This is a Notice to Bidders issued by the North Carolina Department of Adult Correction for the Albemarle Correctional Institution Chiller Replacement project (SCO ID 25-30243-01). The project involves replacing two 140-ton cooling towers, two 140-ton water cooled chillers, and one 40-ton air cooled chiller with two 170-ton air cooled chillers at the Albemarle Correctional Institution. Sealed proposals will be received until 2:00 PM on June 9, 2026, at the NCDAC Central Engineering office located at 2020 Yonkers Road, Raleigh, NC. A mandatory pre-bid meeting will be held on May 19, 2026, at 10:00 AM at Albemarle Correctional Institution; failure to attend will disqualify bidders from submitting proposals. The meeting will address project-specific questions, security issues, bidding procedures, bid forms, and preferred brand alternates. Bids will be received for a single prime contract on a lump sum basis.

Bidders must submit proposals accompanied by a cash deposit or certified check equal to not less than five percent (5%) of the proposal amount, or alternatively, a bid bond of five percent (5%) of the bid executed by a surety company licensed in North Carolina. Performance and payment bonds equivalent to 100 percent of the contract price will be required. Payment will be made based on ninety-five percent (95%) of monthly estimates with final payment upon completion and acceptance of work. General contractors must hold appropriate licensing classification for Unlimited under North Carolina General Statutes Chapter 87, Article 1. Bids may not be withdrawn after the scheduled closing time for a period of 60 days. The owner reserves the right to reject any or all bids and to waive informalities. Bidders must include identification of minority business participation with their proposals, including either Affidavit A or B as applicable; failure to complete these forms is grounds for bid rejection.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCO-Notice To Bidders 2010 – (Updated Dec. 2010)

NOTICE TO BIDDERS

SCO ID 25-30243-01

Sealed proposals will be received by the North Carolina Department of Adult Correction in Raleigh NC, in the office of NCDAC Central Engineering, Door #4, 2020 Yonkers Road, Raleigh, NC; 4216 Mail Service Center, Raleigh, NC 27699-4216 up to 2:00 PM 6/9/2026 and immediately thereafter publicly opened and read for the furnishing of labor, material and equipment entering into the construction of:

ALBEMARLE CI- CHILLER REPLACEMENT

Project involves replacing two 140 ton cooling towers, two 140 ton water cooled chillers, and one 40 ton air cooled chiller with two 170 ton air cooled chillers.

Bids will be received for a single prime contract. All proposals shall be lump sum.

Pre-Bid Meeting

A mandatory pre-bid meeting will be held for all interested bidders on 5/19/2026 at 10:00 AM at Albemarle Correctional Institution. The meeting will address project specific questions, security, issues, bidding procedures and bid forms. Failure to attend the Pre-Bid Conference will disqualify your company from bidding.

The meeting is also to identify preferred brand alternates and their performance standards that the owner will consider for approval on this project.

In accordance with General Statute GS 133-3, Specifications may list one or more preferred brands as an alternate to the base bid in limited circumstances. Specifications containing a preferred brand alternate under this section must identify the performance standards that support the preference. Performance standards for the preference must be approved in advance by the owner in an open meeting. Any alternate approved by the owner shall be approved only where (i) the preferred alternate will provide cost savings, maintain or improve the functioning of any process or system affected by the preferred item or items, or both, and (ii) a justification identifying these criteria is made available in writing to the public.

Complete plans, specifications and contract documents will be open for inspection in the offices of North Carolina Department of Adult Correction – Division of Engineering Construction and Maintenance and in the online plan room of the Associated General Contractors/Reed Construction Data, Carolinas Branch (isqft.com), the online plan room of McGraw-Hill Dodge Corporation (dodge.construction.com), the online plan room at Construct Connect (bidclerk.com) the online plan and in Minority Plan Rooms at

[East Coast Digital Plan room., (speedyblue.com) 210 E. 14th St., Suite D, Greenville, NC 27858, 252-758-1616]

NOTE: The bidder shall include with the bid proposal the form Identification of Minority Business Participation identifying the minority business participation it will use on the project and shall include either Affidavit A or Affidavit B as applicable. Forms and instructions are included within the Proposal Form in the bid documents. Failure to complete these forms is grounds for rejection of the bid. (GS143-128.2c Effective 1/1/2002.)] https://www.isqft.com/start/ https://www.dodge.construction.com/ https://www.bidclerk.com/construction-bids.html https://www.speedyblue.com/East-Coast-Digital-Planroom-c39065011

SCO-Notice To Bidders 2010 (Updated Dec. 2010)

General contractors are notified that Chapter 87, Article 1, General Statutes of North Carolina, will be observed in receiving and awarding general contracts. General contractors submitting bids on this project must have license classification for Unlimited (set forth the license classification required by the NC General Contractors Licensing Board under G.S. 87-1)

NOTE--SINGLE PRIME CONTRACTS: Under GS 87-1, a contractor that superintends or manages construction of any building, highway, public utility, grading, structure or improvement shall be deemed a “general contractor” and shall be so licensed. Therefore, a single prime project that involves other trades will require the single prime contractor to hold a proper General Contractors license. EXCEPT: On public buildings being bid single prime, where the total value of the general construction does not exceed 25% of the total construction value, contractors under GS87- Arts 2 and 4 (Plumbing, Mechanical & Electrical) may bid and contract directly with the Owner as the SINGLE PRIME CONTRACTOR and may subcontract to other properly licensed trades. GS87-1.1- Rules .0210

Each proposal shall be accompanied by a cash deposit or a certified check drawn on some bank or trust company, insured by the Federal Deposit Insurance Corporation, of an amount equal to not less than five percent (5%) of the proposal, or in lieu thereof a bidder may offer a bid bond of five percent (5%) of the bid executed by a surety company licensed under the laws of North Carolina to execute the contract in accordance with the bid bond. Said deposit shall be retained by the owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten days after the award or to give satisfactory surety as required by law.

A performance bond and a payment bond will be required for one hundred percent (100%) of the contract price.

Payment will be made based on ninety-five percent (95%) of monthly estimates and final payment made upon completion and acceptance of work.

No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of 60 days.

The owner reserves the right to reject any or all bids and to waive informalities.

Designer: Owner: NC Department of Adult Correction Kathleen Rhoten and Emaeil Movahed Central Engineering (Name)

2020 Yonkers Road, Raleigh, NC 27604 2020 Yonkers Road, Raleigh, NC 27604 (Address)

(919)716-3400 (Phone) http://www.ncleg.net/EnactedLegislation/Statutes/HTML/BySection/Chapter_87/GS_87-1.html http://www.nclbgc.org/pages/LawNReg.pdf

File details come from the government source that posted it. Updated .