This is a Project Manual and specifications document for Amberly Elementary School's Bid Package 2 (BP2): Early Foundation, issued by Tower Pinkster Titus Associates, Inc. (Architect) on behalf of Portage Public Schools, located in Portage, Michigan. The project manual details comprehensive construction specifications for early foundation work, including cast-in-place concrete and thermal insulation installation. Key specifications include cast-in-place concrete work for footings, foundation walls, slabs-on-grade, suspended slabs, and concrete toppings with minimum compressive strengths as indicated on drawings and maximum water-cement ratios ranging from 0.45 to 0.50. The document establishes requirements for concrete materials, including Portland cement (Type I or IL, with white Portland cement for stained concrete applications), fly ash (ASTM C 618, Class F), slag cement, normal-weight aggregates, air-entraining admixtures, and water-reducing admixtures. Reinforcement specifications call for ASTM A 615/A 615M Grade 60 deformed reinforcing bars and welded-wire reinforcement per ASTM A 1064/A 1064M. Thermal insulation requirements specify extruded polystyrene foam-plastic board insulation with varying compressive strengths depending on location: Type X (15-psi) for general locations, Type IV (25-psi) for foundations, Type VI (40-psi) for slabs subject to foot traffic, and Type VII (60-psi) for slabs subject to vehicle traffic, with a thermal resistivity of 5.0 degrees F per hour per square foot per Btu per inch at 75 degrees Fahrenheit.

The specifications mandate preinstallation meetings with the contractor's superintendent, independent testing agency, ready-mix concrete manufacturer, and concrete subcontractor before design mixtures are submitted. All concrete placement must comply with ACI 301, ACI 306.1 (cold-weather), and related standards, with provisions for slump limits, air content, and curing procedures varying by application. Formwork must achieve surface irregularities not exceeding 1/8 inch for smooth-formed exposed surfaces and 1/2 inch for rough-formed surfaces per ACI 117 tolerance limits. Field quality control requirements include comprehensive testing protocols: at least one composite sample per 100 cubic yards of concrete placed daily, slump testing per ASTM C 143/C 143M, air content testing per ASTM C 231/C 231M, compressive strength testing at 7 and 28 days with laboratory and field-cured specimens, and concrete temperature monitoring. The contractor must employ ACI-certified flatwork technicians and finishers, and ready-mix concrete manufacturers must be certified according to NRMCA standards. Concrete curing must continue for not less than seven days using moisture curing, moisture-retaining covers, or other approved methods, with specific requirements for surfaces receiving floor coverings or penetrating liquid treatments. Installation of thermal insulation requires extension at least 36 inches below exterior grade line with a minimum 3-inch thickness (R-15 value) unless otherwise indicated, with adhesive installation methods specified in accordance with manufacturer instructions.

View the file

Other files

File Type Posted
Amberly BP 2 Early Foundation Project Manual (1).pdf PDF
Amberly BP 2 Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Nurturing curiosity through design since 1953 • towerpinkster.com

©2026 Tower Pinkster Titus Associates, Inc.

AMBERLY ELEMENTARY SCHOOL

BP2: Early Foundation

PROJECT MANUAL

03/02/2026

OWNER:

Portage Public Schools Administration Building

8107 Mustang Drive Portage, MI 49024

PROJECT NUMBER:

Architect’s Project No. 21237.030

PROJECT NO. 21237.030

TABLE OF CONTENTS

AMBERLY ELEMENTARY SCHOOL 1

Portage Public Schools 03/02/2026

[Copyright] 2026 Tower Pinkster Titus Associates - All Rights Reserved

Refer to Construction Manager’s Project Manual issued by <Construction Manager> for additional procurement, contracting, and general requirements

