11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

J 1 2

0001 01 SEP 2026

W9127S

W076 ENDIST LITTLE ROCK

KO CONTRACTING DIVISION, 700 W CAPITOL AVE ROOM 7315

LITTLE ROCK, AR 72201-3225

UNITED STATES

BRANDEE WRIGHT, EMAIL: BRANDEE.M.WRIGHT@USACE.ARMY.MIL TELEPHONE:

5013401466

SCD: PAS:

W9127S26QA054

21 AUG 2026

SEE SECTION G - CONTRACT ADMINISTRATION DATA

The purpose of this amendment is to adjust quantities/occurrences in Section 5.2.3 and 5.3.9, updated quote sheet reflects changes made.

CAROLE M. HOUSEHOLDER

01 SEP 2026

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Services Bid Schedule

BASE YEAR: Provide Janitorial Services for the Ozark Powerhouse and adjacent grounds for the period date of award, whichever is later, through 31 July 2027.

ITEM DESCRIPTION

ESTIMATED

QUANTITY

U/I UNIT PRICE AMOUNT

0001 Daily Services 104 EA 0002 Weekly Services 52 EA 0003 Monthly Services 12 EA 0004 Annual Service 1 EA

ESTIMATED TOTAL BID PRICE

(ITEMS 0001-0004)

OPTON 01: Provide Janitorial Services for the Ozark Powerhouse and adjacent grounds for the period 1 August 2027 through 31 July 2028.

ITEM DESCRIPTION

ESTIMATED

QUANTITY

U/I UNIT PRICE AMOUNT

1001 Daily Services 105 EA 1002 Weekly Services 52 EA 1003 Monthly Services 12 EA 1004 Annual Service 1 EA

ESTIMATED TOTAL BID PRICE

(ITEMS 1001-1004)

OPTION 02: Provide Janitorial Services for the Ozark Powerhouse and adjacent grounds for the period 1 August 2028 through 31 July 2029.

ITEM DESCRIPTION

ESTIMATED

QUANTITY

U/I UNIT PRICE AMOUNT

2001 Daily Services 105 EA 2002 Weekly Services 52 EA 2003 Monthly Services 12 EA 2004 Annual Service 1 EA

ESTIMATED TOTAL BID PRICE

(ITEMS 2001-2004)

TOTAL ESTIMATED PRICE

(ITEMS 0001-2004)

Jennifer Hoban

U.S. ARMY CORPS OF ENGINEERS | 1598 LOCK AND DAM ROAD, RUSSELLVILLE, AR 72801

PERFORMANCE

WORK STATEMENT

JANITORIAL SERVICES OZARK POWERHOUSE

– RUSSELLVILLE SITE OFFICE

US ARMY CORPS OF ENGINEERS

LITTLE ROCK DISTRICT

RUSSELLVILLE SITE OFFICE

Russellville Site Office – CESWL-OPK-R Ozark Powerhouse Janitorial

Performance Work Statement (PWS)

PERFORMANCE WORK STATEMENT (PWS)

MKARNS PROJECT OFFICE, RUSSELLVILLE SITE OFFICE

JANITORIAL SERVICES OZARK POWERHOUSE

PART 1 – GENERAL INFORMATION

1. GENERAL:

This is a non-personal services contract to provide janitorial services for the Ozark Powerhouse.

The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction:

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform janitorial services for the Ozark Powerhouse as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2 Background:

The Ozark Powerhouse is located in Ozark, Arkansas. The Ozark Powerhouse is part of the MKARNS Project Office with authority over areas located along the Arkansas River in the State of Arkansas. The McClellan Kerr Arkansas River Navigation System (MKARNS) is a multipurpose system. It was developed and is maintained for navigation, power generation, environmental stewardship, and recreational purposes.

1.3 Objectives:

Perform janitorial services to the Ozark Powerhouse in a satisfactorily and timely manner according to the performance work statement.

1.4 Scope:

The intent of this contract is to provide janitorial services to the Ozark Powerhouse. Services include but not limited to all janitorial services necessary to maintain the Ozark Powerhouse.

