About this file
This document is a Request for Proposal (RFP) for HVAC services issued by the Alabama Department of Transportation (ALDOT) for the Tuscumbia Area, covering multiple facility types including area offices, district offices, welcome centers, rest areas, and miscellaneous locations. The contract is a statewide agency contract for HVAC maintenance, service, and replacement at ALDOT facilities within specified counties, with pay items including service calls and labor rates. The contract is not intended for new construction or major renovations exceeding $25,000, which would require separate competitive bidding. The contract will be awarded on an "all or none" basis by county groupings to the lowest responsible bidder, with a requirement that successful bidders be located within 100 miles of the primary ALDOT facility in the county.
The contract includes specific pricing provisions, with service and repair parts receiving a 15% mark-up, and transportation costs included in the service call bid price. Contractors must provide detailed labor rates for certified HVAC technicians and helpers, with differentiated pricing for regular and overtime hours. Bidders must demonstrate qualifications including state certification, minimum three years of relevant experience, commercial references, and appropriate insurance coverage. The contract requires comprehensive general liability insurance with minimum limits of $250,000 per occurrence and $500,000 aggregate, as well as workers' compensation insurance. Additional mandatory requirements include providing an emergency contact number, responding to messages within specified timeframes, and performing annual and operational maintenance on HVAC units with detailed inspection and reporting protocols.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HVAC_Tuscumbia.pdf | ||
| Specific_Terms_and_Conditions_-_ALDOT_Tuscumbia_Area_HVAC.docx | DOCX document | |
| ITB_Standard_Boilerplate_udated_9.25.2024.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ALDOT TUSCUMBIA AREA HVAC SERVICES CONTRACT
AREA OFFICES / DISTRICT OFFICES / WELCOME CENTERS / REST AREAS / MISC
I. CONTRACT DESIGN:
1.1 STATEWIDE AGENCY CONTRACT FOR THE HVAC MAINTENANCE
SERVICE/MAINTENANCE AND REPLACEMENT AT ALDOT FACILITIES WITHIN THE
INDICATED COUNTIES. CONTRACT TO INCLUDE THE FOLLOWING PAY ITEMS:
SERVICE CALLS
LABOR RATES
SERVICE AND REPAIR PARTS AND COMPONENTS WILL BE AT A 15% MARK-UP. NO
NEED TO BID THESE LINES.
1.2 THIS CONTRACT IS NOT USED FOR NEW CONSTRUCTION OR MAJOR
RENOVATIONS IN EXCESS OF $25,000. THESE SERVICES SHALL BE PROCURED
THROUGH AN INDIVIDUAL REQUISITION PROCESS. BY COMPETETIVE BID
SOLICITATION, AS REQUIRED UNDER CODE OF ALABAMA TITLE 41, SECTION 16, OR IN
ACCORDANCE WITH DECLARED EMERGENCY BID EXEMPTION PROCESSES. THE
CONTRACT SERVICE PROVIDER WILL BE RESPONSIBLE FOR ASSISTING IN THE
DEVELOPMENT OF COMPETITIVE BIDDABLE SPECIFICATIONS FOR SAID BID PROCESS.
2. SERVICE AND REPAIR PROCEDURES:
2.1 ALL SERVICE AND/OR REPAIR NEEDS DISCOVERED DURING INSPECTION OR
DIAGNOSTICS SERVICE MUST BE BROUGHT TO THE ATTENTION OF THE FACILITY
ADMINISTRATOR. CONTRACTOR WILL PROVIDE THE FACILITY ADMINISTRATOR A
DETAILED REPAIR PROPOSAL INCLUDING COMPREHENSIVE ESTIMATE FOR PARTS
AND LABOR BASED ON CONTRACT PRICING. NO ADDITIONAL WORK WILL BE
PERFORMED WITHOUT THE PRIOR AUTHORIZATION BY THE FACILITY
ADMINISTRATOR.
