This document is an Amendment to Solicitation W912P624B0013 for the Upper Wabash Project Office and Visitor Center project. The key changes in this amendment are:

  1. Revised specification section 07 84 00 Firestopping, drawing I-601, and the Table of Contents are provided.
  2. Specification section 06 20 00 Finish Carpentry is added.
  3. The Bid Due Date is extended from June 7, 2024 to June 12, 2024.

The overall solicitation is for construction services related to the Upper Wabash Project Office and Visitor Center. Bids are due by June 12, 2024 at 1:00 PM local time, with a bid opening to follow at 2:00 PM via Webex. The contracting agency is the U.S. Army Corps of Engineers, Chicago District.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

Provide revised specification section 07 84 00, Draw ing I-601, and the Table of Contents Add specification section 06 20 00 Extend Bid Due Date BY 5 days, FROM JUNE 7, 2024 TO JUNE 12, 2024.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P624B0013

X 9B. DATED (SEE ITEM 11)

01-May-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0003

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Jun-2024

CODE

U.S. ARMY ENGINEER DISTRICT, CHICAGO

231 SOUTH LASALLE STREET SUITE 1500

CHICAGO IL 60604-1437

W912P6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P624B0013

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 31-May-2024 12:00 PM to 12-Jun-2024 01:00 PM.

(End of Summary of Changes)

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C E

R T

IF

IE

D F

IN

A

L D

O C

U M

E N

T S

R

T A

C H

IC

A

G O

D

IS

T R

IC

T

S

L A

S A

L L E

D R

IV

E

S U

IT

E

C H

IC

A

G O

IL

Y A

S S

E F

A

M A

R C

H

W P

B

C

U s e rs

\H E

D D

J D

O \D o c u m e n ts

\4 v I_

H E

D D

J D

O .r v t

/3

/2

:0

:1

P M

I-601

IN

T

E R

IO

R

M A

T E

R

IA

L

R

O O

M F

IN

IS

H S

C H

E U

D L E

S

S A

L A

M O

N

IE

D A

M R

D L A

G R

O

IN

J O

'B R

Y A

N

J O

'B R

Y A

N

L S

C H

W E

IN

H

A R

T

P R

O J E

C T

O F

F

IC

E A

N D

V

IS

IT

O

R C

E N

T E

R

P R

O J E

C T

P

GENERAL NOTES

1 SEE SHEETS IG-110 - IG501 FOR SIGNAGE PLANS, SCHEDULE AND DETAILS.

2 SEE SHEET I-601 FOR INTERIOR COLOR SCHEDULE, ROOM FINISH SCHEDULE, AND INTERIOR

DESIGN NOTES.

3 FINISH PLAN IS NOT INTENDED TO BE COMPREHENSIVE, BUT RATHER, A SUPPLEMENT TO THE FINISH SCHEDULE AND MATERIAL SCHEDULE. REFER TO FINISH SCHEDULE ON SHEET I-601 FOR

FINISHES NOT NOTED.

4 FURNITURE IS GOVERNMENT FURNISHED GOVERNMENT INSTALLED. FURNITURE SHOWN FOR

REFERENCE ONLY.

INTERIOR DESIGN NOTES

1 MANUFACTURERS REFERENCED ARE INTENDED TO ESTABLISH COLOR, PATTERN AND TEXTURE

ONLY, AND ARE NOT INTENDED TO LIMIT SELECTIONS FROM OTHER MANUFACTURERS. WHEN

ALTERNATE SELECTIONS ARE SUBMITTED, SUBMITTAL SHALL INCLUDE COLOR SAMPLES OF

MATERIALS LISTED FOR COMPARISON.

2 INTERIOR WALL COLORS SHALL APPLY TO WALL SURFACES COMPLETE, INCLUDING REVEALS,

VERTICAL FURRED SURFACES, BUILDING STRUCTURE, GRILLES, DIFFUSERS, ELECTRICAL AND

ACCESS PANELS, AND PIPING AND CONDUIT ADJACENT TO WALL SURFACES UNLESS OTHERWISE

SPECIFIED. ITEMS NOT SPECIFIED ELSEWHERE SHALL BE PAINTED TO MATCH ADJACENT WALL

SURFACES.

3 CEILING COLORS SHALL APPLY TO CEILING SURFACES INCLUDING SOFFITS, FURRED DOWN

AREAS, GRILLES, DIFFUSERS, REGISTERS AND ACCESS PANELS. CEILING COLOR SHALL ALSO

APPLY TO JOIST. UNDERSIDE OF ROOF DECK AND CONDUIT AND PIPING WHERE JOIST AND DECK

ARE EXPOSED AND REQUIRE TO BE PAINTED.

4 ALL FLOORING MATERIAL TRANSITIONS TO OCCUR AT CENTERLINE OF DOOR, U.N.O. CONTRACTOR

TO COORDINATE APPROPRIATE TRANSITIONS BETWEEN FINISHED FLOORING MATERIALS, SEE

SHEET I-501 FOR TRANSITION DETAILS.

5 ROLLER SHADES TO BE INSTALLED IN BUILDING PERIMETER WINDOWS (S9) U.N.O.

6 ALL WINDOW SILLS ARE TO BE ITEM (S1), SOLID SURFACING.

7 WALL MOUNT COAT HOOK ITEM (S7) BEHIND ENTRY DOOR OF ALL PRIVATE OFFICES INCLUDING, 6" CLEARANCE BETWEEN WALL AND DOOR AND HEIGHT TO BE 5'-6" AFF. OTHERWISE, MOUNT BESIDE

DOOR.

8 RESTROOM FLOOR TILES SHALL BE FIELD CUT AS NECESSARY IN ORDER TO SLOPE TO THE DRAIN.

SEE PLUMBING SHEETS FOR DRAIN LOCATIONS.

9 PROVIDE AND INSTALL WALL TILE IN RESTROOM TO 5'-0" A.F.F. PAINT WALL ABOVE AS INDICATED

ON FINISH SCHEDULE.

10 PROVIDE AND INSTALL CORNER GUARDS (S4) ON ALL OUTSIDE CORNERS, U.N.O. CORNER GUARDS

SHALL EXTEND FROM THE TOP OF THE WALL BASE TO THE FINISHED CEILING.

11 PROVIDE AND INSTALL WALL CONDITION C1 (SHEET I-501) ON ALL OUTSIDE CORNERS WITH WALL

TILE.

