All_Exhibits.pdf
PDF 8 MB Posted
- Solicitation number
- 0000035440
About this file
I apologize, but no actual file content was provided with the filename "All_Exhibits.pdf". Without the specific text or document contents, I cannot generate a summary. If you would like me to analyze a file, please upload or paste the actual contents of the document, and I will be happy to provide a comprehensive professional summary as requested.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sample_Agreement.pdf | ||
| Bidders_Certification.pdf | ||
| Bid_Form.pdf | ||
| 24WS0029_Addendum_01.pdf | ||
| IFB_Solicitation_-_with_No_DVBE_Goal_.pdf | ||
| Verification_Documents.pdf | ||
| Bidders_Checklist.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
California Department of Veterans Affairs Exhibit A - Scope of Work
Agreement Number: 24WS0029 Contractor: TBD
FIRE AND EXIT DOOR IMPROVEMENTS
1. INTRODUCTION
A. Contractor shall provide services, as specified, to California Department of Veterans Affairs (CalVet).
Contractor shall provide services at the Veterans Home of California-West Los Angeles (Home), located at 11500 Nimitz Ave., Los Angeles, CA 90049. Contractor shall provide all labor, materials, staff, transportation, license, permits and every other item of expense necessary, unless otherwise stated, to provide Fire and Exit Door Improvement services. Services shall be provided at the Home, upon request and in compliance with terms of this Agreement.
B. All work shall be coordinated and approved by CalVet Contract Manager or designated representative.
Services shall be performed during standard business hours 8:00 a.m. to 4:30 p.m., Monday through Friday unless otherwise specified. No work is to be performed on State holidays or on an overtime basis unless prior approval is received in writing from the Contract Manager, prior to this work taking place. Any and all services performed outside the scope of this Agreement or not approved by the Contract Manager, or designated representative, will be at the sole risk and expense of the Contractor.
C. Contactor must be able to perform the tasks associated with providing services under the scope of their license. Contractor will provide services in accordance with federal and state laws and regulations and CalVet policies.
D. Contractor is not authorized to deliver or commence services as described in the Agreement until written approval has been obtained from CalVet Contract Manager and Contractor has received an executed Agreement from CalVet. Any delivery or performance of service commenced prior to the Contractor obtaining all written approvals shall be considered voluntary on the part of the Contractor.
2. CONTACT INFORMATION
A. The project representatives during the term of this agreement will be:
Construction Supervisor Contract Manager Veterans Home of California-West Los Angeles: California Department of Veterans Affairs , Chief of Plant Operations , Associate Construction Analyst 11500 Nimitz Ave., Los Angeles, CA 90049 1227 “O” Street, Sacramento, CA 95814 Phone: Phone:
Email: @calvet.ca.gov Email: @calvet.ca.gov
Contractor Representative:
TBD
B. Contract Representatives, addresses, and phone/fax numbers may be changed by issuing a twenty
(20) day prior written notification and shall not require a formal amendment to this Agreement. The notifying party shall provide complete contact information for the replacement Contract Representative including, name, title, mailing address, phone/fax numbers, and email address. All other changes require a formal written amendment to this agreement.
3. MINIMUM QUALIFICATIONS
All service performed under this Agreement shall be performed by qualified service technicians with a valid contractor license.
Contractor shall provide a service technician who is factory trained on the equipment specified in this Agreement. Contractor shall provide the State with proof of the required training for each service technician providing services under this Agreement. Acceptable proof may be a resume showing experience, training and factory school completion. The Contractor shall submit the proof of training with their bid package to mailto:@calvet.ca.gov mailto:betsy.vierra@calvet.ca.gov
CalVet.
All sub-contractors to the primary contractor must meet the same minimum qualification requirements as the primary contractor.
4. CONTRACTOR’S RESPONSIBILITIES
A. Contractor shall complete this project in accordance with the Exhibit A1: WLA Priority 1 & 2 Doors
Project Manual dated 05/23/2024. This plan, its scope of work and general notes are incorporated herein by this reference. As outlined below, the Contractor Shall:
1. All work provided by the Contractor shall conform to the latest requirements of Federal, State, City, and County regulations. This includes but is not limited to Title 24 of the California Building Code of Regulations and other standards identified in Exhibit A1.
2. Submit a utility out of service request to CalVet’s project representatives in writing, detailing the time and duration of any utility that must be out of service during construction, and refrain from doing so without the State’s consent as specified.
3. CONSTRUCTION SCHEDULE: The Contractor will submit a construction schedule at the pre-construction meeting. Prior approval of the schedule from the State is required before commencement of the work. The Contractor will be responsible for planning and scheduling the work and for monitoring the progress of the work with respect to the schedule. The Contract Manager reviews the schedule against actual field progress and provides comments. Contract Manager also reviews contractor’s monthly update of record drawings for completion. Contractor incorporates Contract Manager’s comments and submit/sends Schedule and Application for Payment to State Contract Manager for approval and payment.
4. SUBMITTALS, RFI’S AND SHOP DRAWINGS: The Contractor will submit a Submittal Schedule at the pre-construction meeting. Prior approval of the schedule from the State is required before commencement of the work. This schedule will become integrated with the construction schedule.
See Exhibit A1 for additional requirements.
5. SUBSTITUTIONS: All proposed deviations from specified items require formal submittal for review by the State. The Contractor will submit each proposal for substitution in writing within 14 days of Notice to Proceed, to the State for review and recommendation. Substitution request transmittal shall be submitted to the Contract Manager, and also be copied to the Construction Supervisor.
The Contractor must submit each such request in ample time for processing so as not to delay progress of the work.
6. CLARIFICATIONS:
a. When the Contractor requires clarification of the Contract Documents, they will submit a
Request for Interpretation (RFI) – Appendix A. The RFI’s will be numbered consecutively, and submitted in a timely manner so that the response can be provided before a critical activity is affected.
b. Each Submittal and RFI’s will be submitted electronically with a cover sheet via email (in MS Word or PDF format with any pdf sketches / drawings necessary attached) directly to the Contract Manager. Contract Manager will log in the Submittal’s and RFI’s and forward it to the A&E. The A&E will furnish the answer back to the Contract Manager as appropriate, and then Contract Manager will issue the final response back to the Contractor and the Construction Supervisor.
c. Responses to Submittal and RFI’s will be made by the State to the Contractor within ten (10) calendar days unless the State notifies the Contractor in writing that a response will take longer.
d. If the A&E determines that a Change Order should be prepared in response to the RFI, they will advise the Contract Manager, if agreed, the A&E will then assist with the necessary documentation and submit it to the Contract Manager for processing.
e. If the Contractor believes the RFI response warrants a Change Order, they will notify the
Contract Manager within seven (7) days of receipt of the RFI response.
7. CHANGE ORDERS:
a. Change Orders shall be processed in accordance with the Conditions of the Contract. The procedures described below are intended to relate that process to the organization for this project. Only a Contract Manager can authorize a Change Order.
b. The process includes the Proposed Change Order (PCO) and the Change Order (CO). The PCO is the source document that identifies and describes a potential change in the work.
After the PCO is approved, it will be followed by a CO which defines the changes in the work, together with any change in the contract price and/or time for completion. The CO, not the PCO, is the official document for amending the contract.
c. Origination – A request for a CO may be initiated by the Contractor, the A&E, or the State. In each case, the PCO will be completed and forwarded to the Contract Manager.
d. Preparation – After review, Contract Manager will request the A&E, if appropriate, to prepare plans and specifications. Contract Manager will then transmit the PCO to the Contractor for pricing and/or time impact.
e. Contractor Proposal – Within the time allowed in the Contract Documents (10 days), the Contractor will return the PCO to the Contract Manager, including a detailed breakdown of all cost and time associated with the change, and justification therefore.
f. Negotiations – Contract Manager will review the Contractor’s proposal, confer with the A&E as required, and will either accept the terms, enter into negotiations with the Contractor, or cancel or modify the PCO, if appropriate.
g. Authorization – When agreement has been reached, Contract Manager will prepare the CO, sign it, and send two copies to the Contractor for signature. Multiple PCO’s may be included in a single CO. When the Contract Manager receives the CO back from the Contractor with their signature, copies will be distributed accordingly. The receipt of the CO signed by the Contract Manager is the Contractor’s authorization to proceed.
h. In the event that the Contractor and the State cannot agree on the cost and/or time required, the State may direct the Contractor to proceed on a “time and material” basis.
