This file is a tower site visit schedule document created by ALEA (Alabama Law Enforcement Agency) for the State of Alabama related to a radio equipment procurement at Monte Sano Tower. The document outlines a mandatory pre-bid site visit scheduled for June 9, 2026, at 11:30 am, located at Monte Sano Tower in State Park, 5105 Nolen Ave, Building T, Huntsville, AL 35801. The associated ITB (Invitation to Bid) number is 184750 for FY26 Radio - Monte Sano Tower Generator, indicating that the primary focus of this procurement involves generator equipment or related radio infrastructure at the specified tower location. The schedule document contains names of attendees and visit logistics, supporting coordination of bidder participation in the mandatory pre-bid conference and site inspection process.

The file serves as an organizational tool for managing bidder access and attendance at the tower location prior to submission of formal bids. By documenting attendee names and visit schedules, ALEA ensures proper coordination and tracking of all parties who conduct on-site inspections before the bidding deadline. This pre-bid site visit requirement allows prospective bidders to assess current conditions at Monte Sano Tower, understand project scope, and gather necessary information for accurate bid preparation. The structured schedule approach demonstrates standard procurement practices for infrastructure and equipment projects requiring physical site evaluation before bidders commit to pricing and contractual terms.

View the file

Other files

File Type Posted
Monte_Sano_Tower_Generator_specs_5-19-26.pdf PDF
Pre-Bid_Conferecee__5___1_ (8).docx DOCX document
ITB Standard Boilerplate.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

LOCATIONDATE - 1TIMEDISTANCE
Clayton Tower12-Jun9:0075 milesWayne
49 Kennedy Tower Rd
Clayton, Alabama 36016
Decatur Post9-Jun9:30Kerri
207 Commerce Circle SW, Suite A
Decatur, Alabama 35601
35 miles
Monte Sano Tower9-Jun11:30Kerri
Monte Sano State Park
5105 Nolen Ave., Building T
Huntsville, Alabama 35801
Evergreen Post10-Jun9:0082 milesMichael
106 Hillcrest Drive
Evergreen, Alabama 36401
Hamilton Post17-Jun10:00176 milesKerri
4521 Military Street
Hamilton, Alabama 35570
Jacksonville Post11-Jun10:00Robbie
1703 Pelham Road South
Jacksonville, Alabama 36265
82 miles
Alexander City Tower11-Jun12:00Robbie
421 Adams Circle
Alexander City, Alabama 35010
Montgomery Post15-Jun2:00Wayne & Michael
1708 Congressman W. L. Dickinson Drive
Montgomery, Alabama 36109
Montgomery Radio Shop15-Jun2:30Wayne & Michael
1038 Coliseum Blvd.
Montgomery, Alabama 36109
Tuscaloosa Tower23-Jun10:00Robbie
2715 Skyland Blvd
Tuscaloosa, Alabama 35010
50 miles
Birmingham Post23-Jun12:00Robbie
908 Bankhead Hwy West
Birmingham, Alabama 35204

Sheet2 5/11 - Track-It - 184682 / 5/12 - RQ260000351367 / FY26/ RADIO - Clayton Tower Generator

5/11 - Track-It - 184683 / 5/12 - RQ260000351434 / FY26 / RADIO - Decatur Post Generator

5/11 - Track-It - 184685 / 5/12 - RQ260000351446 / FY26 / RADIO - Evergreen Post Generator

5/11 - Track-It - 184686 / 5/12 - RQ260000351456 / FY26 / RADIO - Hamilton Post Generator

5/12 - Track-It - 184749 / 5/13 - RQ260000351488 / FY26 / RADIO - Jacksonville Post Generator

5/12 - Track-It - 184750 / 5/13 - RQ260000351489 / FY26 / RADIO - Monte Sano Tower Generator

5/12 - Track-It - 184751 / 5/13 - RQ260000351494 / FY26 / RADIO - Montgomery Post Generator

5/12 - Track-It - 184752 / 5/13 - RQ260000351498 / FY26 / RADIO - Montgomery Radio Shop Generator

5/12 - Track-It - 184753 / 5/13 - RQ260000351514 / FY26 / RADIO - Tuscaloosa Tower Generator

5/12 - Track-It - 184754 / 5/13 - RQ260000351519 / FY26 / RADIO - Alexander City Tower Generator

5/12 - Track-It - 184758 / 5/13 - RQ260000351531 / FY26 / RADIO - Birmingham Post Generator

Sheet3

ClaytonThe requirements for a certified electrician will need to be added.
Will a Plumber/Gas Fitter’s license be required?
Is ALEA okay with sub-contracting different parts of this work, such as the electrical, gas fitting/propane disconnect? If the answer is yes, we will need to require a GC license.
Please remove all terms not related directly to the scope of work. We will add the site visit information and any standard terms and conditions.
The specifications will need to start off with a purpose summary, the contact information needs to be modified to remove any phone numbers or emails until after the bid has been awarded
We need an insurance amount for Liability, and we will add Workman’s comp, too.
Please change RFB to ITB in General section.
Under Scope of Work, #2, where it states, “All wiring, connections, and grounding should (change to shall) be installed per local code (change to industry standard).”
DecaturThe requirements for a certified electrician will need to be added.
Will a Plumber/Gas Fitter’s license be required?
Is ALEA okay with sub-contracting different parts of this work, such as the electrical, gas fitting/propane disconnect? If the answer is yes, we will need to require a GC license.
Please remove all terms not related directly to the scope of work. We will add the site visit information and any standard terms and conditions.
The specifications will need to start off with a purpose summary, the contact information needs to be modified to remove any phone numbers or emails until after the bid has been awarded
We need an insurance amount for Liability, and we will add Workman’s comp, too.
Please change RFB to ITB in General section.
Under Scope of Work, #2, where it states, “All wiring, connections, and grounding should (change to shall) be installed per local code (change to industry standard).”
EvergreenThe requirements for a certified electrician will need to be added.
Will a Plumber/Gas Fitter’s license be required?
Is ALEA okay with sub-contracting different parts of this work, such as the electrical, gas fitting/propane disconnect? If the answer is yes, we will need to require a GC license.
Please remove all terms not related directly to the scope of work. We will add the site visit information and any standard terms and conditions.
The specifications will need to start off with a purpose summary, the contact information needs to be modified to remove any phone numbers or emails until after the bid has been awarded
We need an insurance amount for Liability, and we will add Workman’s comp, too.
Please change RFB to ITB in General section.
Under Scope of Work, #2, where it states, “All wiring, connections, and grounding should (change to shall) be installed per local code (change to industry standard).”
HamiltonThe requirements for a certified electrician will need to be added.
Will a Plumber/Gas Fitter’s license be required?
Is ALEA okay with sub-contracting different parts of this work, such as the electrical, gas fitting/propane disconnect? If the answer is yes, we will need to require a GC license.
Please remove all terms not related directly to the scope of work. We will add the site visit information and any standard terms and conditions.
The specifications will need to start off with a purpose summary, the contact information needs to be modified to remove any phone numbers or emails until after the bid has been awarded
We need an insurance amount for Liability, and we will add Workman’s comp, too.
Please change RFB to ITB in General section.
Under Scope of Work, #2, where it states, “All wiring, connections, and grounding should (change to shall) be installed per local code (change to industry standard).”
JacksonvilleThe requirements for a certified electrician will need to be added.
Will a Plumber/Gas Fitter’s license be required?
Is ALEA okay with sub-contracting different parts of this work, such as the electrical, gas fitting/propane disconnect? If the answer is yes, we will need to require a GC license.
Please remove all terms not related directly to the scope of work. We will add the site visit information and any standard terms and conditions.
The specifications will need to start off with a purpose summary, the contact information needs to be modified to remove any phone numbers or emails until after the bid has been awarded
We need an insurance amount for Liability, and we will add Workman’s comp, too.
Please change RFB to ITB in General section.
Under Scope of Work, #2, where it states, “All wiring, connections, and grounding should (change to shall) be installed per local code (change to industry standard).”
Monte SanoThe requirements for a certified electrician will need to be added.
Will a Plumber/Gas Fitter’s license be required?
Is ALEA okay with sub-contracting different parts of this work, such as the electrical, gas fitting/propane disconnect? If the answer is yes, we will need to require a GC license.
Please remove all terms not related directly to the scope of work. We will add the site visit information and any standard terms and conditions.
The specifications will need to start off with a purpose summary, the contact information needs to be modified to remove any phone numbers or emails until after the bid has been awarded
We need an insurance amount for Liability, and we will add Workman’s comp, too.
Please change RFB to ITB in General section.
Under Scope of Work, #2, where it states, “All wiring, connections, and grounding should (change to shall) be installed per local code (change to industry standard).”
MontgomeryThe requirements for a certified electrician will need to be added.
Will a Plumber/Gas Fitter’s license be required?
Is ALEA okay with sub-contracting different parts of this work, such as the electrical, gas fitting/propane disconnect? If the answer is yes, we will need to require a GC license.
Please remove all terms not related directly to the scope of work. We will add the site visit information and any standard terms and conditions.
The specifications will need to start off with a purpose summary, the contact information needs to be modified to remove any phone numbers or emails until after the bid has been awarded
We need an insurance amount for Liability, and we will add Workman’s comp, too.
Please change RFB to ITB in General section.
Under Scope of Work, #2, where it states, “All wiring, connections, and grounding should (change to shall) be installed per local code (change to industry standard).”
Montgomery RadioThe requirements for a certified electrician will need to be added.
Will a Plumber/Gas Fitter’s license be required?
Is ALEA okay with sub-contracting different parts of this work, such as the electrical, gas fitting/propane disconnect? If the answer is yes, we will need to require a GC license.
Please remove all terms not related directly to the scope of work. We will add the site visit information and any standard terms and conditions.
The specifications will need to start off with a purpose summary, the contact information needs to be modified to remove any phone numbers or emails until after the bid has been awarded
We need an insurance amount for Liability, and we will add Workman’s comp, too.
Please change RFB to ITB in General section.
Under Scope of Work, #2, where it states, “All wiring, connections, and grounding should (change to shall) be installed per local code (change to industry standard).”
TuscaloosaThe requirements for a certified electrician will need to be added.
Will a Plumber/Gas Fitter’s license be required?
Is ALEA okay with sub-contracting different parts of this work, such as the electrical, gas fitting/propane disconnect? If the answer is yes, we will need to require a GC license.
Please remove all terms not related directly to the scope of work. We will add the site visit information and any standard terms and conditions.
The specifications will need to start off with a purpose summary, the contact information needs to be modified to remove any phone numbers or emails until after the bid has been awarded
We need an insurance amount for Liability, and we will add Workman’s comp, too.
Please change RFB to ITB in General section.
Under Scope of Work, #2, where it states, “All wiring, connections, and grounding should (change to shall) be installed per local code (change to industry standard).”
Alexander CityThe requirements for a certified electrician will need to be added.
Will a Plumber/Gas Fitter’s license be required?
Is ALEA okay with sub-contracting different parts of this work, such as the electrical, gas fitting/propane disconnect? If the answer is yes, we will need to require a GC license.
Please remove all terms not related directly to the scope of work. We will add the site visit information and any standard terms and conditions.
The specifications will need to start off with a purpose summary, the contact information needs to be modified to remove any phone numbers or emails until after the bid has been awarded
We need an insurance amount for Liability, and we will add Workman’s comp, too.
Please change RFB to ITB in General section.
Under Scope of Work, #2, where it states, “All wiring, connections, and grounding should (change to shall) be installed per local code (change to industry standard).”
BirminghamThe requirements for a certified electrician will need to be added.
Will a Plumber/Gas Fitter’s license be required?
Is ALEA okay with sub-contracting different parts of this work, such as the electrical, gas fitting/propane disconnect? If the answer is yes, we will need to require a GC license.
Please remove all terms not related directly to the scope of work. We will add the site visit information and any standard terms and conditions.
The specifications will need to start off with a purpose summary, the contact information needs to be modified to remove any phone numbers or emails until after the bid has been awarded
We need an insurance amount for Liability, and we will add Workman’s comp, too.
Please change RFB to ITB in General section.
Under Scope of Work, #2, where it states, “All wiring, connections, and grounding should (change to shall) be installed per local code (change to industry standard).”