Alameda Zone 7 PL 84-99_Plans_Phase 3_Solicitation_Signed.pdf

PDF 35 MB Posted

Attached to
Alameda Zone 7 PL 84-99 Repairs (Phase 2 and 3) Federal contract opportunity
Solicitation number
W912P726BA005
Issued by
Department of the Army Corps of Engineers Engineering District San Francisco

About this file

This document is a solicitation for design plans and specifications for flood control channel repairs in Alameda County, California under the Public Law 84-99 (PL 84-99) program. Phase 3 consists of 20 repair sites across three locations: 16 sites on South San Ramon Creek (Line J), 3 sites on Alamo Canal (Line F), and 1 site on Alamo Creek (Site F04). The project is an operations and maintenance initiative to restore damaged flood control channel slopes to their original grades following storm damage from atmospheric rivers occurring between December 2022 and March 2023. Repairs involve excavation of failed slopes, installation of engineered fill with geogrid reinforcement, rock slope protection (RSP) in 1/2-ton and 1/4-ton soil-filled configurations, gravel filters, topsoil cover, hydroseed, and erosion control measures. The typical channel slopes are designed at 2:1 (horizontal:vertical) ratios, with channel heights ranging from 15 to 30 feet.

The contract requires compliance with extensive environmental and regulatory requirements, including biological monitoring by qualified fisheries biologists, California red-legged frog surveys, turbidity monitoring for in-water work, erosion and sediment control best management practices (BMPs), and protection of sensitive habitats. Construction activities below the top of creek banks are restricted to June 15 through October 15 unless otherwise approved. Work cannot be performed on days when the National Weather Service forecasts 0.1 inch or more rainfall in 24 hours. The contractor must establish water quality baselines, manage diversions, maintain public access to trails (requiring detours at specified sites), protect utilities, manage haul routes and staging areas, and restore all disturbed areas to pre-project conditions. The solicitation references standard specifications from Caltrans (2024) and includes detailed typical repair details, site-specific cross-sections, and construction limits of work maps showing ingress/egress routes, staging areas, and access points throughout Alameda County.

View the file

Other files for this federal contract opportunity

Other files attached to Alameda Zone 7 PL 84-99 Repairs (Phase 2 and 3), newest first.
File Type Posted
W912P726BA005 Alameda Zone 7 P2 P3_Abstract.pdf PDF
PL 84-99 Alameda Zone 7 Site Visit -Sign In.pdf PDF
Alameda Zone 7 PL 84-99_Specifications_Phase 2and3_solicitation.pdf PDF
Alameda Zone 7 PL 84-99_Plans_Phase 2_Solicitation Signed.pdf PDF
W912P726BA005 Alameda Z7 Phase 2 and 3 FINAL.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F04

F07

F31

F32

J01

J02

J03

J05

J06

J11

J12

J13

J16

J17 J18

J20

J21

J30

J36

J38

SOUTH SAN RAMON CREEK

AL

AM

O C

AN

AL

CR

EE

K

AL

AM

O

SOUTH SAN RAMON CREEK

AL

AM

O C

AN

AL

ARROYO MOCHO CANAL

ARRO

YO

DE LA LAG

UNA

CREE

K

TA

SS

AJ

AR

A

ARROYO

CR

EE

K

AL

AM

O

DEL VALLE

ALAM

O

CANAL

US Army Corps of Engineers

LOCATION MAP

SCALE: 1" = 3000'

C O

VE

R

S H

EE

T

G-031

San Francisco District

PROJECT

LOCATION

APPROVED BY:

ROBIN K. INABA, RA, PMP

CHIEF, ENGINEERING AND CONSTRUCTION DIVISION

PREPARED UNDER THE DIRECTION OF:

VIRGINIA R. BRICKNER

LIEUTENANT COLONEL, DISTRICT COMMANDER AND ENGINEER

THIS PROJECT WAS DESIGNED BY THE SAN FRANCISCO DISTRICT OF

THE U.S. ARMY CORPS OF ENGINEERS. THE INITIALS OR SIGNATURES

AND REGISTRATION DESIGNATIONS OF INDIVIDUALS THAT APPEAR

ON THESE PROJECT DOCUMENTS ARE WITHIN THE SCOPE OF THEIR

EMPLOYMENT AS REQUIRED BY ER 1110-1-8152.

SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION

AND APPROVAL OF DRAWINGS IN THIS SET.

SUBMITTED BY:

VICINITY MAP

NOT TO SCALE

LINE F

LINE J

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

San Francisco District

ALAMEDA COUNTY, CALIFORNIA

ZONE 7 FLOOD CONTROL CHANNELS

PL 84-99 REPAIRS

PHASE 3

W912P726BA005

W912P726CA0XX

MARCH 2026

DRAWING INDEX

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SA

N

F R

AN

C

IS

C

O D

IS

TR

IC

T

G O

LD

EN

G

AT

E

AV

E, TH

F

LO

O

R

SA

N F

R

AN

C

IS

C O

, C A

2-

W

2P

6C

A0

XX

M

AY

AN

SI

D

W

2P

6B A0

AL

AM

ED

A

C O

U N

TY

, C

AL

IF

O R

N

IA

ZO

N

E

FL

O

O D

C O

N

TR

O L

C H

AN

N

EL

S

PL

4-

R

EP

AI

R

S

PH

AS

E

(O

PT

IO

N T

AS

K)

SO

LI

C

IT

AT

IO

N C

:\P W

W O

R K\

D

1\

AZ

7_

G -0

.D

W G

9:

:3

AM

/2 3/

L3

ET

9S

IE

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

B.

W

AI

R

S.

E

LL

ER

SO

N

D . B

R

AU

D

J.

L

ER

A-

C H

AN

G-031 COVER SHEET

G-032 GENERAL NOTES

G-033 LEGEND, ABBREVIATIONS AND SUMMARY TABLE

G-130 HAUL ROUTES, STAGING AREAS, AND CONSTRUCTION LIMITS OF WORK: OVERVIEW

G-131 HAUL ROUTES, STAGING AREAS, AND CONSTRUCTION LIMITS OF WORK: SITES F31, F32 AND F07

G-132 CONSTRUCTION LIMITS OF WORK TABLE: SITES F31, F32 AND F07

G-133 HAUL ROUTES, STAGING AREAS, AND CONSTRUCTION LIMITS OF WORK: SITE F04

G-134 HAUL ROUTES, STAGING AREAS, AND CONSTRUCTION LIMITS OF WORK: LINE J

V-130 SURVEY CONTROL

CD131 EXISTING TREE DEMOLITION PLANS, LINE F - ALAMO CREEK

C-130 PROJECT VICINITY AND KEY MAP

C-131 PLANS: LINE F - ALAMO CREEK

C-132 PLANS: LINE F - ALAMO CANAL

C-133 PLANS: LINE J - SOUTH SAN RAMON CREEK SITES J01, J11, J02, J12, J16 AND J36 C-134 PLANS: LINE J - SOUTH SAN RAMON CREEK SITES J03, J05, J06, J13, J17, J18, J20, J21, J30 AND J38

C-331 TYPICAL SECTIONS: LINE F - ALAMO CREEK

C-332 TYPICAL SECTIONS: LINE F - ALAMO CANAL

C-333 TYPICAL SECTIONS: LINE J - SOUTH SAN RAMON CREEK: SITES J01, J02, J03, J11, J12, J13, J16, J18, AND J36 C-334 TYPICAL SECTIONS: LINE J - SOUTH SAN RAMON CREEK: SITES J05, J06, J17, J20, J21, J30 AND J38

C-530 TYPICAL REPAIR DETAILS

C-531 ZONE 7 TYPICAL ROAD AND OUTFALL DETAILS

JANICE M. LERA-CHAN, P.E.