DIVISION 00 — PROCUREMENT AND CONTRACTING REQUIREMENTS

00 2600 - PROCUREMENT SUBSTITUTION PROCEDURES

00 3100 - AVAILABLE PROJECT INFORMATION

00 4325 - SUBSTITUTION DURING PROCUREMENT REQUEST FORM

00 6324 - BIM TRANSFER WAIVER

00 6325 - SUBSTITUTION DURING CONSTRUCTION REQUEST FORM

DIVISION 01 — GENERAL REQUIREMENTS

01 2500 - SUBSTITUTION PROCEDURES

01 2600 - CONTRACT MODIFICATION PROCEDURES

01 3100 - PROJECT MANAGEMENT AND COORDINATION

01 3300 - SUBMITTAL PROCEDURES

01 4000 - QUALITY REQUIREMENTS

01 4200 - REFERENCES

01 4500 - QUALITY ASSURANCE STRUCTURAL TESTING AND INSPECTION

01 5639 - TEMPORARY TREE PLANT PROTECTION

01 6000 - PRODUCT REQUIREMENTS

01 7300 - EXECUTION

01 7700 - CLOSEOUT PROCEDURES

01 7823 - OPERATION AND MAINTENANCE DATA

01 7839 - PROJECT RECORD DOCUMENTS

01 7900 - DEMONSTRATION AND TRAINING

01 9113 - GENERAL COMMISSIONING REQUIREMENTS

DIVISION 02 — EXISTING CONDITIONS

02 4119X - (EXISTING BUILDING) SELECTIVE DEMOLITION…………………………………………………..BP1

DIVISION 03 — CONCRETE

03 3000 - CAST-IN-PLACE CONCRETE ….…………………………………………………………….…………..BP2

03 3000X - (EXISTING BUILDING) CAST-IN-PLACE CONCRETE……………………………….….…………..BP1

03 6000X - (EXISTING BUILDING) POST INSTALLED ANCHORS………………………………….…………..BP1

DIVISION 04 — MASONRY

04 2000X - (EXISTING BUILDING) UNIT MASONRY………………………………………………….…………..BP1

AMBERLY ELEMENTARY SCHOOL 2

DIVISION 05 — METALS

05 1200X - (EXISTING BUILDING) STRUCTURAL STEEL FRAMING……………………………….…………..BP1

05 2100X - (EXISTING BUILDING) STEEL JOIST FRAMING……………………………………...….…………..BP1

05 3100X - (EXISTING BUILDING) STEEL DECKING………………………………………………….…………..BP1

DIVISION 06 — WOOD, PLASTICS, AND COMPOSITES

06 1000X - (EXISTING BUILDING) ROUGH CARPENTRY…………………………………………….…………..BP1

DIVISION 07 — THERMAL AND MOISTURE PROTECTION

07 2100 - THERMAL INSULATION ………………………………….………………………………………………..BP2

07 2100X - (EXISTING BUILDING) THERMAL INSULATION………………………………………….…………..BP1

07 6200X - (EXISTING BUILDING) SHEET METAL FLASHING AND TRIM……………………………………..BP1

07 8443X - (EXISTING BUILDING) JOINT FIRESTOPPING………………………………….……………..……..BP1

07 9200X - (EXISTING BUILDING) JOINT SEALANTS………………………………….………………...………..BP1

DIVISION 08 — OPENINGS

08 1113X - (EXISTING BUILDING) HOLLOW METAL DOORS AND FRAMES……………………..…………..BP1

DIVISION 09 — FINISHES

09 2216X - (EXISTING BUILDING) NON-STRUCTURAL METAL FRAMING…………………….….…………..BP1

09 2900X - (EXISTING BUILDING) GYPSUM BOARD…………………………………...…………….…………..BP1

09 5113X - (EXISTING BUILDING) ACOUSTICAL PANEL CEILINGS………………………………….………..BP1

09 6500X - (EXISTING BUILDING) RESILIENT FLOORING……………………………………….….…………..BP1

09 6513X - (EXISTING BUILDING) RESILIENT BASE AND ACCESSORIES…………………………….……..BP1

09 9114X - (EXISTING BUILDING) EXTERIOR PAINTING…………………………………………….…………..BP1

09 9123X - (EXISTING BUILDING) INTERIOR PAINTING……………………………………….…….…………..BP1

DIVISION 22 — PLUMBING

22 0500X - (EXISTING BUILDING) COMMON WORK RESULTS FOR PLUMBING……………….…….……..BP1

22 0523X - (EXISTING BUILDING) GENERAL DUTY VALVES FOR PLUMBING PIPING……………………..BP1 22 0529X - (EXISTING BUILDING) HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIP…..BP1 22 0553X - (EXISTING BUILDING) IDENTIFICATION FOR PLUMBING PIPING AND EQUIP...….…………..BP1

22 0700X - (EXISTING BUILDING) PLUMBING INSULATION………………………………..……….…………..BP1

22 1113 - FACILITY WATER DISTRIBUTION PIPING …………………………………………...…….…………..BP1

22 1116X - (EXISTING BUILDING) DOMESTIC WATER PIPING………………….………………….…………..BP1

22 1313 - FACILITY SANITARY SEWERS …………………………………………………………………………..BP1

22 1316X - (EXISTING BUILDING) SANITARY WASTE AND VENT PIPING………………………..…………..BP1 22 1319X - (EXISTING BUILDING) SANITARY WASTE PIPING SPECIALTIES…………………….…………..BP1

22 1413X - (EXISTING BUILDING) FACILITY STORM DRAINAGE PIPING……………………………………..BP1

22 1423X - (EXISTING BUILDING) STORM DRAINAGE PIPING SPECIALTIES…………………....…………..BP1

AMBERLY ELEMENTARY SCHOOL 3

DIVISION 23 — HEATING VENTILATING AND AIR CONDITIONING

23 0500X - (EXISTING BUILDING) COMMON WORK RESULTS FOR HVAC……………………….…………..BP1

23 0523X - (EXISTING BUILDING) GENERAL DUTY VALVES FOR HVAC PIPING…………….…….………..BP1 23 0529X - (EXISTING BUILDING) HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT….BP1 23 0593X - (EXISTING BUILDING) TESTING, ADJUSTING, AND BALANCING FOR HVAC…………………..BP1

23 0700X - (EXISTING BUILDING) HVAC INSULATION…………….……………………………………….……..BP1

23 0900X - (EXISTING BUILDING) INSTRUMENTATION AND CONTROL FOR HVAC…………….…...……..BP1

23 2113X - (EXISTING BUILDING) HYDRONIC PIPING…………….…………………………………….………..BP1

23 8223X - (EXISTING BUILDING) UNIT VENTILATORS…………….……………………………………...……..BP1

DIVISION 26 — ELECTRICAL

26 0500X - (EXISTING BUILDING) COMMON WORK RESULTS FOR ELECTRICAL…………...….…………..BP1 26 0519X - (EXISTING BUILDING) LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES..BP1 26 0526X - (EXISTING BUILDING) GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS……….…..BP1 26 0529X - (EXISTING BUILDING) HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS………...…..BP1 26 0533X - (EXISTING BUILDING) RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS………………..BP1 26 0553X - (EXISTING BUILDING) IDENTIFICATION FOR ELECTRICAL SYSTEMS…………..….…………..BP1

26 2726X - (EXISTING BUILDING) WIRING DEVICES…………….………………………………………………..BP1

26 5100X - (EXISTING BUILDING) INTERIOR LIGHTING…………….……………………………………..……..BP1

DIVISION 31 — EARTHWORK

31 1000 - SITE CLEARING …………….……………………………………………………………………...………..BP1

31 2000 - EARTH MOVING …………….……………………………………………………………………..………..BP1

DIVISION 32 — EXTERIOR IMPROVEMENTS

32 1216 - ASPHALT PAVING …………….……………………………………………………………………………..BP1

32 1313 - CONCRETE PAVING …………………………………………………………………………….…………..BP1

32 9200 - TURF AND GRASSES (sf0) ……………………………………………………………………..…………..BP1

DIVISION 33 — UTILITIES

33 4200 - STORMWATER CONVEYANCE ……………………………………………………...……….…………..BP1

PROJECT NO. 21237.030 CAST-IN-PLACE CONCRETE

AMBERLY ELEMENTARY SCHOOL 03 3000 - 1

© 2026 Tower Pinkster Titus Associates - All Rights Reserved

SECTION 03 3000 - CAST-IN-PLACE CONCRETE

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes cast-in-place concrete, including formwork, reinforcement, concrete materials, mixture design, placement procedures, and finishes.

B. Related Requirements:

1. Section 32 1313 "Concrete Paving" for concrete pavement and walks.

1.2 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site.

1. Before submitting design mixtures, review concrete design mixture and examine procedures for ensuring quality of concrete materials. Require representatives of each entity directly concerned with cast-in-place concrete to attend, including the following:

a. Contractor's superintendent.

b. Independent testing agency responsible for concrete design mixtures.

c. Ready-mix concrete manufacturer.

d. Concrete Subcontractor.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Design Mixtures: For each concrete mixture. Submit alternate design mixtures when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant adjustments.

1. Indicate amounts of mixing water to be withheld for later addition at Project site.

C. Steel Reinforcement Shop Drawings: Placing Drawings that detail fabrication, bending, and placement.

Include bar sizes, lengths, material, grade, bar schedules, stirrup spacing, bent bar diagrams, bar arrangement, splices and laps, mechanical connections, tie spacing, hoop spacing, and supports for concrete reinforcement.

1.4 INFORMATIONAL SUBMITTALS

A. Material Test Reports: For aggregates, include service record data indicating absence of deleterious expansion of concrete due to alkali aggregate reactivity.

AMBERLY ELEMENTARY SCHOOL 03 3000 - 2

1.5 QUALITY ASSURANCE

A. Installer Qualifications: A qualified installer who employs on Project personnel qualified as ACI-certified Flatwork Technician and Finisher and a supervisor who is an ACI-certified Concrete Flatwork Technician.

B. Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C 94/C 94M requirements for production facilities and equipment.

1. Manufacturer certified according to NRMCA's "Certification of Ready Mixed Concrete Production Facilities."

C. Testing Agency Qualifications: An independent agency, acceptable to authorities having jurisdiction, qualified according to ASTM C 1077 and ASTM E 329 for testing indicated.

D. Welding Qualifications: Qualify procedures and personnel according to AWS D1.4/D 1.4M.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Steel Reinforcement: Deliver, store, and handle steel reinforcement to prevent bending and damage.

1.7 FIELD CONDITIONS

A. Cold-Weather Placement: Comply with ACI 306.1.

1. Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical accelerators unless otherwise specified and approved in mixture designs.

B. Hot-Weather Placement: Comply with ACI 301.

PART 2 - PRODUCTS

2.1 CONCRETE, GENERAL

A. ACI Publications: Comply with the following unless modified by requirements in the Contract Documents:

1. ACI 301.

2. ACI 117.

2.2 FORM-FACING MATERIALS

A. Smooth-Formed Finished Concrete: Form-facing panels that provide continuous, true, and smooth concrete surfaces. Furnish in largest practicable sizes to minimize number of joints.

1. Plywood, metal, or other approved panel materials.

B. Rough-Formed Finished Concrete: Plywood, lumber, metal, or another approved material. Provide lumber dressed on at least two edges and one side for tight fit.

AMBERLY ELEMENTARY SCHOOL 03 3000 - 3

C. Chamfer Strips: Wood, metal, PVC, or rubber strips, 3/4 by 3/4 inch, minimum.

D. Form-Release Agent: Commercially formulated form-release agent that does not bond with, stain, or adversely affect concrete surfaces and does not impair subsequent treatments of concrete surfaces.

1. Formulate form-release agent with rust inhibitor for steel form-facing materials.

E. Form Ties: Factory-fabricated, removable or snap-off glass-fiber-reinforced plastic or metal form ties designed to resist lateral pressure of fresh concrete on forms and to prevent spalling of concrete on removal.

1. Furnish units that leave no corrodible metal closer than 1 inch to the plane of exposed concrete surface.

2.3 STEEL REINFORCEMENT

A. Reinforcing Bars: ASTM A 615/A 615M, Grade 60, deformed.

B. Plain-Steel Welded-Wire Reinforcement: ASTM A 1064/A 1064M, plain, fabricated from as-drawn steel wire into flat sheets.

C. Deformed-Steel Welded-Wire Reinforcement: ASTM A 1064/A 1064M, flat sheet.

2.4 REINFORCEMENT ACCESSORIES

A. Joint Dowel Bars: ASTM A 615/A 615M, Grade 60, plain-steel bars, cut true to length with ends square and free of burrs.

B. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded-wire reinforcement in place. Manufacture bar supports from steel wire, plastic, or precast concrete according to CRSI's "Manual of Standard Practice," of greater compressive strength than concrete and as follows:

1. For concrete surfaces exposed to view, where legs of wire bar supports contact forms, use CRSI Class 1 plastic-protected steel wire or CRSI Class 2 stainless-steel bar supports.

2.5 CONCRETE MATERIALS

A. Source Limitations: Obtain each type or class of cementitious material of the same brand from the same manufacturer's plant, obtain aggregate from single source, and obtain admixtures from single source from single manufacturer.

B. Cementitious Materials:

1. Portland Cement: ASTM C 150/C 150M, Type I or IL

a. Where stained concrete is indicated, provide white portland cement.

2. Fly Ash: ASTM C 618, Class F.

AMBERLY ELEMENTARY SCHOOL 03 3000 - 4

3. Slag Cement: ASTM C 989/C 989M, Grade 100 or 120.

C. Normal-Weight Aggregates: ASTM C 33/C 33M, Class 3S coarse aggregate or better, graded. Provide aggregates from a single source.

D. Normal-Weight Aggregates: ASTM C 33/C 33M, graded. Provide aggregates from a single source.

1. Maximum Coarse-Aggregate Size: 1 inch nominal.

2. Fine Aggregate: Free of materials with deleterious reactivity to alkali in cement.

3. Combined Aggregate Gradation: Well graded from coarsest to finest with not more than 18 percent and not less than 8 percent retained on an individual sieve, except that less than 8 percent may be retained on coarsest sieve and on No. 50 sieve, and less than 8 percent may be retained on sieves finer than No. 50.

E. Air-Entraining Admixture: ASTM C 260/C 260M.

F. Chemical Admixtures: Certified by manufacturer to be compatible with other admixtures and that do not contribute water-soluble chloride ions exceeding those permitted in hardened concrete. Do not use calcium chloride or admixtures containing calcium chloride.

1. Water-Reducing Admixture: ASTM C 494/C 494M, Type A.

2. Water-Reducing and Retarding Admixture: ASTM C 494/C 494M, Type D.

G. Water: ASTM C 94/C 94M and potable.

H. Porosity-Reducing Admixture: Proprietary formulation that reduces concrete porosity by closing capillaries in the concrete as it cures.

1. Products: Subject to compliance with requirements, provide one of the following:

a. Concrete Moisture Solutions, Inc.; Barrier One.

b. ISE Logik Industries; MVRA 900.

c. Specialty Products Group; Vapor Lock 20/20.

2.6 VAPOR RETARDERS

A. Sheet Vapor Retarder: ASTM E 1745, Class A, except with maximum water-vapor permeance of 0.02 U.S.

perms, minimum 15 mils thick monolithic polyolefin sheet. Include manufacturer's recommended adhesive or pressure-sensitive tape.

1. Products: Subject to compliance with requirements, provide one of the following:

a. Fortifiber Building Systems Group; Moistop Ultra 15.

b. Insulation Solutions, Inc.;Viper VaporCheck II 15-mil.

c. Poly-America, L.P.; Husky Yellow Guard Vapor Barrier 15 Mil ASTM E-1745 Class A.

d. Reef Industries, Inc; Griffolyn 15 mil Green.

e. Stego Industries, LLC; Stego Wrap 15 mil Class A.

http://www.specagent.com/Lookup?ulid=1166 http://www.specagent.com/Lookup?uid=123456976082 http://www.specagent.com/Lookup?uid=123456976085 http://www.specagent.com/Lookup?uid=123456976087 http://www.specagent.com/Lookup?uid=123456976079 http://www.specagent.com/Lookup?uid=123456976080

AMBERLY ELEMENTARY SCHOOL 03 3000 - 5

2.7 CURING MATERIALS

A. Evaporation Retarder: Waterborne, monomolecular film forming, manufactured for application to fresh concrete.

1. Products: Subject to compliance with requirements, provide one of the following:

a. ChemMasters, Inc; Spray-Film.

b. Dayton Superior; AquaFilm Concentrate J74.

c. Euclid Chemical Company (The); an RPM company; Eucobar.

d. L&M Construction Chemicals, Inc; E-CON.

B. Absorptive Cover: AASHTO M 182, Class 2, burlap cloth made from jute or kenaf, weighing approximately 9 oz./sq. yd. when dry.

C. Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlap-polyethylene sheet.

D. Water: Potable.

2.8 RELATED MATERIALS

A. Expansion- and Isolation-Joint-Filler Strips: ASTM D 1751, asphalt-saturated cellulosic fiber.

B. Bonding Agent: ASTM C 1059/C 1059M, Type II, nonredispersible, acrylic emulsion or styrene butadiene.

C. Dovetail Anchor Slots: Hot-dip galvanized-steel sheet, not less than 0.034 inch thick, with bent tab anchors. Temporarily fill or cover face opening of slots to prevent intrusion of concrete or debris.

2.9 CONCRETE MIXTURES, GENERAL

A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory trial mixture or field test data, or both, according to ACI 301.

1. Use a qualified independent testing agency for preparing and reporting proposed mixture designs based on laboratory trial mixtures.

B. Cementitious Materials: Limit percentage, by weight, of cementitious materials other than portland cement in concrete as follows:

1. 20 percent fly ash or 30 percent ground blast furnace slag.

C. Limit water-soluble, chloride-ion content in hardened concrete to 0.15 percent by weight of cement.

D. Admixtures: Use admixtures according to manufacturer's written instructions.

1. Use porosity-reducing admixture in slabs.

http://www.specagent.com/Lookup?ulid=11025 http://www.specagent.com/Lookup?uid=123456975991 http://www.specagent.com/Lookup?uid=123456975992 http://www.specagent.com/Lookup?uid=123456975995 http://www.specagent.com/Lookup?uid=123456975997

AMBERLY ELEMENTARY SCHOOL 03 3000 - 6

2.10 CONCRETE MIXTURES FOR BUILDING ELEMENTS

A. Footings: Normal-weight concrete.

1. Minimum Compressive Strength: As indicated at 28 days.

2. Maximum W/C Ratio: 0.45.

3. Slump Limit: 8 inches for concrete with verified slump of 2 to 4 inches before adding high-range water-reducing admixture or plasticizing admixture, plus or minus 1 inch.

B. Foundation Walls: Normal-weight concrete.

1. Minimum Compressive Strength: As indicated at 28 days.

2. Maximum W/C Ratio: 0.50.

3. Slump Limit: 8 inches for concrete with verified slump of 2 to 4 inches before adding high-range water-reducing admixture or plasticizing admixture, plus or minus 1 inch.

4. Air Content: 6 percent, plus or minus 1.5 percent at point of delivery for 1-inch nominal maximum aggregate size.

C. Slabs-on-Grade: Normal-weight concrete.

1. Minimum Compressive Strength: As indicated at 28 days.

2. Maximum W/C Ratio: 0.45.

3. Minimum Cementitious Materials Content: 470 lb/cu. yd..

4. Slump Limit: 5 inches, plus or minus 1 inch.

5. Air Content: Do not allow air content of trowel-finished floors to exceed 3 percent.

D. Suspended Slabs: Normal-weight concrete.

1. Minimum Compressive Strength: As indicated at 28 days.

2. Maximum W/C Ratio: 0.45.

3. Minimum Cementitious Materials Content: 470 lb/cu. yd..

4. Slump Limit: 5 inches, plus or minus 1 inch.

5. Air Content: Do not allow air content of trowel-finished floors to exceed 3 percent.

E. Concrete Toppings: Normal-weight concrete.

1. Minimum Compressive Strength: As indicated at 28 days.

2. Minimum Cementitious Materials Content: 470 lb/cu. yd..

3. Slump Limit: 5 inches, plus or minus 1 inch.

4. Air Content: Do not allow air content of trowel-finished toppings to exceed 3 percent.

2.11 FABRICATING REINFORCEMENT

A. Fabricate steel reinforcement according to CRSI's "Manual of Standard Practice."

2.12 CONCRETE MIXING

A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete according to ASTM C 94/C 94M and ASTM C 1116/C 1116M, and furnish batch ticket information.

AMBERLY ELEMENTARY SCHOOL 03 3000 - 7

1. When air temperature is between 85 and 90 deg F, reduce mixing and delivery time from 1-1/2 hours to 75 minutes; when air temperature is above 90 deg F, reduce mixing and delivery time to 60 minutes.

PART 3 - EXECUTION

3.1 FORMWORK INSTALLATION

A. Design, erect, shore, brace, and maintain formwork, according to ACI 301, to support vertical, lateral, static, and dynamic loads, and construction loads that might be applied, until structure can support such loads.

B. Construct formwork so concrete members and structures are of size, shape, alignment, elevation, and position indicated, within tolerance limits of ACI 117.

C. Limit concrete surface irregularities, designated by ACI 347 as abrupt or gradual, as follows:

1. Surfaces Exposed to View: Class A, 1/8 inch for smooth-formed finished surfaces.

2. Other Surfaces: Class C, 1/2 inch for rough-formed finished surfaces.

D. Construct forms tight enough to prevent loss of concrete mortar.

E. Construct forms for easy removal without hammering or prying against concrete surfaces. Provide crush or wrecking plates where stripping may damage cast-concrete surfaces. Provide top forms for inclined surfaces steeper than 1.5 horizontal to 1 vertical.

1. Install keyways, reglets, recesses, and the like, for easy removal.

2. Do not use rust-stained steel form-facing material.

F. Set edge forms, bulkheads, and intermediate screed strips for slabs to achieve required elevations and slopes in finished concrete surfaces. Provide and secure units to support screed strips; use strike-off templates or compacting-type screeds.

G. Provide temporary openings for cleanouts and inspection ports where interior area of formwork is inaccessible. Close openings with panels tightly fitted to forms and securely braced to prevent loss of concrete mortar. Locate temporary openings in forms at inconspicuous locations.

H. Chamfer exterior corners and edges of permanently exposed concrete.

I. Form openings, chases, offsets, sinkages, keyways, reglets, blocking, screeds, and bulkheads required in the Work. Determine sizes and locations from trades providing such items.

J. Clean forms and adjacent surfaces to receive concrete. Remove chips, wood, sawdust, dirt, and other debris just before placing concrete.

K. Retighten forms and bracing before placing concrete, as required, to prevent mortar leaks and maintain proper alignment.

L. Coat contact surfaces of forms with form-release agent, according to manufacturer's written instructions, before placing reinforcement.

AMBERLY ELEMENTARY SCHOOL 03 3000 - 8

3.2 EMBEDDED ITEM INSTALLATION

A. Place and secure anchorage devices and other embedded items required for adjoining work that is attached to or supported by cast-in-place concrete. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.

1. Install anchor rods, accurately located, to elevations required and complying with tolerances in Section 7.5 of AISC 303.

2. Install reglets to receive waterproofing and to receive through-wall flashings in outer face of concrete frame at exterior walls, where flashing is shown at lintels, shelf angles, and other conditions.

3. Install dovetail anchor slots in concrete structures as indicated.

3.3 REMOVING AND REUSING FORMS

A. General: Formwork for sides of beams, walls, columns, and similar parts of the Work that does not support weight of concrete may be removed after cumulatively curing at not less than 50 deg F for 24 hours after placing concrete. Concrete has to be hard enough to not be damaged by form-removal operations, and curing and protection operations need to be maintained.

B. Clean and repair surfaces of forms to be reused in the Work. Split, frayed, delaminated, or otherwise damaged form-facing material are not acceptable for exposed surfaces. Apply new form-release agent.

C. When forms are reused, clean surfaces, remove fins and laitance, and tighten to close joints. Align and secure joints to avoid offsets. Do not use patched forms for exposed concrete surfaces unless approved by Architect.

3.4 VAPOR-RETARDER INSTALLATION

A. Sheet Vapor Retarders: Place, protect, and repair sheet vapor retarder according to ASTM E 1643 and manufacturer's written instructions.

1. Lap joints 6 inches and seal with manufacturer's recommended tape.

3.5 STEEL REINFORCEMENT INSTALLATION

A. General: Comply with CRSI's "Manual of Standard Practice" for fabricating, placing, and supporting reinforcement.

1. Do not cut or puncture vapor retarder. Repair damage and reseal vapor retarder before placing concrete.

B. Clean reinforcement of loose rust and mill scale, earth, ice, and other foreign materials that reduce bond to concrete.

C. Accurately position, support, and secure reinforcement against displacement. Locate and support reinforcement with bar supports to maintain minimum concrete cover. Do not tack weld crossing reinforcing bars.

AMBERLY ELEMENTARY SCHOOL 03 3000 - 9

1. Weld reinforcing bars according to AWS D1.4/D 1.4M, where indicated.

D. Set wire ties with ends directed into concrete, not toward exposed concrete surfaces.

E. Install welded-wire reinforcement in longest practicable lengths on bar supports spaced to minimize sagging. Lap edges and ends of adjoining sheets at least one mesh spacing. Offset laps of adjoining sheet widths to prevent continuous laps in either direction. Lace overlaps with wire.

3.6 JOINTS

A. General: Construct joints true to line with faces perpendicular to surface plane of concrete.

B. Construction Joints: Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Architect.

1. Place joints perpendicular to main reinforcement. Continue reinforcement across construction joints unless otherwise indicated. Do not continue reinforcement through sides of strip placements of floors and slabs.

2. Form keyed joints as indicated. Embed keys at least 1-1/2 inches into concrete.

3. Locate joints for beams, slabs, joists, and girders in the middle third of spans. Offset joints in girders a minimum distance of twice the beam width from a beam-girder intersection.

4. Locate horizontal joints in walls and columns at underside of floors, slabs, beams, and girders and at the top of footings or floor slabs.

5. Space vertical joints in walls as indicated. Locate joints beside piers integral with walls, near corners, and in concealed locations where possible.

6. Use a bonding agent at locations where fresh concrete is placed against hardened or partially hardened concrete surfaces.

C. Contraction Joints in Slabs-on-Grade: Form weakened-plane contraction joints, sectioning concrete into areas as indicated. Construct contraction joints for a depth equal to at least one-fourth of concrete thickness as follows:

1. Sawed Joints: Form contraction joints with power saws equipped with shatterproof abrasive or diamond-rimmed blades. Cut 1/8-inch- wide joints into concrete when cutting action does not tear, abrade, or otherwise damage surface and before concrete develops random contraction cracks.

D. Isolation Joints in Slabs-on-Grade: After removing formwork, install joint-filler strips at slab junctions with vertical surfaces, such as column pedestals, foundation walls, grade beams, and other locations, as indicated.

1. Extend joint-filler strips full width and depth of joint, terminating flush with finished concrete surface unless otherwise indicated.

2. Install joint-filler strips in lengths as long as practicable. Where more than one length is required, lace or clip sections together.

E. Doweled Joints: Install dowel bars and support assemblies at joints where indicated. Lubricate or asphalt coat one-half of dowel length to prevent concrete bonding to one side of joint.

AMBERLY ELEMENTARY SCHOOL 03 3000 - 10

3.7 CONCRETE PLACEMENT

A. Before placing concrete, verify that installation of formwork, reinforcement, and embedded items is complete and that required inspections are completed.

B. Do not add water to concrete during delivery, at Project site, or during placement unless approved by Architect.

C. Before test sampling and placing concrete, water may be added at Project site, subject to limitations of

ACI 301.

1. Do not add water to concrete after adding high-range water-reducing admixtures to mixture.

D. Deposit concrete continuously in one layer or in horizontal layers of such thickness that no new concrete is placed on concrete that has hardened enough to cause seams or planes of weakness. If a section cannot be placed continuously, provide construction joints as indicated. Deposit concrete to avoid segregation.

1. Deposit concrete in horizontal layers of depth not to exceed formwork design pressures and in a manner to avoid inclined construction joints.

2. Consolidate placed concrete with mechanical vibrating equipment according to ACI 301.

3. Do not use vibrators to transport concrete inside forms. Insert and withdraw vibrators vertically at uniformly spaced locations to rapidly penetrate placed layer and at least 6 inches into preceding layer. Do not insert vibrators into lower layers of concrete that have begun to lose plasticity. At each insertion, limit duration of vibration to time necessary to consolidate concrete and complete embedment of reinforcement and other embedded items without causing mixture constituents to segregate.

E. Deposit and consolidate concrete for floors and slabs in a continuous operation, within limits of construction joints, until placement of a panel or section is complete.

1. Consolidate concrete during placement operations, so concrete is thoroughly worked around reinforcement and other embedded items and into corners.

2. Maintain reinforcement in position on chairs during concrete placement.

3. Screed slab surfaces with a straightedge and strike off to correct elevations.

4. Slope surfaces uniformly to drains where required.

5. Begin initial floating using bull floats or darbies to form a uniform and open-textured surface plane, before excess bleedwater appears on the surface. Do not further disturb slab surfaces before starting finishing operations.

3.8 FINISHING FORMED SURFACES

A. Rough-Formed Finish: As-cast concrete texture imparted by form-facing material with tie holes and defects repaired and patched. Remove fins and other projections that exceed specified limits on formed-surface irregularities.

1. Apply to concrete surfaces not exposed to public view.

B. Smooth-Formed Finish: As-cast concrete texture imparted by form-facing material, arranged in an orderly and symmetrical manner with a minimum of seams. Repair and patch tie holes and defects. Remove fins and other projections that exceed specified limits on formed-surface irregularities.

AMBERLY ELEMENTARY SCHOOL 03 3000 - 11

1. Apply to concrete surfaces exposed to public view,.

C. Related Unformed Surfaces: At tops of walls, horizontal offsets, and similar unformed surfaces adjacent to formed surfaces, strike off smooth and finish with a texture matching adjacent formed surfaces. Continue final surface treatment of formed surfaces uniformly across adjacent unformed surfaces unless otherwise indicated.

3.9 FINISHING FLOORS AND SLABS

A. General: Comply with ACI 302.1R recommendations for screeding, restraightening, and finishing operations for concrete surfaces. Do not wet concrete surfaces.

B. Scratch Finish: While still plastic, texture concrete surface that has been screeded and bull-floated or darbied. Use stiff brushes, brooms, or rakes to produce a profile amplitude of 1/4 inch in one direction.

1. Apply scratch finish to surfaces to receive mortar setting beds for bonded cementitious floor finishes.

C. Float Finish: Consolidate surface with power-driven floats or by hand floating if area is small or inaccessible to power-driven floats. Restraighten, cut down high spots, and fill low spots. Repeat float passes and restraightening until surface is left with a uniform, smooth, granular texture.

1. Apply float finish to surfaces to receive trowel finish.

D. Trowel Finish: After applying float finish, apply first troweling and consolidate concrete by hand or power-driven trowel. Continue troweling passes and restraighten until surface is free of trowel marks and uniform in texture and appearance. Grind smooth any surface defects that would telegraph through applied coatings or floor coverings.

1. Apply a trowel finish to surfaces exposed to view.

2. Finish surfaces to the following tolerances, according to ASTM E 1155, for a randomly trafficked floor surface:

a. Slabs on Grade: Specified overall values of flatness, F(F) 35; and of levelness, F(L) 25; with minimum local values of flatness, F(F) 24; and of levelness, F(L) 17; for slabs-on-grade.

b. Concrete Topping: Specified overall values of flatness, F(F) 30; and of levelness, F(L) 20;

with minimum local values of flatness, F(F) 24; and of levelness, F(L) 15; for suspended slabs.

E. Trowel and Fine-Broom Finish: Apply a first trowel finish to surfaces where ceramic or quarry tile is to be installed by either thickset or thinset method. While concrete is still plastic, slightly scarify surface with a fine broom.

1. Comply with flatness and levelness tolerances for trowel-finished floor surfaces.

F. Broom Finish: Apply a broom finish to exterior concrete platforms, steps, ramps, and elsewhere as indicated.

1. Immediately after float finishing, slightly roughen trafficked surface by brooming with fiber-bristle broom perpendicular to main traffic route. Coordinate required final finish with Architect before application.

AMBERLY ELEMENTARY SCHOOL 03 3000 - 12

3.10 MISCELLANEOUS CONCRETE ITEM INSTALLATION

A. Filling In: Fill in holes and openings left in concrete structures after work of other trades is in place unless otherwise indicated. Mix, place, and cure concrete, as specified, to blend with in-place construction.

Provide other miscellaneous concrete filling indicated or required to complete the Work.

B. Curbs: Provide monolithic finish to interior curbs by stripping forms while concrete is still green and by steel-troweling surfaces to a hard, dense finish with corners, intersections, and terminations slightly rounded.

C. Equipment Bases and Foundations:

1. Coordinate sizes and locations of concrete bases with actual equipment provided.

2. Construct concrete bases 4 inches high unless otherwise indicated, and extend base not less than

6 inches in each direction beyond the maximum dimensions of supported equipment unless otherwise indicated or unless required for seismic anchor support.

3. Minimum Compressive Strength: 4000 psi at 28 days.

4. Install dowel rods to connect concrete base to concrete floor. Unless otherwise indicated, install dowel rods on 18-inch centers around the full perimeter of concrete base.

5. For supported equipment, install epoxy-coated anchor bolts that extend through concrete base and anchor into structural concrete substrate.

6. Prior to pouring concrete, place and secure anchorage devices. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.

7. Cast anchor-bolt insert into bases. Install anchor bolts to elevations required for proper attachment to supported equipment.

D. Steel Pan Stairs: Provide concrete fill for steel pan stair treads, landings, and associated items. Cast-in inserts and accessories as shown on Drawings. Screed, tamp, and trowel finish concrete surfaces.

3.11 CONCRETE PROTECTING AND CURING

A. General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures.

Comply with ACI 306.1 for cold-weather protection and ACI 301 for hot-weather protection during curing.

B. Evaporation Retarder: Apply evaporation retarder to unformed concrete surfaces if hot, dry, or windy conditions cause moisture loss approaching 0.2 lb/sq. ft. x h before and during finishing operations. Apply according to manufacturer's written instructions after placing, screeding, and bull floating or darbying concrete, but before float finishing.

C. Formed Surfaces: Cure formed concrete surfaces, including underside of beams, supported slabs, and other similar surfaces. If forms remain during curing period, moist cure after loosening forms. If removing forms before end of curing period, continue curing for remainder of curing period.

D. Unformed Surfaces: Begin curing immediately after finishing concrete. Cure unformed surfaces, including floors and slabs, concrete floor toppings, and other surfaces.

E. Cure concrete according to ACI 308.1, by one or a combination of the following methods:

1. Moisture Curing: Keep surfaces continuously moist for not less than seven days with the following materials:

AMBERLY ELEMENTARY SCHOOL 03 3000 - 13

a. Water.

b. Continuous water-fog spray.

c. Absorptive cover, water saturated, and kept continuously wet. Cover concrete surfaces and edges with 12-inch lap over adjacent absorptive covers.

2. Moisture-Retaining-Cover Curing: Cover concrete surfaces with moisture-retaining cover for curing concrete, placed in widest practicable width, with sides and ends lapped at least 12 inches, and sealed by waterproof tape or adhesive. Cure for not less than seven days. Immediately repair any holes or tears during curing period, using cover material and waterproof tape.

a. Moisture cure or use moisture-retaining covers to cure concrete surfaces to receive floor coverings.

b. Moisture cure or use moisture-retaining covers to cure concrete surfaces to receive penetrating liquid floor treatments.

c. Cure concrete surfaces to receive floor coverings with either a moisture-retaining cover or a curing compound that the manufacturer certifies does not interfere with bonding of floor covering used on Project.

3. Curing Compound: Do not use curing compounds.

3.12 LIQUID FLOOR TREATMENT APPLICATION

A. Penetrating Liquid Floor Treatment: Prepare, apply, and finish penetrating liquid floor treatment according to manufacturer's written instructions.

1. Remove curing compounds, sealers, oil, dirt, laitance, and other contaminants and complete surface repairs.

2. Do not apply to concrete that is less than 28 days' old.

3. Apply liquid until surface is saturated, scrubbing into surface until a gel forms; rewet; and repeat brooming or scrubbing. Rinse with water; remove excess material until surface is dry. Apply a second coat in a similar manner if surface is rough or porous.

3.13 JOINT FILLING

A. Prepare, clean, and install joint filler according to manufacturer's written instructions.

1. Defer joint filling until concrete has aged at least six month(s). Do not fill joints until construction traffic has permanently ceased.

B. Remove dirt, debris, saw cuttings, curing compounds, and sealers from joints; leave contact faces of joints clean and dry.

C. Install semirigid joint filler full depth in saw-cut joints and at least 2 inches deep in formed joints. Overfill joint and trim joint filler flush with top of joint after hardening.

3.14 FIELD QUALITY CONTROL

A. Special Inspections: Owner will engage a qualified testing and inspecting agency to perform field tests and inspections and prepare test reports.

AMBERLY ELEMENTARY SCHOOL 03 3000 - 14

B. Inspections:

1. Steel reinforcement placement.

2. Steel reinforcement welding.

3. Headed bolts and studs.

4. Verification of use of required design mixture.

5. Concrete placement, including conveying and depositing.

6. Curing procedures and maintenance of curing temperature.

7. Verification of concrete strength before removal of shores and forms from beams and slabs.

C. Concrete Tests: Testing of composite samples of fresh concrete obtained according to ASTM C 172/C 172M shall be performed according to the following requirements:

1. Testing Frequency: Obtain at least one composite sample for each 100 cu. yd. or fraction thereof of each concrete mixture placed each day.

a. When frequency of testing provides fewer than five compressive-strength tests for each concrete mixture, testing shall be conducted from at least five randomly selected batches or from each batch if fewer than five are used.

2. Slump: ASTM C 143/C 143M; one test at point of placement for each composite sample, but not less than one test for each day's pour of each concrete mixture. Perform additional tests when concrete consistency appears to change.

3. Air Content: ASTM C 231/C 231M, pressure method, for normal-weight concrete; one test for each composite sample, but not less than one test for each day's pour of each concrete mixture.

4. Concrete Temperature: ASTM C 1064/C 1064M; one test hourly when air temperature is 40 deg F and below or 80 deg F and above, and one test for each composite sample.

5. Compression Test Specimens: ASTM C 31/C 31M.

a. Cast and laboratory cure two sets of two standard cylinder specimens for each composite sample.

b. Cast and field cure two sets of two standard cylinder specimens for each composite sample.

6. Compressive-Strength Tests: ASTM C 39/C 39M; test one set of two laboratory-cured specimens at 7 days and one set of two specimens at 28 days.

a. Test one set of two field-cured specimens at 7 days and one set of two specimens at 28 days.

b. A compressive-strength test shall be the average compressive strength from a set of two specimens obtained from same composite sample and tested at age indicated.

7. When strength of field-cured cylinders is less than 85 percent of companion laboratory-cured cylinders, Contractor shall evaluate operations and provide corrective procedures for protecting and curing in-place concrete.

8. Strength of each concrete mixture will be satisfactory if every average of any three consecutive compressive-strength tests equals or exceeds specified compressive strength and no compressive-strength test value falls below specified compressive strength by more than 500 psi.

9. Test results shall be reported in writing to Architect, concrete manufacturer, and Contractor within 48 hours of testing. Reports of compressive-strength tests shall contain Project identification name

AMBERLY ELEMENTARY SCHOOL 03 3000 - 15

and number, date of concrete placement, name of concrete testing and inspecting agency, location of concrete batch in Work, design compressive strength at 28 days, concrete mixture proportions and materials, compressive breaking strength, and type of break for both 7- and 28-day tests.

10. Nondestructive Testing: Impact hammer, sonoscope, or other nondestructive device may be permitted by Architect but will not be used as sole basis for approval or rejection of concrete.

11. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements.

12. Correct deficiencies in the Work that test reports and inspections indicate do not comply with the Contract Documents.

END OF SECTION 03 3000

PROJECT NO. 21237.030 THERMAL INSULATION

AMBERLY ELEMENTARY SCHOOL 07 2100 - 1

SECTION 07 2100 - THERMAL INSULATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Extruded polystyrene foam-plastic board insulation.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product.

1.3 INFORMATIONAL SUBMITTALS

A. Research reports.

1.4 DELIVERY, STORAGE, AND HANDLING

A. Protect insulation materials from physical damage and from deterioration due to moisture, soiling, and other sources. Store inside and in a dry location. Comply with manufacturer's written instructions for handling, storing, and protecting during installation.

B. Protect foam-plastic board insulation as follows:

1. Do not expose to sunlight except to necessary extent for period of installation and concealment.

2. Protect against ignition at all times. Do not deliver foam-plastic board materials to Project site until just before installation time.

3. Quickly complete installation and concealment of foam-plastic board insulation in each area of construction.

PART 2 - PRODUCTS

2.1 EXTRUDED POLYSTYRENE FOAM-PLASTIC BOARD INSULATION

A. Extruded Polystyrene Board Insulation: Maximum flame-spread and smoke-developed indexes of 25 and 450, respectively, when tested in accordance with ASTM E 84.

1. Types and minimum compressive strengths per ASTM C 578 as follows:

a. All Locations Unless Indicated Otherwise: Type X, 15-psi.

b. Foundation: Type IV, 25-psi.

c. Under Slabs Subject to Foot Traffic: Type VI, 40-psi.

d. Under Slabs Subject to Vehicle Traffic: Type VII, 60-psi.

AMBERLY ELEMENTARY SCHOOL 07 2100 - 2

2. Fire Propagation Characteristics: Passes NFPA 285 testing as part of an approved assembly.

3. Thermal Resistivity: 5.0 deg F x h x sq. ft./Btu x in. at 75 deg F.

2.2 ACCESSORIES

A. Insulation for Miscellaneous Voids:

1. Spray Polyurethane Foam Insulation: ASTM C 1029, Type II, closed cell, with maximum flame-spread and smoke-developed indexes of 75 and 450, respectively, per ASTM E 84.

B. Adhesive for Bonding Insulation: Product compatible with insulation and air and water barrier materials, and with demonstrated capability to bond insulation securely to substrates without damaging insulation and substrates.

PART 3 - EXECUTION

3.1 INSTALLATION, GENERAL

A. Comply with insulation manufacturer's written instructions applicable to products and applications.

B. Install insulation that is undamaged, dry, and unsoiled and that has not been left exposed to ice, rain, or snow at any time.

C. Extend insulation to envelop entire area to be insulated. Fit tightly around obstructions and fill voids with insulation. Remove projections that interfere with placement.

D. Provide sizes to fit applications and selected from manufacturer's standard thicknesses, widths, and lengths. Apply single layer of insulation units unless multiple layers are otherwise shown or required to make up total thickness or to achieve R-value.

3.2 INSTALLATION OF FOUNDATION WALL INSULATION

A. Provide extruded polystyrene in thickness indicated, or molded polystyrene or graphite-polystyrene foam-plastic board in increased thickness to provide an equivalent R value.

B. Butt panels together for tight fit.

C. Adhesive Installation: Install with adhesive or press into tacky waterproofing or dampproofing according to manufacturer's written instructions.

1. If not otherwise indicated, extend insulation a minimum of 36 inches below exterior grade line.

2. Thickness: 3 inches, R-15 minimum unless indicated otherwise.

AMBERLY ELEMENTARY SCHOOL 07 2100 - 3

3.3 PROTECTION

A. Protect installed insulation from damage due to harmful weather exposures, physical abuse, and other causes. Provide temporary coverings or enclosures where insulation is subject to abuse and cannot be concealed and protected by permanent construction immediately after installation.

END OF SECTION 07 2100

00 0101 TP Cover Page - BP2
00 0110 - TP Table of Contents - BP2
03 3000 - CAST-IN-PLACE CONCRETE fl0
07 2100 - THERMAL INSULATION

File details come from the government source that posted it. Updated .