The Contractor shall furnish all necessary management, supervision, inspection, personnel, materials, supplies, parts, tools, equipment, transportation, and vehicles, except as otherwise provided for herein, necessary to assure that all services are performed in accordance with the contract specifications, drawings, attachments, exhibits, and all applicable laws, regulations, codes, or directives. The Contractor shall accomplish work in a timely and satisfactorily manner.

1.5 Period of Performance:

The period of performance shall be for one (1) Base Year of 12 months, and two (2) 12-month option years. The Period of Performance reads as follows:

Base Year – August 1, 2026 or date of award whichever is later through 31 July, 2027

Option Year I – August 1, 2027 through 31 July, 2028

Option Year II – August 1, 2028 through 31 July, 2029

1.6 General Information

1.6.1 Quality Control:

In order to assure that the desired level of performance of a service is achieved, the contractor shall establish and implement a quality control plan to ensure contract compliance, establish procedures for inspection and monitor and control the quality of the service. The QC Plan shall include the identification of all contractor personnel, organizational structure, lines of authority and services to be performed. Contractor shall provide a Daily Quality Control Inspection schedule to the Government Representative to determine if services meet the contract requirements and specifications. It is the contractor’s responsibility to correct deficiencies and check the consistency of quality throughout each service, and the plan shall outline whatever actions the contractor deems necessary to provide contract standards for quality control throughout all areas of responsibility. The Quality Control Plan shall be submitted to the COR at the Russellville Site Office. An electronic copy of the plan must be submitted and accepted within 2 weeks of award of the contract. Revisions of the QCP shall be submitted to the COR within 5 working days when changes are made thereafter. After acceptance of the quality control plan the contractor shall receive the COR’s acceptance in writing of any proposed change to his QC system.

1.6.1.1 CQCP Contents: Contractors Quality Control Plan shall include, as a minimum, the following items:

1. Contractor organizational structure

2. Contractor personnel and qualifications

3. Work schedule

4. Submittals schedule

5. Inspection requirements and schedule

6. Contractors Quality Control Procedures

7. Documentation of quality control activities

8. Requirements for corrective action when quality control and/or acceptance criteria are not met.

1.6.1.2 QC Inspection system: An inspection system covering all the services listed on the Performance Requirements Summary, must specify the areas to be inspected on either a scheduled or unscheduled basis, how often inspections will be accomplished, and the name and title of the individual(s) who will perform the inspection. It must specify the methods and procedures for identifying and preventing a cleanup service deficiency before the level of performance has become unacceptable.

1.6.1.3 Daily Quality Control Inspections/Reports: Daily QC inspections shall be conducted by the contractor and corrective action(s) shall be taken to address noted deficiencies observed by QC. A record of all daily inspections conducted by the contractor and necessary corrective action taken shall be prepared. Daily reports shall detail the inspection methods and procedures that were utilized to assure that all required services produced an end product that complies with the Specifications and requirements of the contract. The contractor shall establish a Daily Quality Control Inspection schedule, listing parks/services to be inspected, routes, times, and the person’s name performing the service. The contractor shall provide to the COR a written daily quality control inspection report for each daily service performed. All reports shall be completed daily and submitted on a weekly basis by email, no later than 2:00PM on Friday, to the Russellville Site Office.

The written quality control reports shall contain the following items as a minimum:

a. Contractor's name.

b. Service date, starting time and ending time.

c. Contract, Delivery Order, and Work Order numbers.

d. Statement and description of services performed.

e. Location of services performed.

f. Description of services not performed and reasons for non-performance.

g. Certification Statement that all services performed was in accordance with the specifications.

h. Accidents/damages to Government property.

i. Man-hours worked on Government property.

j. Signature of the contractor's quality control representative.

1.6.2 Quality Control Manager: The contractor shall designate in writing a quality control manager with full knowledge of the contract specifications/standards, this individual is required to have a copy of the contract in their possession at all times for referral concerning questions of contractor’s responsibility. The contractors’ quality control manager shall be present and available whenever work is being performed, and shall have full authority and power to act for the contractor on items pertaining to overall work performance, management, coordination, and supervision to assure that job performance in each category meets the contract specifications and requirements. The quality control manager shall not be a working member of a crew performing any of the scheduled services to be inspected.

Designated individual(s) will be the primary point of contact with the Government Representative for the performance of services and is responsible for communicating all completed services, delays, failures, and remedies in timely manner to avoid an inspection failure that could result in a deduction of payment for that service.

