This is a Request for Proposals (RFP) issued by Ida Public School District in Michigan for the installation of Filter First fixture replacement systems across three school buildings. The project involves the removal of existing water fixtures or retrofitting and installation of new Elkay filter fixtures at Ida Elementary School, Ida Middle School, and Ida High School located in Ida, Michigan 48140. The scope includes removing and disposing of existing fixtures, installing new fixtures with necessary supply, sanitary, and vent piping, caulking, receiving and offloading fixtures, and cleanup. The RFP was issued on November 7, 2025, with a mandatory walk-through beginning at 11:00 a.m. EST on November 14, 2025, at the High School Office, where late arrivals will not be accepted. The deadline for written requests for clarifications is November 18, 2025, at 4:00 p.m. EST. Sealed bid proposals are due December 2, 2025, at 2:00 p.m. EST at Ida Public Schools, Central Office Conference Room, 3145 Prairie Street, Ida, Michigan 48140, with bid opening scheduled for 2:05 p.m. EST the same day. Work commencement is scheduled for after 3:00 p.m. on December 19, 2025, with final completion required by June 28, 2026. The School District reserves the right to modify the selection timeline as it determines necessary.

Pricing must be submitted on the Proposal Pricing Form provided, with separate bid amounts for each school building plus allowance and bond amounts. Bid security of five percent (5%) of the proposal amount is required in the form of a bid bond from a Treasury Surety licensed in Michigan or a certified check/money order made payable to Troy School District. Successful contractors with proposals of $50,000 or more must furnish Performance and Payment Bonds in the amount of 100% of the proposal. The project is subject to the Davis-Bacon Act, requiring prevailing wages and fringe benefits, with minimum rates ranging from $13.30 to $17.75 per hour for covered workers depending on Executive Order applicability and contract entry date. All contractors must submit sworn and notarized Familial Disclosure Affidavits and Iran Economic Sanctions Act Compliance Affidavits, and verification of debarment/suspension status. Prices quoted must be F.O.B. to Ida Public Schools and are not exempt from taxes. The project is funded through the State and Local Fiscal Recovery Funds (SLFRF) under the American Rescue Plan Act of 2021, with eligible use restricted to filtered bottle-filling stations meeting NSF/ANSI standards for lead reduction and particulate removal. Reimbursement requests must be submitted with invoices via email to EGLE-DWEHD-FilterFirst@michigan.gov with supporting documentation.

View the file

Other files

File Type Posted
Amended Ida Filter First RFP.pdf PDF
Ida Filter First RFP (3).pdf PDF
Ida Filter First RFP.pdf PDF
Amended Ida Filter First RFP (1).pdf PDF
Ida Filter First RFP (1).pdf PDF
Ida Filter First RFP (2).pdf PDF
Amended Ida Filter First RFP (2).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ida Public School District 3145 Prairie Street

Ida, MI 48140

REQUEST FOR PROPOSALS

For

Filter First Fixture Replacement Installation

Amended 11/13/25

Page | 2

I. OVERVIEW

1 .1 . PURPOSE

The purpose of the Request For Proposals ("RFP") is for Ida Public Schools (the "School District") to obtain proposals from qualified contractors to provide a comprehensive installation of the Ida Public Schools Filter First Fixture Replacement Installation (the "Work").

1 .2. SELECTION TIMELINE

NOTE: Throughout the remainder of this RFP, a prospective contractor is referred to as the "Contractor. "

The School District' s anticipated timeline for its selection process is:

Issuance of this RFP November 7, 2025.

REQUIRED Walk-through – begins promptly at 11:00 a.m. EST, November 14, 2025. Meet in the High School Office. Late arrivals will be turned away.

Deadline for written Requests For Clarifications 4 p. m. EST, November 18, 2025

DUE DATE FOR PROPOSALS 2:00 p.m. EST, December 2, 2025; late proposals will not be accepted.

BID OPENING 2:05 p.m. EST, December 2, 2025, Ida Public Schools, Central Office Conference Room, 3145 Prairie Street, Ida, MI 48140

Commencement of Work after 3:00 p.m. December 19, 2025

Final Completion of Work June 28, 2026

PLEASE NOTE: The School District reserves the right, in its sole and absolute discretion, to make modifications to the above selection timeline as it determines to be in its best interest.

II. SUBMISSION OF PROPOSALS

2.1. PROPOSAL SUBMISSION DEADLINE AND REQUIREMENTS

The Due Date for receipt of Proposals is:

December 2, 2025 at 2:00 p.m. EST (the “Due Date”)

2.1.1. Sealed bids should be clearly marked “Filter First” and submitted to Ida Public Schools, Attn: Superintendent’s Office, 3145 Prairie Street, Ida, MI 48140.

2.1.2. Late Proposals: Each Contractor is responsible for submission of its Proposal.

Proposals or Proposal revisions received after the Due Date will not be accepted or considered. The School District is not liable for any delivery or postal delays.

2.1.3. Returned Proposals: All Proposals received after Due Date will be unopened and made available to the respective Contractor for pick-up, at its sole cost and expense.

2.1.4. Signed Original Proposal: Each Proposal must be signed by an authorized

Page | 3 member of the Contractor’s firm. Each Proposal must be submitted on the Proposal Forms attached to this RFP.

2.1.5. Opening of Proposals: At the specified location and Due Date stated above, all submitted Proposals shall be publicly opened and read aloud Any interested parties may attend. No immediate decision will be rendered.