8. INSPECTION AND TESTING:
a. Inspection – The Construction Supervisor is responsible for inspection of the Contractor’s work for compliance with the Contract Documents and quality control. The Contractor is responsible for requesting an inspection in writing 48 hours prior to any work being covered.
Failure to properly request inspection prior to covering an area of work is subject to immediate rejection by the State requiring immediate removal and remediation of said work at the Contractor’s expense.
b. Testing – The Contractor will comply with the Contract Documents regarding testing, and will coordinate with the Construction Supervisor and/or Contract Manager regarding the scheduling of such tests.
9. PROJECT COMPLETION AND CONTRACT CLOSEOUT
a. Based on the requirements of the Contract Documents, the following are established:
i. When the Contractor considers the work is complete, he will submit to the Contract Manager:
1. Certification that the work or a designated portion thereof, is complete and ready for final inspection.
2. A list of items to be completed or corrected, if such exists.
3. Certification that the equipment and systems have been tested and are operational.
ii. After receipt of such notice, the Construction Supervisor and/or Contract Manager will determine whether the project is ready for final inspection.
iii. Should the State determine that the work is not complete; the Contractor will be notified in writing by the Contract Manager, giving the reasons therefore. When the Contractor has remedied any deficiencies, they will submit a second notice to the Contract Manager.
b. Final Inspection:
i. When the Contract Manager determines that the project is ready for final inspection, the
Construction Supervisor will arrange for the inspection team, which will include the A&E and Contract Manager.
ii. A punch list will be prepared by the entities noted above and submitted to the Contract Manager for consolidation. Contract Manager will then transmit it to the Contractor for their completion/correction of the listed items.
c. Contract Close Out:
i. Contract Close Out involves review of the Contract Documents, and schedules to ensure that the Contractor has completed all required work.
ii. Contractors shall assist CalVet representatives with updating the drawings within the
Exhibit A1: Domestic Hot Water Demolition and New Work Final Report. No formal construction drawings are expected to be developed by the Contractor. Any drawing errors in this Report will be corrected within the warranty period.
iii. A complete set of product, operations and maintenance manuals for all new equipment shall be provided in a packaged PDF format.
iv. Warranties
v. Spare parts and maintenance materials
vi. Statement of completion of punch list items
vii. The Contractor will prepare the final application for payment in accordance with the
General Conditions and forward it to the Contract Manager for Processing.
10. All work shall be coordinated with the State Contract Representatives. Upon receipt of approved contract, Contractor shall contact the Contract Manager to schedule project pre-construction (start) meeting and to establish project start and completion dates.
11. Contractor understand and agrees that only the best general practice is to prevail and that only workmanship of the finest quality shall be acceptable.
12. Contractor understands and agrees that the cost of furnishing, installing, maintaining and removing signs, lights, barricades or other such devices shall be the responsibility of the Contractor.
13. Contractor shall be responsible for public safety, included but not limited to the placement of barricades, warning cones or roping off of areas in which work is taking place to protect pedestrian traffic.
14. Contractor shall secure all materials, tools, and equipment when not in use.
15. Contractor shall have an easily accessible fire extinguisher, first aid kit, and emergency medical plan of action.
16. Contractor shall make arrangement for and pay all fees, charges and costs required to provide and maintain temporary heat, ventilation, light, water supply, electrical supply, communications system, transportation, enclosures, and all other facilities necessary to successfully carry out the work. It is the Contractor’s responsibility to remove all temporary facilities at his/her expense at the completion of the work, and restore the area to its original condition, unless otherwise directed in writing.
17. Contractor understand that time is of the essence for this Agreement and that the State will sustain damages if the work is not completed by the term end date of this Agreement. Therefore, Contractor agrees to make every effort to complete work by the term end date of this Agreement.
18. Contractor shall comply with the Home’s parking and sign-in policy requirements.
19. Contractor’s employees shall wear visitor identification supplied by the Home upon arrival at the
Home.
5. LICENSES, PERMITS, AND CERTIFICATION REQUIREMENTS
A. Contractor shall ensure all necessary licenses, permits, and certification requirements are verified and current throughout the entire term of this Agreement.
B. Contractor shall maintain a valid Class “C-10” Electrical license issued by the California Department of Consumer Affairs, Contractors State License Board (CSBL). All licenses and certifications shall be verified by CalVet.
C. All work, equipment, materials and installation shall conform to California Administrative Code, Title 24, Title 8, and all Federal and State regulations applicable to this project.
6. WORK AREA
While working on CalVet premises, Contractor agrees to perform services with as little disruption to the Veterans Home operations as possible.
7. WORKMANSHIP
All work provided by the Contractor shall conform to the latest requirements of Federal, State, City, and County regulations. This includes but is not limited to Titles 17, 19 and 22 of the California Code of Regulations. Contractor is responsible for compliance with all applicable laws, codes, rules and regulations in connection with work performed under this Agreement. Any services performed by the Contractor will be inspected by the Contract Manager after completion. The Contract Manager is solely responsible for determining acceptability of the work performed.
8. INDEPENDENT CONTRACTOR STATUS
A. The Contractor shall be considered “Independent Contractors” in relation to CalVet and the State.
Therefore, Contractor shall not be considered employee(s) of the Home and shall not be entitled to any employee benefits from CalVet or the State including, but not limited to, the following:
1. Premium Pay, Overtime Pay, or Holiday Pay;
2. Medical Insurance;
3. Vacation or Sick Leave;
4. Worker’s Compensation; or
5. Other employee benefits
CALVET VETERANS HOME
OF WEST LOS ANGELES
FIRE/EXIT DOOR IMPROVEMENTS
11500 NIMITZ AVENUE
LOS ANGELES, CA 90049
EXHIBIT A1
E7.5 DETAILS
E7.6 DETAILS
SUBMITTAL SCHEDULE
A. DOOR HARDWARE
B. GENERAL ELECTRICAL
C. WIRE MOLD
SECURITY DEVICE SYMBOLS
SYMBOL DESCRIPTION
CARD READER CR
PP
TRANSFORMER.T
STANDARD ELECTRICAL SYMBOLS
SYMBOL DESCRIPTION
CIRCUIT BREAKER.
POWER DISTRIBUTION SYMBOLS
SYMBOL DESCRIPTION
1-POLE 1-PHASE MOTOR RATED DISCONNECT SWITCH.
XXA
ABBREVIATIONS
1PH, 3PH 1 PHASE, 3 PHASE
1P, 2P, 3P 1 POLE, 2 POLE, 3 POLE
3W, 4W 3 WIRE, 4 WIRE
(D) DEMO, DEMOLISH
(E) EXISTING
(ER) EXISTING RELOCATED
(N) NEW
(R) RELOCATE
-A-
A, AMPS AMPERES
AC ALTERNATING CURRENT
AF FRAME RATING IN AMPERES
AFF ABOVE FINISHED FLOOR
AIC AMPERES INTERRUPTING
CAPACITY
AL, ALUM ALUMINUM
ATS AUTO TRANSFER SWITCH
AT TRIP RATING IN AMPERES
AWG AMERICAN WIRE GAUGE
-B-
BTR BUILDING TELECOM ROOM
-C-
C CONDUIT
CB,C/B CIRCUIT BREAKER
CEC CALIFORNIA ELECTRICAL CODE
CT CURRENT TRANSFORMER
CU COPPER
-D-
DC DIRECT CURRENT
-E-
EA EACH
ELEC ELECTRICAL
EMT ELECTRICAL METALLIC TUBING
-F-
FA FIRE ALARM
FACP FIRE ALARM CONTROL PANEL
FATC FIRE ALARM TERMINAL CABINET
FLA FULL LOAD AMPS
FT FOOT OR FEET
-G-
G, GND GROUND
GA GAUGE
GFCI GROUND FAULT CIRCUIT
INTERRUPTER
GFI GROUND FAULT INTERRUPTER
-H-
HOA HAND-OFF-AUTO
HP HORSE POWER
-I-
IG ISOLATION GROUND
-J-
J-BOX JUNCTION BOX
-K-
KVA ONE THOUSAND VOLT-AMPS
KW ONE THOUSAND WATTS
-L-
LCP LIGHTING CONTROL PANEL
LTG LIGHTING
-M-
MCA MINIMUM CIRCUIT AMPACITY
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MLO MAIN LUGS ONLY
MOCP MAXIMUM OVER-CURRENT
PROTECTION
MT EMPTY CONDUIT W/ PULL-LINE
-N-
NC NORMALLY CLOSED
NCTC NURSE CALL TERMINAL CABINET
NEC NATIONAL ELECTRIC CODE
NEMA NATIONAL ELECTRICAL
MANUFACTURER ASSOCIATION
NIES NOT INCLUDED IN ELECTRICAL
SCOPE
NL NIGHT LIGHT
NO NORMALLY OPEN
NTS NOT TO SCALE
-O-
OCP OVER-CURRENT PROTECTION
OFCI OWNER FURNISHED
CONTRACTOR INSTALLED
OFOI OWNER FURNISHED OWNER
INSTALLED
-P-
PT POTENTIAL TRANSFORMER
PVC POLYVINYL CHLORIDE CONDUIT
-R-
RLA RUNNING LOAD AMP
RSC RIGID STEEL CONDUIT
-S-
SPD SURGE PROTECTION DEVICE
SPDT SINGLE POLE DOUBLE THROW
SPST SINGLE POLE SINGLE THROW
SST SOLID STATE TRIP
-T-
TER TELECOM EQUIPMENT ROOM
TR TELECOM ROOM
TM THERMAL MAGNETIC
TTB TERMINAL BACKBOARD
-U-
UG UNDERGROUND
UL UNDERWRITERS LAB.