CHIEF, ENGINEERING BRANCH

GENERAL NOTES

G

EN

ER

AL

N O

TE

S

G-032

GENERAL, SURVEY, SAFETY, AND WEATHER

1. WORK FOR THIS PROJECT IS NOTED AS “ALAMEDA ZONE 7 FLOOD CONTROL CHANNELS, PL 84-99

REPAIRS, PHASE 3”. PHASE 3 OF THE PROJECT CONSISTS OF A TOTAL OF 20 REPAIR SITES

INCLUDING SIXTEEN (16) SITES ON SOUTH SAN RAMON CREEK, THREE (3) SITES ON ALAMO CANAL

(LINE F), AND ONE (1) SITE ON ALAMO CREEK.

2. THE PROJECT IS AN OPERATIONS AND MAINTENANCE PROJECT TO REPAIR STORM DAMAGE TO FLOOD CONTROL CHANNELS IN ALAMEDA COUNTY. REPAIRS TO DAMAGED SITES WILL RESTORE THE

SLOPES TO ORIGINAL GRADE PRIOR TO STORM DAMAGES. THE PLAN VIEWS OF THE DRAWINGS

(C-101 SHEETS) SHOW THE APPROXIMATE EXTENTS OF THE DAMAGED AREAS FOR EACH SITE. THE CROSS SECTIONS (C-301 SHEETS) SHOW THE PLANNED REPAIR TYPE FOR EACH SITE. SHEET C-500 SHOWS THE TYPICAL REPAIR DETAILS. THE SUMMARY TABLE ON SHEET G-003 SHOWS THE DESIGN PARAMETERS AND ESTIMATED QUANTITIES FOR EACH SITE. THE G-100 SHEETS SHOW THE HAUL

ROUTES AND CONSTRUCTION LIMITS OF WORK FOR ACCESSING THE SITES.

3. HORIZONTAL DATUM IS NAD 83 (2011) EPOCH 2010, STATE PLANE COORDINATE SYSTEM, CA ZONE III, U.S. SURVEY FEET.

4. VERTICAL DATUM IS NAVD 88, U.S.SURVEY FEET.

5. EXISTING TOPOGRAPHIC LiDAR AND AERIAL IMAGERY IS SOURCED FROM DATASET PROVIDED BY

THE ALAMEDA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT (ZONE 7 WATER

AGENCY), DATE OF SURVEY IS FEBRUARY- APRIL 2023. SUPPLEMENTAL TOPOGRAPHIC SURVEY WAS CONDUCTED BY THE U.S. ARMY CORPS OF ENGINEERS, SAN FRANCISCO DISTRICT IN FEBRUARY

2025. SURFACE CONTOURS SHOWN ON PLANS AND SECTIONS ARE A COMPOSITE OF THESE

DATASETS. TOPOGRAPHIC CONTOURS AND AERIAL IMAGERY INDICATE THE GENERAL CONDITIONS

AT TIME OF SURVEY. SURVEYS WERE NOT PERFORMED BELOW THE WATER SURFACE AT TIME OF

SURVEY. AS SUCH, THE TOE OF SLOPE AND BOTTOM OF CHANNEL MAY NOT BE ACCURATELY

SHOWN ON PLANS AND CROSS SECTIONS. CONTRACTOR TO VERIFY IN FIELD TOP AND TOE OF

SLOPE PRIOR TO CONSTRUCTION.

6. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, WORK LIMITS, AND ELEVATIONS PRIOR TO

CONSTRUCTION.

7. IF UNANTICIPATED CONDITIONS ARE ENCOUNTERED, OR DIMENSIONS/GRADES APPEAR

INACCURATE, THE CONTRACTOR SHALL IMMEDIATELY BRING THE CONDITION TO THE ATTENTION OF

THE CONTRACTING OFFICER (CO) OR CONTRACTING OFFICER'S REPRESENTATIVE (COR).

8. IMMEDIATELY ON DISCOVERY OF THE NEED FOR INTERPRETATION OF THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL PREPARE AND SUBMIT A REQUEST FOR INFORMATION (RFI) FOR

CLARIFICATION VIA RMS (SPEC. SECTION 01 45 00.15 10, RESIDENT MANAGEMENT SYSTEM

CONTRACTOR MODE (RMS CM)).