1.6.3 Quality Assurance: The Government shall evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.6.3.1 The Contractor’s work will be inspected within 8 hours of the time for completing the work as identified in the Contractor’s schedule. If the work has not been performed, or has not been performed satisfactorily, the inspector will notify the Contractor of that fact within one working day of the inspection. Work may be performed or re-performed within 1 working day of notice of nonperformance or unsatisfactory performance. If the Contractor fails to perform or to re-perform work within 1 working day of notice of nonperformance or unsatisfactory performance, the Contractor has failed to promptly perform the services again, and the defects cannot be corrected by re-performance. Deductions will be made for nonperformance or failure to re-perform.

1.6.4 Recognized Holidays:

The Contractor is not required to perform services on holidays, except for in emergency situations or when approved in advance by the COR.

New Year’s Day Labor Day

Martin Luther King Jr.’s Birthday Columbus Day

Washington’s Birthday Veteran’s Day

Memorial Day

Juneteenth

Thanksgiving Day

Independence Day Christmas Day

1.6.5 Hours of Operation:

The contractor is responsible for conducting business, between the hours of 8:00 a.m. to 4:30 p.m. Monday thru Thursday except some Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.

When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential. (Most services will be conducted on Tuesday’s and Thursday’s unless otherwise notified by the COR.)

1.6.6 Schedule of Work:

The contractor shall submit and obtain approval of required documentation as identified in Technical Exhibit 2 prior to commencing work. The Contractor shall commence work to provide services on the date specified on the written order or within the required start time after receipt of telephone order in emergency situations. Work Order will indicate areas where services are required. Work shall be completed within the time limits stated on the delivery order, work order, or agreed upon schedule unless previously authorized by the COR. In case of inclement weather, additional work days may be allowed.

1.6.6.1 The Contractor shall develop a work schedule identifying all contract work and locations. The Contractor shall submit the work schedules to the COR for review and approval prior to beginning work. The Contractor’s schedule shall include all items of work required. It shall set forth the item of work, locations, and the time/date of beginning and completion. The work schedule shall not be changed without the written approval of the COR.

1.6.6.2 When the Contractor cannot complete Cleanup Services for the Ozark Powerhouse due to construction debris or Government interference, the Contractor shall report in writing to the COR the reason for failure to complete the services within 24 hours (verbal notification should be made within 4 hours). The report shall identify type or interference, location and date of interference.

1.6.6.3 Work delays due to federal holidays, inclement weather, and/or other causes beyond the Contractor’s control will not constitute any requirement not being completed as specified herein. When the Contractor experiences delays due to circumstances beyond his control, the Government may allow the Contractor to work additional hours beyond normal duty hours (7:30 a.m. to 4:30 p.m., Monday through Thursday) and on non-scheduled days, i.e. federal holidays, and weekends, with prior approval from the COR on a case by case basis. In the event that weather or other conditions, over which the Contractor has no control, prevent the Contractor from completing an item of work as required by these specifications, the Contractor shall notify the COR of such conditions as soon as they arise. The Contractor may request a weather time extension.

1.6.7 Place of Performance:

The work required under this solicitation will be located within the Ozark Powerhouse and Grounds.

1.6.8 Type of Contract:

This is a service contract.

1.6.9 Security Requirements:

The Contractor shall be responsible for safeguarding all Government equipment, information and property provided for Contractor use, and must maintain the level of security required for the life of the contract.

1.6.9.1 Security Requirements Required

SECURITY REQUIREMENTS FOR LITTLE ROCK DISTRICT CONTRACTS

1. General Overview.

a. At a minimum, the Little Rock District U.S. Army Corps of Engineers will not grant any individual unescorted physical access to Federal property and/or the authorization to perform work or services on behalf of a Federal agency without first verifying identity and citizenship, as well as vetting such individual against the National Crime Information Center Interstate identification Index (NCIC-III) and the Terrorism Screening Data Base (TSDB).