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER
SUPPLY
-V-
V VOLTS
VA VOLT-AMPS
VAC VOLTS ALTERNATE CURRENT
-W-
W WATTS
WCR WITHSTAND & CLOSING RATING
WP WEATHERPROOF
-X-
XFMR TRANSFORMER
XFER TRANSFER SWITCH
SHEET INDEX
SHEET DESCRIPTION
ABBREVIATIONS, SYMBOLS, & SHEET INDEX
OVERALL FIRST FLOOR PLAN - ELECTRICAL
FIRST FLOOR PLAN - ELECTRICAL - BUILDING C
ENLARGED FIRST FLOOR PLAN - ELECTRICAL - BUILDING C
ENLARGED FIRST FLOOR PLAN - ELECTRICAL - BUILDING C
SECOND FLOOR PLAN - ELECTRICAL - BUILDING C
FIRST FLOOR PLAN - ELECTRICAL - BUILDING E
ENLARGED FIRST FLOOR PLAN - ELECTRICAL - BUILDING E
ENLARGED FIRST FLOOR PLAN - ELECTRICAL - BUILDING E
SECOND FLOOR PLAN - ELECTRICAL - BUILDING E
PANEL SCHEDULE - PANEL 2LSC
PANEL SCHEDULE - PANEL 2LSE
SINGLE-LINE DIAGRAM - BUILDING C & E
DETAILS
DETAILS
DETAILS
DETAILS
DETAILS
DETAILS
E0.1
E1.0
E4.0
E4.1
E4.2
E4.3
E5.0
E5.1
E5.2
E5.3
E6.1
E6.2
E6.3
E7.1
E7.2
E7.3
E7.4
E7.5
E7.6
GENERAL ELECTRICAL NOTES
1. WHERE PROVIDED, THROUGH-PENETRATION FIRESTOP SYSTEM AND MEMBRANE
PENETRATION DETAILS SHOWN IN THE DETAILS ARE FOR REFERENCE ONLY.
THROUGH- PENETRATIONS AND MEMBRANE PENETRATIONS SHALL BE PROTECTED
BY AN APPROVED PENETRATION FIRESTOP SYSTEM OR MEMBRANE PENETRATION
FIRESTOP SYSTEM INSTALLED AS TESTED IN ACCORDANCE WITH ASTM E 814 OR UL
1479, WITH A MINIMUM POSITIVE PRESSURE DIFFERENTIAL OF 0.01 INCH (2.49 PA) OF
WATER OR AS OTHERWISE PERMITTED BY CBC, SECTION 714. LISTED THROUGH-
PENETRATION FIRESTOP SYSTEMS AND MEMBRANE PENETRATIONS SHALL BE
INSTALLED IN ACCORDANCE WITH THE INSTALLATION DETAILS FOR LISTED SYSTEMS.
LISTED THROUGH-PENETRATION FIRESTOP SYSTEMS, MEMBRANE PENETRATION
PROTECTION AND OTHER PERMITTED MEANS AND METHODS OF PENETRATION
PROTECTION SHALL BE SUBMITTED FOR LOCAL FIRE MARSHAL REVIEW AND
APPROVAL PRIOR TO INSTALLATION.
2. ALL ELECTRICAL EQUIPMENT TO BE INSTALLED OR PERMANENTLY CONNECTED
(HARDWIRED) SHALL BE LISTED, LABELED, OR CERTIFIED BY A NATIONALLY
RECOGNIZED TESTING LABORATORY (NRTL) PER CEC 110.2.
3. ALL EQUIPMENT SHALL BE USED IN ACCORDANCE WITH LISTING PER CEC 110.3B.
PUSH PLATE, PROVIDE 3/4"C TO ACCESSIBLE CEILING SPACE ABOVE
CORRIDOR, UON.
ARROW AT END OF RACEWAY INDICATES HOME RUN TO RESPECTIVE
PANELBOARD OR SWITCHBOARD.
BRANCH CIRCUIT WITHOUT FURTHER DESIGNATION INDICATES A 2 #12 AWG
CIRCUIT WITH 1 #12 AWG GROUND.
BRANCH CIRCUIT WITH GROUNDING WIRE LARGER THAN #12 AWG. NUMBER
ADJACENT TO CURVED CROSS-LINE INDICATES WIRE SIZE. #10
BRANCH CIRCUIT RACEWAY WITH WIRE OTHER THAN #12 AWG. NUMBER
ADJACENT TO STRAIGHT OR CURVED CROSS-LINES INDICATES WIRE SIZE.
UNGROUNDED AND NEUTRAL CONDUCTORS SHALL BE THE SAME SIZE #10
UNLESS OTHERWISE NOTED.
RACEWAY SYMBOLS
SYMBOL DESCRIPTION
CALVET VETERANS HOME
OF WEST LOS ANGELES
11500 NIMITZ AVENUE
LOS ANGELES CA 90049
SHEET NO :
DATE:
JOB NO: K306
DRAWN BY: ANH LE
CHECK BY: GORDON WONG
AUG. 4, 2023
Contact
Project Number
Sacramento | Alameda | Irvine
400 R Street, Ste 333 Sacramento, CA 95811 916.256.2460
K306
WILLIAM
E0.1
1'-8"
1'-7"
1'-7"
1'-7"
1'-8
1'-7"
1'-5
1'-9"
2'-4"
1'-7
BUILDING 'A'
BUILDING 'B'
BUILDING 'C'
BUILDING 'D'
BUILDING 'E'
1 OVERALL FIRST FLOOR PLAN - ELECTRICAL
1/128"=1'-0"
CALVET VETERANS HOME
OF WEST LOS ANGELES
11500 NIMITZ AVENUE
LOS ANGELES CA 90049
SHEET NO :
DATE:
JOB NO: K306
DRAWN BY: ANH LE
CHECK BY: GORDON WONG
AUG. 4, 2023
Contact
Project Number
Sacramento | Alameda | Irvine
400 R Street, Ste 333 Sacramento, CA 95811 916.256.2460
K306
E1.0
E4.2
E4.1
CALVET VETERANS HOME
OF WEST LOS ANGELES
11500 NIMITZ AVENUE
LOS ANGELES CA 90049
SHEET NO :
DATE:
JOB NO: K306
DRAWN BY: ANH LE
CHECK BY: GORDON WONG
AUG. 4, 2023
Contact
Project Number
Sacramento | Alameda | Irvine
400 R Street, Ste 333 Sacramento, CA 95811 916.256.2460
K306
WILLIAM
1 FIRST FLOOR PLAN - ELECTRICAL - BUILDING C
1/32" = 1'-0"
E4.0
NUMBERED NOTES
PROPOSED CONDUIT ROUTING PATHWAY.
SEE ENLARGED FLOOR PLAN FOR ADDITIONAL CRITERIA.
EXPOSED RACEWAY MAY BE USED FOR POWER CIRCUITS IN
HARD LID CEILING AREAS WITHIN 25' OF NEW DOOR
OPERATOR. RACEWAY TO RUN TIGHT TO CEILING. PAINT TO
MATCH WALL AND CEILING COLOR.
NO EXPOSED RACEWAY ALLOWED IN HATCHED AREA.
2 2
3 3
C150A
2LSC-13
(E)
(N)
(N)
#10
PP
PP
CR
#10
NUMBERED NOTES
(N) DOOR OPERATOR, 120V,3A,360VA.
THIS CIRCUIT HAS MULTIPLE HOMERUNS. COMBINE ALL
HOMERUNS IN J-BOX BEFORE ROUTING INTO PANEL.
SURFACE MOUNT PUSH PLATE AND RACEWAY TO DOOR
OPERATOR, WIREMOLD OR EQUAL. RUN RACEWAY UP TO
CEILING AND ROUTE TIGHT TO CEILING. PAINT TO MATCH
WALL AND CEILING COLOR.
ROUTE CONDUIT CONCEALED IN WALL AND CEILING SPACE
TO DOOR OPERATOR, WIREMOLD OR EQAUL RACEWAY IS
ALLOWED FOR USE IN CORRIDOR C-120 TO DOOR
OPERATOR. PAINT TO MATCH WALL AND CEILING COLOR.
SHEET NOTES
CONTRACTOR IS TO OBTAIN THE SERVICES OF A SECURITY
VENDOR TO PROVIDE THE FOLLOWING FUNCTIONS FOR THE
DOOR OPERATOR:
1. PUSH PLATE SHALL NOT OPERATE DOOR ON THE
UNSECURED SIDE, UNLESS VALID CARD SWIPE FROM
ACCESS CONTROL ALLOWS ENTRY.
2. PUSH PLATE ON SECURED SIDE SHALL OPERATE DOOR
WHEN PUSHED.
3. DOOR PANIC HARDWARE SHALL OPERATE WHEN PUSHED.
WP
E4.1
CALVET VETERANS HOME
OF WEST LOS ANGELES
11500 NIMITZ AVENUE
LOS ANGELES CA 90049
SHEET NO :
DATE:
JOB NO: K306
DRAWN BY: ANH LE
CHECK BY: GORDON WONG
AUG. 4, 2023
Contact
Project Number
Sacramento | Alameda | Irvine
400 R Street, Ste 333 Sacramento, CA 95811 916.256.2460
K306
WILLIAM
1 ENLARGED FIRST FLOOR PLAN - ELECTRICAL - BUILDING C
3/16" = 1'-0"
C110A
(E)
(N)
(N)
CR
PP
PP
NUMBERED NOTES
(N) DOOR OPERATOR, 120V,3A,360VA.
THIS CIRCUIT HAS MULTIPLE HOMERUNS. COMBINE ALL
HOMERUNS IN J-BOX BEFORE ROUTING INTO PANEL.
SURFACE MOUNT PUSH PLATE AND RACEWAY TO DOOR
OPERATOR, WIREMOLD OR EQUAL. RUN RACEWAY UP TO
CEILING AND ROUTE TIGHT TO CEILING. PAINT TO MATCH
WALL AND CEILING COLOR.
ROUTE CONDUIT CONCEALED IN WALL AND CEILING SPACE
TO DOOR OPERATOR, WIREMOLD OR EQAUL RACEWAY IS
ALLOWED FOR USE IN CORRIDOR C-143 TO DOOR
OPERATOR. PAINT TO MATCH WALL AND CEILING COLOR.
SHEET NOTES
CONTRACTOR IS TO OBTAIN THE SERVICES OF A SECURITY
VENDOR TO PROVIDE THE FOLLOWING FUNCTIONS FOR THE
DOOR OPERATOR:
1. PUSH PLATE SHALL NOT OPERATE DOOR ON THE
UNSECURED SIDE, UNLESS VALID CARD SWIPE FROM
ACCESS CONTROL ALLOWS ENTRY.
2. PUSH PLATE ON SECURED SIDE SHALL OPERATE DOOR
WHEN PUSHED.
3. DOOR PANIC HARDWARE SHALL OPERATE WHEN PUSHED.
2LSC-13
#10
#10
E4.2
CALVET VETERANS HOME
OF WEST LOS ANGELES
11500 NIMITZ AVENUE
LOS ANGELES CA 90049
SHEET NO :
DATE:
JOB NO: K306
DRAWN BY: ANH LE
CHECK BY: GORDON WONG
AUG. 4, 2023
Contact
Project Number
Sacramento | Alameda | Irvine
400 R Street, Ste 333 Sacramento, CA 95811 916.256.2460
K306
WILLIAM
1 ENLARGED FIRST FLOOR PLAN - ELECTRICAL - - BUILDING C
PANEL '2LSC'
OF WEST LOS ANGELES
11500 NIMITZ AVENUE
LOS ANGELES CA 90049
SHEET NO :
DATE:
JOB NO: K306
DRAWN BY: ANH LE
CHECK BY: GORDON WONG
AUG. 4, 2023
Contact
Project Number
Sacramento | Alameda | Irvine
400 R Street, Ste 333 Sacramento, CA 95811 916.256.2460
K306
WILLIAM
1 SECOND FLOOR PLAN - ELECTRICAL - BUILDING C
1/32" = 1'-0"
E4.3
E5.1
E5.2
CALVET VETERANS HOME
OF WEST LOS ANGELES
11500 NIMITZ AVENUE
LOS ANGELES CA 90049
SHEET NO :
DATE:
JOB NO: K306
DRAWN BY: ANH LE
CHECK BY: GORDON WONG
AUG. 4, 2023
Contact
Project Number
Sacramento | Alameda | Irvine
400 R Street, Ste 333 Sacramento, CA 95811 916.256.2460
K306
WILLIAM
1 FIRST FLOOR PLAN - ELECTRICAL - BUILDING E
1/32" = 1'-0"
E5.0
NUMBERED NOTES
PROPOSED CONDUIT ROUTING PATHWAY.
SEE ENLARGED FLOOR PLAN FOR ADDITIONAL CRITERIA.
EXPOSED RACEWAY MAY BE USED FOR POWER CIRCUITS IN
HARD LID CEILING AREAS WITHIN 25' OF NEW DOOR
OPERATOR UNLESS NOTE OTHERWISE. RACEWAY TO RUN
TIGHT TO CEILING. PAINT TO MATCH WALL AND CEILING
COLOR.
NO EXPOSED RACEWAY ALLOWED IN HATCHED AREA.
E126A
2LSE-17
(E)
(N)
(N)2
#10
CR
PP
PP
#10
NUMBERED NOTES
(N) DOOR OPERATOR, 120V,3A,360VA.
THIS CIRCUIT HAS MULTIPLE HOMERUNS. COMBINE ALL
HOMERUNS IN J-BOX BEFORE ROUTING INTO PANEL.
SURFACE MOUNT PUSH PLATE AND RACEWAY TO DOOR
OPERATOR, WIREMOLD OR EQUAL. RUN RACEWAY UP TO
CEILING AND ROUTE TIGHT TO CEILING. PAINT TO MATCH
WALL AND CEILING COLOR.
ROUTE CONDUIT CONCEALED IN WALL AND CEILING SPACE
TO DOOR OPERATOR, WIREMOLD OR EQAUL RACEWAY IS
ALLOWED FOR USE IN CORRIDOR E-142 TO DOOR
OPERATOR. PAINT TO MATCH WALL AND CEILING COLOR.
SHEET NOTES
CONTRACTOR IS TO OBTAIN THE SERVICES OF A SECURITY
VENDOR TO PROVIDE THE FOLLOWING FUNCTIONS FOR THE
DOOR OPERATOR:
1. PUSH PLATE SHALL NOT OPERATE DOOR ON THE
UNSECURED SIDE, UNLESS VALID CARD SWIPE FROM
ACCESS CONTROL ALLOWS ENTRY.
2. PUSH PLATE ON SECURED SIDE SHALL OPERATE DOOR
WHEN PUSHED.
3. DOOR PANIC HARDWARE SHALL OPERATE WHEN PUSHED.
CALVET VETERANS HOME
OF WEST LOS ANGELES
11500 NIMITZ AVENUE
LOS ANGELES CA 90049
SHEET NO :
DATE:
JOB NO: K306
DRAWN BY: ANH LE
CHECK BY: GORDON WONG
AUG. 4, 2023
Contact
Project Number
Sacramento | Alameda | Irvine
400 R Street, Ste 333 Sacramento, CA 95811 916.256.2460
K306
WILLIAM
E5.1
1 ENLARGED FIRSTFLOOR PLAN - ELECTRICAL - BUILDING E
2LSE-17
E167B
#10
CR
PP
#10
PP
(N),WP
NUMBERED NOTES
(N) DOOR OPERATOR, 120V,3A,360VA.
THIS CIRCUIT HAS MULTIPLE HOMERUNS. COMBINE ALL
HOMERUNS IN J-BOX BEFORE ROUTING INTO PANEL.
PROVIDE SURFACE MOUNT BOX FOR DEVICE. ROUTE
SURFACE MOUNTED CONDUIT TO ACCESSIBLE CEILING
SPACE IN CORRIDOR E-153. PROVIDE WEATHERPROOFING
AS REQUIRED. FOR EXTERIOR CONDUIT, PROVIDE
WIREMOLD OR EQUAL TO ENCLOSE CONDUIT.
SURFACE MOUNT PUSH PLATE AND RACEWAY TO
ACCESSIBLE CEILING SPACE, USE WIREMOLD OR EQUAL.
RELOCATE CARD READER ADJACENT TO NEW EXTERIOR
PUSH PLATE LOCATION.
SHEET NOTES
CONTRACTOR IS TO OBTAIN THE SERVICES OF A SECURITY
VENDOR TO PROVIDE THE FOLLOWING FUNCTIONS FOR THE
DOOR OPERATOR:
1. PUSH PLATE SHALL NOT OPERATE DOOR ON THE
UNSECURED SIDE, UNLESS VALID CARD SWIPE FROM
ACCESS CONTROL ALLOWS ENTRY.
2. PUSH PLATE ON SECURED SIDE SHALL OPERATE DOOR
WHEN PUSHED.
3. DOOR PANIC HARDWARE SHALL OPERATE WHEN PUSHED.
CR (ER),WP
(E)
(N)
CALVET VETERANS HOME
OF WEST LOS ANGELES
11500 NIMITZ AVENUE
LOS ANGELES CA 90049
SHEET NO :
DATE:
JOB NO: K306
DRAWN BY: ANH LE
CHECK BY: GORDON WONG
AUG. 4, 2023
Contact
Project Number
Sacramento | Alameda | Irvine
400 R Street, Ste 333 Sacramento, CA 95811 916.256.2460
K306
WILLIAM
E5.2
1 ENLARGED FIRSTFLOOR PLAN - ELECTRICAL - BUILDING E
PANEL '2LSE'
OF WEST LOS ANGELES
11500 NIMITZ AVENUE
LOS ANGELES CA 90049
SHEET NO :
DATE:
JOB NO: K306
DRAWN BY: ANH LE
CHECK BY: GORDON WONG
AUG. 4, 2023
Contact
Project Number
Sacramento | Alameda | Irvine
400 R Street, Ste 333 Sacramento, CA 95811 916.256.2460
K306
WILLIAM
1 SECOND FLOOR PLAN - ELECTRICAL - BUILDING E
1/32" = 1'-0"
E5.3
PANEL NUMBERED NOTES
PROVIDE (N) 20A/1P CIRCUIT BREAKER IN SPACE INDICATED,
MATCH (E) BREAKER TYPE AND AIC RATING.
PANEL SCHEDULE NOTES
1. ALL CIRCUITS INDICATED "LIGHT" ON PANEL SCHEDULES ARE
EXISTING TO REMAIN AND HAVE NOT BEEN MODIFIED AS PART
OF THIS PROJECT.
2. ALL CIRCUITS INDICATED "BOLD" ON PANEL SCHEDULES HAVE
BEEN MODIFIED, ALTERED, OR ADDED AS PART OF THIS
PROJECT.
3. PROVIDE UPDATED 'TYPEWRITTEN' PANEL INDEX. PANEL INDEX
SHALL INCLUDE DATE APPLIED AND ALSO WHERE THE PANEL IS
FED FROM.
4. PROVIDE BLANK COVER PLATES OVER ANY EXPOSED CIRCUIT
BREAKER SPACE THAT IS EXPOSED.
5. UPON OPENING EXISTING PANELS, TURN ANY CIRCUIT
BREAKERS WITH NO CONDUCTORS OR NOT CONNECTED TO A
LOAD INTO THE "OFF" POSITION AND UPDATE PANEL SCHEDULE.
CALVET VETERANS HOME
OF WEST LOS ANGELES
11500 NIMITZ AVENUE
LOS ANGELES CA 90049
SHEET NO :
DATE:
JOB NO: K306
DRAWN BY: ANH LE
CHECK BY: GORDON WONG
AUG. 4, 2023
Contact
Project Number
Sacramento | Alameda | Irvine
400 R Street, Ste 333 Sacramento, CA 95811 916.256.2460
K306
E6.1
PANEL NUMBERED NOTES
PROVIDE (N) 20A/1P CIRCUIT BREAKER IN SPACE INDICATED,
MATCH (E) BREAKER TYPE AND AIC RATING.
PANEL SCHEDULE NOTES
1. ALL CIRCUITS INDICATED "LIGHT" ON PANEL SCHEDULES ARE
EXISTING TO REMAIN AND HAVE NOT BEEN MODIFIED AS PART
OF THIS PROJECT.
2. ALL CIRCUITS INDICATED "BOLD" ON PANEL SCHEDULES HAVE
BEEN MODIFIED, ALTERED, OR ADDED AS PART OF THIS
PROJECT.
3. PROVIDE UPDATED 'TYPEWRITTEN' PANEL INDEX. PANEL INDEX
SHALL INCLUDE DATE APPLIED AND ALSO WHERE THE PANEL IS
FED FROM.
4. PROVIDE BLANK COVER PLATES OVER ANY EXPOSED CIRCUIT
BREAKER SPACE THAT IS EXPOSED.
5. UPON OPENING EXISTING PANELS, TURN ANY CIRCUIT
BREAKERS WITH NO CONDUCTORS OR NOT CONNECTED TO A
LOAD INTO THE "OFF" POSITION AND UPDATE PANEL SCHEDULE.
CALVET VETERANS HOME
OF WEST LOS ANGELES
11500 NIMITZ AVENUE
LOS ANGELES CA 90049
SHEET NO :
DATE:
JOB NO: K306
DRAWN BY: ANH LE
CHECK BY: GORDON WONG
AUG. 4, 2023
Contact
Project Number
Sacramento | Alameda | Irvine
400 R Street, Ste 333 Sacramento, CA 95811 916.256.2460
K306
E6.2
(E)
PANEL
2LSC
(E) 50A/3P (E)
PANEL
2LSE
(E) 50A/3P
(E)
PANEL
2ELSC
(E) 15kVA XFMR 'TLS-C'
480V TO 208Y/120 V
3 PH, 4 W T
(E)
(E) 3/4"C - (3) #10 & (1) #10 'G'
(E)
PANEL
2ELSE
(E) 15kVA XFMR 'TLS-E'
480V TO 208Y/120V
3 PH, 4 W T
(E)
(E) 3/4"C - (3) #10 & (1) #10 'G'
(E) 1-1/2"C - (5) #4
& (1) #8 'G', (1) #8 'IG'
1 ONE-LINE DIAGRAM - BUILDING C & E
NO SCALE
(E) 1-1/2"C - (5) #4
& (1) #8 'G', (1) #8 'IG'
CALVET VETERANS HOME
OF WEST LOS ANGELES
11500 NIMITZ AVENUE
LOS ANGELES CA 90049
SHEET NO :
DATE:
JOB NO: K306
DRAWN BY: ANH LE
CHECK BY: GORDON WONG
AUG. 4, 2023
Contact
Project Number
Sacramento | Alameda | Irvine
400 R Street, Ste 333 Sacramento, CA 95811 916.256.2460
K306
E6.3
FOR CONTINUATION REFER TO
THREADED ROD CONNECTION TO
STRUCTURAL CEILING DETAIL.
CONDUIT SUPPORT ALTERNATIVE
MOUNTING LOCATION
CONDUIT SHALL NOT OBSTRUCT
THE ABILITY TO REMOVE T-GRID
CEILING FOR MAINTENANCE AND
INSPECTION.
CONDUIT CLIP SPRING STEEL
FASTENER - (3) 3/4" OR (3) 1" CONDUIT
MAX. PER ROD OR (1) 1-1/4" CONDUIT
PER ROD
NOTES:
1. WEIGHT: LESS THAN 5LB/FT.
2. SPACING BETWEEN HANGERS SHALL BE PER CEC REQUIREMENTS. DO NOT EXCEED 3 FEET BETWEEN EACH
RACEWAY TERMINATION AND MAXIMUM OF 10 FEET BETWEEN SUPPORTS.
3. PLACEMENT OF HANGER SHALL NOT OBSTRUCT THE REMOVAL AND/OR INSTALLATION OF CEILING MATERIALS
WHETHER FOR CONSTRUCTION OR MAINTENANCE.
1/4" DIAMETER ALL THREADED ROD.
FINISHED CEILING
3/4"
1"
COMBINED WEIGHT
(LBS/LINEAL FOOT)
TRADE
SIZE
ELECTRICAL METALLIC
TUBING (EMT)
0.84
1.30
PROVIDE DOUBLE NUT, TYPICAL.
2 THREADED ROD CONDUIT SUPPORT DETAIL
SCALE: NONE
3/8" DIAMETER THREADED
ROD COUPLER, TYPICAL.
PROVIDE REDUCING ROD
COUPLING WHERE 1/4"
ROD IS USED.
1/4" DIAMETER ALL
THREADED ROD, TYPICAL.
3/8" DIAMETER HILTI KB-TZ2
W/ 2" EMBEDMENT MIN.,
TYPICAL.
CONCRETE FILLED METAL
DECK.
NOTES:
1. VERIFY THAT CONCRETE OVER METAL DECK MUST COMPLY WITH FIGURES 5A TO 5C IN ICC ESR-4266.
2. UPON INSTALLATION OF FASTENER INTO CONCRETE FILLED METAL DECK, CONTRACTOR TO PATCH/REPAIR
DAMAGE TO EXISTING. SPRAY APPLIED FIREPROOFING, AS REQUIRED, TO RESTORE ORIGINAL FIREPROOFING
THICKNESS AND FIRE RATING.
3. ANCHOR MAY BE PLACED AT HIGH OR LOW FLUTE, CENTER ANCHOR IN FLUTE.
4. TORQUE TEST 50% OF EXPANSION ANCHORS TO 30FT-LBS. SEE "POST INSTALLED" NOTES AND "POST INSTALLED
ANCHOR TESTING CRITERIA" NOTES ON STRUCTURAL DRAWINGS FOR ADDITIONAL REQUIREMENTS
3-1/4" MIN.
1-5/8" x 3-1/4", 1-5/8" x 7/8", 1-5/8" x 1-5/8", OR 7/8" x 7/8" x12 GA
SINGLE CHANNEL STRUT, 16"
MIN. LENGTH, WHEN ROD IS
NOT CENTERED ON LOW FLUTE.
PROVIDE W/ (2) 3/8" DIAMETER
HILTI KBTZ2 W/ 2" EMBEDMENT.
PROVIDE SPRING CHANNEL
NUT, SQUARE WASHER, AND
HEX NUT FOR THREADED ROD
CONNECTION.
1" MIN. 1" MIN.
1 THREADED ROD TO CONCRETE FILLED METAL DECK - HILTI ANCHORS
SCALE: NONE
CALVET VETERANS HOME
OF WEST LOS ANGELES
11500 NIMITZ AVENUE
LOS ANGELES CA 90049
SHEET NO :
DATE:
JOB NO: K306
DRAWN BY: ANH LE
CHECK BY: GORDON WONG
AUG. 4, 2023
Contact
Project Number
Sacramento | Alameda | Irvine
400 R Street, Ste 333 Sacramento, CA 95811 916.256.2460
K306
E7.1
1"
1"
TYPICAL PROVIDE CONDUIT COUPLER
FOR NEW CONDUIT INSTALLATIONS.
FITTINGS LISTED FOR GROUNDING
TYPICAL FEEDER CONDUIT
FLEXIBLE CONDUIT SHALL PROVIDE
3" MOVEMENT IN ALL DIRECTIONS.
NOTES:
1. PROVIDE AT EACH CONDUIT PASSING THRU SEISMIC SEPARATION.
2. FLEXIBLE CONDUIT MUST STRETCH TO MINIMUM LENGTH OF
SEISMIC JOINT LENGTH +12".
PROVIDE SEISMIC ON BOTH SIDE.
REFER TO OPM-0043-13 PAGE C1.12.
2 RACEWAY INSTALLATION AT SEISMIC JOINT DETAIL
SCALE: NONE
CBC 714.5.1 EXCEPTION #2
PENETRATIONS IN A SINGLE CONCRETE FLOOR BY STEEL, FERROUS OR COPPER CONDUITS, PIPES, TUBES OR VENTS WITH A MAXIMUM 6-INCH NOMINAL DIAMETER, PROVIDED THE CONCRETE, GROUT OR MORTAR IS INSTALLED THE FULL THICKNESS OF THE FLOOR OR THE THICKNESS REQUIRED TO MAINTAIN THE FIRE-RESISTANCE RATING.
THE PENETRATING ITEMS SHALL NOT BE LIMITED TO THE PENETRATION OF A SINGLE CONCRETE FLOOR, PROVIDED
THE AREA OF THE OPENING THROUGH EACH FLOOR DOES NOT EXCEED 144 SQUARE INCHES.
METAL DECKING, SEE
ARCHITECTURAL
DRAWING
PENETRATIONS IN A SINGLE
CONCRETE FLOOR BY STEEL
OR FERROUS CONDUIT WITH A
MAXIMUM 6-INCH DIAMETER.
FILL WITH MORTAR TO
FULL THICKNESS OF THE
SLAB TO MAINTAIN THE
FIRE-RESISTIVE RATING.
CONCRETE FLOOR
SLAB.
1 FLOOR PENETRATION DETAIL - CBC EXCEPTION
SCALE: NONE
CALVET VETERANS HOME
OF WEST LOS ANGELES
11500 NIMITZ AVENUE
LOS ANGELES CA 90049
SHEET NO :
DATE:
JOB NO: K306
DRAWN BY: ANH LE
CHECK BY: GORDON WONG
AUG. 4, 2023
Contact
Project Number
Sacramento | Alameda | Irvine
400 R Street, Ste 333 Sacramento, CA 95811 916.256.2460
K306
E7.2
GYP BOARD
4", 4-11/16", OR 5" SQUARE
OUTLET BOX
#10 SELF TAPPING SCREWS,
2 REQUIRED.
#10 SELF TAPPING SCREWS,
4 REQUIRED.
BACK BOX BRACKET
WALL STUDS
ELEVATION
PLAN VIEW
1 BOX SUPPORT (BETWEEN STUDS)
SCALE: NONE
CALVET VETERANS HOME
OF WEST LOS ANGELES
11500 NIMITZ AVENUE
LOS ANGELES CA 90049
SHEET NO :
DATE:
JOB NO: K306
DRAWN BY: ANH LE
CHECK BY: GORDON WONG
AUG. 4, 2023
Contact
Project Number
Sacramento | Alameda | Irvine
400 R Street, Ste 333 Sacramento, CA 95811 916.256.2460
K306
E7.3
FINISHED CEILING
STIFFY COMFORT CRADLE,
SERIES 200, ATTACHED TO
METAL STUDS W/ (2) #10 x 2-1/2"
LONG SELF-DRILLING
SELF-TAPPING SCREWS.
6" MIN.
METAL STUDS 20 GA. MIN.
STUD WALL W/ GYP SHEATHING
ONE OR BOTH SIDES (SIM. AT
CONDITION W/O GYP SHEATHING).
NOTES:
1. MAXIMUM TOTAL LOAD PER STIFFY IS 20LBS, MAXIMUM TOTAL UNIFORM LOAD IS 5LBS PER LINEAL FOOT.
2. LEAVE MINIMUM 25% SPACE CAPACITY FOR FUTURE CABLE INSTALLATION.
3. STIFFY SUPPORTS SHALL BE SPACED AT 48", ON CENTER, MAX.
4. CONTRACTOR TO DETERMINE EXACT QUANTITY AND SIZE OF LOOPS REQUIRED.
5. PLACEMENT OF STIFFY SHALL NOT OBSTRUCT THE REMOVAL AND/OR INSTALLATION OF CEILING MATERIALS
WHETHER FOR CONSTRUCTION OR MAINTENANCE.
NOTES:
1. MAXIMUM TOTAL LOAD PER STIFFY IS 20LBS, MAXIMUM TOTAL UNIFORM LOAD IS 5LBS PER LINEAL FOOT.
2. LEAVE MINIMUM 25% SPACE CAPACITY FOR FUTURE CABLE INSTALLATION.
3. STIFFY SUPPORTS SHALL BE SPACED AT 48", ON CENTER, MAX.
4. PROVIDE A MINIMUM WORKING CLEARANCE OF 18" ON THE CABLE PLACEMENT SIDE OF THE CABLE SUPPORT.
5. PLACEMENT OF J-HOOK SHALL NOT OBSTRUCT THE REMOVAL AND/OR INSTALLATION OF CEILING MATERIALS
WHETHER FOR CONSTRUCTION OR MAINTENANCE.
FOR CONTINUATION REFER TO
THREADED ROD CONNECTION TO
STRUCTURAL CEILING DETAIL.
ACCESS OPENING
TELE/DATA WIRING
STIFFY COMFORT CRADLE,
SERIES 200, TYPICAL. PROVIDE
2" OR 3-1/2" DIAMETER CRADLE.
DOUBLE NUTS TOP AND
BOTTOM.
3/8" OR 1/4" DIA. ALL
THREADED ROD.
FINISHED CEILING.
CRADLE SHALL NOT OBSTRUCT
THE ABILITY TO REMOVE T-GRID
CEILING FOR MAINTENANCE,
INSPECTION, AND INSTALLATION
OF FUTURE CABLING.
2 J-HOOK SUPPORT DETAIL - SINGLE (STIFFY COMFORT CRADLE)
SCALE: NONE
1 STIFFY SUPPORT WALL MOUNTED - SINGLE
SCALE: NONE
CALVET VETERANS HOME
OF WEST LOS ANGELES
11500 NIMITZ AVENUE
LOS ANGELES CA 90049
SHEET NO :
DATE:
JOB NO: K306
DRAWN BY: ANH LE
CHECK BY: GORDON WONG
AUG. 4, 2023
Contact
Project Number
Sacramento | Alameda | Irvine
400 R Street, Ste 333 Sacramento, CA 95811 916.256.2460
K306
E7.4
System No. W-L-1222 F Ratings - 1 and 2 Hr (See Item 1)
T Ratings - 1/4, 3/4 and 1 Hr (See Item 2)
1. Wall Assembly - The 1 or 2 hr fire-rated gypsum board/stud wall assembly shall be constructed of the materials and in the manner specified in the individual U300 or U400 Series Wall or Partition Design in the UL Fire Resistance Directory and shall include the following construction features:
A. Studs - Wall framing may consist of either wood studs or steel channel studs. Wood studs to consist of nom 2 by 4 in. (51 by 102 mm) lumber spaced 16 in. (406 mm) OC. Steel studs to be min 3-1/2 in. (89 mm) wide and spaced max 24 in. (610
mm) OC.
B. Gypsum Board* - Thickness, type, number of layers and fasteners as specified in the individual Wall and Partition Design. Max diam of opening is 10-5/8 in. (270 mm).
The hourly F Rating of the firestop system is equal to the hourly fire rating of the wall assembly in which it is installed.
2. Through Penetrant - One metallic pipe, conduit or tube to be installed eccentrically or concentrically within the firestop system. Pipe, conduit or tubing may be installed at an angle not greater than 45 degrees from perpendicular. The annular space between the pipe, conduit or tube and the periphery of the opening shall be min 0 in. (0 mm, point contact) to max 2 in.
(51 mm). Pipe, conduit or tube to be rigidly supported on both sides of the wall assembly. The following types and sizes of metallic pipes, conduits and tubes may be used:
A. Steel Pipe - Nom 8 in. (203 mm) diam (or smaller) Schedule 5 (or heavier) steel pipe.
B. Iron Pipe - Nom 8 in. (203 mm) diam (or smaller) cast or ductile iron pipe.
C. Conduit - Nom 6 in. (152 mm) diam (or smaller) rigid steel conduit, nom 4 in. (102 mm) diam (or smaller) steel electrical metallic tubing (EMT) or nom 4 in. (102 mm) diam (or smaller) flexible steel conduit.
D. Copper Pipe - Nom 4 in. (102 mm) diam (or smaller) Regular (or heavier) copper pipe.
E. Copper Tube - Nom 4 in. (102 mm) diam (or smaller) Type L (or heavier) copper tube.
2A. Through Penetrating Product* - Flexible Metal Piping - As an alternate to Item 2, one nom 1-1/4 in. (32 mm) diam (or smaller) steel flexible metal pipe to be installed either concentrically or eccentrically within the firestop system. The annular space between the pipe and the periphery of the opening shall be min 0 in. (0 mm, point contact) to max 2 in. (51 mm). Pipe to be rigidly supported on both sides of the wall assembly.
OMEGA FLEX INC
GASTITE, DIV OF TITEFLEX
WARD MFG L L C
3. Fill, Void or Cavity Material* - Sealant - Min 5/8 in. (16 mm) thickness of fill material applied within annulus, flush with both surfaces of wall assembly. At point contact location, min 1/4 in. (6 mm) diam bead of fill material applied at metallic pipe/gypsum board interface on both surfaces of wall.
SPECIFIED TECHNOLOGIES INC - SpecSeal LCI Sealant
* Indicates such products shall bear the UL or cUL Certification Mark for jurisdictions employing the UL or cUL Certification (such as Canada), respectively.
1A
1B
3 3
RSTI Created or Revised:
Reproduced courtesy of Underwriters Laboratories, Inc.
Specified Technologies Inc. 210 Evans Way Somerville, NJ 08876
PAGE OF(800)992-1180 · (908)526-8000 · FAX (908)231-8415 · E-Mail:techserv@stifirestop.com · Website:www.stifirestop.com
Type of Penetrant
Steel or iron pipe, steel conduit or EMT
T Rating
1 hr
3/4 hr
2 in. (51 mm)
8 in. (203 mm)Steel or iron pipe, steel conduit or EMT
Max Diam
4 in. (102 mm)Copper pipe or tube 1/4 hr
1 1
W-L-1222JANUARY 23, 2014
CALVET VETERANS HOME
OF WEST LOS ANGELES
11500 NIMITZ AVENUE
LOS ANGELES CA 90049
SHEET NO :
DATE:
JOB NO: K306
DRAWN BY: ANH LE
CHECK BY: GORDON WONG
AUG. 4, 2023
Contact
Project Number
Sacramento | Alameda | Irvine
400 R Street, Ste 333 Sacramento, CA 95811 916.256.2460
K306
E7.5
H ilti F iresto p
S ystem s
System No. F-A-1106
SECTION A-A
FA 1106
1. Floor Assembly —
Min 4-1/2 in. (114 mm) thick reinforced lightweight or normal weight (100-150 pcf or 1600-2400 kg/m3) concrete. As an alternate, any min 2 hr fire rated D700, D800 or D900 Series Floor-Ceiling Design in the UL Fire Resistance Directory having a min 2-1/2 in.
(64 mm) thickness of lightweight or normal weight (100-150 pcf or 1600-2400 kg/m3) concrete topping over the steel deck may be used.
2. Firestop Device* — Cast in place firestop device permanently embedded during concrete placement or grouted in concrete floor assembly in accordance with accompanying installation instructions. Device sized to nom diam of penetrant. Device is to be trimmed flush with the top surface of the floor.
HILTI CONSTRUCTION CHEMICALS, DIV OF HILTI INC —
CP 680-P 2", CP 680-P 3", CP 680-P 4", CP 680-P 6" Cast-In Firestop Device.
CP 680-PX 2", CP 680-PX 3"
2A. Firestop Device* — W ater Barrier Module — (Optional, Not Shown) - Used in combination with the CP 680-P(X) device to achieve a W
Rating. Module is threaded onto top of device. W Rating applies only when water barrier module is used and pipe is installed from bottom of device.
HILTI CONSTRUCTION CHEMICALS, DIV OF HILTI INC —
W ater Barrier Module
Reproduced by HILTI, Inc. Courtesy of Underwriters Laboratories, Inc.
June 29, 2015
C
CLASSIFIED
R
Classified by Underwriters Laboratories, Inc.
to UL 1479 and CAN/ULC-S115
US
ANSI/UL1479 (ASTM E814)
CAN/ULC S115
F Rating - 2 Hr
F Rating - 2 Hr
T Rating - 2 Hr FT Rating - 2 Hr
L Rating At Ambient - Less Than 1 CFM/sq ft FH Rating - 2 Hr
L Rating At 400 F — Less Than 1 CFM/sq ft
FTH Rating - 2 Hr
W Rating —
Class 1 (See Item 2A) L Rating At Ambient - Less Than 1 CFM/sq ft
L Rating At 400 F — Less Than 1 CFM/sq ft
Page: 1 of 2 H ilti F iresto p S ystem s
System No. F-A-1106
FA 1106
3. Through-Penetrant — One metallic pipe installed concentrically or eccentrically within opening. Penetrant to be rigidly supported on both sides of floor assembly. The following types and sizes of penetrants may be used:
A. Steel Pipe —
Nom 6 in. (152 mm) diam (or smaller) Schedule 40 (or heavier) steel pipe.
B. Iron Pipe —
Nom 6 in. (152 mm) diam (or smaller) cast or ductile iron pipe.
C. Iron Pipe —
Nom 4 in. (102 mm) diam (or smaller) steel electrical metallic tubing or nom 6 in. (152 mm) diam (or smaller) rigid steel conduit.
4. Duct W rap Material* — Encapsulated duct wrap tightly wrapped around penetrant to extend 24 in. (610 mm) above the floor for penetrants of nom 4 in. (102 mm) diam or smaller, and 36 in. (914 mm) above floor for penetrants greater than a nom 4 in. (102 mm) diam. An additional layer of encapsulated duct wrap tightly wrapped around the first layer of duct wrap to extend 12 in. (305 mm) (914 mm) above floor. All longitudinal seams of both layers of duct wrap and joints between layers of duct wrap are sealed with foil tape. One of the following types and thicknesses of duct wrap material shall be used.
A. Nom 2 in. (51 mm) ) or 1-1/2 in. (38 mm) thick encapsulated duct wrap.
UNIFRAX I L L C —
FyreW rap 2.0 Duct Insulation or FyreW rap 1.5 Duct Insulation B. Nom 1-1/2 in. (38 mm) thick encapsulated duct wrap.
THERMAL CERAMICS INC —
FireMaster FastW rap XL Duct Insulation
* Indicates such products shall bear the UL or cUL Certification Mark for jurisdictions employing the UL or cUL Certification (such as Canada), respectively.
Reproduced by HILTI, Inc. Courtesy of Underwriters Laboratories, Inc.
June 29, 2015 Page: 2 of 2
CALVET VETERANS HOME
OF WEST LOS ANGELES
11500 NIMITZ AVENUE
LOS ANGELES CA 90049
SHEET NO :
DATE:
JOB NO: K306
DRAWN BY: ANH LE
CHECK BY: GORDON WONG
AUG. 4, 2023
Contact
Project Number
Sacramento | Alameda | Irvine
400 R Street, Ste 333 Sacramento, CA 95811 916.256.2460
K306
E7.6
TABLE OF CONTENTS
00 01 10 - 1
DOCUMENT 00 01 10
LIST OF DRAWINGS
See Drawing Sheet - A.0.0
SPECIFICATIONS
DIVISION 00
Section 00 72 00…...Definitions Page……………………………………………………………….1 through 4
Section 00 72 00…...GENERAL CONDITIONS…………………………………………………….1 through 41
DIVISION 01
Section 01 11 00……..Summary .......................................................................................1 through 4
Section 01 21 00……..Allowances ....................................................................................1 through 2
Section 01 31 00……..Project Management and Coordination ..........................................1 through 2
Section 01 32 16……..Project Schedules and Reports ......................................................1 through 5
Section 01 32 33……..Construction Photographs ..............................................................1 through 2
Section 01 33 00……..Submittal Procedures .....................................................................1 through 5
Section 01 35 16……..Alteration Project Procedures ........................................................1 through 2
Section 01 41 00……..Quality Requirements ....................................................................1 through 2
Section 01 45 29……..Testing Laboratory Services ..........................................................1 through 2
Section 01 51 00……..Temporary Facilities and Controls ..................................................1 through 6
Section 01 60 00……..Product Requirements ...................................................................1 through 2
Section 01 73 29……..Cutting and Patching ......................................................................1 through 2
Section 01 74 19……..Construction Waste Management ..................................................1 through 3
Section 01 74 19.1……Construction Waste Estimate ........................................................1 through 1
Section 01 74 19.2……Waste Management Report ..........................................................1 through 2
Section 01 74 20……..Recycle Content Certification .........................................................1 through 2
Section 01 74 20.1..… Recycle Content Certification Worksheet .......................................1 through 2
Sergio Mondragon-Lopez Cross-Out
00 01 10 - 2
Section 01 74 20.2-2..SABRC Procurement Summary ......................................................1 through 2
Section 01 74 23….…Cleaning .........................................................................................1 through 2
Section 01 75 00....… Starting and Adjusting ....................................................................1 through 2
Section 01 77 00....… Closeout Procedures ......................................................................1 through 4
Section 01 77 00....… Appendix A-1 ..................................................................................1 through 1
Section 01 77 00....… Appendix A-2 ..................................................................................1 through 1
Section 01 79 00....… Demonstration and Training ...........................................................1 through 2
Section 01 86 19...…..Testing, Adjusting, and Balancing, Procedures ...............................1 through 2
Section 23 05 93....… Testing, Adjusting, and Balancing, Procedures for HVAC ...............1 through 1
Section 23 05 93....… Testing, Adjusting, and Balancing, Procedures for HVAC ...............1 through 12
Section 28 16 00....… Intrusion Detection System .............................................................1 through 2
DIVISION 02 – EXISTING CONDITIONS
Section 02 41 19 ........ Selective Demolition ......................................................................1 through 3
DIVISION 08 – OPENINGS
Section 08 71 00 ........ Door Hardware ..............................................................................1 through 11
DIVISION 26 – ELECTRICAL
Section 26 00 00 ........ Electrical Work .............................................................................1 through 30
END OF DOCUMENT
STATE OF CALIFORNIA DEPARTMENT OF VETERANS AFFAIRS
GENERAL CONDITIONS OF THE CONTRACT
CalVet: February 2021 00 72 00 - 1 - Project Number: CA##-####
Document 00 72 00
General Conditions of the Contract for Construction
CalVet: February 2021 00 72 00 - 2 - Project Number: CA##-####
Table of Articles Page
1. GENERAL PROVISIONS 4
1.1. Definitions
1.2. Execution. Correlation and Intent
1.3. Use of the State’s Drawings, Project Manual and other Documents
1.4. Capitalization
1.5. Conflicts in the Contract Documents
1.6. Requests for Information, Clarifications or Additional Instructions
2. ADMINISTRATION OF THE CONTRACT 9
2.1. Information and/or Services Required of the State
2.2. Administration of the Contract
2.3. Breaches, Defaults and Termination for Cause
2.4. Termination for the State’s Convenience
2.5. Suspension by the State for Convenience
2.6. Russian Sanction Orders
3. CONTRACTOR 11
3.1. Review of Contract Documents and Field Conditions by the Contractor
3.2. Supervision and Construction Procedures
3.3. Labor and Materials
3.4. Nondiscrimination Clause
3.5. Guarantee
3.6. Taxes
3.7. Permits, Fees and Notices
3.8. Allowances
3.9.…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .