Amberly BP 2 Drawings.pdf
PDF 6 MB Posted
- Solicitation number
- RFP PPS 260000001499 1
- Issued by
- Kalamazoo County, Michigan
About this file
This is a set of construction documents for Amberly Elementary School's Bid Package 2 Early Foundation project, prepared for Portage Public Schools in Portage, Michigan. The documents comprise detailed structural and civil engineering drawings dated March 2, 2026, covering the early foundation phase of construction for the elementary school expansion. The project involves foundation design and construction for four structural units (Units A, B, C, and D) with associated site work, including spread footings, wall footings, concrete piers, foundation walls, and slab-on-grade construction. The structural design is based on the Michigan Building Code 2021, with design loads specified for roof (20 PSF dead load), floor (133 PSF dead load), and live loads ranging from 40 PSF in classrooms to 150 PSF in mechanical rooms. Seismic design is based on Risk Category III with design wind speeds of 114 MPH ultimate and 85 MPH nominal, and snow loads of 30 PSF ground snow with a 23.1 PSF flat roof snow load. The project site is located at 6637 Amberly Street, Portage, Michigan 49024.
The construction documents include comprehensive foundation plans for all four units, foundation details, typical construction details, and axonometric views with schedules for spread footings (ranging from 4'-0" to 11'-0" in size with various reinforcement configurations) and wall footings (ranging from 24" to 78" in width). Special inspections and testing requirements are specified for concrete construction, soil preparation, and reinforcement placement, with continuous and periodic inspection protocols outlined in compliance with the Michigan Building Code. The design incorporates foundation bearing elevations generally at 97'-0", with variations by unit, and includes provision for 3'-6" minimum depth below finished grade for exterior footings. Concrete specifications require 4,000 PSI strength for footings and foundation walls, with 4,500 PSI for weather-exposed retaining walls. The documents reference coordination requirements with civil, mechanical, plumbing, and architectural drawings, and note that a geotechnical investigation report (Number 2250351.3A by Driesenga & Associates, Inc., dated August 12, 2022) forms the basis for foundation design parameters and soil bearing capacity of 2,000 PSF.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amberly BP 2 Early Foundation Project Manual (1).pdf | ||
| Amberly BP 2 Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T T
IT
L
E
D A
T E
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
DESIGN TEAM
ARCHITECT/ENGINEER
AMBERLY ELEMENTARY SCHOOL
PORTAGE PUBLIC SCHOOLS
Portage, Michigan
CONSTRUCTION DOCUMENTS
C O
V E
R S
H E
E T
.0
G
A M
B E
R L Y
E L E
M E
N T
A R
Y S
C H
O O
L B
P
E
A R
L Y
F O
U N
D A
T
IO
N
P o rt a g e M ic h ig a n
P O
R T
A G
E P
U B
L
IC
S C
H O
O L S
F E
B R
U A
R Y
BP 2: EARLY FOUNDATION
CIVIL CONSULTANT
FOOD SERVICE CONSULTANT
AMBERLY ELEMENTARY SCHOOL
6637 AMBERLY STREET
PORTAGE, MICHIGAN 49024
242 E. KALAMAZOO AVE, SUITE 100
KALAMAZOO, MICHIGAN 49007
PHONE: 269.343.6133
FAX: 269.343.6633
CONSTRUCTION MANAGER
SITE ADDRESS
2800 SOUTH 11TH STREET
KALAMAZOO, MICHIGAN 49009
PHONE: 269.552.4960
401 HALL STREET SW
SUITE 185H
GRAND RAPIDS, MICHIGAN 49503
PHONE: 616.454.4433
460 HILTON ROAD
FERNDALE, MICHIGAN 48220
PHONE: 248.703.3681
2700 STADIUM DRIVE
SUITE 2
KALAMAZOO, MICHIGAN 49007
PHONE: 269.276.9700
DESIGN PARTNER
PORTAGE PUBLIC SCHOOLS
8107 MUSTANG DRIVE
PORTAGE, MICHIGAN 49002
OWNER ADDRESS
ISSUED FOR DATE
BP 1 01/16/2026
BP 2 03/02/2026
P R
O J E
C T
T
IT
L E
A M
B E
R L
Y E
L E
M E
N T
A R
Y S
C H
O O
L B
P
E A
R L Y
F O
U N
D A
T
IO
N
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T T
IT
L
E
D A
T E
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
D R
A W
IN
G
I N
D E
X
.0
G
A M
B E
R L Y
E L E
M E
N T
A R
Y S
C H
O O
L B
P
E
A R
L Y
F O
U N
D A
T
IO
N
P o rt a g e M ic h ig a n
P O
R T
A G
E P
U B
L
IC
S C
H O
O L S
M A
R C
H
DRAWING INDEX
TOPOGRAPHY
V-101 BOUNDARY SURVEY
V-102 TOPOGRAPHIC SURVEY
CIVIL DEMOLITION
CD 100 SITE DEMOLITION PLAN - NORTH
CD 101 SITE DEMOLITION PLAN - SOUTH
CD 200 UTILITY DEMOLITION PLAN - NORTH
CD 201 UTILITY DEMOLITION PLAN - SOUTH
CD 300 SITE STAGING PLAN
CD 301 STAGE 2 SITE LAYOUT & GRADING PLAN
CIVIL
C 100 SITE LAYOUT PLAN - NORTH
C 101 SITE LAYOUT PLAN - SOUTH
C 102 FIRE ACCESS PLAN
C 200 SITE GRADING PLAN - OVERALL
C 201 SITE GRADING PLAN - NORTH
C 202 SITE GRADING PLAN - SOUTH
C 203 SITE EARTHWORK PLAN - OVERALL
C 204 SITE EARTHWORK PLAN - NORTH
C 205 SITE EARTHWORK PLAN - SOUTH
C 206 SITE SESC PLAN - NORTH
C 207 SITE SESC PLAN - SOUTH
C 208 SITE SESC NOTES & SCHEDULE
C 209 GRADING DETAILS
C 210 GRADING DETAILS
C 300 SITE UTILITY PLAN - OVERALL
C 301 SITE UTILITY PLAN - NORTH
C 302 SITE UTILITY PLAN - SOUTH
C 303 STORM PROFILES
C 304 STORM PROFILES
C 305 WATERSHED MAP
C 306 PRE-DEVELOPMENT WATERSHED
C 307 POST-DEVELOPMENT WATERSHED MAP
C 308 SANITARY PROFILES
C 309 WATER MAIN PROFILES
C 310 WATER MAIN PROFILES
C 400 SITE DETAILS
C 500 UTILITY DETAILS
C 501 STORM WATER DETAILS
C 502 STORM WATER DETAILS
C 503 AQUAMOD DETAILS
C 504 AQUAMOD DETAILS
C 505 WATER MAIN DETAILS
GENERAL
G 001 COVER SHEET
G 002 DRAWING INDEX
G 003 TYPICAL SYMBOLS AND REFERENCES, ABBREVIATIONS, AND DEVICE ALIGNMENT GUIDELINES
GENERAL - EXISTING BUILDING
G 101X (EXISTING BUILDING) PARTIAL FIRST FLOOR CODE COMPLIANCE PLAN
STRUCTURAL - EXISTING BUILDING
S 101X (EXISTING BUILDING) PARTIAL FOUNDATION & ROOF FRAMING PLANS, DETAILS, & NOTES
ARCHITECTURAL - EXISTING BUILDING
A 001X (EXISTING BUILDING) GENERAL ARCHITECTURAL NOTES, INTERIOR PARTITION TYPES, FIRE-RATED WALL DETAILS
A 101X (EXISTING BUILDING) PARTIAL FIRST FLOOR DEMOLITION PLANS, FLOOR PLANS, REFL.
CEILING PLANS, & DETAILS
PLUMBING - EXISTING BUILDING
PD 101X (EXISTING BUILDING) PARTIAL PLUMBING DEMOLITION PLANS
P 101X (EXISTING BUILDING) PARTIAL PLUMBING PLANS
MECHANICAL - EXISTING BUILDING
M 101X (EXISTING BUILDING) PARTIAL MECHANICAL PLANS
TECHNOLOGY - EXISTING BUILDING
T 101X (EXISTING BUILDING) PARTIAL TECHNOLOGY PLANS
EXISTING BUILDING, THESE SHEETS ONLY
STRUCTURAL GENERAL
SG 001 STRUCTURAL GENERAL NOTES
SG 003 STATEMENT OF SPECIAL INSPECTIONS
STRUCTURAL
S 101 OVERALL FOUNDATION PLAN
S 101A FOUNDATION PLAN - UNIT A
S 101B FOUNDATION PLAN - UNIT B
S 101C FOUNDATION PLAN - UNIT C
S 101D FOUNDATION PLAN - UNIT D
S 102 FOUNDATION AXONOMETRIC
S 301 TYPICAL FOUNDATION DETAILS
S 302 TYPICAL FOUNDATION DETAILS
S 303 FOUNDATION DETAILS
ISSUED FOR DATE
P R
O J E
C T
T
IT
L E
A M
B E
R L
Y E
L E
M E
N T
A R
Y S
C H
O O
L B
P
E A
R L Y
F O
U N
D A
T
IO
N
H O
O K L
EN
G
TH
90° HOOK LENGTH
SD01
SD02 SD02
SD04
SD03
SD05
SD06
SD08
SD09
S D
SD11
S D
SD07S
D
1/32" = 1'-0"
SNOW DRIFT PLAN AND SCHEDULE
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
T O
W E
R P
IN
K
S T
E R
.C O
M
A L
L R
IG
H
T S
R E
S E
R V
E D
S T
R U
C T
U R
A L G
E N
E R
A L
N O
T E
S
-2
.0
S G
A M
B E
R L
Y E
L E
M E
N T
A R
Y S
C H
O O
L B
P
E A
R L Y
F O
U N
D A
T
IO
N
P o rt a g e
M ic h ig a n
P O
R T
A G
E P
U B
L
IC
S C
H O
O L
S
M A
R C
H
STRUCTURAL LOADS
1. BUILDING CODE:
MICHIGAN BUILDING CODE 2021
2. STRUCTURAL DESIGN CODES AND STANDARDS:
DESIGN LOADS ASCE 7-16
STEEL AISC 360-16
CONCRETE ACI 318-19
MASONRY TMS402-16/ACI 530-16
WOOD ANSI/AWC NDS-18
COLD FORMED METAL AISI S100-16 (2020)
3. BUILDING RISK CATEGORY III
4. DESIGN LOADS:
ROOF DEAD:
ROOFING 1.0 PSF
COVER BOARD 2.0 PSF
INSULATION 1.5 PSF
METAL DECK 2.0 PSF
FRAMING 4.0 PSF
MECHANICAL 4.0 PSF
CEILING 2.0 PSF
MISCELLANEOUS 3.5 PSF
TOTAL 20.0 PSF
FLOOR DEAD:
FINISHED FLOOR 1.0 PSF
TOPPING SLAB 50.0 PSF
10" CONCRETE PLANK 71.0 PSF
MECHANICAL 4.0 PSF
CEILING 2.0 PSF
MISCELLANEOUS 5.0 PSF
TOTAL 133.0 PSF
DESIGN LIVE LOADS:
GROUND FLOOR 100 PSF
CLASSROOMS 40 PSF
STAIRS 100 PSF
CORRIDORS ABOVE FIRST FLOOR 80 PSF
LEARNING COMMONS 80 PSF
MECHANICAL ROOMS 150 PSF
ROOF 20 PSF
LIVE LOAD REDUCTION HAS NOT BEEN UTILIZED
SNOW:
GROUND SNOW Pg = 30.0 PSF
IMPORTANCE FACTOR I = 1.1
THERMAL FACTOR Ct = 1.0
EXPOSURE FACTOR Ce = 1.0
FLAT ROOF SNOW Pf = 23.1 PSF
SLOPE FACTOR Cs = 1.0
SNOW DRIFT LOADS AS INDICATED
WIND:
ULTIMATE DESIGN WIND SPEED Vult = 114 MPH
NOMINAL DESIGN WIND SPEED Vasd = 85 MPH
EXPOSURE CATEGORY B
INTERNAL PRESSURE COEFFICIENT ± 0.18
TOPOGRAPHIC FACTOR Kzt = 1.0
DIRECTIONALITY FACTOR Kd = 0.85
GROUND ELEVATION FACTOR Ke = 1.0
GUST EFFECT FACTOR G = 0.85
SEISMIC:
SEISMIC IMPORTANCE FACTOR Ie = 1.25
MAPPED ACCELERATION PARAMETERS Ss = 0.117 & S1 = 0.054
SITE CLASS D
DESIGN ACCELERATION PARAMETERS Sds = 0.125 & Sd1 = 0.087
SEISMIC DESIGN CATEGORY B
SEISMIC FORCE RESISTING SYSTEM INTERMEDIATE REINFORCED MASONRY SHEAR WALLS
SEISMIC RESPONSE COEFFICIENT Cs = 0.045
RESPONSE MODIFICATION COEFFICIENT R = 3.5
ANALYSIS PROCEDURE USED EQUIVALENT LATERAL FORCE
COMPONENTS & CLADDING ULTIMATE WIND PRESSURES
ZONE 10 SF 50 SF 100 SF
WALL
NEGATIVE ZONE 4 -23.2 PSF -21.0 PSF -20.1 PSF
NEGATIVE ZONE 5 -28.6 PSF -24.2 PSF -22.3 PSF
POSITIVE ZONES 4 & 5 21.4 PSF 19.2 PSF 18.3 PSF
PARAPET
WINDWARD PARAPET ZONE 4 -67.9 PSF -53.0 PSF -46.6 PSF
WINDWARD PARAPET ZONE 5 -67.9 PSF -53.0 PSF -46.6 PSF
LEEWARD PARAPET ZONE 4 -23.5 PSF -21.3 PSF -20.3 PSF
LEEWARD PARAPET ZONE 5 -28.9 PSF -24.5 PSF -22.5 PSF
ROOF
NEGATIVE ZONE 1 -37.3 PSF -31.6 PSF -29.1 PSF
NEGATIVE ZONE 2 -49.2 PSF -41.9 PSF -38.7 PSF
NEGATIVE ZONE 3 -67.1 PSF -52.4 PSF -46.1 PSF
POSITIVE ALL ZONES 16.0 PSF 16.0 PSF 16.0 PSF
GENERAL
1. ADDITIONAL ENGINEERING EFFORT TO BRING BUILT CONDITIONS TO COMPLIANCE WITH STRUCTURAL DRAWINGS MAY
RESULT IN ADDITIONAL FEE.