b. Individuals who (1) require issuance of a physical access key to federal property; (2) require unescorted physical access to Federal property or perform work or services on behalf of a Federal agency for a duration of longer than 6 consecutive months; (3) require access to government information systems and/or networks; or, (4) require issuance of a Common Access Card are must also undergo a Tier 1 background investigation through the Office of Personnel Management (OPM). This process is initiated by the Little Rock District Security Office, details located in paragraph 2b.

c. Proposed foreign contractors seeking to work on a USACE contract must be cleared through the Department of State prior to having site access. To obtain approval, each individual must complete and submit the appropriate documents for processing. The required procedure takes approximately 45 business days to process once all documentation is completed properly and submitted. In order to initiate this process, please call the Little Rock District Security Office at (501) 324-7138 as soon as possible.

d. The security provisions of this contract and/or applicable task order apply to all Contractor and Subcontractor Employees (CSEs).

e. The Little Rock District Security Office reserves the right to require additional information or upgrade the security requirement(s) of any contract and/or applicable task order; this includes upgrading the investigation standard for specific CSEs.

f. Prime Contractors are responsible for subcontractor compliance with the security provisions of this contract and shall coordinate all security requirements on the behalf of the subcontractors and their employees.

g. Prime Contractors will appoint ONE (1) point of contact (POC) who is responsible for communicating with and submitting all background investigation packages to the Little Rock

District Security Office. The Little Rock District Security Office will not communicate directly with any contractor and subcontractor employee (CSE) other than the appointed point of contact.

h. Background Investigation packages will be submitted for each CSE at a minimum of fifteen (15) days prior to contract start. Investigation packages can be transmitted using any of the methods specified in paragraph 3.

i. CSEs working on this contract must always have a REAL ID ACT compliant driver’s license or government issued identification card with them.

j. Any change in personnel (whether an addition or replacement) throughout the duration of the contract will require the new person or replacement person to be vetted and approved by the Little Rock District Security Office in accordance with the requirements contained herein, prior to being granted Work Authorization or Site Access.

k. Throughout the duration of this contract or any applicable task orders, the Little Rock

District Security Office shall be notified of the arrest or conviction of any CSE. CSEs may be denied access upon the discovery of such information.

l. The CSE POC is responsible for contacting either the Contracting Officers Representative

(COR) or the Little Rock District Security Office, prior to the first day of work, to receive a list of approved individuals to be onsite. CSEs must be aware that COR, USACE personnel, and/or Security Office personnel can and will conduct identification checks on all persons onsite at USACE property. Any person found onsite without proper identification or approval will be escorted offsite.

m. Applies to Powerplant Control Rooms only. A Little Rock District employee must always be present while a CSE is performing work inside the control room. CSEs will be required to sign-in to the control room daily.

2. Background Investigation Package Requirements

a. All CSEs are required to provide the following documents to the Little Rock District Security Office.

(1) SWL form 487 dated 2016, Contractor Required Information Form. Form must be complete and clearly legible. This form can be obtained through the COR or the Little Rock District Security Office.

(2) A clearly legible COLOR copy of the CSE’s REAL ID ACT compliant driver’s license or government issued identification card. Photo must be clearly visible. If a CSE does not have a REAL ID ACT compliant driver’s license or government issued identification card, he/she will be required to provide a clearly legible COLOR copy of his/her non-REAL ID ACT compliant driver’s license or government issued identification card AND a clearly legible his/her proof of citizenship document or proof of authorization to work in the United States. Acceptable documents are:

(a) E-Verify Case Verification Form

(b) U.S. Birth Certificate

(c) U.S. Passport

(d) U.S. Certificate of Citizenship-INS

(e) U.S. Certification of Naturalization

(f) FS-545, Certificate of Birth Abroad

(g) U.S. Certificate of Report of Birth

(h) U.S. Consular Report of Birth Abroad

(i) Workers’ Visa

(j) Permanent Resident Card

b. CSEs who (1) require issuance of a physical access key to federal property; (2) require unescorted physical access to Federal property or perform work or services on behalf of a Federal agency for a duration of longer than 6 consecutive months; (3) require access to government information systems and/or networks; or, (4) require issuance of a Common Access Card are also required to undergo a Tier 1 background investigation through the Office of Personnel Management (OPM). The Little Rock District Security Office must initiate this investigation for each CSE before they are granted work authorization or site access. To initiate such investigation, the following documents are required in addition to the requirements specified above:

(1) OF 306- Declaration for Federal Employment Form. Form must be complete and clearly legible. This form can be obtained through the COR or the Little Rock District Security Office.

(2) Fingerprints: electronically or manually using the FD258 card. Contact the Little Rock

District Security Office (501-324-7138) to coordinate fingerprinting.

Note. After all the required documents have been received, the Little Rock District Security Office requests the Tier 1 through the Army Personnel Security Investigation - Center of Excellence (PSI-COE). CSEs will receive emails from the PSI-COE and an online database called “E-QIP”. CSEs must complete and submit their electronic personnel form in E-QIP as soon as possible.

3. Background Investigation Package Transmission.

a. All methods must have a transmittal letter that contains the following information:

engenerrs

1) Contract Number and Title

2) Contracting Officer’s Representative name, office number, and cellular number

3) Prime Contractor contact information

b. If mailed- the investigation package will be transmitted in an opaque envelope. Mailing

Address:

USACE SWL

Attn: Security Office 700 West Capitol Ave (room 6410) P.O. Box 867 Little Rock, AR 72201

c. If faxed- transmittal letter must be the first document, and it must also state: “Page(s) that contain PII follow”. Fax number: (501) 324-5471

d. If emailed- Documents must be password protected as they contain personally identifiable information. Passwords to documents must be sent in separate email. Email address:

m4xslceswlcontracts@usace.army.mil

Note. Incomplete forms, illegible forms, etc., will be returned for correction and/ or completion and can delay the CSE from beginning work.

4. Background Investigation Disqualifying Factors.

a. Vetting that results in the discovery of any of the following derogatory information will result in an automatic denial:

(1) Being identified in the NCIC known or appropriately suspected terrorist (KST) file or

TSDB report as known to be, or is suspected of being, a terrorist or belonging to an organization with known links to terrorism or support of terrorist activity;

(2) Being registered as a sex offender;

(3) Current arrest warrant, regardless of the offense or violation;

(4) Current bar from entry or access to a Federal installation or facility;

(5) Conviction of crimes encompassing sexual assault, armed robbery, rape, child molestation, production or possession of child pornography, trafficking in humans, or drug possession with intent to sell or distribute;

(6) Conviction for espionage, sabotage, sedition, treason, terrorism, or murder;

(7) Felony conviction within the last 10 years regardless of the offense or violation;

(8) Felony conviction for a firearms or explosives violation regardless of when the conviction occurred; or,

(9) Engaged in acts or activities designed to overthrow the U.S. Government by force.

b. Vetting that results in the discovery of other criminal arrest information that may present a threat to the good order, discipline, or health and safety of USACE will be reviewed by the Little Rock District Security Office and the adjudication authority is the Chief of Security and Law Enforcement. See Disqualifying Factors Table.

mailto:m4xslceswlcontracts@usace.army.mil

c. A waiver may be requested by a denied CSE. To submit a waiver, CSEs must obtain a certified copy of their complete criminal history to include all arrests and convictions, and submit a letter requesting the denial be waived. CSEs will submit letters through the PC security POC to the SWL-DSO. The SWL-DSO will review the letter and forward to the Deputy Commander for decision. The letter will be addressed to the Little Rock District Deputy Commander, must include all offenses, and an explanation why the conduct should not result in the denial of access.

Disqualifying Factors Table

CRIMINAL HISTORY/ CRIMINAL INFORMATION CHARGED* OR

CONVICTED

< 5 Yrs. < 10 Yrs. > 10 Yrs.

Known/suspected terrorist or belongs to known/suspected terrorist organization (verified through terrorist watch list)

DENY DENY DENY

Registered Sex Offender DENY DENY DENY Active wants or warrants DENY DENY DENY Barred from any Federal installation or facility DENY DENY DENY Espionage, sabotage, treason, or terrorism (not terroristic threats); or conspiracy or attempt to commit offense

DENY DENY DENY

Knowingly/willfully engaged in acts or activities to overthrow the U.S.

Government by force in any jurisdiction or any country; or conspiracy or attempt to commit offense

DENY DENY DENY

Sex crimes such as, but not limited to, rape, forcible sodomy, or sexual assault, or conspiracy or attempt to commit offense; Any sexual offense involving a minor or child, including child molestation, or child pornography;

or conspiracy or attempt to commit offense

DENY DENY DENY

Any type of identity fraud or inability to verify claimed identity DENY DENY DENY Crimes against a person such as, but not limited to, kidnapping, hostage taking, human trafficking, or human smuggling, or conspiracy or attempt to commit offense; hate crimes; child abuse involving serious bodily injury to a child or minor; mayhem or maiming

DENY DENY DENY

Importation, manufacture, distribution of, or possession with intent to distribute a controlled substance, or conspiracy or attempt to commit offense

DENY DENY DENY

Computer/cybercrimes such as improperly accessing (or introducing a virus or other contaminant) a computer, system, or network; modifying, damaging, using, disclosing, copying, or taking programs or data

DENY DENY DENY

Illegal Weapons charges, to include but not limited to, illegal owning or possessing; armed robbery or burglary; armed violent crimes

DENY DENY DENY

Crimes involving unlawful distribution, sale, use, possession, or manufacture of and explosive, explosive device, or firearm; or conspiracy or attempt to commit offense

DENY DENY DENY

Criminal homicide, murder, manslaughter, or negligent homicide DENY DENY DENY Any Felony Charge (except those specifically identified in table) DENY DENY ALLOW Any type of violent crime such as, but not limited to, assault and domestic abuse

DENY DENY ALLOW

Any type of threat or disruption to the public or disturbing the peace (terroristic threat, inciting a riot, etc.)

DENY DENY ALLOW

Any type of arson, vandalism, or willful destruction of property DENY DENY ALLOW Any type of extortion, bribery, or fraud to include “hot checks” DENY DENY ALLOW Any type of burglary, robbery, theft, larceny or conspiracy or attempt to commit offense

DENY DENY ALLOW

Any type of possession or distribution of stolen property DENY DENY ALLOW Illegal possession or use of a controlled substance DENY ALLOW ALLOW Operation of a motor vehicle while intoxicated by alcohol or drugs in any jurisdiction (1 conviction)

ALLOW ALLOW ALLOW

3 or more offenses for any crime (excluding minor traffic violations) DENY DENY ALLOW

LEGEND/NOTES

DENY Individual(s) are not cleared to work on USACE property under any circumstance ALLOW Individuals MAY be cleared to work on USACE property pending final approval through SWL-

DSO.

Individual must be finished through legal processes of being charged with a crime and will be required to provide documentation if record suggests otherwise.

5. IWATCH/ Corps Watch Suspicious Activity Reporting. This section must be provided to all CSEs.

a. Security is simply EVERYONE’s responsibility. We owe it to our organization, our families, and ourselves to constantly be vigilant about what goes on around us. Trust your instincts. We rely on our senses every day of our lives. If a behavior or activity makes you feel uncomfortable, report it. If it doesn’t look, sound, or smell right, report it. The simple rule is, “If you see something, say something!”

b. If you see something suspicious, provided below is the type of information to report:

(1) What you witnessed (the suspicious activity) including the date, time, and location.

(2) Description of who was involved

(3) Gender of person(s) involved

(4) Height, build, hair/skin color, and approx. age of person(s) involved

(5) Language spoken (if known)

(6) Vehicle description/ license number (if known)

(7) Have you seen this activity before?

c. How to report:

(1) In an emergency- call 911

(2) Notify your immediate supervisor and COR

1.6.9.2 Key Control:

The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas.

The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.

1.6.9.2.1 In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying.

When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

1.6.9.2.2 The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.

1.6.9.3 Physical Security:

The Contractor shall take special care to protect Government Property including buildings, grounds, roads, and any other surfaces from materials not intended. Return areas damaged as a result of work under this contract to their original condition, to include painting, refinishing, or replacement, as necessary. The Contractor shall report all damages of Government property on the quality control program report. Contractor shall be liable for any and all damages or losses, public or private, caused through fault or negligence of his agents and/or employees.

1.6.9.4 Lock Combinations:

The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s Quality Control Plan.

1.6.10 Post Award Conference/Periodic Progress Meetings:

The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The Contracting Officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.6.11 Contracting Officer Representative (COR):

The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract:

perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.12 Special Qualifications:

A copy of all licenses required by state and federal regulations shall be submitted to the COR within 2 weeks of award of the contract, and within 5 working days when changes are made thereafter. Only properly trained and qualified personnel shall be used in the performance of this contract, they shall have the education, experience or knowledge as evidenced by license, certificate, diploma, etc., to provide a comprehensive understanding of the systems, components, equipment, and facilities to be serviced, operated, maintained, repaired, renovated and constructed under this contract. All employees shall be subject to such Government regulations as are applicable during the time spent performing work under this contract. The Contractor shall maintain a file containing the qualifications, certification, diplomas and/or licenses of all personnel (including subcontractor personnel). These files shall be submitted to the COR and will be used as part of the basis for determining the qualifications of personnel. In the event the Contractor does not have a qualified employee to perform the specific work, the Contractor will be required to immediately provide qualified personnel or to subcontract the work to a specialist familiar with the type of work to be accomplished.

1.6.13 Key Personnel:

The follow personnel are considered key personnel by the government: The contractor shall provide a contract manager who shall be responsible for the performance of the work.

The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 7:30 a.m. to 4:00p.m, Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons. This individual may also serve as a Quality Control Inspector and be a working member of a crew, provided that job performance in each category is maintained at an acceptable level to the COR. For the purpose of this contract, it is intended that these shall be administrative positions whose responsibility is to ensure compliance with contract specifications. The Contract Manager and Quality Control Inspector shall be required to have a copy of the contract in their possession at all times for referral concerning questions of Contractor responsibility.

1.6.14 Daily Communication:

The Contractor must communicate daily with the designated Government representative assigned to this contract between the hours of 8:00 and 9:00 a.m. Monday through Friday, excluding Federal Holidays while work is being performed. Communications shall cover work accomplished, on-going work and issuance of new work orders and/or delivery orders. Daily communication is extremely important and must be either by telephone or E-mail, although in person visits may be required in order to exchange or discuss paperwork associated with the performance of this contract.

1.6.15 Identification of Contractor Employees:

All contract personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed. The Contractor shall provide ball caps/hats or shirts with the company name or logo to be worn by all employees and subcontractors while working on Government property.

1.6.16 Conduct:

All individuals involved in operations shall not be under the influence of drugs or alcoholic beverages. The Contractor shall, at all times, be responsible for the conduct and discipline of his/her employees and all subcontractors and their employees. Contractor personnel shall present a neat appearance and shall conduct themselves in a proper manner at all times during the performance of this contract. All individuals involved in services shall be dressed neatly and fully to include shoes (safety toed shoes, as required), pants, shirt with sleeves that shall be closed or buttoned. Personal Protective Equipment shall fully comply with the current edition of EM-385-1-1 at the time of award. Since a significant portion of the work will be performed in the presence of the public, the conduct of all employees and/or subcontractors is critical and will be closely monitored. Contractors and/or their employees and/or subcontractors and their employees may be required to undergo a criminal background check prior to performing any work on Government Property and/or during the contract performance (at no additional expense to the Government). The background check must be coordinated with and approved by the Little Rock District Security Office.

1.6.17 Removal of Contractor's Employees:

The Contracting Officer may require the Contractor to immediately remove from the work site any employee who endangers persons or property, disrupts the project, or whose physical or mental condition would impair the employee's ability to satisfactorily perform the required work.

Notification to the Contractor will be verbal and in writing if time and circumstances permit.

Otherwise, notification shall be verbal or by telephone, and shall be in writing as soon as possible. No such removal, however, shall reduce the Contractor’s obligation to perform all work required under this contract, and immediate replacement shall be made as required. This requirement shall not be the basis of any claim for compensation or damages against the Government.

1.6.18 Organizational Conflict of Interest:

Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.6.19 Environment and OSHA:

Comply with all Federal, state, and local environmental and occupational safety laws, rules, and regulations. Any apparent conflict between compliance with such Federal, State, or local laws, rules, and regulations and compliance with the requirements of the contract shall be immediately brought to the attention of the Contracting Officer or the COR for final resolution.