9. RIGHT BANK AND LEFT BANK ARE REFERENCED LOOKING DOWNSTREAM.

10. CONSTRUCTION-RELATED PERMITS: PRIOR TO GRANTING ACCESS AND RIGHTS TO OCCUPY

PREMISES, CONTRACTOR MUST SUBMIT WORK PLANS FOR REVIEW AND APPROVAL AS DESCRIBED

IN SPECIFICATIONS, AND OBTAIN REQUIRED PERMITS. CONTRACTOR MUST COMPLY WITH

CONDITIONS OF ENCROACHMENT PERMITS FOR LAYDOWN/STAGING AREAS AND ACCESS

LOCATIONS.

11. CONTRACTOR SHALL BECOME FAMILIAR WITH AND OBEY WORK REGULATIONS INCLUDING SAFETY, FIRE, TRAFFIC, AND SECURITY REGULATIONS. KEEP WITHIN THE LIMITS OF THE WORK AND AVENUES

OF INGRESS AND EGRESS. REFERENCE SPEC. SECTION 01 35 26, GOVERNMENTAL SAFETY

REQUIREMENTS, AND COMPLY WITH CORPS EM 385-1-1 FOR SAFETY REQUIREMENTS TO INCLUDE

PERSONAL PROTECTIVE EQUIPMENT.

12. REGULAR WORKING HOUR RESTRICTIONS ARE PROVIDED IN SPECIFICATIONS. WORK OUTSIDE OF

REGULAR WORKING HOURS AND ON FEDERAL HOLIDAYS REQUIRE WRITTEN APPROVAL FROM THE

CONTRACTING OFFICER.

13. ALL CONSTRUCTION ACTIVITIES BELOW THE TOP OF CREEK BANK WILL BE LIMITED TO OCCUR

BETWEEN JUNE 15 TO OCTOBER 15, UNLESS APPROVED BY THE CONTRACTING OFFICER, PER

SPECIFICATION SECTION 01 14 00, PARAGRAPH 1.3.4.

14. WORK SHALL NOT BE PERFORMED ON DAYS THE NATIONAL WEATHER SERVICE FORECASTS 0.1 INCH OR MORE OF RAIN IN 24 HOURS. AHEAD OF THESE RAIN EVENTS AND NO LATER THAN THE DAY

PRIOR, THE CONTRACTOR SHALL IMPLEMENT A WORK STOPPAGE PLAN. WORK STOPPAGE

INCLUDES THE COMPLETION OF WORK OR PLACEMENT OF TEMPORARY MEASURES FOR PARTIALLY

COMPLETED WORK. TEMPORARY MEASURES INCLUDE EROSION CONTROL, SEDIMENT CONTROL,

AND OTHER PROTECTIVE MEASURES. TEMPORARY MEASURES SHALL BE STORED ONSITE AND

AVAILABLE AT ALL TIMES. WORK STOPPAGE ALSO INCLUDES THE REMOVAL OF DIVERSIONS WHEN

THE NATIONAL WEATHER SERVICE FORECASTS HIGH WATER OR WHEN DIRECTED BY THE

CONTRACTING OFFICER.

15. RAIN THAT LEADS TO THE REQUIREMENT TO REMOVE WATER DIVERSIONS SHALL BE CONSIDERED

UNANTICIPATED CONDITIONS. DAMAGE TO PROJECT CONSTRUCTION WORK SUSTAINED BECAUSE

OF A RAIN EVENT SHALL BE CONSIDERED UNANTICIPATED.

UTILITIES, SPILLS, AND RELATED

16. CONTACT UNDERGROUND SERVICE ALERT NORTH AT TEL. 811 OR 800-642-2444 A MINIMUM OF 2 WORKING DAYS PRIOR TO THE START OF EXCAVATION TO MARK EXISTING UTILITIES. UTILITIES THAT INTERFERE WITH WORK ARE TO BE PROTECTED AS REQUIRED AND KEPT IN SERVICE AT ALL TIMES. LOCATIONS OF MAPPED UTILITIES WITHIN PLANS ARE APPROXIMATE AND TO BE VERIFIED BY

CONTRACTOR.

17. IMMEDIATELY NOTIFY THE CONTRACTING OFFICER AFTER ALL SPILLS, REGARDLESS OF QUANTITY, INCLUDING ALL PERSONNEL EXPOSURES. THE CONTRACTOR SHALL SUBMIT A WRITTEN

NOTIFICATION NO LATER THAN 2 CALENDAR DAYS AFTER THE INITIAL NOTIFICATION.

18. SPILL KITS SHALL BE STORED AT EACH REPAIR SITE AND LAYDOWN/STAGING AREA AND BE MADE

AVAILABLE AT ALL TIMES.

19. LAYDOWN/STAGING AREAS WITHIN 100 FEET OF WATERWAYS SHALL INCLUDE SECONDARY

CONTAINMENT FOR VEHICLE AND EQUIPMENT FUELING AND MAINTENANCE.

20. VEHICLE AND EQUIPMENT FUELING AND MAINTENANCE MAY TAKE PLACE AT WORK SITES OR

LAYDOWN/STAGING AREAS WHICH MUST INCLUDE CONTAINMENT (PROTECTIVE) MEASURES TO

PROTECT AGAINST POTENTIAL DISCHARGE OF FLUIDS TO WATERWAYS.

21. VEHICLE AND EQUIPMENT SHALL BE CHECKED BEFORE THEY ARE USED FOR THE FIRST TIME, AND

THEN DAILY FOR FUEL, OIL, AND HYDRAULIC FLUID LEAKS OR OTHER PROBLEMS THAT COULD

RESULT IN SPILLS OF TOXIC MATERIALS.

22. VEHICLE, EQUIPMENT, MATERIAL, AND TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

SHALL BE REMOVED FROM THE REPAIR SITE WHEN WORK IS COMPLETE.

23. CONSTRUCTION WATER SHALL BE PURCHASED FROM AN APPROVED SOURCE OR BROUGHT IN FROM

OFF-SITE; CONSTRUCTION WATER MAY NOT BE TAKEN FROM WATERWAYS.

SITE ACCESS AND RELATED

24. MARK CONSTRUCTION LIMITS OF WORK IN THE FIELD AND HAVE CONSTRUCTION LIMITS OF WORK

APPROVED BY THE CO OR COR PRIOR TO THE START OF WORK.

25. ONLY OPERATE EQUIPMENT ON APPROVED ACCESS ROUTES AND WITHIN CONSTRUCTION WORK

LIMITS INDICATED ON THE DRAWINGS.

26. IN ALL AREAS WHERE PROJECT RELATED ACTIVITIES OCCUR, THE CONTRACTOR SHALL RETURN THE

EASEMENTS, ACCESS POINTS AND PROVIDED LAY-DOWN/STAGING AREAS TO THEIR ORIGINAL

PRE-PROJECT CONDITIONS PRIOR TO VACATING THE SITE UNLESS NOTED OTHERWISE HEREIN AS

AN ALLOWABLE SOIL SPOILS/GREEN WASTE DISPOSAL SITE.

27. DURING THE COURSE OF THE PROJECT, THE COUNTY OF ALAMEDA, PROPERTY OWNERS, AND ITS

AUTHORIZED REPRESENTATIVES SHALL BE PROVIDED ACCESS TO THE COUNTY EASEMENTS,

COUNTY ACCESS POINTS AND COUNTY-PROVIDED LAY-DOWN/STAGING AREAS AT ALL TIMES IN

ORDER TO CONDUCT THE COUNTY'S NORMAL BUSINESS ACTIVITIES.

28. GRAVEL MAINTENANCE ROADS THAT BECOME RUTTED, CONTAMINATED, CRUSHED OR OTHERWISE DAMAGED BY PROJECT CONSTRUCTION SHALL BE REPAIRED BY CONTRACTOR AT THEIR EXPENSE.