2. THESE NOTES SUPPLEMENT THE PROJECT SPECIFICATIONS, SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
3. THESE DRAWINGS REPRESENT THE COMPLETED PROJECT WHICH HAS BEEN DESIGNED FOR THE DEAD LOAD WEIGHT OF
MATERIALS INDICATED PLUS THE SUPERIMPOSED LIVE LOADS INDICATED IN THE DESIGN DATA. IT IS THE CONTRACTOR’S
RESPONSIBILITY TO DETERMINE ALLOWABLE CONSTRUCTION LOADS AND TO PROVIDE PROPER DESIGN AND
CONSTRUCTION OF FALSEWORK, FORMWORK, STAGING, BRACING, AND SHORING. CONTRACTOR HAS SOLE
RESPONSIBILITY FOR CONSTRUCTION MEANS AND METHODS, SEQUENCES, AND PROCEDURES OF CONSTRUCTION. THE
STRUCTURE IS STABLE ONLY IN ITS COMPLETED FORM, WITH COMPLETED CONNECTIONS, AND FIELD INSTALLED
MATERIALS HAVING REACHED SPECIFIED DESIGN STRENGTH.
4. CROSS CHECK ALL DIMENSIONS AND ELEVATIONS INDICATED. REPORT DISCREPANCIES FOR CLARIFICATION PRIOR TO
STARTING CONSTRUCTION OR ORDERING MATERIALS. REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS NOT
INDICATED ON THE STRUCTURAL DRAWINGS. DO NOT SCALE THESE DRAWINGS.
5. IN THE CASE OF A CONFLICT WITHIN THE CONTRACT DOCUMENTS, INCLUDING DRAWINGS AND SPECIFICATIONS, THE
MOST STRINGENT REQUIREMENTS WILL GOVERN.
6. REFER TO ARCHITECTURAL, MECHANICAL, PLUMBING, ELECTRICAL, CIVIL, AND FOOD SERVICE DRAWINGS FOR SIZE AND
LOCATION OF OPENINGS, SLEEVES, CONCRETE HOUSEKEEPING PADS, INSERTS, EMBEDDED ITEMS, CURBS, RAMPS, DRAINS, DEPRESSIONS, ETC. NOTIFY STRUCTURAL ENGINEER OF ANY DISCREPANCIES.
7. REFER TO ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR DETAILED INFORMATION REGARDING SPECIAL FINISHES
ON STRUCTURAL MEMBERS, FIREPROOFING, WATERPROOFING, ETC.
8. REFER TO ARCHITECTURAL DRAWINGS FOR MASONRY AND DRYWALL NON-LOADBEARING PARTITIONS. PROVIDE SLIP
CONNECTIONS THAT ALLOW VERTICAL MOVEMENT AT THE HEADS OF SUCH PARTITIONS. CONNECTIONS SHALL SUPPORT
THE TOP OF THE WALLS LATERALLY FOR THE CODE REQUIRED LATERAL LOAD.
9. REPRODUCTION OF THE STRUCTURAL DRAWINGS FOR SUBMISSION AS SHOP DRAWINGS IS PROHIBITED. SUBMITTALS
PRODUCED IN THIS MANNER WILL BE REJECTED.
10. DELEGATED DESIGN SUBMITTALS: PORTIONS OF THE DESIGN HAVE BEEN DELEGATED AND WILL BE DESIGNED BY
PRODUCT MANUFACTURERS QUALIFIED LICENSED ENGINEERS. THE STRUCTURAL ENGINEER OF RECORD WILL ONLY
REVIEW SUBMITTALS OF THESE SYSTEMS FOR GENERAL CONFORMANCE WITH THE PROJECT PARAMETERS INDICATED
AND IS NOT RESPONSIBLE FOR DELEGATED DESIGN SUBMITTAL. DELEGATED DESIGN SUBMITTALS INCLUDE, BUT ARE
NOT LIMITED TO THE FOLLOWING. SEE SPECIFICATIONS FOR ANY ADDITIONAL DELEGATED DESIGNS REQUIRED.
PRECAST CONCRETE PLANK
STRUCTURAL STEEL CONNECTIONS
COLD-FORMED METAL FRAMING
PRE-FABRICATED STEEL STAIRS
METAL LADDERS
STOREFRONT WINDOW WALL SYSTEMS
CURTAIN WALL SYSTEMS
11. CONTRACTOR TO PROVIDE A SUBMITTAL FOR ENGINEER REVIEW FOR THE FOLLOWING. SEE SPECIFICATIONS FOR ANY
ADDITIONAL SUBMITTALS REQUIRED.
CONCRETE MIX
CONCRETE REINFORCEMENT
MASONRY REINFORCEMENT
STRUCTURAL STEEL
STEEL JOISTS
STEEL DECK
ENGINEERED WOOD FRAMING
STRUCTURAL GENERAL NOTES
ABBREVIATIONS CONTINUED
FDN FOUNDATION
FO FLOOR OPENING
GA GAUGE
HDG HOT-DIP GALVANIZED
HORIZ HORIZONTAL
k KIP = 1,000 POUNDS
MAX MAXIMUM
MIN MINIMUM
NTS NOT TO SCALE
OC ON-CENTER
PL PLATE
PSF POUNDS PER SQUARE FOOT
PT PRESSURE TREATED
RO ROOF OPENING
SIM SIMILAR
SP SOUTHERN PINE
SPF SPRUCE-PINE-FIR
T&B TOP AND BOTTOM
TF TOP OF FOOTING ELEVATION
TP TOP OF PIER ELEVATION
TS TOP OF STEEL ELEVATION
TW TOP OF WALL ELEVATION
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VERT VERTICAL
VIF VERIFY IN FIELD
w/ WITH
WWF WELDED WIRE FABRIC
FOUNDATIONS
1. LOCATE ALL UNDERGROUND UTILITIES BEFORE STARTING WORK. CONTACT UTILITY LOCATING SERVICES PRIOR TO
EXCAVATION. IN MICHIGAN CALL "MISS DIG" 800-482-7171 AT LEAST 72 HOURS PRIOR TO STARTING WORK.
2. ANY EXISTING UTILITIES INDICATED ON DRAWINGS ARE BASED ON ORIGINAL CONSTRUCTION DRAWINGS AND SITE
SURVEYS. EXACT UTILITY LOCATIONS AND ELEVATIONS OF UTILITIES MUST FIELD VERIFIED BY THE CONTRACTOR PRIOR
TO BEGINNING WORK.
3. FOUNDATION DESIGN IS BASED ON THE SOILS INVESTIGATION REPORT NUMBER 2250351.3A BY DRIESENGA &
ASSOCIATES, INC. DATED AUGUST 12, 2022.
4. FOUNDATIONS SHALL BEAR ON SOILS HAVING A MINIMUM ALLOWABLE BEARING PRESSURE OF 2,000 PSF FOR SPREAD
FOOTINGS AND 2,000 PSF FOR WALL FOOTINGS.
5. FOOTINGS SHALL BEAR ON UNDISTURBED SOIL AT ELEVATIONS SHOWN ON THE DRAWINGS. IF OVER-EXCAVATION IS
REQUIRED, ENGINEERED COMPACTED FILL SHALL BE PLACED PER SPECIFICATIONS UP TO BEARING ELEVATION. ALL
ENGINEERED COMPACTED FILL SHALL BE PLACED IN THE PRESENCE OF AND AS DIRECTED BY A QUALIFIED GEOTECHNICAL
ENGINEERING FIRM. LOCATION AND EXTENT OF AREAS TO RECEIVE ENGINEERED COMPACTED FILL SHALL BE PER THE
GEOTECHNICAL REPORT AND TESTING OF SOILS SHALL BE ACCORDING TO SPECIFICATIONS PRIOR TO PLACEMENT OF
FOOTINGS.
6. CONTRACTOR SHALL PROVIDE SLEEVES FOR ALL OPENINGS REQUIRED IN WALLS. NO CORE DRILLING WILL BE ALLOWED
WITHOUT PRIOR APPROVAL BY THE STRUCTURAL ENGINEER. COORDINATE LOCATION AND SIZE OF OPENINGS WITH
APPLICABLE CONTRACTORS.
7. DO NOT REPAIR MISPLACED OR DAMAGED COLUMN ANCHOR BOLTS WITHOUT PRIOR APPROVAL BY THE STRUCTURAL
ENGINEER.
8. WHERE FOUNDATION WALLS ARE TO HAVE EARTH PLACED ON EACH SIDE, PLACE FILL ON ALTERNATING SIDES OF WALL IN
SHALLOW LIFTS.
9. COORDINATE ELECTRICAL SERVICE GROUNDING REQUIREMENTS TO FOUNDATION REINFORCING WITH ELECTRICIAN. SEE
ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
LOCATION 28 DAY f'c (PSI) AIR CONTENT MAX W/C
FOOTINGS & FOUNDATION WALLS 4,000 6% ± 1% 0.50
INTERIOR SLABS 4,000 NO TEST 0.45
RETAINING WALLS & ALL OTHER CONCRETE EXPOSED TO WEATHER 4,500 6% ± 1% 0.45
TOPPING SLABS/SUSPENDED SLABS 4,000 NO TEST 0.45
CONCRETE
1. ALL MATERIAL AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH APPLICABLE AMERICAN CONCRETE INSTITUTE (ACI)
DOCUMENTS REFERENCED IN SPECIFICATIONS.