12 PROVIDE AND INSTALL WALL CONDITION A1 (SHEET I-501) AS CAP WALL TILE WAINSCOT.

13 WHERE LVT ABUTS CARPET NO TRANSITION STRIP IS REQUIRED. LVT THICKNESS IS 4.5 MM

CREATING A FLUSH INSTALLATION WITH CARPET.INTERIOR COLOR AND MATERIAL SCHEDULE

TAG MATERIAL MANUFACTURER PATTERN COLOR SIZE COMMENTS

FLOOR

F1 CARPET TILE WALK OFF INTERFACE STEP REPEAT SR799 104935 GRANITE 19.69" X 19.69" NON DIRECTIONAL

F2 CARPET TILE INTERFACE CACTUS GROOVES 107416 FOSSIL 9.845" X 39.38" ASHLAR INSTALLATION

F3 CARPET TILE INTERFACE JUST DESERTS 107428 FOSSIL 9.845" X 39.38" ASHLAR INSTALLATION

F4 LUXURY VINYL TILE INTERFACE CACTUS MAKES PERFECT A02103 FOSSIL 9.845" X 39.38" ASHLAR INSTALLATION

F5 NOT USED

F6 PORCELAIN TILE DALTILE EMMERSON WOOD BALSAM FIR 6" X 48" GROUT - CUSTOM BUILDING PRODUCTS - 185 NEW TAUPE, STAGGERED BRICK JOINT PATTERN, OVERLAPSHOULD NOT

EXCEED 33%

F7 EXISTING SLAB

F8 STATIC DISSIPATIVE TILE TARKETT IQ GRANIT SD DARK GRAY 712 12" X 12"

BASE

B1 RESILIENT BASE TARKETT BASEWORKS TB1 PEPPERCORN 4" HIGH RUBBER ROLL GOODS ONLY

WALL

W1 PAINT SHERWIN-WILLIAMS SW7029 AGREEABLE GRAY EGGSHELL FINISH

W2 PAINT SHERWIN-WILLIAMS 7030 ANEW GRAY SEMI GLOSS FINISH

W3 PORCELAIN TILE DALTILE COLOR WHEEL CLASSIC 0190 ACTIC WHITE 6" X 18" GROUT - CUSTOM BUILDING PRODUCTS - 185 NEW TAUPE, STAGGERED BRICK JOINT PATTERN, OVERLAPSHOULD NOT

EXCEED 33%

CEILING

C1 ACOUSTICAL CEILING TILE USG CEILING SOLUTIONS ECLIPSE/ CLIMAPLUS SLT 76775 HRC WHITE 2' X 2' GRID: USG DX/DXL

C2 PAINT GWB SHERWIN-WILLIAMS SW 7004 SNOWBOUND FLAT FINISH PAINT ALL GYPSUM BOARD CEILINGS

C3 PAINT EXPOSED / STRUCTURE SHERWIN-WILLIAMS SW 7004 SNOWBOUND FLAT FINISH PAINT ALL EXPOSED CEILINGS

SPECIAL ITEMS

S1 SOLID SURFACE AVONITE SURFACES WHITE 8016 SATIN 1/2" THICK WINDOW SILLS

S2 SOLID SURFACE AVONITE SURFACES MOON CRYSTAL 7501 1/2" THICK BREAK ROOM COUNTER TOP

S3 PLASTIC LAMINATE WILSONART LAMINATE FIELD ELM 7999K-12 MATTE FINISH, ALL CASEWORK

S4 CORNER GUARDS C/S GROUP ACROVYN SUEDE TEXTURE 262 DRIFTWOOD 3" X 3" HEIGHT FROM TOP OF BASE TO FINISHED CEILING

S5 METAL EDGE PROTECTION SCHLUTER SYSTEMS JOLLY STAINLESS STEEL USE FOR WALL TILE CORNER CONDITION AND WALL TILE

WAINSCOT CONDITION

S6 COAT HOOK / COAT HOOK PANEL MAGNUSON GROUP K SERIES HOOK PANELS WALNUT 4" X 12" TO HOLD 2 HOOKS K-55BC ZINK DIE CAST KNOB. BRUSHED CHROME

S7 SIGNAGE TEXT COLOR 2/90 SIGN SYSTEMS 208 SOFT WHITE

S8 SIGNAGE BACKGROUND COLOR 2/90 SIGN SYSTEMS 734 DARK GREY

S9 ROLLER SHADE MECHOSHADE SOHO SERIES 1900 5% OPEN 1903 LIGHT GREY INSIDE MOUNT

S10 METAL TRANSITION COVE SCHLUTER SYSTEMS STAINLESS STEEL DILEX- HKS

S11 METAL TRANSITION REDUCER STRIP SCHLUTER SYSTEMS RENO- U STAINLESS STEEL

ROOM FINISH SCHEDULE

ROOM NO ROOM NAME FLOOR FINISH BASE FINISH WALL FINISH CEILING FINISH COMMENTS

F.F.

100 VESTIBULE F1 B1 W1 C1

101 LOBBY F4 B1 W1 C1

102 TOILET F6 NONE W3/W1 C2 SEE NOTE 9, 11 & 12

103 CORRIDOR F4 B1 W1 C1

104 CONF. ROOM F3 B1 W1 C1

105 MECHANIC (3x) OFFICE F3 B1 W1 C1

106 SECTION CHIEF F4 B1 W1 C1

107 OPEN OFFICE F4/F2 B1 W1 C1 SEE NOTE 13

108 PRINT/FILES F4 B1 W1 C1

109 OPEN OFFICE F4/F2 B1 W1 C1 SEE NOTE 13

110 PROJECT OFFICE CHIEF F2 B1 W1 C1

111 NRM SPECIALIST F2 B1 W1 C1

112 BREAK AREA F4 B1 W1 C1

113 MEN F6 B1 W3/W1 C2 SEE NOTE 9, 11 & 12

114 WOMEN F6 B1 W3/W1 C2 SEE NOTE 9, 11 &12

115 JANITOR F7 B1 W1 C3

116 TELECOM F8 B1 W1 C3

117 ADMIN. F2 B1 W1 C1

118 CORRIDOR F4 B1 W1 C1

119 ELECTRICAL F7 NONE W1 C3

120 MECHANICAL F7 NONE W1 C3

121 GARAGE F7 NONE W1 C3

C

H A

N G

E S

T O

C O

L O

R S

C H

E D

U L

E

A M

E N

D M

E N

T

J U

N E

Upper Wabash Pr oj ect Of f i ce and Vi s i t or Cent er W912P624B0013

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 10 00 06/ 15 GENERAL PROVI SI ONS

01 20 00 11/ 20, CHG 3: 02/ 23 PRI CE AND PAYMENT PROCEDURES

01 33 00 09/ 19 SUBMI TTAL PROCEDURES

01 35 26 11/ 20, CHG 4: 08/ 23 GOVERNMENTAL SAFETY REQUI REMENTS

01 42 00 02/ 19 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 00 08/ 23 QUALI TY CONTROL

01 45 00. 15 10 11/ 16, CHG 2: 08/ 19 RESI DENT MANAGEMENT SYSTEM CONTRACTOR

MODE ( RMS CM)

01 46 00. 00 06 04/ 20 TOTAL BUI LDI NG COMMI SSI ONI NG

01 50 00 05/ 18 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND

CONTROLS

01 57 19. 02 11/ 15 TEMPORARY ENVI RONMENTAL CONTROLS

I NDI ANA

01 58 00 10/ 19 PROJECT I DENTI FI CATI ON

01 78 00 02/ 15 CLOSEOUT SUBMI TTALS

01 78 23 08/ 15 OPERATI ON AND MAI NTENANCE DATA

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 05/ 10 DEMOLI TI ON

DI VI SI ON 03 - CONCRETE

03 30 00 02/ 19, CHG 4: 08/ 22 CAST- I N- PLACE CONCRETE

DI VI SI ON 04 - MASONRY

04 20 00 11/ 15, CHG 2: 05/ 19 UNI T MASONRY

DI VI SI ON 05 - METALS

05 30 00 05/ 15, CHG 2: 08/ 18 STEEL DECKS

05 40 00 05/ 15, CHG 1: 08/ 18 COLD- FORMED METAL FRAMI NG

05 50 13 05/ 17, CHG 1: 08/ 18 MI SCELLANEOUS METAL FABRI CATI ONS

05 72 00 05/ 18 DECORATI VE METAL SPECI ALTI ES

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

06 10 00 08/ 16, CHG 2: 11/ 18 ROUGH CARPENTRY

06 20 00 08/ 16, CHG 2: 11/ 18 FI NI SH CARPENTRY

06 41 16. 00 10 08/ 10, CHG 1: 11/ 18 PLASTI C- LAMI NATE- CLAD ARCHI TECTURAL

CABI NETS

06 61 16 08/ 20 SOLI D SURFACI NG FABRI CATI ONS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 21 13 02/ 16, CHG 2: 08/ 20 BOARD AND BLOCK I NSULATI ON

