This document is an amendment to a federal contract opportunity for the renovation of Building 416 for a security relocation at Naval Air Station Pax River in Maryland. The amendment provides responses to several questions received through a Request for Information (RFI) process, including details on design submittals, government furnished equipment, electrical requirements, and the optional bid item for a generator. The amendment also includes attachments with electrical as-builts, an updated wage determination, and a revised bid schedule. The solicitation is reserved exclusively for vendors on the $750M 8(a) MACC contract managed by NAVFAC Washington, with a proposal due date of August 13, 2024. The contract opportunity does not require LEED certification.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N40080-22-D-2222 X028
Section SF 30 – BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
The purpose of this Amendment #0002 is to provide:
1) RFI responses below Page 2-3
2) Pre Award Sign In sheet Page 4
3) Elec as Builts Page 5-12
4) Updated WD MD20240055 8/2/24 Supersedes Wage Determination MD20240055 06/14/2024 Page 13-22
The Proposal due date changed: Thursday, 13 August 2024 no later than 2:00 pm (Local Time).
RFI Log
B416 Renovate for Security Relocation
NAS Pax River, MD.
44. Question: What are design submittals and the Government review time?
Response: See revised RFP (from Amendment 0001) section 01 33 10.05 20 para 1.8 and para 2.2.2.
45. Question: Will the Government remove all FF&E in renovated areas? If not, please specify the location of the storage and who is responsible for re-installation of FF&E (if any).
Response: Removal of FFE will be a Contractor task for removal and disposal, there is no reinstall. See the concept drawings for the layout in part 6, attachment 1 and 2.
There are some areas of FF&E that remain and just need to be surveyed to be in working condition. The two attachments in part 6 show the existing floor plan with all the FF&E. The New Concept Plan with the FF&E removed, and showing what remaining FF&E stays, and the new wall layouts.
46. Question: Please confirm this is not a LEED project
Response: This is not a Leed project.
47. Question: During the job walk the Government mentioned a placement of the generator. Please confirm that a generator is required for this task order and provide location and details for the generation.
Response: Option 2-CLIN 0003 is to be an Optional Bid Item, details are in the option 2 description, and the location would be on the south side of the bldg., to be finalized in
Design. A Generator is required for the project. Details for the generator were provided in the RFP. The Contractor is to propose the location in design drawings.
48. Question: The lead time for a generator can be up to 6 months and we are asking to confirm or re-consider the period of performance for this task order.
Response: The period of performance will remain unchanged.
49. Please provide a clean bid schedule.
Response: See the revised solicitation from Amendment 0001.
50. Question: Please confirm that no electrical work on first floor in areas 1 through 8 and area 10. Also, confirm that no electrical work on second floor in areas 1,2, and 3.
Response: See room data sheets for these area, there may be some electrical work for the design portion of the project.
51. Question: Please clarify electrical requirements for areas 5,6, 14 through 17 on second floor.
Response See the room data sheets for these area, there may be some electrical work for the design portion of the project.
52. Question: Please clarify electrical requirements for areas 2,5,6,8, and 10 on first floor since no electrical outlets shown.
Response: See the room data sheets for these area, there may be some electrical work for the design portion of the project.
53. Question: Will electrical work be required for Option 1 or it's re-use of existing power if sufficient?
Response: See the room data sheets for these areas, there may be some electrical work for the design portion of the project. Calculations will need to be run to verify the new sizing of the HVAC as well as if new electrical is needed for these units .Yes, there may be some electrical work for option 1.
54. Question: Please provide electrical as-built for existing services.
Response: See attachment to this amendment labeled Electric as builts.