2. MATERIAL PROPERTIES:
3. REINFORCEMENT BARS SHALL BE ASTM A615 GRADE 60 UNO.
4. SEE SPECIFICATIONS FOR ALL TESTING REQUIREMENTS. SUBMIT EACH CONCRETE MIX DESIGN FOR REVIEW. SUBMITTAL
SHALL CONSIST OF DESIGN MIXES FOR EACH TYPE AND STRENGTH OF CONCRETE AND INCLUDE DATA BY EITHER
LABORATORY TRIAL MIX OR FIELD TEST DATA BASE PER ACI 318.
5. ALL CONCRETE SHALL BE CURED FOR A MINIMUM OF 7 DAYS PRIOR TO REMOVAL OF FORMS. IF FORMS ARE REMOVED
BEFORE THE END OF CURING PERIOD, COAT SURFACES WITH LIQUID CURING COMPOUND.
6. PROVIDE DOWELS IN WALL FOOTINGS WITH EQUAL SIZE AND SPACING AS VERTICAL WALL STEEL, UNO.
7. ALL OPENINGS IN SLABS AND WALLS SHALL HAVE REINFORCEMENT ON EACH SIDE EQUAL TO HALF THE AMOUNT OF
REINFORCING DISPLACED. REFER TO TYPICAL DETAIL.
8. ALL CONCRETE SLABS ON GRADE SHALL BE REINFORCED WITH 6"x6"- W1.4xW1.4 WELDED WIRE FABRIC UNO.
9. REFER TO ARCHITECTURAL DRAWINGS FOR SIZE, DEPTH, AND LOCATION OF DEPRESSED FLOOR SLABS REQUIRED.
10. PROVIDE CLASS "B" TENSION LAP SPLICES FOR ALL BARS UNO.
11. TOP BARS ARE DEFINED AS HORIZONTAL REINFORCEMENT POSITIONED SUCH THAT MORE THAN 12" OF FRESH
CONCRETE IS PLACED BELOW THE REINFORCEMENT. ALL HORIZONTAL BARS IN WALLS SHALL BE CONSIDERED TOP BARS.
12. MECHANICAL COUPLERS DEVELOPING AT LEAST 125% OF THE BAR YIELD STRENGTH MAY BE USED AT CONTRACTOR'S
OPTION IN LIEU OF LAP SPLICES. CONTRACTOR SHALL SUBMIT MECHANICAL COUPLER PRODUCT DATA TO ENGINEER FOR
REVIEW PRIOR TO STARTING CONSTRUCTION OR ORDERING MATERIAL.
13. USE NON-SHRINK, NON-METALLIC GROUT UNDER ALL BASE PLATES, BEARING PLATES, AND SETTING PLATES.
14. TOP AND BOTTOM HORIZONTAL REINFORCEMENT IN WALLS TO BE LOCATED NO LESS THAN 2" AND NO MORE THAN 3"
FROM TOP OR BOTTOM OF THE WALL.
15. WHERE BAR LENGTHS ARE GIVEN ON DRAWINGS, THE LENGTH OF ANY HOOK, IF REQUIRED, IS NOT INCLUDED.
16. THE HARDENED CONCRETE OF CONSTRUCTION JOINTS SHALL BE CLEANED TO REMOVE ALL DEBRIS AND LAITANCE.
DAMPEN SURFACE OF HARDENED CONCRETE TO A SATURATED SURFACE DRY CONDITION IMMEDIATELY BEFORE PLACING
FRESH CONCRETE.
17. WELDED WIRE FABRIC SHALL CONFORM TO ASTM A1064 DELIVERED IN FLAT SHEETS.
18. LAP WELDED WIRE FABRIC ONE SPACE (TWO CROSS WIRES) + 2" AT ALL EDGES AND ENDS OF SHEETS.
19. WELDING OF REINFORCEMENT STEEL IS NOT PERMITTED UNO.
20. PROVIDE 3/4" CHAMFERS ON EXPOSED CORNERS OF COLUMNS, BEAMS, AND WALLS UNLESS OTHERWISE INDICATED ON
THE ARCHITECTURAL DRAWINGS. MINIMUM CLEAR COVER FOR REINFORCEMENT BARS SHALL CONFORM WITH THE CLEAR
COVER REQUIREMENTS NOTED BELOW.
21. COMPLY WITH THE ARCHITECTURAL DRAWINGS FOR LOCATION AND EXTENT OF SPECIAL FINISHES OR TREATMENTS TO
EXPOSED CONCRETE.
BAR SIZE
LAP LENGTH (fc = 4,000 PSI) STANDARD 90°
HOOK LENGTH
STANDARD 180°
HOOK LENGTHTOP BARS OTHER BARS
#3 25" 19" 6" 4"
#4 33" 25" 8" 4 1/2"
#5 41" 31" 10" 5"
#6 49" 37" 12" 6"
#7 71" 54" 14" 7"
CONCRETE REINFORCEMENT CLEAR COVER REQUIREMENTS
OCCURANCES COVER
1. CONCRETE CAST AGAINST AND PERMANENTLY IN CONTACT WITH GROUND 3"
2. CONCRETE EXPOSED TO WEATHER OR IN CONTACT WITH GROUND
A. #5 BAR AND SMALLER 1 1/2"
B. #6 BAR AND LARGER 2"
3. CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND
A. SLABS, JOISTS, AND WALLS (NOT LARGER THAN #11 BAR) 3/4"
B. BEAMS, COLUMNS, AND PIERS 1 1/2"
NOTE: CLEAR COVER DIMENSIONS LISTED ARE CODE-REQUIRED MINIMUMS. PROVIDE
GREATER COVER WHERE SPECIFICALLY REQUIRED BY DETAILS.
CONCRETE TESTING
1. TESTING AGENCY: OWNER WILL ENGAGE A QUALIFIED INDEPENDENT TESTING AND INSPECTING AGENCY TO SAMPLE
MATERIALS, PERFORM TESTS, AND SUBMIT TEST REPORTS DURING CONCRETE PLACEMENT. SAMPLING AND TESTING FOR
QUALITY CONTROL MAY INCLUDE THOSE SPECIFIED IN THIS ARTICLE.
2. TESTING SERVICES: TESTING OF COMPOSITE SAMPLES OF FRESH CONCRETE OBTAINED ACCORDING TO ASTM C172
SHALL BE PERFORMED ACCORDING TO THE FOLLOWING REQUIREMENTS:
A. TESTING FREQUENCY: OBTAIN AT LEAST ONE COMPOSITE SAMPLE FOR EACH 100 CUBIC YARD OR FRACTION THEREOF
OF EACH CONCRETE MIX PLACED EACH DAY. WHEN FREQUENCY OF TESTING WILL PROVIDE FEWER THAN FIVE
COMPRESSIVE-STRENGTH TESTS FOR EACH CONCRETE MIX, TESTING SHALL BE CONDUCTED FROM AT LEAST FIVE
RANDOMLY SELECTED BATCHES OR FROM EACH BATCH IF FEWER THAN FIVE ARE USED.
B. SLUMP: ASTM C143, ONE TEST AT POINT OF PLACEMENT FOR EACH COMPOSITE SAMPLE, BUT NOT LESS THAN ONE
TEST FOR EACH DAY'S POUR OF EACH CONCRETE MIX. PERFORM ADDITIONAL TESTS WHEN CONCRETE CONSISTENCY
APPEARS TO CHANGE.
C. AIR CONTENT: ASTM C231, PRESSURE METHOD, FOR NORMAL-WEIGHT CONCRETE; ONE TEST FOR EACH COMPOSITE
SAMPLE, BUT NOT LESS THAN ONE TEST FOR EACH DAY'S POUR OF EACH CONCRETE MIX.
D. CONCRETE TEMPERATURE: ASTM C1064, ONE TEST HOURLY WHEN AIR TEMPERATURE IS 40 DEGREES F AND BELOW
AND WHEN 80 DEGREES F AND ABOVE, AND ONE TEST FOR EACH COMPOSITE SAMPLE.
E. COMPRESSIVE-STRENGTH TESTS: ASTM C39, TEST TWO LABORATORY-CURED SPECIMENS AT 7 DAYS AND TWO AT 28
DAYS. A COMPRESSIVE-STRENGTH TEST SHALL BE THE AVERAGE COMPRESSIVE STRENGTH FROM SPECIMENS OBTAINED
FROM THE SAME COMPOSITE SAMPLE AND TESTED AT THE AGE INDICATED. CAST AND FIELD CURE ADDITIONAL SETS OF
STANDARD CYLINDER SPECIMENS IN SETS OF THREE FOR EACH COMPOSITE SAMPLE WHEN REQUIRED TO VERIFY
STRENGTH OF IN PLACE CONCRETE FOR REMOVAL OF SHORING. SPECIMENS SHALL BE STORED ADJACENT TO AND
CURED SIMILAR TO CONCRETE TO BE VERIFIED.
3. WHEN STRENGTH OF FIELD-CURED CYLINDERS (IF REQUIRED) IS LESS THAN 85 PERCENT OF COMPANION
LABORATORY-CURED CYLINDERS, CONTRACTOR SHALL EVALUATE OPERATIONS AND PROVIDE CORRECTIVE PROCEDURES
FOR PROTECTING AND CURING IN-PLACE CONCRETE.
4. STRENGTH OF EACH CONCRETE MIX WILL BE SATISFACTORY IF EVERY AVERAGE OF ANY THREE CONSECUTIVE
COMPRESSIVE-STRENGTH TESTS EQUALS OR EXCEEDS SPECIFIED COMPRESSIVE STRENGTH AND NO
COMPRESSIVE-STRENGTH TEST VALUE FALLS BELOW SPECIFIED COMPRESSIVE STRENGTH BY MORE THAN 500 PSI.
5. TEST RESULTS SHALL BE REPORTED IN WRITING TO ENGINEER, CONCRETE MANUFACTURER, AND CONTRACTOR WITHIN
48 HOURS OF TESTING. REPORTS OF COMPRESSIVE-STRENGTH TESTS SHALL CONTAIN PROJECT IDENTIFICATION NAME
AND NUMBER, DATE OF CONCRETE PLACEMENT, NAME OF CONCRETE TESTING AND INSPECTING AGENCY, LOCATION OF
CONCRETE BATCH IN WORK, DESIGN COMPRESSIVE STRENGTH AT 28 DAYS, CONCRETE MIX PROPORTIONS AND
MATERIALS, COMPRESSIVE BREAKING STRENGTH, AND TYPE OF BREAK FOR BOTH 7- AND 28-DAY TESTS.
6. NONDESTRUCTIVE TESTING: IMPACT HAMMER SONOSCOPE, OR OTHER NONDESTRUCTIVE DEVICE MAY BE PERMITTED BY
ENGINEER BUT WILL NOT BE USED AS SOLE BASIS FOR APPROVAL OR REJECTION OF CONCRETE.
7. ADDITIONAL TESTS: TESTING AND INSPECTING AGENCY SHALL MAKE ADDITIONAL TESTS OF CONCRETE WHEN TEST
RESULTS INDICATE THAT SLUMP, AIR ENTRAINMENT, COMPRESIVE STRENGTHS, OR OTHER REQUIREMENTS HAVE NOT
BEEN MET, AS DIRECTED BY ENGINEER. TESTING AND INSPECTING AGENCY MAY CONDUCT TESTS TO DETERMINE
ADEQUACY OF CONCRETE BY CORED CYLINDERS COMPLYING WITH ASTM C42 OR BY OTHER METHODS AS DIRECTED BY
ARCHITECT.