07 21 16 11/ 11, CHG 4: 08/ 18 MI NERAL FI BER BLANKET I NSULATI ON

07 22 00 02/ 16, CHG 3: 11/ 18 ROOF AND DECK I NSULATI ON

07 27 10. 00 10 08/ 19, CHG 1: 02/ 20 BUI LDI NG AI R BARRI ER SYSTEM

07 27 19. 01 05/ 17, CHG 2: 08/ 20 SELF- ADHERI NG AI R BARRI ERS

07 27 26 05/ 17, CHG 2: 08/ 20 FLUI D- APPLI ED MEMBRANE AI R BARRI ERS

07 27 36 05/ 17, CHG 3: 02/ 23 SPRAY FOAM AI R BARRI ERS

07 60 00 05/ 17, CHG 2: 11/ 18 FLASHI NG AND SHEET METAL

07 61 14. 00 20 08/ 16, CHG 1: 08/ 18 STEEL STANDI NG SEAM ROOFI NG

PROJECT TABLE OF CONTENTS Page 1

RTA - 06/ 03/ 24

07 84 00 05/ 10, CHG 1: 08/ 13 FI RESTOPPI NG

07 92 00 08/ 16, CHG 3: 11/ 18 JOI NT SEALANTS

DI VI SI ON 08 - OPENI NGS

08 11 13 08/ 20 STEEL DOORS AND FRAMES

08 11 16 05/ 17, CHG 2: 11/ 18 ALUMI NUM DOORS AND FRAMES

08 14 00 08/ 16, CHG 1: 08/ 18 WOOD DOORS

08 36 13 08/ 20 SECTI ONAL OVERHEAD DOORS

08 44 00 05/ 19 CURTAI N WALL AND GLAZED ASSEMBLI ES

08 51 13 05/ 19 ALUMI NUM WI NDOWS

08 71 00 02/ 16, CHG 4: 02/ 22 DOOR HARDWARE

08 81 00 05/ 19 GLAZI NG

08 91 00 08/ 20 METAL WALL AND DOOR LOUVERS

DI VI SI ON 09 - FI NI SHES

09 22 00 02/ 10, CHG 2: 08/ 18 SUPPORTS FOR GYPSUM BOARD

09 29 00 08/ 16, CHG 4: 02/ 20 GYPSUM BOARD

09 30 10 08/ 17 CERAMI C, QUARRY, AND GLASS TI LI NG

09 51 00 08/ 20 ACOUSTI CAL CEI LI NGS

09 62 38 08/ 17 STATI C- CONTROL FLOORI NG

09 65 00 08/ 10, CHG 3: 08/ 18 RESI LI ENT FLOORI NG

09 68 00 11/ 17, CHG 2: 08/ 20 CARPETI NG

09 90 00 02/ 21 PAI NTS AND COATI NGS

DI VI SI ON 10 - SPECI ALTI ES

10 11 00 08/ 20 VI SUAL DI SPLAY UNI TS

10 14 00. 10 08/ 17 EXTERI OR SI GNAGE

10 14 00. 20 08/ 17 I NTERI OR SI GNAGE

10 26 00 08/ 17 WALL AND DOOR PROTECTI ON

10 28 13 08/ 20 TOI LET ACCESSORI ES

10 44 16 11/ 19 FI RE EXTI NGUI SHERS

DI VI SI ON 11 - EQUI PMENT

11 11 37 11/ 18 ELECTRI C VEHI CLE SUPPLY EQUI PMENT

DI VI SI ON 12 - FURNI SHI NGS

12 24 13 08/ 20 ROLLER WI NDOW SHADES

DI VI SI ON 22 - PLUMBI NG

22 00 00 11/ 15, CHG 4: 05/ 21 PLUMBI NG, GENERAL PURPOSE

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 05 93. 00 06 08/ 16 TESTI NG, ADJUSTI NG, AND BALANCI NG

( TAB) OF HVAC

23 07 00 02/ 13, CHG 7: 05/ 20 THERMAL I NSULATI ON FOR MECHANI CAL

SYSTEMS

23 09 00 02/ 19, CHG 2: 02/ 20 I NSTRUMENTATI ON AND CONTROL FOR HVAC

23 09 13 11/ 15, CHG 2: 05/ 21 I NSTRUMENTATI ON AND CONTROL DEVI CES

FOR HVAC

23 09 23. 02 02/ 19, CHG 1: 02/ 20 BACNET DI RECT DI GI TAL CONTROL FOR HVAC

AND OTHER BUI LDI NG CONTROL SYSTEMS

23 11 20 05/ 20 FACI LI TY GAS PI PI NG

PROJECT TABLE OF CONTENTS Page 2

23 21 23 08/ 17 HYDRONI C PUMPS

23 23 00 08/ 21 REFRI GERANT PI PI NG

23 30 00 05/ 20, CHG 1: 02/ 22 HVAC AI R DI STRI BUTI ON

23 52 00 04/ 08, CHG 5: 11/ 19 HEATI NG BOI LERS

23 54 19 08/ 21 BUI LDI NG HEATI NG SYSTEMS, WARM AI R

23 64 26 08/ 09, CHG 6: 11/ 22 HOT WATER PI PI NG SYSTEMS

23 81 00 05/ 18, CHG 1: 02/ 21 DECENTRALI ZED UNI TARY HVAC EQUI PMENT

DI VI SI ON 25 - I NTEGRATED AUTOMATI ON

25 05 11 05/ 21 CYBERSECURI TY FOR FACI LI TY- RELATED

CONTROL SYSTEMS

DI VI SI ON 26 - ELECTRI CAL

26 05 73 08/ 23 POWER SYSTEM STUDI ES

26 08 00 11/ 22 APPARATUS I NSPECTI ON AND TESTI NG

26 20 00 08/ 19, CHG 3: 11/ 21 I NTERI OR DI STRI BUTI ON SYSTEM

26 24 13 08/ 21 SWI TCHBOARDS

26 29 23 02/ 20, CHG 1: 05/ 21 ADJUSTABLE SPEED DRI VE ( ASD) SYSTEMS

UNDER 600 VOLTS

26 32 15. 00 05/ 20 ENGI NE- GENERATOR SET STATI ONARY

15- 2500 KW, WI TH AUXI LI ARI ES

26 36 23 05/ 20, CHG 1: 08/ 21 AUTOMATI C TRANSFER SWI TCHES AND

BY- PASS/ I SOLATI ON SWI TCH

26 41 00 08/ 23 LI GHTNI NG PROTECTI ON SYSTEM

26 51 00 05/ 20, CHG 2: 11/ 21 I NTERI OR LI GHTI NG

26 56 00 08/ 21 EXTERI OR LI GHTI NG

DI VI SI ON 27 - COMMUNI CATI ONS

27 10 00 08/ 11 BUI LDI NG TELECOMMUNI CATI ONS CABLI NG

SYSTEM

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 08 10 05/ 16 ELECTRONI C SECURI TY SYSTEM ACCEPTANCE

TESTI NG

28 10 05 05/ 16 ELECTRONI C SECURI TY SYSTEMS ( ESS)

28 31 76 08/ 20 I NTERI OR FI RE ALARM AND MASS

NOTI FI CATI ON SYSTEM, ADDRESSABLE

DI VI SI ON 31 - EARTHWORK

31 00 00 10/ 14 EARTHWORK

31 05 19. 13 03 12/ 14 GEOTEXTI LES USED AS FI LTERS AND

UNDERLAYS

31 11 00 11/ 18 CLEARI NG AND GRUBBI NG

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 05 33 08/ 17 LANDSCAPE ESTABLI SHMENT

32 11 23 08/ 17 AGGREGATE BASE COURSES

32 11 23. 23 08/ 17 BASE COURSE DRAI NAGE LAYERS

32 12 13 05/ 17 BI TUMI NOUS TACK

32 12 16. 16 11/ 20 ROAD- MI X ASPHALT PAVI NG

32 16 19 05/ 18 CONCRETE CURBS, GUTTERS AND SI DEWALKS

32 17 23 08/ 16, CHG 5: 11/ 18 PAVEMENT MARKI NGS

32 92 19 08/ 17, CHG 1: 08/ 21 SEEDI NG

PROJECT TABLE OF CONTENTS Page 3

DI VI SI ON 33 - UTI LI TI ES

33 05 23. 13 11/ 19 UTI LI TY HORI ZONTAL DI RECTI ONAL DRI LLI NG

33 11 00 02/ 18, CHG 2: 11/ 23 WATER UTI LI TY DI STRI BUTI ON PI PI NG

33 30 00 05/ 18 SANI TARY SEWERAGE

33 56 10 05/ 19, CHG 1: 11/ 20 FACTORY- FABRI CATED FUEL STORAGE TANKS

33 71 02 08/ 21 UNDERGROUND ELECTRI CAL DI STRI BUTI ON

33 82 00 04/ 06 TELECOMMUNI CATI ONS OUTSI DE PLANT ( OSP)

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 4

SECTION 06 20 00

FINISH CARPENTRY

08/16, CHG 2: 11/18

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN FOREST FOUNDATION (AFF)

ATFS STANDARDS (2015) American Tree Farm System Standards of Sustainability 2015-2020

AMERICAN HARDBOARD ASSOCIATION (AHA)

AHA A135.4 (1995; R 2004) Basic Hardboard

AHA A135.6 (1998; R 2006) Hardboard Siding

AMERICAN LUMBER STANDARDS COMMITTEE (ALSC)

ALSC PS 20 (2015) American Softwood Lumber Standard

AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)

ASME B18.2.1 (2012; Errata 2013) Square and Hex Bolts and Screws (Inch Series)

ASME B18.2.2 (2022) Nuts for General Applications:

Machine Screw Nuts, and Hex, Square, Hex

Flange, and Coupling Nuts (Inch Series)

ASME B18.6.1 (2016) Wood Screws (Inch Series)

AMERICAN WOOD PROTECTION ASSOCIATION (AWPA)

AWPA M4 (2023) Standard for the Care of

Preservative-Treated Wood Products

AWPA U1 (2023) Use Category System: User

Specification for Treated Wood

APA - THE ENGINEERED WOOD ASSOCIATION (APA)

APA E445 (2002) Performance Standards and

Qualification Policy for Structural-Use

Panels (APA PRP-108)

APA L870 (2010) Voluntary Product Standard, PS

1-09, Structural Plywood

APA S350 (2014) PS 2-10, Performance Standard for

Wood-Based Structural-Use Panels

ASTM INTERNATIONAL (ASTM)

ASTM C1186 (2022; E 2023) Standard Specification for

Flat Fiber-Cement Sheets

ASTM D2898 (2010; R 2017) Standard Practice for

Accelerated Weathering of

Fire-Retardant-Treated Wood for Fire

Testing

ASTM E84 (2023) Standard Test Method for Surface

Burning Characteristics of Building

Materials

ASTM E136 (2022) Standard Test Method for Assessing

Combustibility of Materials Using a

Vertical Tube Furnace at 750 Degrees C

ASTM F547 (202) Standard Terminology of Nails for

Use with Wood and Wood-Base Materials

BUILDERS HARDWARE MANUFACTURERS ASSOCIATION (BHMA)

ANSI/BHMA A156.9 (2020) Cabinet Hardware

CALIFORNIA AIR RESOURCES BOARD (CARB)

CARB 93120 (2007) Airborne Toxic Control Measure

(ATCM) to Reduce Formaldehyde Emissions from Composite Wood Products

CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)

CDPH SECTION 01350 (2017; Version 1.2) Standard Method for the Testing and Evaluation of Volatile

Organic Chemical Emissions from Indoor

Sources using Environmental Chambers

COMPOSITE PANEL ASSOCIATION (CPA)

CPA A208.1 (2016) Particleboard

CSA GROUP (CSA)

CSA Z809-08 (R2013) Sustainable Forest Management

FOREST STEWARDSHIP COUNCIL (FSC)

FSC STD 01 001 (2015) Principles and Criteria for Forest

Stewardship

GREEN SEAL (GS)

GS-36 (2013) Adhesives for Commercial Use

HARDWOOD PLYWOOD AND VENEER ASSOCIATION (HPVA)

HPVA HP-1 (2020) American National Standard for

Hardwood and Decorative Plywood

INTERNATIONAL CODE COUNCIL (ICC)

ICC IBC (2021) International Building Code

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

ANSI/NEMA LD 3 (2005) Standard for High-Pressure

Decorative Laminates

NATIONAL HARDWOOD LUMBER ASSOCIATION (NHLA)

NHLA Rules (2015) Rules for the Measurement &

Inspection of Hardwood & Cypress

NORTHEASTERN LUMBER MANUFACTURERS ASSOCIATION (NELMA)

NELMA Grading Rules (2013) Standard Grading Rules for

Northeastern Lumber

PROGRAMME FOR ENDORSEMENT OF FOREST CERTIFICATION (PEFC)

PEFC ST 2002:2013 (2015) PEFC International Standard Chain of Custody of Forest Based Products

Requirements

REDWOOD INSPECTION SERVICE (RIS) OF THE CALIFORNIA REDWOOD

ASSOCIATION (CRA)

RIS Grade Use (1998) Redwood Lumber Grades and Uses

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)

SCAQMD Rule 1168 (2017) Adhesive and Sealant Applications

SOUTHERN PINE INSPECTION BUREAU (SPIB)

SPIB 1003 (2014) Standard Grading Rules for Southern

Pine Lumber

SUSTAINABLE FOREST INITIATIVE (SFI)

SFI 2015-2019 (2015) Standards, Rules for Label Use, Procedures and Guidance

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

40 CFR 770 Formaldehyde Standards for Composite Wood

Products

UNDERWRITERS LABORATORIES (UL)

UL 2818 (2022) GREENGUARD Certification Program

For Chemical Emissions For Building

Materials, Finishes And Furnishings

WEST COAST LUMBER INSPECTION BUREAU (WCLIB)

WCLIB 17 (2015) Standard Grading Rules

WESTERN WOOD PRODUCTS ASSOCIATION (WWPA)

WWPA G-5 (2017) Western Lumber Grading Rules

WINDOW AND DOOR MANUFACTURERS ASSOCIATION (WDMA)

WDMA I.S.4 (2015A) Preservative Treatment for Millwork

WOOD MOULDING AND MILLWORK PRODUCERS ASSOCIATION (WMMPA)

WMMPA WM 6 (2007) Quality Industry Standards Booklet

WOODWORK INSTITUTE (WI)

NAAWS 3.1 (2017; 2018 Errata Edition) North American

Architectural Woodwork Standards

1.2 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Installer Qualifications; G

SD-02 Shop Drawings

Detail Drawings Indicating All Fiber Cement Assemblies; G

SD-03 Product Data

Fiber Cement Products; G

Siding; G

Fascias and Trim; G

SD-04 Samples

Samples; G

1.3 DETAIL DRAWINGS

Submit detail drawings indicating all fiber cement assemblies proposed for use in the project. Indicate materials, finish details of construction, location of use in the project, finishes, types, method and arrangement of fasteners, and installation details. This includes all fabricated assemblies.

1.4 PRODUCT DATA

Submit Manufacturers printed data sufficient to demonstrate compliance with this specification for each type of fiber cement product specified.

1.5 SAMPLES

Samples indicating for each type of fiber cement product specified.

Provide samples of sufficient size to show pattern and color ranges of proposed products.

1.6 DELIVERY, STORAGE, AND HANDLING

Deliver products to the jobsite in an undamaged condition. Stack materials to ensure ventilation and drainage. Protect against dampness before and after delivery. Store materials under cover in a well ventilated enclosure and protect against extreme changes in temperature and humidity. Keep materials wrapped and separated from off-gassing materials (such as drying paints and adhesives). Do not use materials that have visible moisture or biological growth. Do not store products in building until wet trade materials are dry and humidity of the space is within wood manufacturer's tolerance limits for storage. Store siding on edge or lay flat on a smooth level surface. Protect edges and corners from chipping. Store sheets under cover and keep dry prior to installing.

1.7 QUALITY ASSURANCE

1.7.1 Qualifications

1.7.1.1 Installer Qualifications

Minimum 2 years experience with installation of similar products.

PART 2 PRODUCTS

2.1 FIBER CEMENT PRODUCTS

Fiber cement board products shall be ASTM C1186 type A, grade II. Products shall comply with ASTM E136 and ASTM E84. Fiber cement products shall be engineered to perform in climates with seasonal temperature variations, freezing temperatures and snow and ice associated with the respective climate zone. Refer to finish schedules on the drawings for finish colors to be provided. Provide touch up kits to match all factory applied finishes. Provide manufacturer's 15-year limited product warranty against manufacturing finish defects on all factory applied finishes.

2.1.1 Siding

Provide factory primed and applied finish face and longitudinal edges, factory sealed back, lap type, 7-1/4 inch width with 6 inch exposure, maximum practicable lengths, 5/16 inch or 3/8 thick, with wood grain textured face. Siding shall have a sloped top, beveled drip edge and nailing line. Provide manufacturer's standard non-prorated 30-year product warranty.

2.2 FASCIAS AND TRIM

2.2.1 Trim

Provide factory primed and applied finish face and longitudinal edges, factory sealed back 3-1/2 inch width, maximum practicable lengths, 3/4 inch thick, with smooth face. Provide manufacturer's standard 15-year limited product warranty.

Rake and Fascia Board

Provide factory primed and applied finish face and longitudinal edges, factory sealed back 7-1/4 inch width, maximum practicable lengths, 1 inch thick, with smooth face. Provide manufacturer's standard 15-year limited product warranty.

2.3 HARDWARE AND ACCESSORIES

Provide sizes, types, and spacings of hardware and accessories as recommended in writing by the fiber cement product manufacturer, except as otherwise specified.

2.3.1 Wood Screws

ASME B18.6.1.

2.3.2 Bolts, Nuts, Lag Screws, and Studs

ASME B18.2.1 and ASME B18.2.2.

2.3.3 Nails

Use nails of a size and type best suited for each application and in accordance with ASTM F547. Use hot-dipped galvanized or aluminum nails for exterior applications. For siding, provide nails of sufficient length to extend 1-1/2 inches into supports, including wood sheathing over framing.

Where nailing is impractical, provide screws of a size and type best suited for each application.

PART 3 EXECUTION

Do not install building construction materials that show visual evidence of biological growth.

3.1 FINISH WORK

3.1.1 Exterior Finish Work

Machine sand exposed flat members and square edges. Machine finish semi-exposed surfaces. Construct joints to exclude water. In addition to nailing, glue joints with waterproof glue as necessary for weather resistant construction. Evenly distribute end joints in built-up members.

Provide shoulder joints in flat work. Reinforce backs of wide-faced miters with metal rings and waterproof glue. Unless otherwise indicated, provide fascia and other flat members 3/4 inch thick minimum. Provide door and window trim in single lengths. Provide braced, blocked, and rigidly anchored cornices for support and protection of vertical joints. Provide soffits in largest practical size. Fasten soffits with aluminum or stainless steel nails. Back prime all concealed surfaces of exterior trim.

3.2 SIDING

3.2.1 Installation of Siding

Fit and position siding without springing or otherwise forcing panels into place. For siding to have a paint finish, drive nails flush.

3.2.2 Horizontal Siding

Locate end joints over framing members and alternate such that there are a minimum of two boards between joints on the same support. Evenly distribute shorter pieces throughout the installation. Provide starter strips to establish proper cant for siding. Predrill ends of siding as necessary to prevent splitting when nailed. Plain lap siding: Overlap and nail into each support in accordance with recommendations of siding manufacturer.

3.3 FASCIA AND EXTERIOR TRIM

Construct, caulk, and machine sand exposed surfaces and edges to exclude water. In addition to nailing, glue joints as necessary for weather resistance. Evenly distribute end joints in built-up members. Shoulder joints in flat work. Reinforce backs of wide-faced miters with metal rings and glue. Provide fascia and other flat members in maximum practicable lengths. Braced, block, and rigidly anchor cornices for support and protection of vertical joints.

-- End of Section --

SECTI ON TABLE OF CONTENTS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

SECTI ON 07 84 00

FI RESTOPPI NG

05/ 10, CHG 1: 08/ 13

PART 1 GENERAL

1. 1 SUMMARY

1. 2 REFERENCES

1. 3 SEQUENCI NG

1. 4 SUBMI TTALS

1. 5 QUALI TY ASSURANCE

1. 5. 1 I nst al l er

1. 6 DELI VERY, STORAGE, AND HANDLI NG

PART 2 PRODUCTS

2. 1 FI RESTOPPI NG SYSTEM

2. 2 FI RESTOPPI NG MATERI ALS

2. 2. 1 Fi r e Hazar d Cl assi f i cat i on

2. 2. 2 Toxi c i t y

2. 2. 3 Fi r e Resi st ance Rat i ng

2. 2. 3. 1 Thr ough- Penet r at i ons

2. 2. 3. 1. 1 Penet r at i ons of Fi r e Resi st ance Rat ed Wal l s and

Par t i t i ons

2. 2. 3. 1. 2 Penet r at i ons of Fi r e Resi st ance Rat ed Fl oor s, Fl oor - Cei l i ng Assembl i es and t he Cei l i ng Membr ane of Roof - Cei l i ng Assembl i es

2. 2. 3. 1. 3 Penet r at i ons of Fi r e and Smoke Resi st ance Rat ed Wal l s, Fl oor s, Fl oor - Cei l i ng Assembl i es, and t he cei l i ng membr ane of Roof - Cei l i ng Assembl i es

2. 2. 3. 2 Const r uct i on Joi nt s and Gaps

2. 2. 4 Mat er i al Cer t i f i cat i on

PART 3 EXECUTI ON

3. 1 PREPARATI ON

3. 2 I NSTALLATI ON

3. 2. 1 I nsul at ed Pi pes and Duct s

3. 2. 2 Fi r e Damper s

3. 2. 3 Dat a and Communi cat i on Cabl i ng

3. 2. 3. 1 Re- Ent er abl e Devi ces

3. 2. 3. 2 Re- Seal abl e Pr oduct s

3. 3 I NSPECTI ON

3. 3. 1 I nspect i on St andar ds

3. 3. 2 I nspect i on Repor t s

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 07 84 00 Page 1

SECTI ON 07 84 00

FI RESTOPPI NG

05/ 10, CHG 1: 08/ 13

PART 1 GENERAL

1. 1 SUMMARY

Fur ni sh and i nst al l t est ed and l i s t ed f i r est oppi ng syst ems, combi nat i on of mat er i al s, or devi ces t o f or m an ef f ect i ve bar r i er agai nst t he spr ead of f l ame, smoke and gases, and mai nt ai n t he i nt egr i t y of f i r e r esi st ance r at ed wal l s, par t i t i ons, f l oor s, and cei l i ng- f l oor assembl i es, i ncl udi ng t hr ough- penet r at i ons and const r uct i on j oi nt s and gaps.

a. Thr ough- penet r at i ons i ncl ude t he annul ar space ar ound pi pes, t ubes, condui t , wi r es, cabl es and vent s.

b. Const r uct i on j oi nt s i ncl ude t hose used t o accommodat e expansi on, cont r act i on, wi nd, or sei smi c movement ; do not al l ow f i r est oppi ng mat er i al t o i nt er f er e wi t h t he r equi r ed movement of t he j oi nt .

Gaps r equi r i ng f i r est oppi ng i ncl ude gaps bet ween t he cur t ai n wal l and t he f l oor s l ab and bet ween t he t op of t he f i r e- r at ed wal l s and t he r oof or f l oor deck above and at t he i nt er sect i on of shaf t assembl i es and adj oi ni ng f i r e r esi st ance r at ed assembl i es.

1. 2 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

ASTM I NTERNATI ONAL ( ASTM)

ASTM E84 ( 2020) St andar d Test Met hod f or Sur f ace Bur ni ng Char act er i st i cs of Bui l di ng Mat er i al s

ASTM E119 ( 2022) St andar d Test Met hods f or Fi r e Test s of Bui l di ng Const r uct i on and Mat er i al s

ASTM E814 ( 2013a; R 2017) St andar d Test Met hod f or Fi r e Test s of Penet r at i on Fi r est op Syst ems

ASTM E1399/ E1399M ( 1997; R 2022) St andar d Test Met hod f or Cycl i c Movement and Measur i ng t he Mi ni mum and Maxi mum Joi nt Wi dt hs of Ar chi t ect ur al Joi nt Syst ems

ASTM E1966 ( 2015; R 2019) St andar d Test Met hod f or Fi r e- Resi st i ve Joi nt Syst ems

ASTM E2174 ( 2020a) St andar d Pr act i ce f or On- Si t e I nspect i on of I nst al l ed Fi r est op Syst ems

SECTI ON 07 84 00 Page 2

ASTM E2307 ( 2020) St andar d Test Met hod f or Det er mi ni ng Fi r e Resi st ance of Per i met er Fi r e Bar r i er Syst ems Usi ng I nt er medi at e- Scal e, Mul t i - st or y Test Appar at us

ASTM E2393 ( 2020a) St andar d Pr act i ce f or On- Si t e I nspect i on of I nst al l ed Fi r e Resi st i ve Joi nt Syst ems and Per i met er Fi r e Bar r i er s

FM GLOBAL ( FM)

FM 4991 ( 2013) Appr oval of Fi r est op Cont r act or s

FM APP GUI DE ( updat ed on- l i ne) Appr oval Gui de ht t p: / / www. appr oval gui de. com/

I NTERNATI ONAL CODE COUNCI L ( I CC)

I CC I BC ( 2021) I nt er nat i onal Bui l di ng Code

UNDERWRI TERS LABORATORI ES ( UL)

UL 723 ( 2018) UL St andar d f or Saf et y Test f or Sur f ace Bur ni ng Char act er i st i cs of Bui l di ng Mat er i al s

UL 1479 ( 2015; Repr i nt May 2021) Fi r e Test s of Thr ough- Penet r at i on Fi r est ops

UL 2079 ( 2015; Repr i nt Jul 2020) Test s f or Fi r e Resi st ance of Bui l di ng Joi nt Syst ems

UL Fi r e Resi st ance ( 2014) Fi r e Resi st ance Di r ect or y

1. 3 SEQUENCI NG

Coor di nat e t he speci f i ed wor k wi t h ot her t r ades. Appl y f i r est oppi ng mat er i al s, at penet r at i ons of pi pes and duct s, pr i or t o i nsul at i ng, unl ess i nsul at i on meet s r equi r ement s speci f i ed f or f i r est oppi ng. Appl y f i r est oppi ng mat er i al s. at bui l di ng j oi nt s and const r uct i on gaps, pr i or t o compl et i on of encl osi ng wal l s or assembl i es. Locat e cast - i n- pl ace f i r est op devi ces and i nst al l i n pl ace bef or e concr et e pl acement . I nst al l pi pe, condui t or cabl e bundl es t hr ough cast - i n- pl ace devi ce af t er concr et e pl acement but bef or e ar ea i s conceal ed or made i naccessi bl e. Fi r est op mat er i al must be i nspect ed and appr oved pr i or t o f i nal compl et i on and encl osi ng of any assembl i es t hat may conceal i nst al l ed f i r est op.

1. 4 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 02 Shop Dr awi ngs

Fi r est oppi ng Syst em; G, CS, DV

SECTI ON 07 84 00 Page 3

SD- 03 Pr oduct Dat a

Fi r est oppi ng Mat er i al s; G, CS, DV

SD- 06 Test Repor t s

I nspect i on; G, CS, DV

SD- 07 Cer t i f i cat es

I nspect or Qual i f i cat i ons

Fi r est oppi ng Mat er i al s

I nst al l er Qual i f i cat i ons; G, CS, DV

1. 5 QUALI TY ASSURANCE

1. 5. 1 I nst al l er

Engage an exper i enced I nst al l er who i s:

a. FM Resear ch appr oved i n accor dance wi t h FM 4991, oper at i ng as a UL Cer t i f i ed Fi r est op Cont r act or , or

b. Cer t i f i ed, l i censed, or ot her wi se qual i f i ed by t he f i r est oppi ng manuf act ur er as havi ng t he necessar y st af f , t r ai ni ng, and a mi ni mum of 3 year s exper i ence i n t he i nst al l at i on of manuf act ur er ' s pr oduct s i n accor dance wi t h speci f i ed r equi r ement s. Submi t document at i on of t hi s exper i ence. A manuf act ur er ' s wi l l i ngness t o sel l i t s f i r est oppi ng pr oduct s t o t he Cont r act or or t o an i nst al l er engaged by t he Cont r act or does not i n i t sel f conf er i nst al l er qual i f i cat i ons on t he buyer . The I nst al l er must be a t r ai ned r epr esent at i ve of t he manuf act ur er ( not di st r i but or or agent ) i n t he pr oper sel ect i on and i nst al l at i on pr ocedur es. Obt ai n and submi t i nst al l er ' s wr i t t en cer t i f i cat i on of t r ai ni ng, and r et ai n pr oof of cer t i f i cat i on f or dur at i on of f i r est op i nst al l at i on.

1. 6 DELI VERY, STORAGE, AND HANDLI NG

Del i ver mat er i al s i n t he or i gi nal unopened packages or cont ai ner s showi ng name of t he manuf act ur er and t he br and name. St or e mat er i al s of f t he gr ound, pr ot ect ed f r om damage and exposur e t o el ement s and t emper at ur es i n accor dance wi t h manuf act ur er r equi r ement s. Remove damaged or det er i or at ed mat er i al s f r om t he si t e. Use mat er i al s wi t hi n t hei r i ndi cat ed shel f l i f e.

PART 2 PRODUCTS

2. 1 FI RESTOPPI NG SYSTEM

Submi t det ai l dr awi ngs i ncl udi ng manuf act ur er ' s descr i pt i ve dat a, t ypi cal det ai l s conf or mi ng t o UL Fi r e Resi st ance or ot her det ai l s cer t i f i ed by anot her nat i onal l y r ecogni zed t est i ng l abor at or y, i nst al l at i on i nst r uct i ons or UL l i s t i ng det ai l s f or a f i r est oppi ng assembl y i n l i eu of f i r e- t est dat a or r epor t . For t hose f i r est op appl i cat i ons f or whi ch no UL t est ed syst em i s avai l abl e t hr ough a manuf act ur er , submi t a manuf act ur er ' s engi neer i ng j udgment , der i ved f r om si mi l ar UL syst em desi gns or ot her t est s f or r evi ew and appr oval pr i or t o i nst al l at i on. Submi t t al must i ndi cat e t he f i r est oppi ng mat er i al t o be pr ovi ded f or each t ype of

SECTI ON 07 84 00 Page 4 appl i cat i on. When mor e t han a t ot al of 5 penet r at i ons and/ or const r uct i on j oi nt s ar e t o r ecei ve f i r est oppi ng, pr ovi de dr awi ngs t hat i ndi cat e l ocat i on, " F" " T" and " L" r at i ngs, and t ype of appl i cat i on.

Al so, submi t a wr i t t en r epor t i ndi cat i ng l ocat i ons of and t ypes of penet r at i ons and t ypes of f i r est oppi ng used at each l ocat i on; r ecor d t ype by UL l i s t pr i nt ed number s.

2. 2 FI RESTOPPI NG MATERI ALS

Pr ovi de f i r est oppi ng mat er i al s, suppl i ed f r om a si ngl e domest i c manuf act ur er , consi st i ng of commer ci al l y manuf act ur ed, asbest os- f r ee, nont oxi c pr oduct s FM APP GUI DE appr oved, or UL l i s t ed, f or use wi t h appl i cabl e const r uct i on and penet r at i ng i t ems, compl yi ng wi t h t he f ol l owi ng mi ni mum r equi r ement s:

2. 2. 1 Fi r e Hazar d Cl assi f i cat i on

Pr ovi de mat er i al t hat has a f l ame spr ead of 25 or l ess, and a smoke devel oped r at i ng of 50 or l ess, when t est ed i n accor dance wi t h ASTM E84 or UL 723. Pr ovi de an appr oved f i r est oppi ng mat er i al as l i s t ed i n UL Fi r e Resi st ance or by a nat i onal l y r ecogni zed t est i ng l abor at or y.

2. 2. 2 Toxi c i t y

Pr ovi de mat er i al t hat i s nont oxi c and car ci nogen f r ee t o humans at al l s t ages of appl i cat i on or dur i ng f i r e condi t i ons and does not cont ai n hazar dous chemi cal s or r equi r e har mf ul chemi cal s t o c l ean mat er i al or equi pment .

2. 2. 3 Fi r e Resi st ance Rat i ng

Fi r est op syst ems must be UL Fi r e Resi st ance l i s t ed or FM APP GUI DE appr oved wi t h " F" r at i ng at l east equal t o f i r e- r at i ng of f i r e wal l or f l oor i n whi ch penet r at ed openi ngs ar e t o be pr ot ect ed. Wher e r equi r ed, f i r est op syst ems must al so have " T" r at i ng at l east equal t o t he f i r e- r at ed f l oor i n whi ch t he openi ngs ar e t o be pr ot ect ed.

2. 2. 3. 1 Thr ough- Penet r at i ons

Fi r est oppi ng mat er i al s f or t hr ough- penet r at i ons, as descr i bed i n par agr aph SUMMARY, must pr ovi de " F" , " T" and " L" f i r e r esi st ance r at i ngs i n accor dance wi t h ASTM E814 or UL 1479. Pr ovi de f i r e r esi st ance r at i ngs as f ol l ows:

2. 2. 3. 1. 1 Penet r at i ons of Fi r e Resi st ance Rat ed Wal l s and Par t i t i ons

F Rat i ng = 1 hour .

2. 2. 3. 1. 2 Penet r at i ons of Fi r e Resi st ance Rat ed Fl oor s, Fl oor - Cei l i ng Assembl i es and t he Cei l i ng Membr ane of Roof - Cei l i ng Assembl i es

F Rat i ng = 1 hour , T Rat i ng = 1 hour . Wher e t he penet r at i ng i t em i s out si de of a wal l cavi t y t he F r at i ng must be equal t o t he f i r e r esi st ance r at i ng of t he f l oor penet r at ed, and t he T r at i ng must be i n accor dance wi t h t he r equi r ement s of I CC I BC.

SECTI ON 07 84 00 Page 5

2. 2. 3. 1. 3 Penet r at i ons of Fi r e and Smoke Resi st ance Rat ed Wal l s, Fl oor s, Fl oor - Cei l i ng Assembl i es, and t he cei l i ng membr ane of Roof - Cei l i ng Assembl i es

F Rat i ng = 1 hour , T Rat i ng = 1 hour and L Rat i ng = Wher e L r at i ng i s r equi r ed.

2. 2. 3. 2 Const r uct i on Joi nt s and Gaps

Fi r e r esi st ance r at i ngs of const r uct i on j oi nt s, as descr i bed i n par agr aph SUMMARY, and gaps such as t hose bet ween f l oor s l abs and cur t ai n wal l s must be t he same as t he const r uct i on i n whi ch t hey occur . Pr ovi de const r uct i on j oi nt s and gaps wi t h f i r est oppi ng mat er i al s and syst ems t hat have been t est ed i n accor dance wi t h ASTM E119, ASTM E1966 or UL 2079 t o meet t he r equi r ed f i r e r esi st ance r at i ng. Pr ovi de cur t ai n wal l j oi nt s wi t h f i r est oppi ng mat er i al s and syst ems t hat have been t est ed i n accor dance wi t h ASTM E2307 t o meet t he r equi r ed f i r e r esi st ance r at i ng. Syst ems i nst al l ed at const r uct i on j oi nt s must meet t he cycl i ng r equi r ement s of ASTM E1399/ E1399M or UL 2079. Pr ovi de a mi ni mum cl ass I I movement capabi l i t y f or al l j oi nt s at t he i nt er sect i on of t he t op of a f i r e r esi st ance r at ed wal l and t he under si de of a f i r e- r at ed f l oor , f l oor cei l i ng, or r oof cei l i ng assembl y.

2. 2. 4 Mat er i al Cer t i f i cat i on

Submi t cer t i f i cat es at t est i ng t hat f i r est oppi ng mat er i al compl i es wi t h t he speci f i ed r equi r ement s. Pr ovi de cer t i f i cat i on of compl i ance wi t h UL 1479 f or al l i nt umescent f i r est op mat er i al s used i n t hr ough penet r at i on syst ems.

PART 3 EXECUTI ON

3. 1 PREPARATI ON

Ar eas t o r ecei ve f i r est oppi ng must be f r ee of di r t , gr ease, oi l , or l oose mat er i al s whi ch may af f ect t he f i t t i ng or f i r e r esi st ance of t he f i r est oppi ng syst em. For cast - i n- pl ace f i r est op devi ces, f or mwor k or met al deck t o r ecei ve devi ce pr i or t o concr et e pl acement must be sound and capabl e of suppor t i ng devi ce. Pr epar e sur f aces as r ecommended by t he manuf act ur er .

3. 2 I NSTALLATI ON

Compl et el y f i l l voi d spaces wi t h f i r est oppi ng mat er i al r egar dl ess of geomet r i c conf i gur at i on, subj ect t o t ol er ance est abl i shed by t he manuf act ur er . Fi r est oppi ng syst ems f or f i l l i ng f l oor voi ds 4 i nches or mor e i n any di r ect i on must be capabl e of suppor t i ng t he same l oad as t he f l oor i s desi gned t o suppor t or be pr ot ect ed by a per manent bar r i er t o pr event l oadi ng or t r af f i c i n t he f i r est opped ar ea. I nst al l f i r est oppi ng i n accor dance wi t h manuf act ur er ' s wr i t t en i nst r uct i ons. Pr ovi de t est ed and l i s t ed f i r est op syst ems i n t he f ol l owi ng l ocat i ons, except i n f l oor s l abs on gr ade:

a. Penet r at i ons of duct , condui t , t ubi ng, cabl e and pi pe t hr ough f l oor s and t hr ough f i r e- r esi st ance r at ed wal l s, par t i t i ons, and cei l i ng- f l oor assembl i es.

b. Penet r at i ons of ver t i cal shaf t s such as pi pe chases, el evat or shaf t s, and ut i l i t y chut es.

c. Gaps at t he i nt er sect i on of f l oor s l abs and cur t ai n wal l s, i ncl udi ng

SECTI ON 07 84 00 Page 6 i nsi de of hol l ow cur t ai n wal l s at t he f l oor s l ab.

d. Gaps at per i met er of f i r e- r esi st ance r at ed wal l s and par t i t i ons, such as bet ween t he t op of t he wal l s and t he bot t om of r oof decks.

e. Const r uct i on j oi nt s i n f l oor s and f i r e r at ed wal l s and par t i t i ons.

f . Ot her l ocat i ons wher e r equi r ed t o mai nt ai n f i r e r esi st ance r at i ng of t he const r uct i on.

3. 2. 1 I nsul at ed Pi pes and Duct s

Cut and r emove t her mal i nsul at i on wher e pi pes or duct s pass t hr ough f i r est oppi ng, unl ess i nsul at i on meet s r equi r ement s speci f i ed f or f i r est oppi ng. Repl ace t her mal i nsul at i on wi t h a mat er i al havi ng equal t her mal i nsul at i ng and f i r est oppi ng char act er i st i cs.

3. 2. 2 Fi r e Damper s

I nst al l and f i r est op f i r e damper s i n accor dance wi t h Sect i on 23 30 00 HVAC AI R DI STRI BUTI ON. Fi r est op i nst al l ed wi t h f i r e damper must be t est ed and appr oved f or use i n f i r e damper syst em. Fi r est op i nst al l ed wi t h f i r e damper must be t est ed and appr oved f or use i n f i r e damper syst em.

3. 2. 3 Dat a and Communi cat i on Cabl i ng

Seal cabl i ng f or dat a and communi cat i on appl i cat i ons wi t h r e- ent er abl e f i r est oppi ng pr oduct s and devi ces as i ndi cat ed.

3. 2. 3. 1 Re- Ent er abl e Devi ces

Pr ovi de f i r est oppi ng devi ces t hat ar e pr e- manuf act ur ed modul ar devi ces, cont ai ni ng bui l t - i n sel f - seal i ng i nt umescent i nser t s. Al l ow f or cabl e moves, addi t i ons or changes wi t hout t he need t o r emove or r epl ace any f i r est op mat er i al s. Devi ces must be capabl e of mai nt ai ni ng t he f i r e r esi st ance r at i ng of t he penet r at ed membr ane at 0 per cent t o 100 per cent v i sual f i l l of penet r ant s; whi l e mai nt ai ni ng " L" r at i ng of <10 cf m/ sf measur ed at ambi ent t emper at ur e and 400 degr ees F at 0 per cent t o 100 per cent v i sual f i l l .

3. 2. 3. 2 Re- Seal abl e Pr oduct s

Pr ovi de f i r est oppi ng pr e- manuf act ur ed modul ar pr oduct s, cont ai ni ng sel f - seal i ng i nt umescent i nser t s. Al l ow f or cabl e moves, addi t i ons or changes. Pr ovi de devi ces capabl e of mai nt ai ni ng t he f i r e r esi st ance r at i ng of t he penet r at ed membr ane at 0 per cent t o 100 per cent v i sual f i l l of penet r ant s.

3. 3 I NSPECTI ON

For al l pr oj ect s, do not cover or encl ose t he f i r est opped ar eas unt i l i nspect i on i s compl et e and appr oved by t he Cont r act i ng Of f i cer . I nspect t he appl i cat i ons i ni t i al l y t o ensur e adequat e pr epar at i ons ( c l ean sur f aces sui t abl e f or appl i cat i on, et c. ) and per i odi cal l y dur i ng t he wor k t o assur e t hat t he compl et ed wor k has been accompl i shed accor di ng t o t he manuf act ur er ' s wr i t t en i nst r uct i ons and t he speci f i ed r equi r ement s.

Submi t wr i t t en r epor t s i ndi cat i ng l ocat i ons of and t ypes of penet r at i ons and t ypes of f i r est oppi ng used at each l ocat i on; r ecor d t ype by UL l i s t ed pr i nt ed number s.

SECTI ON 07 84 00 Page 7

3. 3. 1 I nspect i on St andar ds

I nspect al l f i r est oppi ng i n accor dance wi t h ASTM E2393 and ASTM E2174 f or f i r est op i nspect i on, and document i nspect i on r esul t s t o be submi t t ed.

3. 3. 2 I nspect i on Repor t s

Submi t i nspect i on r epor t st at i ng t hat f i r est oppi ng wor k has been i nspect ed and f ound t o be appl i ed accor di ng t o t he manuf act ur er ' s r ecommendat i ons and t he speci f i ed r equi r ement s.

- - End of Sect i on - -