2.1.6. E-Mail Clarifications: The School District intends to communicate with Contractors via e-mail (e.g., RFP clarifications and addenda). Except for the delivery of the Proposal itself, references in this RFP to “written” form of communications include e-mail.

2.1.7. Additional Requests For Clarification: Prospective Contractors may request that the School District clarify information contained in this RFP. All such requests must be made in writing via email. The School District will attempt to provide a written response to all written Requests For Clarification within five

(5) business days after the receipt of such request. The School District will not respond to any Request For Clarification received after November 18, 2025 at 4:00 p.m. Requests For Clarification and inquiries must be made via e-mail. All requests for clarification must be directed to Cortney Galloro at galloro@idaschools.org and Greg Pello at pello@idaschools.org. (Subject Line:

Filter First Fixture Replacement Installation RFP Request For Clarification). No response will be made to any oral questions. All questions and answers will be posted on the School District’s website. It is each Contractor’s responsibility to check the School District’s website prior to RFP Due Date to ensure that it has received all of the information, including, but not limited to, all Addenda to this

RFP.

2.1.8. Restrictions On Communication: From the issue date of this RFP until a Contractor is selected and the selection announced, a prospective Contractor shall not communicate about subject of this RFP or a Contractor’s Proposal with the School District, its Board of Education, or any individual member, administrators, faculty, staff, students, employees, or its Construction Manager, if any, except for additional Requests For Clarification in accordance with Paragraph 2.1.7 above, or as otherwise required by applicable law.

2.1.9. Addenda to the RFP: If it becomes necessary to revise any part of this RFP, notice of the revision will be e-mailed to all parties that requested a copy of this RFP. All addenda will be issued through the School District’s website and all addenda shall become a part of this RFP. Each Contractor must in its Proposal, to avoid any miscommunication, acknowledge all addenda which it has received, but the failure of a Contractor to receive, or acknowledge receipt of, any addendum shall not relieve the Contractor of the responsibility for complying with the terms thereof.

2.1.10. RFP/Proposal Information Controlling: The School District intends that all Contractors shall have equal access to information relative to this RFP, and that this RFP contains adequate information. No information communicated, either verbally or in writing, to or from a Contractor shall be effective unless confirmed by written communication contained in an addendum to this RFP, a Request For Clarification or other written response thereto, or in the Proposal.

2.1.11. Finality of Decision: Any decision made by the School District, including the mailto:galloro@idaschools.org

Page | 4

Contractor selection, shall be final.

2.1.12. Reservation of Rights: The School District reserves the right, in its sole and absolute discretion (for this provision and all other provisions contained in this RFP), to accept or reject, in whole or in part, any or all Proposals with or without cause. The School District further reserves the right to waive any irregularity or informality in the RFP process or any Proposal, and the right to award the Contract to other than the Contractor(s) submitting the best financial Proposal (low bidder). The School District reserves the right to request additional information from any or all Contractors. The School District reserves the right to select one or more Contractors to perform the Work on behalf of the School District. In the event the Contractor’s Proposal is accepted by the School District and the Contractor asserts exceptions, special considerations or conditions after acceptance, the School District, in its sole and absolute discretion, reserves the right to reject the Proposal and award the Contract to another contractor.

2.1.13. Release of Claims: Each Contractor by submitting its Proposal releases the School District from any and all claims arising out of, and related to, this RFP process and selection of a Contractor.

2.1.14. Contractor Bears Proposal Costs: A recipient of this RFP is responsible for any and all costs and liabilities incurred by it or others acting on its behalf in preparing or submitting a Proposal, or otherwise responding to this RFP, or any negotiations incidental to its Proposal or this RFP.

2.1.15. Irrevocability of Proposals: All Proposals submitted shall not be withdrawn and shall be irrevocable for a minimum period of thirty (30) calendar days following the Due Date for receipt of Proposals set forth above.

2.1.16. Collusive Bidding: The Contractor certifies that its Proposal is made without any previous understanding, agreement, or connection with any person, firm or corporation making a Proposal for the same Work and is in all respects fair, without outside control, collusion, fraud, or otherwise illegal action.

2.2 PROPOSAL REQUIREMENTS AND FORMAT

This outlines the information that must be provided by each Contractor and the required format for its Proposal. Any Proposal not providing the required information, or not conforming to the format specified, may be disqualified on that basis. Please also refer to Sections 2.1, 4.1, and 4.2 of this RFP for additional Proposal requirements. Attached to this RFP is a form of contract under which the Work requested under this RFP shall be provided by the successful Contractor (the “Contract” and referred to throughout the Contract as the “Agreement”) (See also Section 3.1 of this RFP). The Contract contains many details relative to the Work requested by the School District, the terms and conditions under which the Work shall be provided by the Contractor, and should be reviewed carefully by each Contractor prior to submitting a Proposal.

Any exceptions to the terms and conditions contained in this RFP or the form of Contract attached to this RFP, or any other special considerations or conditions requested or required by the Contractor MUST be specifically enumerated by the Contractor and be submitted as part of its Proposal, together with an explanation as to the reason such terms and conditions of the RFP or form of Contract cannot be met by, or, in the Contractor’s opinion, are not applicable to, the Contractor.

Page | 5

The Contractor shall be required and expected to meet the specifications and requirements as set forth in this RFP and the form of Contract in their entirety, except to the extent exceptions or special considerations or conditions are expressly set forth in the Contractor’s Proposal and those exceptions or special considerations or conditions are expressly accepted by the School District. All Pricing factors must be clearly indicated in the Proposal Forms provided as part of Contractor’s Proposal.