SNOW DRIFT SCHEDULE
MARK MAGNITUDE WIDTH NOTES
SD01 53.4 PSF 11'-7" -
SD02 60.4 PSF 13'-0" -
SD03 52.5 PSF 11'-4" -
SD04 46.4 PSF 10'-0" -
SD05 55.1 PSF 11'-10" -
SD06 57.1 PSF 12'-4" -
SD07 63.2 PSF 13'-8" -
SD08 86.6 PSF 20'-0" -
SD09 63.2 PSF 13'-8" -
SD10 16.2 PSF 7'-0" -
SD11 45.2 PSF 9'-9" -
ABBREVIATIONS
ARCH ARCHITECTURAL
BRG BEARING
BS BOTTOM OF STEEL ELEVATION
BTM BOTTOM
CIP CAST-IN-PLACE
CJ CONTROL OR CONSTRUCTION JOINT
CL CENTER LINE
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONT CONTINUOUS
CVR COVER
DBE DECK BEARING ELEVATION
DF DOUG FIR-LARCH
DIA DIAMETER
EA EACH
EC EPOXY COATED
EF EACH FACE
EL ELEVATION
EQ EQUAL
EW EACH WAY
ISSUED FOR DATE
REQUIRED SPECIAL INSPECTIONS AND TESTS OF CONCRETE CONSTRUCTION
SPECIAL INSPECTION TASK
CONTINUOUS SPECIAL
INSPECTION
PERIODIC SPECIAL
INSPECTION
1. INSPECT REINFORCEMENT AND VERIFY PLACEMENT.
2. REINFORCING BAR WELDING (PERMITTED ONLY WHEN SPECIFICALLY SHOWN IN THE
DETAILS OR WITH PERMISSION IN WRITING BY THE ENGINEER):
A. VERIFY WELDABILITY OF REINFORCING BARS OTHER THAN ASTM A706
B. INSPECT SINGLE-PASS FILLET WELDS UP TO AND INCLUDING 5/16"
C. INSPECT ALL OTHER WELDS
3. INSPECT ANCHORS CAST IN CONCRETE
4. INSPECT ANCHORS POST-INSTALLED IN HARDENED CONCRETE
A. ADHESIVE ANCHORS INSTALLED IN HORIZONTALLY OR UPWARDLY INCLINED
ORIENTATIONS TO RESIST SUSTAINED TENSION LOADS
B. ALL OTHER ANCHORS POST-INSTALLED IN HARDENED CONCRETE
5. VERIFY USE OF REQUIRED DESIGN MIX.
6. PRIOR TO CONCRETE PLACEMENT, FABRICATE SPECIMENS FOR STRENGTH TESTS,
PERFORM SLUMP AND AIR CONTENT TESTS, AND DETERMINE THE TEMPERATURE
OF THE CONCRETE.
7. INSPECT CONCRETE PLACEMENT FOR PROPER APPLICATION TECHNIQUES.
8. VERIFY MAINTENANCE OF SPECIFIED CURING TEMPERATURE AND TECHNIQUES.
9. INSPECT PRESTRESSED CONCRETE FOR APPLICATION OF PRESTRESSING FORCES.
10. INSPECT ERECTION OF PRECAST CONCRETE MEMBERS.
11. VERIFY IN-SITU CONCRETE STRENGTH PRIOR TO REMOVAL OF SHORES AND
FORMS FROM BEAMS AND STRUCTURAL SLABS.
12. INSPECT FORMWORK FOR SHAPE, LOCATION AND DIMENSIONS OF CONCRETE
MEMBER BEING FORMED.
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
EXCEPTIONS - THE ABOVE SPECIAL INSPECTIONS AND TESTS SHALL NOT BE REQUIRED FOR THE FOLLOWING BUILDING ELEMENTS:
1. ISOLATED SPREAD FOOTINGS OF BUILDINGS THREE STORIES OR LESS ABOVE GRADE THAT ARE FULLY SUPPORTED ON EARTH OR ROCK.
2. NONSTRUCTURAL SLABS SUPPORTED DIRECTLY ON THE GROUND.
GENERAL NOTES REGARDING SPECIAL INSPECTIONS AND TESTS
1. SPECIAL INSPECTIONS ARE IN ADDITION TO INSPECTIONS BY THE BUILDING OFFICIAL THAT ARE IDENTIFIED IN SECTION 110 OF THE
MICHIGAN BUILDING CODE. SPECIAL INSPECTIONS DO NOT RELIEVE THE CONTRACTOR FROM COMPLYING WITH THE CONTRACT
DOCUMENTS.
2. CONTINUOUS SPECIAL INSPECTION IS DEFINED AS SPECIAL INSPECTION BY THE SPECIAL INSPECTOR WHO IS PRESENT
CONTINUOUSLY WHEN AND WHERE THE WORK TO BE INSPECTED IS BEING PERFORMED.
3. PERIODIC SPECIAL INSPECTION IS DEFINED AS SPECIAL INSPECTION BY THE SPECIAL INSPECTOR WHO IS INTERMITTENTLY PRESENT
WHERE THE WORK TO BE INSPECTED HAS BEEN OR IS BEING PERFORMED. THE FREQUENCY OF THESE SPECIAL INSPECTION TASKS
SHALL BE ADEQUATE TO DETERMINE THAT WORK HAS BEEN PERFORMED IN ACCORDANCE WITH THE APPROVED CONSTRUCTION
DOCUMENTS.
4. WHERE A SPECIAL INSPECTION TASK IS NOTED AS "OBSERVE," THE SPECIAL INSPECTOR SHALL OBSERVE THESE ITEMS ON A RANDOM
BASIS. OPERATIONS NEED NOT BE DELAYED PENDING THESE INSPECTIONS. THE FREQUENCY OF THESE SPECIAL INSPECTION TASKS
SHALL BE ADEQUATE TO DETERMINE THAT THE WORK HAS BEEN PERFORMED IN ACCORDANCE WITH THE APPROVED CONSTRUCTION
DOCUMENTS.
5. WHERE A SPECIAL INSPECTION TASK IS NOTED AS "PERFORM," THE TASK SHALL BE PERFORMED FOR EACH MEMBER, JOINT, OR
ELEMENT PRIOR TO FINAL ACCEPTANCE.
6. THE SPECIAL INSPECTOR SHALL BE A QUALIFIED PERSON EMPLOYED OR RETAINED BY AN APPROVED AGENCY AND APPROVED BY THE
BUILDING OFFICIAL AS HAVING THE COMPETENCE NECESSARY TO INSPECT A PARTICULAR TYPE OF CONSTRUCTION REQUIRING
SPECIAL INSPECTION.
7. THE PERIOD OF TIME BETWEEN SPECIAL INSPECTIONS CAN VARY GREATLY DEPENDING ON THE TYPE OF INSPECTION DONE, THE PACE
OF CONSTRUCTION, THE QUALITY OF WORKMANSHIP, AND OTHER FACTORS. IT IS THE RESPONSIBILITY OF THE SPECIAL INSPECTOR
TO PROVIDE INSPECTIONS AT AN APPROPRIATE FREQUENCY AND AT APPROPRIATE TIMES DURING CONSTRUCTION. THE SPECIAL
INSPECTOR MUST HAVE ADEQUATE EXPERIENCE AND EXHIBIT PROFESSIONAL JUDGEMENT IN DETERMINING THE TIMING AND
FREQUENCY OF INSPECTIONS.
8. PRIOR TO THE START OF CONSTRUCTION, THE APPROVED SPECIAL INSPECTION AGENCY SHALL SUBMIT WRITTEN DOCUMENTATION
TO THE BUILDING OFFICIAL DEMONSTRATING THE COMPETENCE AND RELEVANT EXPERIENCE OR TRAINING OF THE SPECIAL
INSPECTORS WHO WILL PERFORM THE SPECIAL INSPECTIONS AND TESTS DURING CONSTRUCTION.
9. THE CONSTRUCTION OR WORK FOR WHICH SPECIAL INSPECTION OR TESTING IS REQUIRED SHALL REMAIN ACCESSIBLE AND EXPOSED
FOR SPECIAL INSPECTION OR TESTING PURPOSES UNTIL COMPLETION OF REQUIRED SPECIAL INSPECTIONS OR TESTS. SEE
SPECIFICATION FOR ADDITIONAL REQUIREMENTS, INCLUDING CONTRACTOR'S RESPONSIBILITY TO PROVIDE ACCESS FOR SPECIAL
INSPECTIONS AND CONTRACTOR'S RESPONSIBILITY TO PROVIDE DUE NOTICE TO SPECIAL INSPECTOR PRIOR TO THE TIME THAT
SPECIAL INSPECTION IS REQUIRED.
10. SPECIAL INSPECTION AGENCY SHALL KEEP RECORDS OF SPECIAL INSPECTIONS AND TESTS AND SHALL SUBMIT REPORTS OF SPECIAL
INSPECTIONS AND TESTS TO THE BUILDING OFFICIAL AND TO THE ENGINEER. REPORTS SHALL INDICATE THAT WORK INSPECTED OR
TESTED WAS OR WAS NOT COMPLETED IN CONFORMANCE TO APPROVED CONSTRUCTION DOCUMENTS. DISCREPANCIES SHALL BE
BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR CORRECTION. IF THEY ARE NOT CORRECTED, THE
DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE BUILDING OFFICIAL AND TO THE ENGINEER PRIOR TO THE
COMPLETION OF THAT PHASE OF THE WORK. A FINAL REPORT DOCUMENTING REQUIRED SPECIAL INSPECTIONS AND TESTS, AND
CORRECTION OF ANY DISCREPANCIES NOTED IN THE INSPECTIONS AND TESTS, SHALL BE SUBMITTED TO THE BUILDING OFFICIAL.
11. WHERE SPECIAL INSPECTION OF STRUCTURAL MEMBERS OR ASSEMBLIES IS BEING CONDUCTED ON THE PREMISES OF A
FABRICATOR'S SHOP, SPECIAL INSPECTION OF THE FABRICATED ITEMS SHALL BE PERFORMED DURING FABRICATION.
12. SPECIAL INSPECTIONS DURING FABRICATION ARE NOT REQUIRED WHERE THE WORK IS DONE ON THE PREMISES OF A FABRICATOR
REGISTERED AND APPROVED BY THE BUILDING OFFICIAL TO PERFORM SUCH WORK WITHOUT SPECIAL INSPECTION. UPON THE
COMPLETION OF FABRICATION, THE APPROVED FABRICATOR SHALL SUBMIT A CERTIFICATE OF COMPLIANCE TO THE OWNER OR THE
OWNER'S AUTHORIZED AGENT FOR SUBMITTAL TO THE BUILDING OFFICIAL STATING THAT THE WORK WAS PERFORMED IN
COMPLIANCE WITH THE APPROVED CONSTRUCTION DOCUMENTS.
13. REFER TO THE CODE SECTIONS REFERENCED IN THE HEADER OF EACH TABLE ON THIS SHEET FOR TESTING AND INSPECTION
CRITERIA.
14. REFER TO PROJECT SPECIFICATIONS FOR ADDITIONAL TESTING AND INSPECTION CRITERIA.
REQUIRED SPECIAL INSPECTIONS AND TESTS OF SOILS
SPECIAL INSPECTION TASK
CONTINUOUS SPECIAL
INSPECTION
PERIODIC SPECIAL
INSPECTION
1. VERIFY MATERIALS BELOW SHALLOW FOUNDATIONS ARE ADEQUATE TO ACHIEVE
THE DESIGN BEARING CAPACITY.
2. VERIFY EXCAVATIONS ARE EXTENDED TO THE PROPER DEPTH AND HAVE REACHED
PROPER MATERIAL.
3. PERFORM CLASSIFICATION AND TESTING OF COMPACTED FILL MATERIALS.
4. DURING FILL PLACEMENT, VERIFY USE OF PROPER MATERIALS AND PROCEDURES
IN ACCORDANCE WITH THE PROVISIONS OF THE APPROVED GEOTECHNICAL
REPORT. VERIFY DENSITIES AND LIFT THICKNESSES DURING PLACEMENT AND
COMPACTION OF COMPACTED FILL.
5. PRIOR TO PLACEMENT OF COMPACTED FILL, INSPECT SUBGRADE AND VERIFY
THAT SITE HAS BEEN PREPARED PROPERLY.
X
X
X
X
X
NOTE: FOR PROJECTS THAT DO NOT INCLUDE AN APPROVED GEOTECHNICAL REPORT,
REFER TO PROJECT SPECIFICATION FOR REQUIREMENTS OF FILL PLACEMENT.