3. CONTRACT PERIOD, PURCHASE ORDER ISSUANCE, INVOICE PAYMENTS:
3.1 EACH ALDOT REGIONAL / DISTRICT WILL PREPARE A REQUISTION FROM THE
CONTRACT DOCUMENT IN ORDER TO GENERATE A PURCHASE ORDER TO THE
CONTRACTOR(S) RESPONSIBLE FOR COUNTIES WITHIN THEIR GEOGRAPHICAL AREA.
THE PURCHASE ORDER SHALL INCLUDE ENCUMBERANCE FOR ANTICIPATED
SERVICE CALLS WHICH FALL WITHIN THE SCOPE OF THE CURRENT FISCAL YEAR
(OCTOBER 1 THROUGH SEPTEMBER 30) TO INCLUDE ENCUMBERANCES FOR LABOR
AND PARTS IN ANTICIPATION OF SERVICES AND REPAIRS AT ALDOT FACILITIES IN
EACH COUNTY DURING THE FISCAL YEAR.
3.4 TRANSPORTATION COSTS WILL BE A CONSEQUENTIAL COST INCLUDED IN THE
SERVICE CALL BID PRICE.
3.5 IN THE EVENT THAT AUTHORIZED SERVICE OR REPAIRS REQUIRE PARTS OR
COMPONENTS NOT CUSTOMARILY WAREHOUSED BY THE CONTRACTOR, NOR
AVAILIABLE FROM LOCAL SUPPLIERS, SPECIAL-ORDER FREIGHT CHARGES MAY BE
INCLUDED IN THE PARTS INVOICE AT NET CONTRACTOR COST, NO MARK-UP
ALLOWED ON THE FREIGHT PORTION.
3.6 CONTRACTOR WILL INVOICE IN ARREARS FOR EACH SERVICE CALL. INVOICE
MUST ITEMIZE FOR PARTS, FREIGHT LABOR AND TRAVEL SEPERATELY.
3.7 BID PRICES SHALL INCLUDE THE FOLLOWING PAY ITEMS:
SERVICE CALL, TO INCLUDE TRAVEL FROM CONTRACTOR’S FACILITY OR LAST
CUSTOMER LOCATION TO THE ALDOT FACILITY, AND ONE (1) HOUR LABOR FOR
CERTIFIED HVAC TECHNICIAN AND HELPER.
HOURLY LABOR RATE FOR A CERTIFIED HVAC TECHNICIAN, REGULAR HOURS
(MONDAY-FRIDAY, 7:30AM – 4:30 PM)
HOURLY LABOR RATE FOR A CERTIFIED HVAC TECHNICIAN, OVERTIME HOURS (ALL
OTHER DAYS AND HOURS, STATE & FEDERAL HOLIDAYS)
HOURLY LABOR FOR A HVAC TECH HELPER, REGULAR HOURS (MONDAY-FRIDAY,
7:30AM – 4:30 PM)
HOURLY LABOR RATES FOR A HVAC TECH HELPER OVERTIME HOURS (ALL OTHER
DAYS AND HOURS, STATE & FEDERAL HOLIDAYS)
___ % MARK-UP PERCENTAGE FOR REPLACEMENT PARTS AND COMPONENTS. NO
NEED TO BID THESE LINES.
SPECIAL FREIGHT REIMBURSEMENT AS DESCRIBED IN ABOVE PARAGRAPH
3.8 THE DEPARTMENT RESERVES THE RIGHT TO REQUEST CANCELLATION OF A
CONTRACT WITH A THIRTY (30) DAY WRITTEN NOTICE. GROUNDS FOR CANCELLATION
WOULD INCLUDE BUT NOT LIMITED TO A CONTRACTOR’S FAILURE TO
SATISFACTORILY DISCHARGE THEIR RESPONSIBILITIES UNDER THESE
SPECIFICATIONS, MISREPRESENTATION OR FRAUDULENT ACTS BY OR ON BEHALF
OF THE CONTRACTOR, UNFORSEEN BUDGETARY CONSTRAINTS OR IN THE EVENT
THAT THE DEPARTMENT CLOSES, SELLS OR OTHERWISE DIVESTS ITSELF OR
OWNERSHIP OF A PARTICULAR FACILITY WHICH REPRESENTED THE DEPARTMENT’S
SOLE PRESENCE IN A SPECIFIC COUNTY.
4.0 EVALUATION AND AWARD:
4.1 AWARD WILL BE ALL OR NONE BY GROUPING OF COUNTY’S AS INDICATED IN THE
BID DOCUMENTS AND THESE SPECIFICATIONS, TO THE BIDDER, WHO DURING THE
EVALUATION PROCESS, IS DETERMINED TO BE THE LOWEST RESPONSIBLE BIDDER
FOR THAT SPECIFIC COUNTY.
4.2 SUCCESSFUL BIDDER MUST BE LOCATED WITHIN A ONE HUNDRED (100) MILE
DRIVING DISTANCE OF THE PRIMARY ALDOT FACILITY WITHIN THE COUNTY FOR
WHICH HE SUBMITS A BID. PROXIMITY WILL BE DETERMINED PER THE FOLLOWING
HEIRARCHY OF FACILITY TYPES: REGIONAL OR DISTRICT OFFICE, WELCOME CENTER,
REST AREA, AND PROJECT OFFICE. IN THE EVENT THAT THE ONLY FACILITIES
WITHIN A PARTICULAR COUNTY ARE OF THE SAME HEIARCHY, PROXIMITY WILL BE
DETERMINED AS AN AVERAGE DISTANCE FROM THE BIDDER’S FACILITY TO THE
ALDOT FACILITLES.
5.0 CONTRACTOR QUALIFICATIONS AND REQUIREMENTS:
5.1 EACH BIDDER SHALL PROVIDE WITH THEIR BID PROOF OF CERTIFICATION BY THE
STATE OF ALABAMA BOARD OF HEATING AND AIR CONDITIONING & REFRIGERATION.
PROOF OF INDIVIDUAL CERTIFICATIONS FOR EACH JOURNEYMAN OR MASTER
PLUMBER SHALL ALSO BE INCLUDED.
5.2 EACH BIDDER SHALL PROVIDE WITH THEIR BID A MINIMUM OF TWO (2)
COMMERCIAL REFERENCES TO DOCUMENT A MINIMUM OF THREE (3) YEARS TOTAL
EXPERIENCE IN HVAC SERVICES FOR FACILITIES OF A SIMILAR SIZE, NATURE AND
SCOPE TO THE FACILITY FOR WHICH HE IS SUBMITTING A BID. IF NO REFERENCES
ARE SUBMITTED WITH BIDS THIS COULD BE GROUNDS FOR REJECTION. EACH
REFERENCE MUST INCLUDE COMPLETE CONTACT INFORMATION.
5.3 ALL LEGAL AND REGULATORY PROVISIONS OF TITLE 34 SECTION 37, CODE OF
ALABAMA, AND THE ADMINISTRATIVE RULES AND REGULATIONS OF THE STATE OF
ALABAMA, PLUMBERS AND GAS FITTERS EXAMINING BOARD ARE HEREBY
INCORPORATED INTO THESE SPECIFICATIONS BY REFERENCE.
6.0 INSURANCE REQUIREMENT:
6.1DURING EACH CONTRACT PERIOD, THE CONTRACT VENDOR SHALL MAINTIAIN
“COMPREHENSIVE GENERAL LIABILITY AND PROPERTY DAMAGE INSURANCE POLICY”
WITH AN INSURANCE COMPANY AUTHORIZED TO DO BUSINESS IN ALABAMA.
6.2 THE MINIMUM AMOUNT OF INSURANCE LIMITS SHALL BE NO LESS THAN TWO
HUNDRED FIFTY THOUSAND DOLLARS ($250,000) PER OCCURRENCE, FIVE HUNDRED
THOUSAND DOLLARS ($500,000) AGGREGATE.
6.3 THE SUCCESSFUL BIDDER SHALL HAVE “WORKMAN’S COMPENSATION
INSURANCE” IN ACCORDANCE WITH THE LAWS OF THE STATE OF ALABAMA AND
SHALL FURNISH A CERTIFICATE TO THAT EFFECT.
6.4 EACH BIDDER SHALL SUBMIT WITH THE HIS BID PROOF OF INSURANCE
CERTIFICATES (LIABLILITY AND WORKMAN’S COMPENSATION). ANY FAILURE TO
FOLLOW THIS PROCEDURE MAY DELAY THE BID EVALUATION AND CONTRACT
AWARD.
6.5 THE INSURANCE CERTIFICATES SHOULD IDENTIFY THE STATE OF ALABAMA AS
THE CERTIFICATE HOLDER AND SHOULD BE MAILED TO:
DEPARTMENT OF FINANCE
DIVISION OF PROCUREMENT
P.O. BOX 302620
MONTGOMERY AL. 36130-2620
THE SUCCESSFUL CONTRACTOR SHALL SATISFY THE FOLLOWING MANDATORY
RESPONSE REQUIREMENTS:
6.6 CONTRACTOR SHALL PROVIDE AN EMERGENCY CONTACT PHONE NUMBER UPON
AWARD OF CONTRACT. PHONE SHOULD BE ANSWERED LIVE DURING NORMAL
BUSINESS HOURS AND MUST BE CONNECTED TO A VOICEMAIL. ACCOUNT OR
ANSWERING MACHINE 24/365 FOR BUSY CONDITION OR AFTER HOURS.
6.7 CONTRACTOR MUST RESPOND TO VOICE MAIL OR MESSAGES WITHIN ONE (1)
HOUR DURING NORMAL BUSINESS DAY/HOURS
6.8 CONTRACTOR MUST RESPOND TO AFTER-HOURS VOICE MAIL OR MESSAGES NO
LATER THAN 8:00 AM THE NEXT CALENDAR DAY.
6.9 CONTRACTOR MUST RESPOND TO EMERGENCY SERVICE REQUESTS WITHIN TWO
(2) CLOCK HOURS FROM THE TIME OF THE FIRST DOCUMENTED CONTACT.
7 BUSINESS LICENSE:
THE SUCCESSFUL BIDDER MUST HAVE A VALID BUSINESS LICENSE IN EACH
LOCALITY WHERE HE IS AWARDED A CONTRACT.
ENVIROMENTAL PROTECTION:
THE VENDOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL FEDERAL STATE
AND LOCAL ENVIROMENTAL REGULATIONS, AND FOR REPORTING ANY VIOLATIONS
TO THE ALDOT FACILITES MANAGER.
UPON REQUESTS CONTRACTOR MUST BE PREPARED TO PROVIDE LEGAL
IDENTIFICATION (STATE-ISSUED DRIVER’S LICENSE OR NON-DRIVER’S
IDENTIFICATION CARD) AND A USCIS FROM I-9 FOR ANY CONTRACTOR EMPLOYEE
WORKING ON AN ALDOT CONTRACT.
8 PREVENTIVE MAINTENANCES:
Annual Maintenance: 1 time per year per unit
Clean Condenser Coils
Check Unit Operation
Check Pressures and temps; air delta, super heat, subcooling, Check and record volts and amps
Check belts
Check general condition of unit
Check gas pressure if applicable
Check all safeties
Verify Proper function of the condensate drains
Clean intake air screens
Clean change air filters
Verify the operation of the oil heater
Grease all fittings
Provide a written report of completed work, operating log and indicate deficiencies detected.
Operational Inspection: 3 timer per year
Description Package Units, Split Systems, and Mini-Split Unit Operational
Verify Proper function of the condensate drains and treat if necessary
Ensure proper unit function
Clean/change filters
Grease all fittings
Provide a written report of completed work, operating log and indicate deficiencies detected
Annual Maintenance: 1 time per year
Exhaust Fans
Check Integrity of fan blades
Clean excess buildup
Check electrical connections
Replace belts
Lubricate motors
Provide a written report of completed work, operating log and indicate deficiencies detected