Each Proposal must include, at a minimum, the following:

2.2.1 A detailed list setting forth any exceptions to this RFP and/or the Contract, or other special considerations or conditions of Contractor, including explanations of such exceptions or the reason such terms and conditions of the RFP or form of Contract cannot be met by, or on Contractor’s opinion are not applicable to, the Contractor.

2.2.2 References – Each Proposal must include detailed evidence that the Contractor is currently providing Work for other public school districts (preferred) or similar sized projects. The Contractor must provide this information, including contact names, addresses, phone numbers, and type and scope of work provided. This should include projects of similar size and scope as the School District.

2.2.3 Evidence of the Contractor’s ability to provide adequate insurance coverages as required by this RFP and the Contract to protect the interests of the Contractor and the School District.

2.2.4 Demonstrate that the Contractor understands and will comply with all regulatory laws, codes, and requirements of any Local, State, and Federal law that apply to the requirements and obligations under this RFP and the Contract.

2.2.5 A completed Proposal Pricing Form provided as ATTACHMENT A.

2.2.6 A completed Familial Disclosure Affidavit provided as ATTACHMENT B.

2.2.7 A completed Iran Economics Sanctions Act Form provided as ATTACHMENT C.

2.3 SPECIFICATIONS

Items listed below may vary depending on if new or ability to retrofit.

Ida Elementary School:

Main Hall – LZWSRK (retrofit or new) 22 Hall – LZWSRK (retrofit or new) Main Hall – LZWSRK (retrofit or new) 24 Hall – LZS8WSSP Side Hall – LZS8WSSP

Ida Middle School:

Main Hall – LZS8WSSP (2 single or 1 also in locker room) Back Hall – LZS8WSSP Locker Room – LZS8WSSP (not needed if 2 single in main hall)

Ida High School:

Main Hall - LZWSRK (retrofit or new)

Page | 6

Main Hall – LZS8WSSP Side Hall – LZS8WSSP Gym or Athletics Room – LZS8WSSP Weight Room – LZS8WSSP

ITEM IES

BLDG

IMS

BLDG

IHS

BLDG

Elkay

LZWSRK

3 or 0 1 or 0

Elkay

LZS8WSSP

2 or 4/5 3 4 or 5

Elkay

LKAV7051F

(new faucet)

3 1 3

Hose Bib

Z1341XL

EWF3000

Filter Kit

1 2 1

Quantities above may vary depending on if new or ability to retrofit.

A completed State of Michigan Assurances and Certificates as ATTACHMENT D.

Davis-Bacon Act Wage Rate Determination also see ATTACHMENT E.

2.4 BUILDING AND LOCATIONS IN IDA, MI 48140

1. Ida Elementary School (IES). Address: 7900 Ida Street

2. Ida Middle School (IMS). Address: 3143 Prairie Street

3. Ida High School (IHS). Address: 3145 Prairie Street

2.5 WORK SCOPE

Include but not limited to:

1. The existing fixture to be removed or retrofitted and the new fixture to be installed with the necessary trim.

2. Remove and dispose of the existing fixture off-site.

3. Installation of the new fixture including but not limited to all necessary supply, sanitary, and vent piping from the existing fixture removal.

4. Caulking of all new fixtures and all clean up.

Page | 7

5. Receiving and offloading all fixtures. The supplier will deliver the fixtures to the receiving area for each building. The contractor is to place each fixture in the building at a location designated by the District for storage.

6. The District will provide a location in the building for staging.

III. CONTRACTUAL OBLIGATIONS

3.1. FORM OF CONTRACT

3.1.1. Form of Contract: This is a Request For Proposals only. Proposals will be treated as offers to enter into the Contract (as defined above) with the School District.

The School District and successful Contractor shall memorialize their contractual relationship and obligations using ATTACHMENT A (Contractor Information and Bid). Any exceptions to the terms and conditions contained in the Contract, or any other special considerations or conditions requested or required by the Contractor relative to this RFP or the form of Contract shall be expressly/specifically enumerated by the Contractor and be submitted as part of its Proposal, together with an explanation as to the reason such terms and conditions cannot be met by, or, in the Contractor's opinion are not applicable to, the Contractor, provided however, that exceptions or special conditions of the Contractor will not be binding upon the School District unless those exceptions or special conditions are expressly accepted by the School District, and incorporated into the final Contract. Following the selection of the successful Contractor by the School District, the Contract will be finalized by the parties.

The below sections contain information relative to selected provisions of the Contract and/or the expectations of the School District relative to the provision of the Work.

3.1.1.1. Familial Disclosure Affidavit: All Contractors must provide familial disclosure in compliance with MCL 380.1267 and attach this information to its Proposal. The Proposal must be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the owner and/or any employee of the Contractor and any member of the School District’s Board of Education or the School District’s Superintendent. The School District will not accept a Proposal that doesn’t include this sworn and notarized disclosure statement. The Familial Disclosure Affidavit is attached to this RFP as

ATTACHMENT B.

3.1.1.2. Iran Economic Sanctions Act: In accordance with Michigan Public Act No. 517 of 2012, all Proposals must be accompanied by a sworn and notarized statement certifying that the Contractor is not an Iran Linked Business. The School District will not accept a Proposal that does not include this sworn and notarized statement. The Affidavit of Compliance

– Iran Economic Sanctions Act is attached to this RFP as

ATTACHMENT C.

