ALEA Tuscaloosa_Post_Generator_Bid_-_UPDATE_3-21-24 (1).pdf

PDF 118 KB Posted

Attached to
FY24 / RADIO - RFB - Tuscaloosa generator
Solicitation number
SRC0000021477
Issued by
Tuscaloosa County, Tuscaloosa City, Alabama

About this file

This document is a Request for Bids (RFB) from the Alabama Law Enforcement Agency (ALEA) for the replacement of the backup generator at the Tuscaloosa State Trooper Post. The RFB includes detailed specifications for a 17-20 KW natural gas generator with a single-phase, 240-volt automatic transfer switch. The contractor will be responsible for the removal of the existing generator, installation of the new generator and transfer switch, all necessary electrical connections, and testing of the new system. The RFB also requires the contractor to maintain safety precautions, acquire all necessary permits, and coordinate the work schedule with ALEA to minimize disruptions to normal business operations. The contract is a turnkey solution, and final payment will be contingent upon successful completion of the scope of work, including training of ALEA personnel.

The RFB specifies that the contractor must have a current Alabama Business License and provide at least three commercial references to demonstrate their qualifications. The contractor will be responsible for all debris removal and any claims against delivery carriers for missing or damaged items. The new generator and transfer switch must come with a standard five-year manufacturer's warranty, and the warranty period will begin upon the successful installation and testing of the new system.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ALABAMA LAW ENFORCEMENT AGENCY

Tuscaloosa Highway Patrol Post

2645 Skyland Blvd

Tuscaloosa, AL 35405

Contact(s):

Brannon Odom

Radio Engineering

1038 Coliseum Blvd

Montgomery, AL 36109

(334) 277-3722

Instructions and Conditions:

This document constitutes the set of written general specifications and requirements.

MANDATORY Pre-Bid meeting will be held April 2nd at 10:30 a.m.

To ensure uniformity and clarity of the information that is provided.

Respondents will have the opportunity to ask specific questions before submitting a bid.

A tour of the facilities will also be provided. Any firm wishing to submit bids to be considered for these services must be represented at this meeting.

General Qualifications:

Bidders (Respondent or Contractor) shall have a current Alabama Business License.

Bidders (Respondent or Contractor) must demonstrate qualifications to ALEA by submitting at least three (3) commercial references.

Key Points:

Conditions of Property:

The contractor is responsible for the conditions of all existing roadways, sidewalks, parking lots, buildings, and property used during the removal phase of old equipment and installation phase of new equipment.

Safety:

The contractor will provide and maintain all barricades, guard railings, caution tape, temporary protection, and safety equipment for ALEA personnel, staff, trainees, and contractor workers.

The contractor must provide secure protection of new equipment during the installation process.

The contractor must strictly comply with all federal, state, and local codes and OSHA safety regulations.

Specifications:

17-20 KW

Fuel type: Natural gas

Single Phase, 240 volts

Automatic Transfer Switch: NEMA 3R enclosure, single phase, 100 amp, 240 volt, 2 pole, 60Hz

Unit shall indicate (at a minimum)

1) Ready to run conditions

2) Engine run hours

3) High engine temperature

4) Low oil pressure

5) High oil temperature

6) Engine over crank

7) Start battery condition

8) Internal wiring fault

9) Control wiring problem / fault

General:

The contractor is totally responsible for acquiring all permits necessary to perform the items listed in the RFB.

The contractor is responsible for all debris removal incurred.

All operations will be coordinated with the Radio Engineering Shop and the ALEA location, so it does not interfere with normal business operations to a minimum.

The contractor shall be responsible for making all claims against delivery carriers for missing or damaged items.

The contractor must coordinate with the ALEA representative with respect to parking, material staging, storage areas, use of utilities, allowable hours of work.

Warranty:

All manufacturer’s warranty obligations of the product will be maintained for the standard five (5) year warranty period

The warranty date will begin on the date the new system is installed, tested, and operational as intended.

Payment for work:

Final payment shall not occur until a final walk thru inspection is done and approved by an ALEA representative.

Final payment shall not occur until training has been provided satisfactorily to an ALEA representative and maintenance personnel.

Final payment shall not occur until 100% of the scope of work has been completed satisfactorily.

Scope of work:

The State of Alabama Law Enforcement Agency is requesting bids to replace the backup generator at the Tuscaloosa State Trooper Post. The generator in place is a Kohler 17RY 240v 2 pole 60hz natural gas generator with 100-amp auto transfer switch. Bid shall include all parts and labor to replace the generator, transfer switch and all necessary electrical connections. Installation should include the following:

1) REMOVAL:

Disconnect power to existing generator.

Remove and dispose of old generator.

Furnish a backup generator to keep the facility operational during the removal and installation.

2) INSTALLATION:

Install new generator.

Install new transfer switch

Automatic transfer switch/controller shall be NEMA1 or NEMA3, 100 Amps compatible with associated generator Install connections to the natural gas fuel source.

Make all necessary electrical connections to existing building circuits.

All wiring, connections, and grounding should be installed per local code.

Generator pads and all necessary parts shall be included.

This is a turnkey solution.

3) TEST SYSTEM

Remove locks from electrical source Start up new system and test for proper operation Advise ALEA representatives upon completion of work

4) WORK SCHEDULE

Work on the outside unit will be performed during normal working hours of 8:00 a.m. and 5:00 p.m., Monday thru Friday