This document is an Amended Exhibit B Cost Sheet for a University of Wisconsin-Milwaukee (UWM) procurement involving signage installation services. The cost sheet represents a bidding structure where vendors must submit pricing for at least one of two available options, with UWM awarding the contract based on the lowest total extended cost between the options.

The procurement covers two signs (Sign A and Sign B) with two distinct configuration options. Option 1 requires pricing for both signs but shows "No Bid" entries, while Option 2 shows Sign A priced at $9,995.00 and Sign B at $13,350.00, totaling $23,345.00. All bid prices must be fully inclusive of comprehensive costs including mounting hardware, connecting materials, insurance, packing, parking, materials, tools, equipment, permits, freight, drawings, installation, operation manuals, supervision, setup, instruction, labor, and any other applicable fees. UWM explicitly states no additional charges beyond those listed in the exhibit will be paid, establishing a firm fixed-price structure for the signage procurement.

View the file

Other files

File Type Posted
Amendment 2 (Final) Bid Document- Lemberg.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Qty Sign Price to UWM in $

1 A No Bid

B

(Option 1) No Bid

1 A 9,995.00$

B

(Option 2) 13,350.00$

23,345.00$ Option 2

Total Extended Cost

Sign A and B (Option 1)

Sign A and B (Option 2)

Option 1 Total Extended Cost

Amended Exhibit B Cost Sheet Directions: Please fill in the cost sheet for the "blue" cell for Sign A. Next, fill in the cost sheet for Sign B for the "green" cells. You must bid on at least one option for Sign B to be considered for an award. You may want to bid on both options, as UWM will award the bid based on the lowest Total Extended Cost for Option 1 or Option 2.

Bid prices must be fully inclusive of all costs and fees such as but not limited to all necessary mounting hardware, connecting materials, insurance, packing, parking, materials, tools, equipment, permits (as required), freight, drawings, installation, operation manuals, supervision, set up, instruction, labor, and any other applicable costs and fees UWM will not pay any additional charges that are not listed in this Exhibit.

File details come from the government source that posted it. Updated .