3.1.1.3. Bid Security: Contractors must submit with its Proposal bid security in the form of a Bid Bond issued by a qualified surety or certified check/money order in an amount of five percent (5%) of the Proposal (“Bid Security”). Failure to include this Bid Security with the Contractor’s Proposal will result in the rejection of your Proposal. If a

Page | 8

Bid Bond is posted by a Contractor, it shall be from a Treasury Surety licensed to do business in the State of Michigan, and the attorney-in-fact who executes the Bid Bond on behalf of the Contractor shall attach a certified, current copy of its power of attorney. In the event a certified check/money order is submitted, it shall be made payable to “Troy School District.” The School District shall not be liable for any interest earned thereon. The Bid Security shall be forfeited as liquidated damages, and not as a penalty, if the Contractor withdraws its Proposal after the Due Date for submission of Proposals or, upon acceptance of its Proposal by the School District, the Contractor fails to execute the form of Contract acceptable to the School District, substantially evidencing and incorporating this RFP and its Proposal and fails to provide the required Performance Bond and/or Payment Bond, if any, and the required insurance certificates, within fifteen (15) days of an award of a Contract to the Contractor. Bid Bonds shall be duly executed by the Contractor, as principal and by a surety that is properly licensed and authorized to do business in the state in which the Work is to be performed. All sureties providing bonds for this Project must be listed in the latest version of the Department of Treasury’s Circular 570, entitled “Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies”, with the bond amount less than or equal to the underwriting limitation, and/or have an A.M. best rating of A- or better. Bid Security shall be returned to all non-successful Contractors within a reasonable time after the award of a Contract and execution of a Contract by the successful Contractor. The bid bond can be included with the proposal as submitted through Buildingconnected.com. If the bid security is a certified check/money order, this must be delivered to the following address:

3145 Prairie Street, Ida, MI 48140 prior to the bid due date and time.

3.1.1.4. Performance Bond: Successful Contractors whose Proposals are $50,000 or more will be required to furnish Performance and Payment Bonds, in a form satisfactory to the School District, in the amount of 100% of its Proposal by a Treasury-listed Surety licensed to do business in the State of Michigan, and the attorney-in-fact who executed the Performance and Payment Bonds on behalf of the Contractor shall attach a certified, current copy of its power of attorney. The cost of the Bonds shall be included in each Proposal.

3.1.1.5. Governing Law: The Contract shall be governed by and construed in accordance with the laws of the State of Michigan. The parties hereby agree to the exclusive jurisdiction and venue of courts sitting in Monroe County, Michigan.

3.1.1.6. General Indemnification: Contractor shall indemnify, defend and hold harmless the School District, its Board of Education, its Board Members, in their official and individual capacities, its administrators, employees, agents, contractors, successors and assignees, from and against any and all claims, counter claims, suits, debts, demands, actions, judgments, liens, costs, expenses, damages, injuries and liabilities, including actual attorney’s fees and actual expert witness fees arising out of or in

Page | 9 connection with Contractor’s performance of the Contract and/or from Contractor’s violation of any of the terms of the Contract, including, but not limited to: (i) the negligent acts or willful misconduct of the Contractor, its officers, directors, employees, successors, assignees, contractors and agents; (ii) any breach of the terms of the Contract by the Contractor, its officers, directors, employees, successors, assignees, contractors and agents; (iii) any violation or breach of any applicable Federal, State or local law, rule, regulation, ordinance, policy and/or licensing and permitting requirements applicable to the Contract; or (iv) any breach of any representation or warranty by the Contractor, its officers, directors, employees, successors, assignees, contractors and agents under the Contract. The Contractor shall notify the School District by certified mail, return receipt requested, immediately upon actual knowledge of any claim, suit, action, or proceeding for which Ida Public School District may be entitled to indemnification under the Contract.

This paragraph shall survive the expiration or earlier termination of the Contract.

3.1.1.7. Compliance With Laws: Contractor shall comply with any and all applicable federal, state, and local laws, rules, ordinances, policies, and regulations, including any licensing and permitting requirements, under the Contract. Contractor, including its personnel, employees, contractors, consultants, and agents shall be responsible for knowing the School District’s policies concerning appropriate behavior of persons in School District facilities and, on School District properties, including for example, the prohibitions of sexual harassment and smoking, and shall comply with all such policies. Contractor represents and warrants to the School District that it shall at all times be in compliance with any and all applicable federal and state laws, rules, ordinances, policies and regulations, and licensing and permitting requirement applicable to the Contract. Contractor shall indemnify, defend, and hold School District harmless from any liability from its failure to so comply.

3.1.1.8. Right to Terminate on Breach: Each party shall have, in addition to all other remedies available to it, the right to terminate the Contract immediately upon written notice to the other party that the other party has committed a material breach of any of its obligations herein and such material party has committed a material breach of any of its obligations herein and such material breach shall not have been cured or corrected within ten (10) days following written notice of the same. Furthermore, if the School District must regularly request that the Contractor cure breaches of the Contract, such circumstances shall be grounds for termination of the Contract for cause, even if each breach on its own would not be material.

3.1.1.8.1.Events Upon Termination: Upon termination of the Contract by either party for Breach or default of the other party, each party shall be entitled to exercise any other right, remedy or privilege which may be available to it under applicable law or proceed by appropriate court action to enforce the terms of the Contract or to recover damages for the breach of the Contract.

Page | 10

Upon termination of the Contract, the Contractor shall immediately provide the School District with any and all drawings and documentation regarding the Work. In the event of termination, title to all supplies, materials, equipment or products purchased by the Contractor for integration into the Work shall pass to the School District, and Contractor shall deliver possession of said supplies, materials, equipment or products to the School District at a location to be designated by the School District.