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
T O
W E
R P
IN
K
S T
E R
.C O
M
A L
L R
IG
H
T S
R E
S E
R V
E D
S T
A T
E M
E N
T O
F S
P E
C
IA
L I
N S
P E
C T
IO
N
S
-2
.0
S G
A M
B E
R L
Y E
L E
M E
N T
A R
Y S
C H
O O
L B
P
E A
R L Y
F O
U N
D A
T
IO
N
P o rt a g e
M ic h ig a n
P O
R T
A G
E P
U B
L
IC
S C
H O
O L
S
M A
R C
H
W /D
M
D D
F F
H H
E E
S
R
2 3 4
B B
A A
6 1075
P
N
M
C C
8 11 12
G G
Q
J
K
L
96'-0" 111'-4" 93'-4"
300'-8"
'-0
'-0
'-0
'-8
149'-8 5/8"
'-1
/4
65'-8"
MECHANICAL
M118
KITCHEN
ELEC
E116
SERVERY
CAFE
TABLE STG
110S
CONFERENCE
TEACHER LOUNGE
FLEX OFFICE
PRINCIPAL
RECEPTION
COPY
RECORDS
101 WOMEN
CUST
MEN
CLINIC TLT
102T
GYM
WELCOMING ENTRY
100H
LIVING ROOM
120G
PASSAGEWAY
120H
MUSIC
GYM STG
120S
PASSAGEWAY
120H
LIBRARY
MAKERSPACE
HEART
ASD STUDIO
LEARNING STUDIO
STAIR
ST03
LEARNING STUDIO
EDUCATOR WORKSHOP
LEARNING STUDIO
168 LEARNING COMMONS
LEARNING STUDIO
SGR
160GPASSAGEWAY
160H
ESI STUDIO
132STORAGE
129S
CUST
KILN
129K
FLEX STUDIO
FLEX STUDIO
LEARNING STUDIO
STAIR
ST01
LEARNING STUDIO
LEARNING STUDIO
LEARNING COMMONS
LEARNING STUDIO
ESI STUDIO
PASSAGEWAY
140H
SGR
146G
EDUCATOR WORKSHOP
PASSAGEWAY
150H
TLT
150T
DATA/IT
D130ELEV
EL01
PASSAGEWAY
130H
LEARNING STUDIO
LEARNING STUDIO
STAIR
ST02
LEARNING STUDIO
LEARNING STUDIO
LEARNING COMMONS
SGR
151G
TLT
160T
21.6
23.5
24.5
J.5
K.6
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
T O
W E
R P
IN
K
S T
E R
.C O
M
A L
L R
IG
H
T S
R E
S E
R V
E D
O V
E R
A L
L F
O U
N D
A T
IO
N
P L A
N
-2
.0
S
A M
B E
R L
Y E
L E
M E
N T
A R
Y S
C H
O O
L B
P
E A
R L Y
F O
U N
D A
T
IO
N
P o rt a g e
M ic h ig a n
P O
R T
A G
E P
U B
L
IC
S C
H O
O L
S
M A
R C
H
KEYED NOTES - STRUCTURAL - FOUNDATION
1 INTERIOR CMU SHEAR WALL ABOVE, REFER TO FRAMING PLANS.
LEGEND - STRUCTURAL - FOUNDATION
SF STEPPED FOOTING. REFER TO TYPICAL DETAILS. CREATE EQUAL STEPS
BETWEEN ADJACENT TOP OF FOOTING ELEVATIONS.
TOP OF FOUNDATION ELEMENT; REFER TO FOUNDATION PLAN NOTES FOR
ELEVATIONS NOT NOTED ON PLANS
TW TW - TOP OF WALL
TP TP - TOP OF PIER
TF TF - TOP OF FOUNDATION
Fx.x/WFx.x SPREAD FOOTING OR WALL FOOTING DESIGNATION. REFER TO FOOTING
SCHEDULES.
Px CONCRETE PIER DESIGNATION. REFER TO TYPICAL PIER DETAILS.
BPx STEEL COLUMN BASE PLATE, REFER TO BASE PLATE DETAILS AND ANCHOR
SETTING DETAILS.
NOTES - STRUCTURAL - FOUNDATION
1 FLOOR CONSTRUCTION, UNO: 4" SLAB ON GRADE WITH 6x6-W1.4xW1.4 WWF. REFER
TO TYPICAL DETAILS ON FOR ADDITIONAL REQUIREMENTS.
2 TOP OF SLAB-ON-GRADE ELEVATION = VARIES AS NOTED, REFER TO ARCHITECTURAL.
3 TOP OF PIER ELEVATION = REFER TO PLAN.
4 TOP OF BRICK LEDGE ELEVATION = REFER TO PLAN.
5 TOP OF FOOTING ELEVATION = 97'-0" UNO. ALL EXTERIOR FOOTINGS TO EXTEND A
MINIMUM OF 3'-6" BELOW FINISHED GRADE.
6 REFER TO GENERAL NOTES FOR DESIGN SOIL BEARING CAPACITY.
7 PROVIDE FROST-FREE ENTRANCE APRON AT ALL EXTERIOR DOORS, REFER TO TYPICAL
DETAIL.
8 REFER TO TYPICAL DETAIL FOR PIPE CROSSINGS AT FOUNDATIONS, STEP FOOTINGS AS
REQUIRED TO ALLOW PIPE TO PASS THROUGH FOUNDATION WALL. REFER TO
MECHANICAL FOR SIZES AND LOCATIONS OF PIPING, COORDINATE FINAL SIZES AND
ELEVATIONS WITH MECHANICAL SUPPLIER.
9 PROVIDE THICKENED SLAB UNDER ALL INTERIOR NON-LOADBEARING CMU WALLS AND
STAIR STRINGERS PER TYPICAL DETAILS. THESE ITEMS ARE NOT SHOWN ON THE
STRUCTURAL FOUNDATION PLANS. COORDINATE LOCATION WITH THE ARCHITECTURAL
DRAWINGS.
10 VERIFY LOCATIONS OF COLUMNS, WALLS, OPENINGS, ETC. WITH ARCHITECTURAL
DRAWINGS BEFORE PLACING FOUNDATIONS.
11 COORDINATE WITH ALL DRAWINGS FOR LOCATION OF OPENINGS, SLEEVES, AND UNDER
FLOOR PIPES, CONDUITS, DRAINS, DEPRESSIONS, ETC.
12 SUBGRADE IMPROVEMENTS OVER PORTIONS OF THE BUILDING FOOTPRINT ARE
EXPECTED AS NOTED IN THE GEOTECHNICAL REPORT RECOMMENDATIONS.
1/16" = 1'-0"
OVERALL FOUNDATION PLAN
TRUE NORTH
AMBERLY ELEMENTARY
UNIT A
UNIT B UNIT C UNIT D
KEY PLAN
SCALE: NO SCALE
THIS DRAWING SHEET IS INTENDED TO BE PLOTTED IN
COLOR. IF THIS TEXT APPEARS IN BLACK AND WHITE,
IT IS PLOTTED INCORRECTLY. DISCARD AND OBTAIN
AN ACCURATE DRAWING
M
S
R
P
N
M
Q
S 303
S 303
S 303
S 303
S 303
S 303
S 303
W F2
WF32
WF24
W F2
W F2
W F3
WF24
WF24
W F2
WF24
W F2
W F2
W F2
WF24
WF24
WF24
W F2
WF24
WF24
WF24
W F2
WF36
W F3
S 303
9 SIM
S 303
S 303
S O
G
'-8
S O
G
'-0
S O
G
'-8
S O
G '-0
S 303
S 303
S 303
S 303
S 303
S 303
S 303
F4.0
TF=
95'-4"
F4.0
TF=
97'-0"
F4.0
TF=
98'-0"
F4.0
TF= 98'-0"
F4.0
TF= 98'-0"
F11.4
TF= 97'-0"
F4.0
TF= 95'-0"
S 303
W F2
W F3
WF32
WF32 W
F3
WF36
J
J
'-8
'-8
'-4
13'-8"
7'-1"
29'-0"
21'-11"
25'-3 1/2"
54'-5 1/2" 20'-9" 1'-3"
K
K
L
L
'-7
/4
'-3
'-0
'-0
'-0
1'-2"
14'-2"
11'-8"
4'-8"
1'-8"
TW= 100'-0"
TF= 97'-0"
'-0
'-0
'-6
'-2
'-0
'-1
/8
1'-4"
5'-8"
8"
'-8
S 301
R 6' - 8"
R 6' - 8"
21'-1 7/8"
1'-4"
TW= 100'-0"
'-1
/2
'-0
SF
SF
F4.0
TF= 95'-0"
'-0
'-0
'-0
'-0
'-0
27'-4"
'-0
10°
8" 8"
10 3/8"
4'-8"
3'-0"
3'-0"
TW= 100'-0"
WF24
"8
S 301
'-4
'-6
1'-4"
4'-0"
S 301
'-0
'-0
'-4
8"
8"
'-6
RWF54
TW= 98'-0"
'-0
RW
F5
1'-4"
TF= 95'-0"
'-4
RWF54
RW
F5
TW= 97'-4"
TF= 95'-0"
1'-4"
TF= 95'-0"
TW= 97'-4"
6'-7"
19'-4"
1'-4"
1'-9"
'-0
78'-0 5/8"
10'-5"
5'-8"
5'-10"
16'-4"
4'-8"
2'-5"
5'-7" S 301
'-4
'-0
S 301
TF= 95'-0"
TW= 98'-0"
TW= 100'-0"
WF24
TW= 98'-8"
S 301
TW= 98'-8"
'-8
'-0
'-0
'-4
'-4
TF= 95'-0"
TW= 98'-0"
TW= 98'-8"
'-0
'-1
/4 "3'-0"
TW= 98'-8"
TW= 98'-0"
TF= 95'-0"
8" 8"
1'-4"
S 301
'-0
1'-0" 8"
1'-8"
TW= 98'-8"
TW= 98'-0"
TF= 95'-0"
65'-8"
TW= 98'-8"
TW= 98'-0"
TF= 95'-0"
'-0
'-8
TW= 98'-0"
TW= 98'-8"
TF= 95'-0"
FAMILY RESOURCE
13'-3"
S 303
S 303
'-7
/2
'-1
'-4
/4
'-3
5"
5'-5"
9'-4 1/2"
5"
10'-0"
93'-0 1/2"
S 303
S 303
S 303
S 303
4'-9 1/2"
24'-1 3/4"
RA
M
P
UNIT
A
UNIT
C
MUSIC
TW= 99'-4"
TW= 100'-0"
TF= 97'-0"
S F
S F
TF= 97'-0"
TW= 99'-4"
TW= 100'-0"
'-0
45°
65°
SF
SF
'-4
'-0
'-4
SF
SF
TF= 97'-0"
TW= 99'-4"
TF= 97'-0"
TF= 94'-0"
S F
S F
TF= 94'-0"
TF= 97'-0"
TW= 99'-4"
TEACHER LOUNGE
FLEX OFFICE
PRINCIPAL
W F3
WF32
TW= 97'-4"
SF
SF
TF= 95'-0"
TW= 98'-0"
TW= 98'-0"
TF= 93'-0"
RW
F5
S 303
S 303
SIM
S 301
TYP
9'-11 1/2"
'-6
/2
W F2
W F2
SF
SF
SF
SF
SF
SF
S F
S F
S F
S F
SF
SF
S
FS
F
S
FS
F
TS
TS24
S 301
S 301
TS
TS24
S 301
TS
S F
SOG=98'-8"
SOG100'-0"
WF48 S 303
S 303
BP1
P1
TP=97'-8"BP1
P1
TP=99'-0"
BP1
SIM
TF= 95'-0"
S F
S F
TW= 98'-0"
TF= 93'-0"
TF= 95'-0"
BP3
BP3
BP4
BP4
BP6
BP5
BP6
BP5
BP6
BP7
B P
B P
B P
B P
B P
SF
SF
TF= 92'-0"SF
SF
TW= 98'-0"
TF= 95'-0"
TF= 95'-0"
P2
TP=99'-0"
BP2
BP2
F11.4
TF= 97'-0"
P2
TP=99'-0"
BP2
BP2
LIBRARY
MEN
SERVERY
S F
7'-0" ±
'-8
" 8"
2'-8"
TF= 98'-0"
MECHANICAL
M118
DRY STORAGE
KITCHEN
ELEC
E116
RECEIVING
CAFE
GYM
WELCOMING ENTRY
100H
GYM STG
120S
PE OFFICE
ELEC
E120
FAMILY TLT
120T
TLT
100T
RECEPTION
COPY
CLINIC
CONFERENCE
CLINIC TLT
102T
DISHWASHING
CUST
WOMEN
DATA/IT
D120
LIVING ROOM
120G
PASSAGEWAY
120H
SECURE VESTIBULE
V100
TABLE STG
110S
VESTIBULE
110V
SF
'-0
'-0
SF
SF
TF= 97'-4"
TF= 96'-8"
TF= 98'-0"
S 301
PASSAGEWAY
120H
TF= 97'-4"
WF24
WF24
135°
'-8
'-6
/8
Room
NA
MAKERSPACE
TW= 99'-4"
TF= 97'-0"
W F2
W F2
W F2
SF
SF
SF
TS24
W F2
W F2
S 303
S 303
4'-6"
'-6
4'-6"
WF24
TW= 99'-4"
TF= 97'-0"S 303
21.6
7'-10"
6'-4"
5'-10"
5'-10"
23.5
24.5
TW= 100'-0"
TF= 97'-0"
J.5
'-4
'-8
'-1
/2
'-4
/2
K.6
TW= 99'-4"
S 301
S
FS
FS
F
TF= 99'-4"
UNIT A
UNIT C
S 303
5 SIM
WF32
20°
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
T O
W E
R P
IN
K
S T
E R
.C O
M
A L
L R
IG
H
T S
R E
S E
R V
E D
F O
U N
D A
T
IO
N P
L A
N
U N
IT
A
-2
.0
S
A
A M
B E
R L
Y E
L E
M E
N T
A R
Y S
C H
O O
L B
P
E A
R L Y
F O
U N
D A
T
IO
N
P o rt a g e
M ic h ig a n
P O
R T
A G
E P
U B
L
IC
S C
H O
O L
S
M A
R C
H
KEYED NOTES - STRUCTURAL - FOUNDATION
1 INTERIOR CMU SHEAR WALL ABOVE, REFER TO FRAMING PLANS.
LEGEND - STRUCTURAL - FOUNDATION
SF STEPPED FOOTING. REFER TO TYPICAL DETAILS. CREATE EQUAL STEPS
BETWEEN ADJACENT TOP OF FOOTING ELEVATIONS.
TOP OF FOUNDATION ELEMENT; REFER TO FOUNDATION PLAN NOTES FOR
ELEVATIONS NOT NOTED ON PLANS
TW TW - TOP OF WALL
TP TP - TOP OF PIER
TF TF - TOP OF FOUNDATION
Fx.x/WFx.x SPREAD FOOTING OR WALL FOOTING DESIGNATION. REFER TO FOOTING
SCHEDULES.
Px CONCRETE PIER DESIGNATION. REFER TO TYPICAL PIER DETAILS.
BPx STEEL COLUMN BASE PLATE, REFER TO BASE PLATE DETAILS AND ANCHOR
SETTING DETAILS.
NOTES - STRUCTURAL - FOUNDATION
1 FLOOR CONSTRUCTION, UNO: 4" SLAB ON GRADE WITH 6x6-W1.4xW1.4 WWF. REFER
TO TYPICAL DETAILS ON FOR ADDITIONAL REQUIREMENTS.
2 TOP OF SLAB-ON-GRADE ELEVATION = VARIES AS NOTED, REFER TO ARCHITECTURAL.
3 TOP OF PIER ELEVATION = REFER TO PLAN.
4 TOP OF BRICK LEDGE ELEVATION = REFER TO PLAN.
5 TOP OF FOOTING ELEVATION = 97'-0" UNO. ALL EXTERIOR FOOTINGS TO EXTEND A
MINIMUM OF 3'-6" BELOW FINISHED GRADE.
6 REFER TO GENERAL NOTES FOR DESIGN SOIL BEARING CAPACITY.
7 PROVIDE FROST-FREE ENTRANCE APRON AT ALL EXTERIOR DOORS, REFER TO TYPICAL
DETAIL.
8 REFER TO TYPICAL DETAIL FOR PIPE CROSSINGS AT FOUNDATIONS, STEP FOOTINGS AS
REQUIRED TO ALLOW PIPE TO PASS THROUGH FOUNDATION WALL. REFER TO
MECHANICAL FOR SIZES AND LOCATIONS OF PIPING, COORDINATE FINAL SIZES AND
ELEVATIONS WITH MECHANICAL SUPPLIER.
9 PROVIDE THICKENED SLAB UNDER ALL INTERIOR NON-LOADBEARING CMU WALLS AND
STAIR STRINGERS PER TYPICAL DETAILS. THESE ITEMS ARE NOT SHOWN ON THE
STRUCTURAL FOUNDATION PLANS. COORDINATE LOCATION WITH THE ARCHITECTURAL
DRAWINGS.
10 VERIFY LOCATIONS OF COLUMNS, WALLS, OPENINGS, ETC. WITH ARCHITECTURAL
DRAWINGS BEFORE PLACING FOUNDATIONS.
11 COORDINATE WITH ALL DRAWINGS FOR LOCATION OF OPENINGS, SLEEVES, AND UNDER
FLOOR PIPES, CONDUITS, DRAINS, DEPRESSIONS, ETC.
12 SUBGRADE IMPROVEMENTS OVER PORTIONS OF THE BUILDING FOOTPRINT ARE
EXPECTED AS NOTED IN THE GEOTECHNICAL REPORT RECOMMENDATIONS.
TRUE NORTH
AMBERLY ELEMENTARY
UNIT A
UNIT B UNIT C UNIT D
KEY PLAN
SCALE: NO SCALE
1/8" = 1'-0"
FOUNDATION PLAN - UNIT A
THIS DRAWING SHEET IS INTENDED TO BE PLOTTED IN
COLOR. IF THIS TEXT APPEARS IN BLACK AND WHITE,
IT IS PLOTTED INCORRECTLY. DISCARD AND OBTAIN
AN ACCURATE DRAWING
WALL FOOTING SCHEDULE
MARK
SIZE REINFORCEMENT
THICKNESS WIDTH LONGITUDINAL TRANSVERSE
WF24 12" 24" (2) #5 -
WF32 12" 32" (3) #5 -
WF36 14" 36" (3) #5 -
WF42 14" 42" (4) #5 -
WF48 16" 48" (4) #5 #5 @ 12" OC
WF54 16" 54" (5) #5 #5 @ 12" OC
RWF54 18" 54" REFER TO DETAIL
WF60 18" 60" (5) #5 #5 @ 12" OC
WF78 18" 78" (6) #5 #6 @ 12" OC
SPREAD FOOTING SCHEDULE
MARK
SIZE
REINFORCEMENTTHICKNESS WIDTH LENGTH
F4.0 12" 4'-0" 4'-0" (4) #5 EW
F4.5 12" 4'-6" 4'-6" (4) #5 EW
F5.5 12" 5'-6" 5'-6" (6) #5 EW
F5.7 14" 7'-0" 5'-5" (6) #6 LONG, (5) #6 SHORT
F6.0 12" 6'-0" 6'-0" (7) #5 EW
F6.5 13" 6'-6" 6'-6" (6) #6 EW
F7.0 14" 7'-0" 7'-0" (6) #6 EW
F7.5 15" 7'-6" 7'-6" (7) #6 EW
F8.5 17" 8'-6" 8'-6" (7) #7 EW
F9.5 18" 9'-6" 9'-6" (8) #7 EW
F10.7 17" 10'-0" 7'-0" (8) #7 LONG, (6) #7 SHORT
F11.4 12" 11'-0" 4'-0" (7) #6 LONG, (4) #6 SHORT
UNIT B
UNIT C
UNIT
B
UNIT
C
D
F
H
E
1 2 3
B
C
G
S 303
S 303
S 303
S 303
S 303
1 S 303
S 303
S 303
S 303
S 303
S 303
WF36
WF32
W F4
WF36
W F4
WF42
W F3
WF36
TYP
F7.5
TF= 97'-0"
F5.5
TF= 94'-10"
F7.5
TF= 95'-4"
'-0
'-5
'-9
'-6
'-0
'-8
'-4
'-0
1'-0" 6'-9" 5'-4" 27'-9" 1'-2"
'-4
'-4
'-4
'-4
'-0
'-4
S F
SF
'-0
'-0
'-0
'-8
'-4
S F
28'-8" 22'-8" 30'-8" 14'-0"
96'-0"
S 301
6'-6"
'-4
WF42
'-8
TW= 99'-4"
TW= 98'-8"
TF= 96'-0"
'-4
8" 8"
'-4
TW= 99'-4"
TW= 98'-8"
TF= 96'-0"
'-4
"8" 8"
TW= 99'-4"
TW= 98'-8"
3'-8" 18'-0" 3'-8"
W F4
8" 8"
TW= 99'-4"
TW= 98'-8"
TF= 96'-0"
TW= 99'-4"
TF= 97'-0" 1
'-4
TF= 97'-0"
TW= 99'-4"
1'-4"
100'-0"
26'-8" 42'-0" 31'-4"
S 301
'-0
TF= 96'-0"
TW= 98'-8"
TW= 99'-4"
W F4
8" 8"
'-4
TF= 96'-0"
TW= 99'-4"
WF32
8" 8"
TF= 96'-0"
TF= 97'-0"
TW= 98'-8"
TW= 99'-4"
S 303
39'-10" 33'-6"
8'-0" 4'-0"
SF
SF
SF
SF
SF
SF
SF
SF
SF
TF= 92'-0"
TF= 97'-0"
WF42
WF42
W F3
WF78
TYP
P1
TP=98'-4"
BP2
P1
TP=98'-4"
BP2
BP2
SGR
146G
LEARNING STUDIO
TLT
146T
19'-2" 9'-6"
28'-8"
S 301
S 303
SF
SF
TW= 98'-8"
SF
SF
S 301
SF
P1
TP=98'-4"
TF= 95'-4"
SF
'-0
F6.5
TF= 98'-8"
W F4
TF= 98'-8"
TF= 98'-8"
CUST
KILN
129K
ESI STUDIO
FLEX STUDIO
SF
W F4
W F3
W F3
TF= 96'-0"
W F3
SF
W F3
TW= 98'-8" 2
'-0
TF= 96'-0"
TW= 98'-8"
S 303
8"
LEARNING STUDIO
LEARNING COMMONS
LEARNING STUDIO
TLT
148T
TLT
147T
STAIR
ST01
LEARNING STUDIO
PASSAGEWAY
140H
TLT
149T
ELEC
E140
SGR
140G
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
T O
W E
R P
IN
K
S T
E R
.C O
M
A L
L R
IG
H
T S
R E
S E
R V
E D
F O
U N
D A
T
IO
N P
L A
N
U N
IT
B
-2
.0
S
B
A M
B E
R L
Y E
L E
M E
N T
A R
Y S
C H
O O
L B
P
E A
R L Y
F O
U N
D A
T
IO
N
P o rt a g e
M ic h ig a n
P O
R T
A G
E P
U B
L
IC
S C
H O
O L
S
M A
R C
H
KEYED NOTES - STRUCTURAL - FOUNDATION
1 INTERIOR CMU SHEAR WALL ABOVE, REFER TO FRAMING PLANS.
LEGEND - STRUCTURAL - FOUNDATION
SF STEPPED FOOTING. REFER TO TYPICAL DETAILS. CREATE EQUAL STEPS
BETWEEN ADJACENT TOP OF FOOTING ELEVATIONS.
TOP OF FOUNDATION ELEMENT; REFER TO FOUNDATION PLAN NOTES FOR
ELEVATIONS NOT NOTED ON PLANS
TW TW - TOP OF WALL
TP TP - TOP OF PIER
TF TF - TOP OF FOUNDATION
Fx.x/WFx.x SPREAD FOOTING OR WALL FOOTING DESIGNATION. REFER TO FOOTING
SCHEDULES.
Px CONCRETE PIER DESIGNATION. REFER TO TYPICAL PIER DETAILS.
BPx STEEL COLUMN BASE PLATE, REFER TO BASE PLATE DETAILS AND ANCHOR
SETTING DETAILS.
