBS) levels.
The State's responses clarify that there are no major differences in data fields available between DB and DBB methodologies across the integrated applications, and that comparable data on specific task durations and delays are available through contractors' project-specific CPM (Critical Path Method) schedules. Offerors must acknowledge receipt of this amendment by signing and returning it, identifying the amendment number and date, submitting a letter, or including indication of receipt in their bid submission. All other terms, conditions, bidding instructions, and specifications from the original solicitation remain unchanged. Questions or clarifications regarding the amendment should be directed to Procurement Officer Renee Frazier at 803-737-0970 or FrazierRC@scdot.org.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Document.pdf | ||
| Award Notice Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
State of South Carolina
Request for Proposal
AMENDMENT 1- QUESTIONS
Solicitation:
Date Issued:
Procurement Officer:
Phone:
E-Mail Address:
Mailing Address:
5400022008 10/20/2021
RENEE FRAZIER
803-737-0970 FrazierRC@scdot.org SCDOT Procurement Office PO Box 191 Columbia SC 29202-0191
DESCRIPTION: DESIGN BUILD RESEARCH PROJECT- PHASE II
USING GOVERNMENTAL UNIT: SC Department of Transportation
SUBMIT YOUR OFFER ON-LINE AT THE FOLLOWING URL: http://www.procurement.sc.gov SUBMIT OFFER BY (Opening Date/Time): 11/19/2021 (See "Deadline For Submission Of Offer" provision) QUESTIONS MUST BE RECEIVED BY: 10/18/2021 12:00:00 (See "Questions From Offerors" provision)
NUMBER OF COPIES TO BE SUBMITTED: FIVE
CONFERENCE TYPE: Not Applicable
DATE & TIME:
(As appropriate, see "Conferences - Pre-Bid/Proposal" & "Site Visit" provisions)
LOCATION: Not Applicable
AWARD &
AMENDMENTS
Award will be posted on 11/23/2021. The award, this solicitation, any amendments, and any related notices will be posted at the following web address: http://www.procurement.sc.gov
You must submit a signed copy of this form with Your Offer. By signing, You agree to be bound by the terms of the Solicitation. You agree to hold Your Offer open for a minimum of thirty (30) calendar days after the Opening Date.
(See "Signing Your Offer" provision.)
NAME OF OFFEROR
(full legal name of business submitting the offer)
Any award issued will be issued to, and the contract will be formed with, the entity identified as the Offeror. The entity named as the offeror must be a single and distinct legal entity. Do not use the name of a branch office or a division of a larger entity if the branch or division is not a separate legal entity, i.e., a separate corporation, partnership, sole proprietorship, etc.
AUTHORIZED SIGNATURE
(Person must be authorized to submit binding offer to contract on behalf of Offeror.)
DATE SIGNED
TITLE
(business title of person signing above)
STATE VENDOR NO.
(Register to Obtain S.C. Vendor No. at www.procurement.sc.gov)
PRINTED NAME
(printed name of person signing above)
STATE OF INCORPORATION
(If you are a corporation, identify the state of incorporation.)
OFFEROR'S TYPE OF ENTITY: (Check one) (See "Signing Your Offer" provision.)
___ Sole Proprietorship ___ Partnership ___ Other_____________________________
___ Corporate entity (not tax-exempt) ___ Corporation (tax-exempt) ___ Government entity (federal, state, or local)
COVER PAGE - ON-LINE ONLY (MAR. 2015)
mailto:FrazierRC@scdot.org http://www.procurement.sc.gov/ http://www.procurement.sc.gov/ http://www.procurement.sc.gov/
AMENDMENTS TO SOLICITATION (JAN 2004)
(a) The Solicitation may be amended at any time prior to opening. All actual and prospective Offerors should monitor the following web site for the issuance of Amendments: www.procurement.sc.gov (b) Offerors shall acknowledge receipt of any amendment to this solicitation (1) by signing and returning the amendment, (2) by identifying the amendment number and date in the space provided for this purpose on Page Two, (3) by letter, or (4) by submitting a bid that indicates in some way that the bidder received the amendment. (c) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged. [02-2A005-1]
All other terms, conditions, bidding instructions, and specifications remain unchanged. If there are any questions or if any confusion or uncertainty arises as a result of this amendment, it is the sole responsibility of the offeror to contact the procurement officer for clarification. Contact information can be found in the top right-hand corner of the cover page of this amendment. Reference the “duty to inquire” clause in the original invitation for bid.
QUESTIONS FROM OFFERORS - AMENDMENT (JUN 2017)
THE SOLICITATION IS AMENDED AS PROVIDED HEREIN. INFORMATION OR CHANGES RESULTING
FROM QUESTIONS WILL BE SHOWN IN A QUESTION-AND-ANSWER FORMAT. ALL QUESTIONS
RECEIVED HAVE BEEN REPRINTED BELOW. THE “STATE’S RESPONSE” SHOULD BE READ WITHOUT REFERENCE TO THE QUESTIONS. THE QUESTIONS ARE INCLUDED SOLELY TO PROVIDE A CROSS-
REFERENCE TO THE POTENTIAL OFFEROR THAT SUBMITTED THE QUESTION. QUESTIONS DO NOT
FORM A PART OF THE CONTRACT; THE “STATE’S RESPONSE” DOES. ANY RESTATEMENT OF PART OR ALL OF AN EXISTING PROVISION OF THE SOLICITATION IN AN ANSWER DOES NOT MODIFY THE
ORIGINAL PROVISION EXCEPT AS FOLLOWS: UNDERLINED TEXT IS ADDED TO THE ORIGINAL
PROVISON. STRICKEN TEXT IS DELETED. [02-2A097-1]
QUESTIONS AND ANSWERS ARE BELOW. THE SCDOT’S ANSWER APPEARS IN RED.
1. The CPM report states that “P2S integrates with agency applications such as ITMS, Primavera, CBES, Webtransport, and Sitemanager” – Are there any major differences in the data fields available for DB and DBB between these applications? Only a high-level response is being requested at this point.
- NO
2. In relation to the P2S integration with Primavera, at what WBS levels are data available for comparison between DB and DBB? For example, is it at the overall project level or is comparable information available on specific task durations and delays? Again, only a general response is being requested at this point.
- We have comparable data on the specific task durations and delays in the form of Contractor’s project-specific CPM schedules.