3.1.1.9. Pricing: Prices quoted are to be F.O.B. to Ida Public Schools. All purchases Prices shall be net; including transportation, insurance and delivery charges fully prepaid by the successful Contractor to destinations indicated in the Proposal.

3.1.1.10.Taxes: This project is NOT exempt from taxes.

3.1.1.11. Proposal Withdrawal: Contractors may withdraw its Proposals any time before the Due Date. Proposals may not be withdrawn for at least 30 days after the Due Date.

3.1.1.12. Competition: The name of a model, manufacturer, or brand in this RFP shall not be considered as exclusive of other brands. Brands and models specified in this RFP are preferred. The School District expects all supplies, materials, equipment, or products bid by a Contractor to meet or exceed the Specifications set forth in this RFP. Further, it is the School District’s intent that this RFP permit competition. Accordingly, the use of any patent, proprietary name, or manufacturer’s name is for demonstrative purposes only and is not intended to curtail competition.

Whenever any supplies, material, equipment, or products requested in this RFP are specified by patent, proprietary name or by the name of the manufacturer, unless stated differently, such specification shall be considered as if followed by the words “or comparable equivalent,” whether or not such words appear. The School District in its sole and absolute discretion, shall have the right to determine if the proposed equivalent products/brands submitted by the Contractor meet the Specifications contained in this RFP and possess equivalent and/or better qualities. It is the Contractor’s responsibility to notify the School District in writing if any Specifications or suggested comparable equivalent products/brands require clarification by the School District prior to the Due Date for Proposals. Any and all deviations from Specifications must be noted on the Proposal Form.

IV. PROPOSAL

4.1 PROPOSAL FORMS

Each Contractor shall submit its Proposal using the Proposal Pricing Form attached hereto as ATTACHMENT A, along with any other information required by this RFP or deem necessary and appropriate by the Contractor for evaluation of its Proposal.

Page | 11

4.2 PROPOSAL CHECKLIST

In addition to the Proposal Pricing Form and any information required under Section

4.1 above, please attach copies of the following documents to your Proposal:

4.2.1 Proposal Pricing Form and detailed list setting forth any exceptions to the RFP and/or Contract, or other special considerations or conditions of the Contractor, including explanations of such exceptions or the reason such terms and conditions of the RFP or form of Contract cannot be met by, or are not applicable to, the Contractor.

4.2.2 List of Contractor’s References (K-12 references preferred) with which Contractor has contracted to perform Work or services similar to the Work described herein. The Contractor must provide this information, including contact names, addresses, phone numbers, and type and scope of Work/services provided including the size of the array and date of installation.

4.2.3 Contractor’s Verification of addenda to the RFP, if any.

4.2.4 Evidence of the Contractor’s ability to provide adequate insurance coverages as required by this RFP and the Contract to protect the interests of the Contractor and the School District.

4.2.5 A completed Familial Disclosure Affidavit, which is attached hereto as

ATTACHMENT B.

4.2.6 A completed Iran Sanctions Act Affidavit of Compliance, which is attached hereto as ATTACHMENT C.

Page | 12

1. PROJECT SCOPE

The grant application, its appendices and the grant award constitute the entire Agreement between the State and the Grantee and may be modified only by written agreement between the State and the Grantee.

(A) The scope of this project is limited to the activities specified in the grant application and such activities as are authorized by the State under this Agreement. Any change in project scope requires prior written approval in accordance with Section 3, Changes, in this Agreement.

(B) By acceptance of the grant award, the Grantee commits to complete the project identified in the grant application within the time period allowed for in this Agreement and in accordance with the terms and conditions of this Agreement.

2. AGREEMENT PERIOD

Upon award by the State, the Agreement shall be effective from the Start Date until the End Date listed above. The State shall have no responsibility to provide funding to the Grantee for project work performed except between the Start Date and the End Date specified above. Expenditures made by the Grantee prior to the Start Date or after the End Date of this Agreement are not eligible for payment under this Agreement.

3. CHANGES

Any changes to this Agreement shall be requested by the Grantee or the State in writing and implemented only upon approval in writing by the State. The State reserves the right to deny requests for changes to the Agreement or to the appendices. No changes can be implemented without approval by the State.

4. GRANTEE DELIVERABLES AND REPORTING REQUIREMENTS

The Grantee shall submit deliverables and follow reporting requirements specified in the application and this Agreement.

The Grantee must complete and submit a final expenditure report (FER) in NexSys. The report shall be due 30 days after the completion of the project work, and no later than 30 days from the End Date of this Agreement.

5. GRANTEE RESPONSIBILITIES

(A) The Grantee agrees to abide by all applicable local, state, and federal laws, rules, ordinances, and regulations in the performance of this grant, including Uniform Guidance for Federal Awards

(2 CFR 200).

(B) All local, state, and federal permits, if required, are the responsibility of the Grantee. Award of this grant is not a guarantee of permit approval by the State.

(C) The Grantee shall be solely responsible to pay all applicable taxes and fees, if any, that arise from the Grantee's receipt or execution of this grant.

Page | 13

(D) The Grantee is responsible for the professional quality, technical accuracy, timely completion, and coordination of all designs, drawings, specifications, reports, and other services submitted to the State under this Agreement. The Grantee shall, without additional compensation, correct or revise any errors, omissions, or other deficiencies in drawings, designs, specifications, reports, or other services.