NOTES - STRUCTURAL - FOUNDATION
1 FLOOR CONSTRUCTION, UNO: 4" SLAB ON GRADE WITH 6x6-W1.4xW1.4 WWF. REFER
TO TYPICAL DETAILS ON FOR ADDITIONAL REQUIREMENTS.
2 TOP OF SLAB-ON-GRADE ELEVATION = VARIES AS NOTED, REFER TO ARCHITECTURAL.
3 TOP OF PIER ELEVATION = REFER TO PLAN.
4 TOP OF BRICK LEDGE ELEVATION = REFER TO PLAN.
5 TOP OF FOOTING ELEVATION = 97'-0" UNO. ALL EXTERIOR FOOTINGS TO EXTEND A
MINIMUM OF 3'-6" BELOW FINISHED GRADE.
6 REFER TO GENERAL NOTES FOR DESIGN SOIL BEARING CAPACITY.
7 PROVIDE FROST-FREE ENTRANCE APRON AT ALL EXTERIOR DOORS, REFER TO TYPICAL
DETAIL.
8 REFER TO TYPICAL DETAIL FOR PIPE CROSSINGS AT FOUNDATIONS, STEP FOOTINGS AS
REQUIRED TO ALLOW PIPE TO PASS THROUGH FOUNDATION WALL. REFER TO
MECHANICAL FOR SIZES AND LOCATIONS OF PIPING, COORDINATE FINAL SIZES AND
ELEVATIONS WITH MECHANICAL SUPPLIER.
9 PROVIDE THICKENED SLAB UNDER ALL INTERIOR NON-LOADBEARING CMU WALLS AND
STAIR STRINGERS PER TYPICAL DETAILS. THESE ITEMS ARE NOT SHOWN ON THE
STRUCTURAL FOUNDATION PLANS. COORDINATE LOCATION WITH THE ARCHITECTURAL
DRAWINGS.
10 VERIFY LOCATIONS OF COLUMNS, WALLS, OPENINGS, ETC. WITH ARCHITECTURAL
DRAWINGS BEFORE PLACING FOUNDATIONS.
11 COORDINATE WITH ALL DRAWINGS FOR LOCATION OF OPENINGS, SLEEVES, AND UNDER
FLOOR PIPES, CONDUITS, DRAINS, DEPRESSIONS, ETC.
12 SUBGRADE IMPROVEMENTS OVER PORTIONS OF THE BUILDING FOOTPRINT ARE
EXPECTED AS NOTED IN THE GEOTECHNICAL REPORT RECOMMENDATIONS.
TRUE NORTH
AMBERLY ELEMENTARY
UNIT A
UNIT B UNIT C UNIT D
KEY PLAN
SCALE: NO SCALE
1/8" = 1'-0"
FOUNDATION PLAN - UNIT B
THIS DRAWING SHEET IS INTENDED TO BE PLOTTED IN
COLOR. IF THIS TEXT APPEARS IN BLACK AND WHITE,
IT IS PLOTTED INCORRECTLY. DISCARD AND OBTAIN
AN ACCURATE DRAWING
WALL FOOTING SCHEDULE
MARK
SIZE REINFORCEMENT
THICKNESS WIDTH LONGITUDINAL TRANSVERSE
WF24 12" 24" (2) #5 -
WF32 12" 32" (3) #5 -
WF36 14" 36" (3) #5 -
WF42 14" 42" (4) #5 -
WF48 16" 48" (4) #5 #5 @ 12" OC
WF54 16" 54" (5) #5 #5 @ 12" OC
RWF54 18" 54" REFER TO DETAIL
WF60 18" 60" (5) #5 #5 @ 12" OC
WF78 18" 78" (6) #5 #6 @ 12" OC
SPREAD FOOTING SCHEDULE
MARK
SIZE
REINFORCEMENTTHICKNESS WIDTH LENGTH
F4.0 12" 4'-0" 4'-0" (4) #5 EW
F4.5 12" 4'-6" 4'-6" (4) #5 EW
F5.5 12" 5'-6" 5'-6" (6) #5 EW
F5.7 14" 7'-0" 5'-5" (6) #6 LONG, (5) #6 SHORT
F6.0 12" 6'-0" 6'-0" (7) #5 EW
F6.5 13" 6'-6" 6'-6" (6) #6 EW
F7.0 14" 7'-0" 7'-0" (6) #6 EW
F7.5 15" 7'-6" 7'-6" (7) #6 EW
F8.5 17" 8'-6" 8'-6" (7) #7 EW
F9.5 18" 9'-6" 9'-6" (8) #7 EW
F10.7 17" 10'-0" 7'-0" (8) #7 LONG, (6) #7 SHORT
UNIT
C
UNIT
D
UNIT B
UNIT C
UNIT
B
UNIT
C
D
F
H
E
3 4
B
A
6 1075
C
8 11 12
G
S 303
S 303
S 303
S 303
S 303
S 303
S 303
S 303
S 303
WF42
W F3
W F4
WF42
WF48
W F3
2 WF48
W F4
WF42
W F3
W F5
WF32
W F3
W F5
W F3
WF36
WF54
W F3
WF60
W F3
WF24
WF24
W F4
WF36
W F3
S 301
12TYP
S 303
SOG=99'-4"
SOG=98'-8"
SOG=99'-4"
SOG=100'-0"
S 303
7TYP
S 303
S 303
9 SIM
F5.5
TF= 98'-8"
F6.0
TF= 98'-4"
F7.5
TF= 95'-0"
F9.5
TF= 98'-8"
F8.5
TF= 98'-4"
F7.0
TF= 98'-4"
'-4
'-3
/2
'-4
/2
'-5
'-9
'-6
'-0
'-8
'-4
5'-0" 31'-2 1/2" 17'-0" 13'-3" 3'-4" 11'-3" 5'-3 1/2" 9'-9 1/2" 15'-2 1/2" 5'-3 1/2"
LEARNING STUDIO
'-4
'-8
'-4
'-0
'-8
'-0
S F
'-7
/2
F4.5
TF= 98'-0"
S O
G
'-8
'-8
S 301
4'-0"
1'-4"
8" 8"
TW= 100'-0"
TW= 99'-4"
TF= 95'-0"
TW= 98'-8"
S 301
TF= 95'-0"
TW= 99'-4"
TW= 100'-0"
WF42
TF= 95'-0"
TW= 99'-4"
TW= 98'-8"
'-4
'-4
'-0
'-4
'-4
S 301
1'-4" 4'-0"
8" 8"
TW= 99'-4"
TW= 98'-8"
TF= 96'-0"
8" 8"
'-8
'-4
'-0
1'-10 1/2" 18'-7 1/2" 7'-10 1/2"
TW= 99'-4"
TW= 98'-8"
TF= 96'-0"
TW= 99'-4"
TF= 96'-0"
8" 8"
1'-4"
35'-4" 76'-0"
10 1/2" 6'-1 1/2" 5'-4" 5'-6 1/2"
S 301
'-0
TW= 99'-4"
TW= 98'-8"
TF= 96'-0"
'-4
8" 8"
TW= 99'-4"
TW= 98'-8"
TF= 96'-0"
'-4
"8
8" 8"
1'-4"
4'-0" 8" 8"
'-8
'-4
8" 8"
1'-4"
TW= 99'-4"
TW= 98'-8"
TF= 97'-0"
SF SF
SOG=99'-4"
SOG=100'-0"
S 303
S 303
S 303
S 303
S 303
6'-0" 22'-3 1/2"
'-9
/2
9'-0"
2"
'-2
'-2
9'-9"
'-0
S 303
S 303
S 303
S 303
S 303
RAMP
R A M
P
UNIT
A
UNIT
C
MUSIC
S F
4'-0" 8" 8"
F10.7
TF= 95'-0"
P1
TP=98'-4"
BP2
F5.7
TF= 95'-0"
P1
TP=98'-8"
BP2
S F
WF36
S F
S F
SF
SF
S F
S F
S F
SF
SF
SF
SF
S F
S F
UNIT C UNIT D
S F
SOG=98'-8"
SOG100'-0"
WF48 S 303
BP2
S F
SF
WF36
SF
TF= 98'-8"
S F
S F
BP2
TS24
TS24
SF
SF
SF
W F2
W F2
SF
1 1
SF
S F
S F
SF
'-0
'-0
6"
WF60
TF= 98'-8"
S F
SF
SF
TF= 98'-0"
TF= 97'-4"
S 301
8SIM
TW= 98'-8"
F5.5
TF= 96'-0"
W F4
BP2 BP2
BP2
BP2
P1
TP=98'-4"
BP2 8
/8
2'-6 7/8" 6'-1 1/8"
'-8
/8
'-2
/8
TW= 98'-8"
TF= 94'-4"
TF= 98'-8"
WF48
S F
S
FSF
HEART
STAFF TLT
140T
CUST
ESI SENSORY
STORAGE
129S
KILN
129K
MAKERSPACE
ESI SGR /OFFICE
ESI SPEECH OFFICE
ESI STUDIO
ASD STUDIO
PASSAGEWAY
160H
TLT
160T
EDUCATOR WORKSHOP
LEARNING COMMONS
SGR
151G
TLT
150T
EDUCATOR WORKSHOP
PASSAGEWAY
150H
LEARNING STUDIO
LEARNING STUDIO
LEARNING STUDIO
FLEX STUDIO
LIBRARY
STAIR
ST02
S F
SF
SF
ELEC
E160
TLT
160T-1
TLT
160T-2
TLT
160T-3
TLT
160T-4
'-0
'-0
S F
S F
S F
W F3
SF
TF= 98'-8"
TF= 98'-8"
TF= 97'-0"
S F
S F
10'-4 1/4" ±
TF= 99'-4"
TF= 98'-8"
TW= 98'-8"
TF= 98'-8"
TW= 98'-8"
S 303
TF= 95'-0"
WF24
TS
WF24
" WF42
W F3
W F4
GYM STG
120S
PASSAGEWAY
120H
SF
W F3
'-0
TF= 96'-0"
TW= 98'-8"
S 303
8"
W F5
SGR
150G
ELEC
E150
DATA/IT
D130
ESI STUDIO
S 301
S O
G
'-4
TW= 98'-8"
TF= 95'-0"
TF= 96'-8"
TF= 98'-0"
TF= 98'-8"
LEARNING STUDIO
TF= 96'-0"
W F3
W
F3 2 4'-0"
TF= 99'-4"
S 303
UNIT A
UNIT C
TF= 99'-4"
TF= 98'-8"
W F5
TW= 98'-8"
TW= 99'-4"
TW= 98'-0"
WF48
WF48
TF= 98'-8"
4'-0"
'-4
'-0
21'-4"
TW= 98'-8"
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
T O
W E
R P
IN
K
S T
E R
.C O
M
A L
L R
IG
H
T S
R E
S E
R V
E D
F O
U N
D A
T
IO
N P
L A
N
U N
IT
C
-2
.0
S
C
A M
B E
R L
Y E
L E
M E
N T
A R
Y S
C H
O O
L B
P
E A
R L Y
F O
U N
D A
T
IO
N
P o rt a g e
M ic h ig a n
P O
R T
A G
E P
U B
L
IC
S C
H O
O L
S
M A
R C
H
KEYED NOTES - STRUCTURAL - FOUNDATION
1 INTERIOR CMU SHEAR WALL ABOVE, REFER TO FRAMING PLANS.
LEGEND - STRUCTURAL - FOUNDATION
SF STEPPED FOOTING. REFER TO TYPICAL DETAILS. CREATE EQUAL STEPS
BETWEEN ADJACENT TOP OF FOOTING ELEVATIONS.
TOP OF FOUNDATION ELEMENT; REFER TO FOUNDATION PLAN NOTES FOR
ELEVATIONS NOT NOTED ON PLANS
TW TW - TOP OF WALL
TP TP - TOP OF PIER
TF TF - TOP OF FOUNDATION
Fx.x/WFx.x SPREAD FOOTING OR WALL FOOTING DESIGNATION. REFER TO FOOTING
SCHEDULES.
Px CONCRETE PIER DESIGNATION. REFER TO TYPICAL PIER DETAILS.
BPx STEEL COLUMN BASE PLATE, REFER TO BASE PLATE DETAILS AND ANCHOR
SETTING DETAILS.
NOTES - STRUCTURAL - FOUNDATION
1 FLOOR CONSTRUCTION, UNO: 4" SLAB ON GRADE WITH 6x6-W1.4xW1.4 WWF. REFER
TO TYPICAL DETAILS ON FOR ADDITIONAL REQUIREMENTS.
2 TOP OF SLAB-ON-GRADE ELEVATION = VARIES AS NOTED, REFER TO ARCHITECTURAL.
3 TOP OF PIER ELEVATION = REFER TO PLAN.
4 TOP OF BRICK LEDGE ELEVATION = REFER TO PLAN.
5 TOP OF FOOTING ELEVATION = 97'-0" UNO. ALL EXTERIOR FOOTINGS TO EXTEND A
MINIMUM OF 3'-6" BELOW FINISHED GRADE.
6 REFER TO GENERAL NOTES FOR DESIGN SOIL BEARING CAPACITY.
7 PROVIDE FROST-FREE ENTRANCE APRON AT ALL EXTERIOR DOORS, REFER TO TYPICAL
DETAIL.
8 REFER TO TYPICAL DETAIL FOR PIPE CROSSINGS AT FOUNDATIONS, STEP FOOTINGS AS
REQUIRED TO ALLOW PIPE TO PASS THROUGH FOUNDATION WALL. REFER TO
MECHANICAL FOR SIZES AND LOCATIONS OF PIPING, COORDINATE FINAL SIZES AND
ELEVATIONS WITH MECHANICAL SUPPLIER.
9 PROVIDE THICKENED SLAB UNDER ALL INTERIOR NON-LOADBEARING CMU WALLS AND
STAIR STRINGERS PER TYPICAL DETAILS. THESE ITEMS ARE NOT SHOWN ON THE
STRUCTURAL FOUNDATION PLANS. COORDINATE LOCATION WITH THE ARCHITECTURAL
DRAWINGS.
10 VERIFY LOCATIONS OF COLUMNS, WALLS, OPENINGS, ETC. WITH ARCHITECTURAL
DRAWINGS BEFORE PLACING FOUNDATIONS.
11 COORDINATE WITH ALL DRAWINGS FOR LOCATION OF OPENINGS, SLEEVES, AND UNDER
FLOOR PIPES, CONDUITS, DRAINS, DEPRESSIONS, ETC.
12 SUBGRADE IMPROVEMENTS OVER PORTIONS OF THE BUILDING FOOTPRINT ARE
EXPECTED AS NOTED IN THE GEOTECHNICAL REPORT RECOMMENDATIONS.
TRUE NORTH
AMBERLY ELEMENTARY
UNIT A
UNIT B UNIT C UNIT D
KEY PLAN
SCALE: NO SCALE
1/8" = 1'-0"
FOUNDATION PLAN - UNIT C
THIS DRAWING SHEET IS INTENDED TO BE PLOTTED IN
COLOR. IF THIS TEXT APPEARS IN BLACK AND WHITE,
IT IS PLOTTED INCORRECTLY. DISCARD AND OBTAIN
AN ACCURATE DRAWING
WALL FOOTING SCHEDULE
MARK
SIZE REINFORCEMENT
THICKNESS WIDTH LONGITUDINAL TRANSVERSE
WF24 12" 24" (2) #5 -
WF32 12" 32" (3) #5 -
WF36 14" 36" (3) #5 -
WF42 14" 42" (4) #5 -
WF48 16" 48" (4) #5 #5 @ 12" OC
WF54 16" 54" (5) #5 #5 @ 12" OC
RWF54 18" 54" REFER TO DETAIL
WF60 18" 60" (5) #5 #5 @ 12" OC
WF78 18" 78" (6) #5 #6 @ 12" OC
SPREAD FOOTING SCHEDULE
MARK
SIZE
REINFORCEMENTTHICKNESS WIDTH LENGTH
F4.0 12" 4'-0" 4'-0" (4) #5 EW
F4.5 12" 4'-6" 4'-6" (4) #5 EW
F5.5 12" 5'-6" 5'-6" (6) #5 EW
F5.7 14" 7'-0" 5'-5" (6) #6 LONG, (5) #6 SHORT
F6.0 12" 6'-0" 6'-0" (7) #5 EW
F6.5 13" 6'-6" 6'-6" (6) #6 EW
F7.0 14" 7'-0" 7'-0" (6) #6 EW
F7.5 15" 7'-6" 7'-6" (7) #6 EW
F8.5 17" 8'-6" 8'-6" (7) #7 EW
F9.5 18" 9'-6" 9'-6" (8) #7 EW
F10.7 17" 10'-0" 7'-0" (8) #7 LONG, (6) #7 SHORT
UNIT
C
UNIT
D
D
F
H
E
B
C
11 12
G
S 303
S 303
S 303
S 303
S 303
S 303
S 303
S 303
W F4
WF36
W F4
2 WF42
WF36
W F4
WF42
W F3
WF32
WF32
W F4
SOG=99'-4"
SOG=98'-8"
WF78
S 303
F7.0
TF= 97'-8"
S 301
9 TYP
F7.0
TF= 97'-8"
F6.0
TF= 97'-8"
F7.0
TF= 97'-8"
'-0
'-5
'-9
'-6
'-0
'-8
'-4
'-0
'-0
'-8
S F
1'-10 1/2" 18'-7 1/2" 7'-10 1/2" 12'-8" 38'-10" 1'-0" 7'-8" 4'-0" 16'-0"
S F
S O
G
'-8
41'-4" 42'-0" 26'-8"
21'-11 1/2" 19'-4 1/2" 1'-2" 34'-4" 5'-4"
2"
1'-0"
'-4
TF= 95'-0"
TW= 98'-0"
TW= 98'-8"
8" 8"
'-4
TF= 95'-0"
TW= 98'-0"
TW= 98'-8"
110'-0"
S 301
'-0
8" 8"
'-4
TF= 95'-0"
TW= 98'-8"
'-8
"SF
TW= 98'-8"
1'-4"
8" 8"
TW= 98'-8"
TW= 98'-0"
TF= 94'-0"
1'-4"
8" 8"
106'-8"
55'-4" 22'-8" 28'-8"
'-4
8" 8"
'-4
'-4
'-0
'-4
'-0
1'-4" 2'-4" 18'-0" 2'-4" 1'-4"
S 301
"8" 8"
S 303
WF32
'-4
TW= 98'-8"
TW= 98'-0"
TF= 95'-0"
TW= 98'-0"
TW= 98'-8"
TF= 95'-0"
6'-4"
SF
SF
SF
SF
UNIT C UNIT D
BP2
BP2
BP2
1 1
S F
S F
TF= 94'-0"
TF= 93'-0"
TW= 98'-8"
TW= 96'-8"
TF= 95'-0"
TW= 98'-0"
13'-2" 19'-0"
F6.5
TF= 98'-0"
TW= 98'-0"
ESI STUDIO
ASD STUDIO
PASSAGEWAY
160H
TLT
160T
EDUCATOR WORKSHOP
ELEC
E160
TLT
160T-1
TLT
160T-2
TLT
160T-3
TLT
160T-4
W F4
W
F3
W F4
BP2
32'-2"
TW= 96'-8"
S O
G
'-4
TF= 95'-0"
LEARNING STUDIO
LEARNING COMMONS
LEARNING STUDIO
STAIR
ST03
LEARNING STUDIO
LEARNING STUDIO
SGR
162G
TF= 96'-8"
TW= 98'-8"
WF48
4'-0"
'-0
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
T O
W E
R P
IN
K
S T
E R
.C O
M
A L
L R
IG
H
T S
R E
S E
R V
E D
F O
U N
D A
T
IO
N P
L A
N
U N
IT
D
-2
.0
S
D
A M
B E
R L
Y E
L E
M E
N T
A R
Y S
C H
O O
L B
P
E A
R L Y
F O
U N
D A
T
IO
N
P o rt a g e
M ic h ig a n
P O
R T
A G
E P
U B
L
IC
S C
H O
O L
S
M A
R C
H
KEYED NOTES - STRUCTURAL - FOUNDATION
1 INTERIOR CMU SHEAR WALL ABOVE, REFER TO FRAMING PLANS.
LEGEND - STRUCTURAL - FOUNDATION
SF STEPPED FOOTING. REFER TO TYPICAL DETAILS. CREATE EQUAL STEPS
BETWEEN ADJACENT TOP OF FOOTING ELEVATIONS.
TOP OF FOUNDATION ELEMENT; REFER TO FOUNDATION PLAN NOTES FOR
ELEVATIONS NOT NOTED ON PLANS
TW TW - TOP OF WALL
TP TP - TOP OF PIER
TF TF - TOP OF FOUNDATION
Fx.x/WFx.x SPREAD FOOTING OR WALL FOOTING DESIGNATION. REFER TO FOOTING
SCHEDULES.
Px CONCRETE PIER DESIGNATION. REFER TO TYPICAL PIER DETAILS.
BPx STEEL COLUMN BASE PLATE, REFER TO BASE PLATE DETAILS AND ANCHOR
SETTING DETAILS.
NOTES - STRUCTURAL - FOUNDATION
1 FLOOR CONSTRUCTION, UNO: 4" SLAB ON GRADE WITH 6x6-W1.4xW1.4 WWF. REFER
TO TYPICAL DETAILS ON FOR ADDITIONAL REQUIREMENTS.
2 TOP OF SLAB-ON-GRADE ELEVATION = VARIES AS NOTED, REFER TO ARCHITECTURAL.
3 TOP OF PIER ELEVATION = REFER TO PLAN.
4 TOP OF BRICK LEDGE ELEVATION = REFER TO PLAN.
5 TOP OF FOOTING ELEVATION = 97'-0" UNO. ALL EXTERIOR FOOTINGS TO EXTEND A
MINIMUM OF 3'-6" BELOW FINISHED GRADE.
6 REFER TO GENERAL NOTES FOR DESIGN SOIL BEARING CAPACITY.
7 PROVIDE FROST-FREE ENTRANCE APRON AT ALL EXTERIOR DOORS, REFER TO TYPICAL
DETAIL.
8 REFER TO TYPICAL DETAIL FOR PIPE CROSSINGS AT FOUNDATIONS, STEP FOOTINGS AS
REQUIRED TO ALLOW PIPE TO PASS THROUGH FOUNDATION WALL. REFER TO
MECHANICAL FOR SIZES AND LOCATIONS OF PIPING, COORDINATE FINAL SIZES AND
ELEVATIONS WITH MECHANICAL SUPPLIER.
9 PROVIDE THICKENED SLAB UNDER ALL INTERIOR NON-LOADBEARING CMU WALLS AND
STAIR STRINGERS PER TYPICAL DETAILS. THESE ITEMS ARE NOT SHOWN ON THE
STRUCTURAL FOUNDATION PLANS. COORDINATE LOCATION WITH THE ARCHITECTURAL
DRAWINGS.
10 VERIFY LOCATIONS OF COLUMNS, WALLS, OPENINGS, ETC. WITH ARCHITECTURAL
DRAWINGS BEFORE PLACING FOUNDATIONS.
11 COORDINATE WITH ALL DRAWINGS FOR LOCATION OF OPENINGS, SLEEVES, AND UNDER
FLOOR PIPES, CONDUITS, DRAINS, DEPRESSIONS, ETC.
12 SUBGRADE IMPROVEMENTS OVER PORTIONS OF THE BUILDING FOOTPRINT ARE
EXPECTED AS NOTED IN THE GEOTECHNICAL REPORT RECOMMENDATIONS.
TRUE NORTH
AMBERLY ELEMENTARY
UNIT A
UNIT B UNIT C UNIT D
KEY PLAN
SCALE: NO SCALE
1/8" = 1'-0"
FOUNDATION PLAN - UNIT D
THIS DRAWING SHEET IS INTENDED TO BE PLOTTED IN
COLOR. IF THIS TEXT APPEARS IN BLACK AND WHITE,
IT IS PLOTTED INCORRECTLY. DISCARD AND OBTAIN
AN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .