Amend #1 Champion Mill Stabilization Project (Revised).pdf
PDF 58 KB Posted
- Solicitation number
- IFB1 PKAA 2017000297 3
- Issued by
- Kit Carson County, Denver City, Colorado
About this file
This is Amendment No. 1 to the Invitation for Bid issued by the State of Colorado, Division of Reclamation, Mining & Safety for the Champion Mill Stabilization Project (Revised), identified as project number 2017-0297. The amendment clarifies specifications for roof decking fastening and introduces a new bid item for concrete pier installation. The project involves stabilization work on a historic mill structure, including tasks such as stabilizing the upper shed, support trusses and posts, north wall of the lower shed, masonry wall bracing, and repair or replacement of rafters, purlins, roof decking, and metal roofing. Roof decking work totals 5,550 square feet, metal roofing replacement totals 6,660 square feet, and rafter and purlin repair spans 550 linear feet. A pre-bid meeting was held prior to this amendment's issuance on June 29, 2017. The bid submission deadline is 4:00 p.m. on Wednesday, July 12, 2017, and bidders must acknowledge receipt and acceptance of the amendment and submit the revised bid schedule.
The revised bid schedule includes nine base line items with unit pricing requirements and four additional non-guaranteed bid items. Item 14.0, the newly added concrete pier installation task, allows for up to ten concrete piers to be installed as directed by the project manager, with piers measuring twelve inches across both axes and poured to a depth of twenty-four inches, reinforced with #3 rebar cages, and designed to achieve a minimum strength of 3,500 psi. Contractors must submit bids on all line items including lump sum mobilization and demobilization costs, a Project Safety, Health & Environmental Action Plan, and hourly rates for helicopter services and three-person work crews. Payment for concrete piers will be made on a per-unit basis upon completion and project manager approval, with all costs for labor, materials, equipment, and incidentals included in the unit price bid. The bid schedule requires all pages to be returned with all line items completed and no amendments to the schedule itself.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us John W. Hickenlooper, Governor | Robert Randall, Executive Director | Virginia Brannon, Director
DATE: June 29, 2017
TO: All Bidders on the Champion Mill Stabilization Project (Revised)
FROM: Craig Bissonnette, Division of Reclamation, Mining & Safety
RE: Amendment No. 1 to 2017-0297
Thank you for your attendance at the Pre-Bid Meeting. The following clarifications and amendments should be noted and incorporated into the bid documents:
1. Item 8.0: Roof decking will be fastened using 16d/penny common nails (3½ inches).
2. A new Additional Bid Item has been added to the project. This Item is not guaranteed.
Item 14.0: Install Concrete Piers CONTRACTOR shall install concrete piers as needed or directed by the PROJECT MANAGER. Concrete piers may be round or square, but must measure twelve (12) inches across both axes and will be poured to a depth of twenty-four (24) inches. If competent bedrock is encountered prior to this depth, further excavation is not required.
A #3 rebar (3/8 inch) cage consisting of top and bottom horizontal bars (square or round) connected by four (4) vertical bars will be fabricated for additional strength. Rebar cage must have a minimum coverage of three (3) inches on all edges. The concrete mix shall be designed to produce a minimum strength of 3,500 psi. Up to ten (10) concrete piers may be required for this task. Concrete testing is not required.
Measurement and Payment Payment for this task will be made at the unit price established in Item 14.0 of the Bid Schedule. Measurement for payment will be made for each concrete pier constructed.
The price bid shall include all costs for labor, materials, equipment and all other items necessary and incidental to complete the tasks as described in Item 14.0. Payment will be made upon completion of the described task and approval by the PROJECT MANAGER.
The bid submittal for this project is no later than 4:00 p.m. on Wednesday, July 12, 2017.
Please use the REVISED Bid Schedule included with this amendment when submitting your bid.
All terms and conditions of the Invitation for Bid other than as changed by this amendment remain the same.
Receipt and acceptance of this amendment shall be acknowledged on the bid form and by submitting the REVISED Bid Schedule.
http://mining.state.co.us/
Champion Mill Stabilization Project (Revised) REVISED Bid Schedule
June 29, 2017 2017 - 0297
ITEM DESCRIPTION QTY UNIT UNIT PRICE AMOUNT
1.0 Mobilization/Demobilization 1
Lump Sum N/A $
2.0 Project Safety, Health & Environmental Action Plan (SHEAP) 1
Lump Sum N/A $
3.0 Stabilize Upper Shed 1
Lump Sum N/A $
4.0 Stabilize Support Trusses & Posts 1
Lump Sum N/A $
5.0 Stabilize North Wall of Lower Shed 1
Lump Sum N/A $
6.0 Brace Masonry Wall 1
Lump Sum N/A $
7.0 Repair/Replace Rafters & Purlins 550
Linear Feet $ /LF $
8.0 Remove & Replace Roof Decking 5,550
Square
Feet $ /ft2 $
9.0 Replace Metal Roofing 6,660
Square
Feet $ /ft2 $
ADDITIONAL BID ITEMS – THESE BID ITEMS ARE NOT GUARANTEED
10.0 Helicopter Services 5 Hour $ /hr $
11.0 Provide Three Person Work Crew 8 Hour $ /hr $
12.0 Provide Add’l Construction Materials N/A N/A N/A $ 25,000.00
13.0 Previous Job Experience SUBMIT WITH BID N/A
14.0 Install Concrete Piers 10 Each $ $
TOTAL $
DO NOT AMEND ANY PART OF THIS BID SCHEDULE
ALL PAGES OF THIS BID SCHEDULE MUST BE RETURNED
ALL LINES ITEMS MUST BE COMPLETED
Page 1 of 1 Pages