(E) The State's approval of drawings, designs, specifications, reports, and incidental work or materials furnished hereunder shall not in any way relieve the Grantee of responsibility for the technical adequacy of the work. The State's review, approval, acceptance, or payment for any of the services shall not be construed as a waiver of any rights under this Agreement or of any cause of action arising out of the performance of this Agreement.

(F) The Grantee acknowledges that it is a crime to knowingly and willingly file false information with the State for the purpose of obtaining this Agreement or any payment under the Agreement, and that any such filing may subject the Grantee, its agents, and/or employees to criminal and civil prosecution and/or termination of the grant.

6. USE OF MATERIAL

Unless otherwise specified in this Agreement, the Grantee may release information or material developed under this Agreement, provided it is acknowledged that the State funded all or a portion of its development.

The State, and federal awarding agency, if applicable, retains a royalty-free, nonexclusive and irrevocable right to reproduce, publish, and use in whole or in part, and authorize others to do so, any copyrightable material or research data submitted under this grant whether or not the material is copyrighted by the Grantee or another person. The Grantee will only submit materials that the State can use in accordance with this paragraph.

7. ASSIGNABILITY

The Grantee shall not assign this Agreement or assign or delegate any of its duties or obligations under this Agreement to any other party without the prior written consent of the State. The State does not assume responsibility regarding the contractual relationships between the Grantee and any subcontractor.

8. SUBCONTRACTS & SUBAWARDS

The State reserves the right to deny the use of any consultant, contractor, associate, or other personnel to perform any portion of the project. The Grantee is solely responsible for all contractual activities performed under this Agreement. Further, the State will consider the Grantee to be the sole point of contact with regard to contractual matters, including payment of any and all charges resulting from the anticipated Grant. All subcontractors used by the Grantee in performing the project shall be subject to the provisions of this Agreement and shall be qualified to perform the duties required.

No subawards are allowed under this Agreement.

9. NON-DISCRIMINATION

The Grantee shall comply with the Elliott Larsen Civil Rights Act, 1976 PA 453, as

Page | 14 amended, MCL 37.2101 et seq., the Persons with Disabilities Civil Rights Act, 1976 PA 220, as amended, MCL 37.1101 et seq., and all other federal, state, and local fair employment practices and equal opportunity laws and covenants that it shall not discriminate against any employee or applicant for employment, to be employed in the performance of this Agreement, with respect to his or her hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment, because of his or her race, religion, color, national origin, age, sex, height, weight, marital status, or physical or mental disability that is unrelated to the individual's ability to perform the duties of a particular job or position. The Grantee agrees to include in every subcontract entered into for the performance of this Agreement this covenant not to discriminate in employment. A breach of this covenant is a material breach of this Agreement.

10. UNFAIR LABOR PRACTICES

The Grantee shall comply with the Employers Engaging in Unfair Labor Practices Act, 1980 PA 278, as amended, MCL 423.321 et seq.

11. LIABILITY

(A) The Grantee, not the State, is responsible for all liabilities as a result of claims, judgments, or costs arising out of activities to be carried out by the Grantee under this Agreement, if the liability is caused by the Grantee, or any employee or agent of the Grantee acting within the scope of their employment or agency.

(B) Nothing in this Agreement should be construed as a waiver of any governmental immunity by the Grantee, the State, its agencies, or their employees as provided by statute or court decisions.

12. CONFLICT OF INTEREST

No government employee, or member of the legislative, judicial, or executive branches, or member of the Grantee's Board of Directors, its employees, partner agencies, or their families shall benefit financially from any part of this Agreement.

13. ANTI-LOBBYING

If all or a portion of this Agreement is funded with federal funds, then in accordance with 2 CFR 200, as appropriate, the Grantee shall comply with the Anti-Lobbying Act, which prohibits the use of all project funds regardless of source, to engage in lobbying the state or federal government or in litigation against the State. Further, the Grantee shall require that the language of this assurance be included in the award documents of all subawards at all tiers.

If all or a portion of this Agreement is funded with state funds, then the Grantee shall not use any of the grant funds awarded in this Agreement for the purpose of lobbying as defined in the State of Michigan's lobbying statute, MCL 4.415(2).

'"Lobbying' means communicating directly with an official of the executive branch of state government or an official in the legislative branch of state government for

Page | 15 the purpose of influencing legislative or administrative action." The Grantee shall not use any of the grant funds awarded in this Agreement for the purpose of litigation against the State. Further, the Grantee shall require that language of this assurance be included in the award documents of all subawards at all tiers.

14. DEBARMENT AND SUSPENSION

Each eligible applicant must obtain a Unique Entity Identifier (UEI) and maintain an active registration with the Federal System for Award Management (SAM). The SAM website is:

https://www.sam.gov/SAM.

By signing this Agreement, the Grantee certifies that it has checked the federal debarment/suspension list at www.SAM.gov to verify that its agents, and its subcontractors:

● Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any federal department or the state.

● Have not within a three-year period preceding this Agreement been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (federal, state, or local) transaction or contract under a public transaction, as defined in 45 CFR 1185;

violation of federal or state antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property.

● Are not presently indicted or otherwise criminally or civilly charged by a government entity (federal, state, or local) with commission of any of the offenses enumerated in subsection (2).

● Have not within a three-year period preceding this Agreement had one or more public transactions (federal, state, or local) terminated for cause or default.

● Will comply with all applicable requirements of all other state or federal laws, executive orders, regulations, and policies governing this program.

15. AUDIT AND ACCESS TO RECORDS

Federal Audit Requirements

● (2 CFR 200.501) Audit required. A non-federal entity that expends $750,000 or more during the non-Federal entity's fiscal year in Federal awards must have a single or program specific audit conducted for that year in accordance with the provisions of this part

● (2 CFR 200.508) Auditee requirements:

1. Procure or otherwise arrange for the audit, if required.

2. Prepare appropriate financial statements, including the schedule of expenditures of Federal awards.

3. Promptly follow up and take corrective action on the audit findings.

4. Provide the auditor with access to personnel, accounts, books, records, supporting documentation, and other information as needed for the auditor to perform the audit.

http://www.sam.gov/SAM http://www.sam.gov/SAM http://www.sam.gov/SAM http://www.sam.gov/SAM http://www.sam.gov/ http://www.sam.gov/

Page | 16

The State reserves the right to conduct a programmatic and financial audit of the project, and the State may withhold payment until the audit is satisfactorily completed. The Grantee will be required to maintain all pertinent records and evidence pertaining to this Agreement, including grant and any required matching funds, in accordance with generally accepted accounting principles and other procedures specified by the State. The State or any of its duly authorized representatives must have access, upon reasonable notice, to such books, records, documents, and other evidence for the purpose of inspection, audit, and copying. The Grantee will provide proper facilities for such access and inspection. All records must be maintained through December 31, 2031.

Random post audits that determine non-compliance of the requirements of this grant will require full repayment

16. INSURANCE

(A) The Grantee must maintain insurance or self-insurance that will protect it from claims that may arise from the Grantee's actions under this Agreement.

(B) The Grantee must comply with applicable workers' compensation laws while engaging in activities authorized under this Agreement.

17. OTHER SOURCES OF FUNDING

The Grantee guarantees that any claims for reimbursement made to the State under this Agreement must not be financed by any source other than the State under the terms of this Agreement. If funding is received through any other source, the Grantee agrees to delete from Grantee's billings, or to immediately refund to the State, the total amount representing such duplication of funding.

18. COMPENSATION

(A) A breakdown of costs allowed under this Agreement is identified in the grant application and award. The State will pay the Grantee a total amount not to exceed the grant award, and only for expenses incurred and paid. All other costs necessary to complete the project are the sole responsibility of the Grantee.

(B) Expenses incurred by the Grantee prior to the Start Date or after the End Date of this Agreement are not allowed under the Agreement.

(C) The State will approve payment requests after approval of reports and related documentation as required under this Agreement.

(D) The State reserves the right to request additional information necessary to substantiate payment requests.

(E) Payments under this Agreement may be processed by Electronic Funds Transfer (EFT). The Grantee may register to receive payments by EFT at the SIGMA Vendor Self Service web site (https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService).

https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService

Page | 17

19. CLOSEOUT

(A) A determination of project completion, which may include a site inspection and an audit, shall be made by the State after the Grantee has met any match obligations, satisfactorily completed the activities, and provided products and deliverables described in the grant award.

(B) Upon issuance of final payment from the State, the Grantee releases the State of all claims against the State arising under this Agreement. Unless otherwise provided in this Agreement or by State law, final payment under this Agreement shall not constitute a waiver of the State's claims against the Grantee.

(C) The Grantee shall immediately refund to the State any payments in excess of the costs allowed by this Agreement.

(D) Any funds received under the authorizing legislation for this program expended by the eligible applicant in a manner that does not adhere to the American Rescue Plan 117-2 or Uniform Guidance 2 CFR 200, as applicable, shall be returned to the state. If it is determined that an eligible applicant receiving funds under this act expends any funds under this act for a purpose that is not consistent with the requirements of the American Rescue Plan, Public Law 117-2, or Uniform Guidance 2 CFR 200, the state budget director is authorized to withhold payment of state funds, in part or in whole, payable from any state appropriation.

20. CANCELLATION

This Agreement may be canceled by the State, upon 30 days written notice, due to Executive Order, budgetary reduction, other lack of funding, upon request by the Grantee, or upon mutual agreement by the State and Grantee. The State may honor requests for just and equitable compensation to the Grantee for all satisfactory and eligible work completed under this Agreement up until 30 days after written notice, upon which time all outstanding reports and documents are due to the State and the State will no longer be liable to pay the grantee for any further charges to the grant.

21. TERMINATION

(A) This Agreement may be terminated by the State as follows.

(1) Upon 30 days written notice to the Grantee:

If the Grantee fails to comply with the terms and conditions of the Agreement, or with the requirements of the authorizing legislation cited on page 2, or the rules promulgated thereunder, or other applicable law or rules.

1. If the Grantee knowingly and willingly presents false information to the State or the purpose of obtaining this Agreement or any payment under this Agreement.

2. If the State finds that the Grantee, or any of the Grantee's agents or representatives, offered or gave gratuities, favors, or gifts of monetary value to any official, employee, or agent of the State in an attempt to secure a subcontract or favorable treatment in

Page | 18 awarding, amending, or making any determinations related to the performance of this Agreement.

3. If the Grantee or any subcontractor, manufacturer, or supplier of the Grantee appears in the register of persons engaging in unfair labor practices that is compiled by the Michigan Department of Licensing and Regulatory Affairs or its successor.

4. During the 30-day written notice period, the State shall withhold payment for any findings under subparagraphs a through d, above and the Grantee will immediately cease charging to the grant and stop earning match for the project (if applicable).

(2) Immediately and without further liability to the State if the Grantee, or any agent of the Grantee, or any agent of any subcontract is:

1. Convicted of a criminal offense incident to the application for or performance of a State, public, or private contract or subcontract.

2. Convicted of a criminal offense, including but not limited to any of the following: embezzlement, theft, forgery, bribery, falsification or destruction of records, receiving stolen property, or attempting to influence a public employee to breach the ethical conduct standards for State of Michigan employees.

3. Convicted under State or federal antitrust statutes; or

4. Convicted of any other criminal offense that, in the sole discretion of the State, reflects on the Grantee's business integrity.

5. Added to the federal or state Suspension and Debarment list.

(B) If a grant is terminated, the State reserves the right to require the Grantee to repay all or a portion of funds received under this Agreement.

22. IRAN SANCTIONS ACT

By signing this Agreement, the Grantee is certifying that it is not an Iran linked business, and that its contractors are not Iran linked businesses, as defined in MCL 129.312.

23. PROTECTED PERSONALLY IDENTIFIABLE INFORMATION (PII) and THE

PRIVACY ACT

In accordance with the Uniform Guidance (including but not limited to, sections §200.303 and §200.338) and the Privacy Act of 1974 (5 U.S.C. § 552a), the recipient is required to take reasonable measures to safeguard protected personally identifiable information and other information the US Department of Treasury or State of Michigan designates as sensitive or the recipient considers sensitive consistent with applicable Federal, State, local, and tribal laws regarding privacy and responsibility over confidentiality.

Page | 19

24. STATUTORY CATEGORIES FOR USE OF FISCAL RECOVERY FUND (FRF)

The four statutory categories for use of FRF funds are included below as outlined in the guidance. The program design has been approved to ensure that the program meets one of the requirements below. The Project-Specific Requirements section provides additional details on eligible uses to ensure it aligns with Treasury's guidance.

(1) To respond to the COVID-19 public health emergency or its negative economic impacts

(2) To respond to workers performing essential work during the COVID-19 public health emergency by providing premium pay to such eligible workers of the recipient, or by providing grants to eligible employers that have eligible workers who performed essential work

(3) For the provision of government services, to the extent of the reduction in revenue of such recipient due to the COVID-19 public health emergency, relative to revenues collected in the most recent full fiscal year of the recipient prior to the emergency

(4) To make necessary investments in water, sewer, or broadband infrastructure

Treasury's Final Rule details compliance responsibilities and provides additional information on eligible and restricted uses of SLFRF award funds and reporting requirements. Your organization should review and comply with the information contained in Treasury's Interim Final Rule, and any subsequent final rule when building appropriate controls for SLFRF award funds.

25. PUBLICATIONS

Any publications produced with funds from this award must display the following language:

"This project was supported, in whole or in part, by federal award number SLFRP0127 awarded to The State of Michigan by the U.S. Department of the Treasury."

26. PREVAILING WAGE and LABOR AGREEMENT

This project is subject to the Davis-Bacon Act, 40 USC 276a, et seq, which requires that prevailing wages and fringe benefits be paid to contractors and subcontractors performing on federally funded projects over $2,000 for the construction, alteration, repair (including painting and decorating) of public buildings or works.

Grantee must provide either

● a certificate for a project labor agreement, meaning a pre-hire collective bargaining agreement consistent with section 8(f) of the National Labor Relations Act (29 U.S.C. 158(f))

● or provide a project workforce continuity plan, detailing:

1. How the recipient will ensure the project has ready access to a sufficient supply of appropriately skilled and unskilled labor to ensure high-quality construction throughout the life of the project, including a description of any required professional certifications and/or in-house training;

2. How the recipient will minimize risks of labor disputes and disruptions that would jeopardize timeliness and cost-effectiveness of the project;

3. How the recipient will provide a safe and healthy workplace that avoids delays and

Page | 20 costs associated with workplace illnesses, injuries, and fatalities, including descriptions of safety training, certification, and/or licensure requirements for all relevant workers (e.g., OSHA 10, OSHA 30);

4. Whether workers on the project will receive wages and benefits that will secure an appropriately skilled workforce in the context of the local or regional labor market;

and

□Yes □No

5. Whether the project has completed a project labor agreement.

□Yes □No

FEDERALLY FUNDED PROGRAM-SPECIFIC REQUIREMENTS

Funds were added under sections 602 and 603 of section 9901 of the Social Security Act of section 9901 of Public Law No. 117-2, known as American Rescue Plan Act of 2021 ("ARPA"), signed into law on March 11, 2021 https://home.treasury.gov/policy issues/coronavirus/assistance-for-state-local-and-tribal-governments/state-and-local fiscal-recovery-funds as the Coronavirus State and Local Fiscal Recovery Funds ("FRF"). The State of Michigan was awarded $6.54 billion dollars under the Fiscal Recovery Fund, on May 13, 2021.

OMB Uniform Guidance for Non-federal Agencies Receiving These Funds

The U.S. Department of Treasury has indicated in the Coronavirus State and Local Fiscal Recovery Fund Frequently Asked Questions that are accessible at U.S. Department of Treasury State and Local Fiscal Recovery Funds, located at https://home.treasury.gov/system/files/136/SLFRF-Final- Rule-FAQ.pdf, that the SLFRF awards are generally subject to the requirements set forth in the Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, 2 CRF Part 200 (the "Uniform Guidance"). All reimbursements requested under this program should be accounted for with supporting documentation. Eligible applicants should maintain documentation evidencing that the funds were expended in accordance with federal, state, and local regulations.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .