Amendment-02-to-BAA-23-S-5012-03Mar23(FINAL).pdf

PDF 142 KB Posted

Attached to
Materials for Integrated Nano-electronic and Optoelectronic Structures (MINOS)- AMENDMENT 2 Federal contract opportunity
Solicitation number
FA865023S5012AMD02
Issued by
Department of the Air Force Materiel Command Research Laboratory

View the file

Other files for this federal contract opportunity

Other files attached to Materials for Integrated Nano-electronic and Optoelectronic Structures (MINOS)- AMENDMENT 2, newest first.
File Type Posted
2nd-QAs-BAA-23-S-5012-03Mar23(FINAL).pdf PDF
Att 7 - Report Document Page-SF 298.pdf PDF
Att 11- Base Spt Eqmt List-Facilities.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BAA: FA8650-23-S-5012 Amendment 02

Amendment 02

Broad Agency Announcement Number: FA8650-23-S-5012

Materials for Integrated Nano-electronic and Optoelectronic Structures (MINOS)

The following sections are hereby amended as indicated below in bold and italics:

1. Under Part IV. Proposal and Submission Information, c. Technical/Management Proposal, i. Page

Limitations (page 12) is revised to the following:

“i. Page Limitations: The following describes proposal page limitations:

a) The Technical/Management Proposal shall be limited to 30 pages for the Basic IDIQ;

and the Technical/Management Proposal shall be limited to 30 pages each for Task

Order with the pages, prepared and submitted in Microsoft Word format. Signed pages may be submitted in Adobe.”

2. Under Part IV. Proposal and Submission Information, c. Technical/Management Proposal, i. Page

Limitations, paragraphs f) through g (page 13) are revised as follows:

“f) Pages shall be numbered starting with the cover page being Page 1, and the last page being no greater than Page 30 for the Basic IDIQ and no greater than 30 for T.O. 0001 and

T.O. 0002. The page limitation covers all information including indices, photographs, foldouts (counted as 1 page for each 8.5 by 11 portion), appendices, attachments, etc. The proposal page limit does not include resumes, tables, and/or charts which will be provided as attachments to the proposal.

g) The proposal page limit does not include the offeror’s proposed Statement of Work (SOW);

however, the same formatting rules apply to the SOW, which is limited to 10 pages for the

Basic IDIQ and 10 pages for each Task Order.”

3. Under Part IV. Proposal and Submission Information, c. Technical/Management Proposal, ii. The Technical/Management proposal(s) for the Basic IDIQ, T.O. 0001 and T.O. 0002 (page 13) is revised as follows:

“ii. The Technical/Management proposal(s) for the Basic IDIQ, T.O. 0001 and T.O. 0002 shall include a discussion of the nature and scope of the research and the technical approach as well as a brief discussion of the qualifications of the proposed personnel not to exceed one paragraph. Additional information on prior work in this area, descriptions of available equipment, use of base support (if desired), data and facilities and resumes of personnel who will be participating in this effort should also be included as attachments to the technical proposal. These volumes shall include a SOW detailing the technical tasks proposed to be accomplished under the proposed effort and suitable for contract incorporation. Do not include any proprietary information in the SOW. Refer to the BAA Guide for Industry referenced above to assist in SOW preparation. In addition to the contractor proposed SOW, a Government generated SOW attachment containing additional contracting requirements will be included in any resulting contracts. The SOW Supplemental Requirements are included in

Attachment 4 to this BAA.

BAA: FA8650-23-S-5012 Amendment 02

4. Under Part IV. Award Administration Information, 1. Award Notices, is revised to read as follows:

“Offerors will be notified whether their proposal is recommended for award on or about 17

April 2023. The notification is not to be construed to mean that any contract award is assured, as availability of funds and successful negotiations are prerequisites to any award.”

5. Attachment 07 – Report Documentation Page (SF298) and Attachment 11 – Base Support Equipment List & Available Base Facilities, to Broad Agency Announcement Number: FA8650-23-S-5012, have been replaced to corrected the numbering in the headers and footers.

File details come from the government source that posted it. Updated .