The Contractor shall notify the Contracting Officer or COR in writing in addition to any verbal notification of such conflicts. The Contractor shall be liable for all fines, penalties, and costs which result from violations of, or failure to comply with, all such Federal, State, or local laws, rules, and regulations. All unsafe acts or conditions fostered by the Contractor or Contractor personnel may be grounds for Contracting Officer or COR to halt any and all Contractor performance with a commensurate deduction of monies due the Contractor until such unsafe conditions are corrected. Take due caution not to endanger personnel during performance of this contract.

1.6.19.1 The contractor is responsible for using recycled content paper products and trash bags in order to comply with EPA designated products program. Additional information about EPA-designated products can be found at:

http://www3.epa.gov/epawaste/conserve/tools/cpg/products/

1.6.19.2 The contractor is responsible for meeting requirements set forth by the USDA Bio Preferred Program. Additional information about USDA BioPreferred Program can be found at:

http://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xht

1.6.19.3 The Contractor will be responsible for providing a list of chemicals, product labels, Material Safety Data Sheets (MSDS), Safety Data Sheets (SDS), and proposed application rates of all products proposed for use to the COR for review within two weeks of award of the contract. Changing conditions or other factors may result in the Contractor’s desire to use chemicals other than those previously submitted and approved by the COR. The use of other chemicals in combination with, or instead of those previously approved must be approved by the COR at least thirty (30) working days prior to their use. MSDS/SDS sheets shall be maintained according to OSHA standards 29 CFR 1910.

1.6.20 Safety Requirements:

The Contractor shall develop an Accident Prevention Plan in accordance with EM 385-1-1 Appendix A. The plan must be submitted and approved by the date of the post award conference meeting. In order to provide safety control for protection to the life and health of employees and other persons; for prevention of damage to property, materials, supplies, and equipment; and for avoidance of work interruptions in the performance of this contract, the Contractor shall comply with Occupational Safety and Health Act (OSHA) regulations and all pertinent provisions of the current edition of Safety and Health Requirements Manual, EM 385- 1-1.

1.6.20.1 If the Contractor fails or refuses to promptly comply with the safety requirements as specified herein, the COR may stop all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop shall be made subject to claim for extension of time or for excess costs or damages to the Contractor. Also, the Contractor will not be paid for work not performed as a result of work stoppage due to failure to comply with safety requirements.

http://www3.epa.gov/epawaste/conserve/tools/cpg/products/

1.6.20.2 The Contractor shall perform work requirements in a manner to protect buildings, vehicles and Government and public personal property from damage, and employees and project visitors from any harm or injury. Work shall be scheduled and completed to afford this protection.

1.6.20.3 The Contractor shall maintain an accurate record of, and shall report to the COR, all accidents within 24 hours of the occurrence. All serious accidents (those resulting in death or injury requiring medical attention) shall be reported to the COR immediately.

1.6.20.4 The Contractor shall immediately correct all safety deficiencies upon notification of the deficiencies by the Quality Assurance Representative, and shall notify the COR of the corrective action to be taken. Such notice when delivered to the Contractor or his representative at the site of work shall be deemed sufficient for this purpose. The Government assumes no responsibility or duty to inspect. The Contractor is responsible for ensuring that the equipment is in a safe operating condition, that it is used in a safe manner, and that it is used in a safe environment and condition.

1.6.20.5 The Contractor shall have competent personnel trained and capable of dealing with minor personnel injuries. In addition to this, each crew of workers shall be provided with first aid kits complying with OSHA and other Federal and State requirements and a minimum of two crew members trained and certified in first aid and CPR to care for minor injuries normally sustained in the type of work required.

1.6.20.6 All work crews, office personnel, and the COR shall be provided with information pertaining to the Contractor’s arrangements for emergency medical treatment. This information shall include the following:

Local Hospital: Name Phone No.

Local Ambulance: Name Phone No.

Local Doctor: Name Phone No.

1.6.20.7 The Contractor shall survey the work areas for hazardous conditions. The Contractor shall flag, mark, or identify and report to the COR any hazardous areas that he/she discovers.

The Contractor shall determine and use alternate methods and equipment to perform work in these areas in a safe manner.

1.6.20.8 The Contractor shall conduct safety meetings with all personnel before each service and at a minimum of weekly intervals to discuss potential safety hazards, etc.

This is the start of the file's text. The full file is on GovTribe.