29. ASPHALT CONCRETE (AC) ROADWAY(S) SHALL BE PROTECTED FROM DAMAGE BY THE CONTRACTOR

TO THE MAXIMUM EXTENT PRACTICABLE IN ORDER TO PERFORM THE WORK.

30. CONTRACTOR SHALL PROVIDE TRACK-OUT CONSTRUCTION GRATES AT ALL EXITS TO PUBLIC ROADS

AS REQUIRED TO LIMIT TRACKING OF MUD AND DEBRIS OFF THE SITE.

HABITAT PROTECTION, ENVIRONMENTAL PERMITS, AND COMPLIANCE

31. PERFORM ALL WORK IN A MANNER THAT COMPLIES WITH ALL PERMITS AND IS PROTECTIVE OF THE ENVIRONMENT, INCLUDING AIR AND WATER QUALITY, WILDLIFE, VEGETATION AND HUMAN HEALTH AND IN ACCORDANCE WITH SPEC. SECTION 01 57 19 AND RELATED. CONTRACTOR SHALL INSTALL AND MAINTAIN BEST MANAGEMENT PRACTICES (BMPs) AS REQUIRED BY ALL PERMITS. IF BMPs ARE

DAMAGED, RESTORE/REPLACE TO CONTINUE PROTECTION TO THE ENVIRONMENT.

32. THE CONTRACTOR SHALL APPOINT AN ENVIRONMENTAL MANAGER, FOR COORDINATING

CONTRACTOR COMPLIANCE WITH ENVIRONMENTAL REQUIREMENTS. THE CONTRACTOR SHALL

PROVIDE A BIOLOGICAL MONITOR AT ALL TIMES WHEN ACCESSING THE CONSTRUCTION LIMITS OF WORK. THE CONTRACTOR SHALL PROVIDE A QUALIFIED FISHERIES BIOLOGIST WHEN PERFORMING IN-WATER WORK. SEE SPECIFICATIONS 01 57 19, SECTION 1.6 FOR QUALITY ASSURANCE DETAILS.

33. THE CONTRACTOR IS RESPONSIBLE FOR NOTIFYING THE CONTRACTING OFFICER 72 HOURS IN

ADVANCE OF PERFORMING BIOLOGICAL SURVEYS TO ALLOW SUFFICIENT TIME FOR THE

GOVERNMENT ENVIRONMENTAL PLANNER TO ALSO ATTEND THE SURVEY.

34. THE CONTRACTOR-PROVIDED BIOLOGIST SHALL RESURVEY AREAS OF DISTURBANCE WHENEVER A

LAPSE IN CONSTRUCTION ACTIVITY OF TWO WEEKS OR GREATER HAS OCCURRED.

35. IF SENSITIVE HABITATS ARE IDENTIFIED BY THE BIOLOGICAL MONITOR, THE CONTRACTOR SHALL FENCE AND USE SIGNAGE TO CLEARLY DENOTE ALL AREAS THAT ARE NOT TO BE DISTURBED BY

CONSTRUCTION ACTIVITIES.

36. SURVEYS FOR THE PRESENCE OR THE ABSENCE OF CALIFORNIA RED-LEGGED FROGS ARE

REQUIRED WITHIN THE CONSTRUCTION LIMITS OF WORK. BIOLOGISTS' ACCEPTABLE QUALIFYING

EXPERIENCE FOR CALIFORNIA RED-LEGGED FROG MUST BE EQUIVALENT TO, OR EXCEED, THE

MINIMUM QUALIFICATIONS FOR OBTAINING A SECTION 10(A)(1)(A) RECOVERY PERMIT FOR THE SPECIES AND BE APPROVED BY THE CONTRACTING OFFICER. DAILY WORK MAY COMMENCE IN THE ABSENCE OF CALIFORNIA RED-LEGGED FROGS. IF CALIFORNIA RED-LEGGED FROGS ARE FOUND, IMMEDIATELY NOTIFY THE CONTRACTING OFFICER OR THE CORPS' ENVIRONMENTAL MANAGER.

37. BEFORE THE START OF IN-WATER CONSTRUCTION ACTIVITIES THAT MAY CAUSE ELEVATED

TURBIDITY, BACKGROUND NEPHELOMETRIC TURBIDITY UNIT (NTU) LEVELS MUST BE ESTABLISHED

PER MEASUREMENTS TAKEN DAILY PRIOR TO WORK COMMENCEMENT. NTU LEVELS SHALL BE

MONITORED UPSTREAM OF PROJECT ACTIVITIES (I.E., BACKGROUND) AND DOWNSTREAM OF THE

IN-STREAM CONSTRUCTION CONSISTENT WITH WATER QUALITY PERMITTING REQUIREMENTS AND

SPEC. SECTION 01 57 19. IF TURBIDITY MONITORING MEASUREMENTS EXCEED ALLOWABLE LEVELS

PER APPLICABLE ENVIRONMENTAL PERMITS, OR AN EXCEEDANCE OF THE BACKGROUND NTUS BY

20%, WHICHEVER IS MORE STRINGENT, REMEDIAL ACTIONS WILL BE IMPLEMENTED TO REDUCE AND

MAINTAIN TURBIDITY AT OR BELOW COMPLIANCE THRESHOLD LEVELS.

38. TURBIDITY CURTAINS WILL BE DEPLOYED IN A WAY THAT EXCLUDES FISH FROM THE WORK AREA TO THE MAXIMUM EXTENT PRACTICABLE AND MINIMIZES THE POTENTIAL FOR FISH TO OCCUR IN THE WORK AREA ONCE ISOLATED, IN COMPLIANCE WITH ALL TERMS AND CONDITIONS OF THE LETTER OF CONCURRENCE FROM THE NATIONAL MARINE FISHERIES SERVICE. SEE SPECIFICATIONS 01 57 19, SECTION 3.3.1.2 FOR DETAILS.

39. PRIOR TO DEPLOYING THE TURBIDITY CURTAIN AND IN-WATER WORK, A QUALIFIED FISH BIOLOGIST

WILL CONDUCT SNORKEL SURVEYS ALONG THE TOE OF THE ENTIRE WORK AREA WHERE THE

TURBIDTY CURTAIN WILL BE DEPLOYED. IF NO SALMONID SPECIES (CALIFORNIA COASTAL

STEELHEAD) ARE DETECTED IN THE WORK AREA, THE CONTRACTOR SHALL IMMEDIATELY DEPLOY THE TURBIDITY CURTAIN. BIOLOGISTS ACCEPTABLE QUALIFYING EXPERIENCE FOR CALIFORNIA COASTAL STEELHEAD MUST BE EQUIVALENT TO, OR EXCEED, THE MINIMUM QUALIFICATIONS FOR OBTAINING A SECTION 10(A)(1)(A) RECOVERY PERMIT FOR THE SPECIES AND BE APPROVED BY THE CONTRACTING OFFICER. IF CENTRAL CALIFORNIA COASTAL STEELHEAD ARE FOUND, IMMEDIATELY

STOP WORK AND NOTIFY THE ENVIRONMENTAL MANAGER OR CONTRACTING OFFICER.

40. MATERIAL NOT ACTIVELY IN USE SHALL BE COVERED AND SURROUNDED BY AN APPROPRIATE EXCLUSION BARRIER TO KEEP WILDLIFE AWAY. ANY MATERIAL STOCKPILED THAT IS NOT ACTIVELY

BEING USED DURING CONSTRUCTION SHALL BE COVERED AND SURROUNDED WITH A LINEAR

SEDIMENT BARRIER.

41. THE CONTRACTOR SHALL MINIMIZE CLEARING AND GRUBBING IN HABITAT AREAS TO ONLY THOSE

AREAS NECESSARY TO COMPLETE THE PROJECT CONSTRUCTION. TREES TO BE PROTECTED IN

PLACE TO MAXIMUM EXTENT PRACTICABLE. ANY TREES THAT ARE REMOVED ARE TO BE TRACKED

AND REPORTED TO THE ENVIRONMENTAL MANAGER. THE CONTRACTOR SHALL STABILIZE ALL

DISTURBED AREAS WITHIN 12 HOURS OF ANY BREAK IN WORK UNLESS CONSTRUCTION WILL

RESUME WORK WITHIN SEVEN DAYS. EARTHWORK WILL BE COMPLETED AS QUICKLY AS POSSIBLE, AND SITE RESTORATION WILL OCCUR IMMEDIATELY FOLLOWING USE. WHERE POSSIBLE, THE

CONTRACTOR SHALL ACCOMPLISH EXCAVATION OF THE EXISTING SLOPE BY USING EQUIPMENT

LOCATED AND OPERATED FROM THE TOP OF BANK, WITH THE LEAST REMOVAL PRACTICAL FOR

VEGETATION.

42. CONTRACTOR SHALL INSTALL EROSION CONTROL AS REQUIRED BY THE SWPPP AND FOR FINAL

SURFACES IN ACCORDANCE WITH SPECIFICATIONS.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SA

N

F R

AN

C

IS

C

O D

IS

TR

IC

T

G O

LD

EN

G

AT

E

AV

E, TH

F

LO

O

R

SA

N F

R

AN

C

IS

C O

, C A

2-

W

2P

6C

A0

XX

M

AY

AN

SI

D

W

2P

6B A0

AL

AM

ED

A

C O

U N

TY

, C

AL

IF

O R

N

IA

ZO

N

E

FL

O

O D

C O

N

TR

O L

C H

AN

N

EL

S

PL

4-

R

EP

AI

R

S

PH

AS

E

(O

PT

IO

N T

AS

K)

SO

LI

C

IT

AT

IO

N C

:\P W

W O

R K\

D

1\

AZ

7_

G -0

.D

W G

9:

:1

AM

/2 3/

L3

ET

9S

IE

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

B.

W

AI

R

S.

E

LL

ER

SO

N

D . B

R

AU

D

J.

L

ER

A-

C H

AN

LE

G

EN

D

, A

BB

R

EV

IA

TI

O N

S

AN

D S

U M

M

AR

Y

TA

BL

E

G-033

SURVEY CONTROL AB AGGREGATE BASE

APPROX APPROXIMATE

ATC AT TIME OF CONSTRUCTION

BMP BEST MANAGEMENT PRACTICE

CENTERLINE

CO CONTRACTING OFFICER

COR CONTRACTING OFFICER REPRESENTATIVE

CONC CONCRETE

DBH DIAMETER AT BREAST HEIGHT

DIA/Ø DIAMETER

DR DRIVE

(E) EXISTING

E EASTING

EA EACH

EG EXISTING GRADE

EL ELEVATION

EM ENGINEERING MANUAL

FG FINISHED GRADE

FT FOOT/FEET

H/HORIZ HORIZONTAL

HWY HIGHWAY

IN INCH/INCHES

INV INVERT

LAT LATERAL

LB LEFT BANK

LF LINEAR FEET

LT LEFT

MAX MAXIMUM

MAINT. MAINTENANCE

MIN MINIMUM

N NORTHING

N/A NOT APPLICABLE

NAD 83 NORTH AMERICAN DATUM OF 1983

NAVD 88 NORTH AMERICAN VERTICAL DATUM OF 1988

NGS NATIONAL GEODETIC SURVEY

NO NUMBER

NTS NOT TO SCALE

OFF OFFSET

OG ORIGINAL GRADE

PID PERMANENT IDENTIFIER

PIP PROTECT IN PLACE

R RADIUS

RB RIGHT BANK

RC REINFORCED CONCRETE

RD ROAD

RSP ROCK SLOPE PROTECTION

SL SLOPE

STA STATION

SWPPP STORMWATER POLLUTION PREVENTION PLAN

SYMM. SYMMETRICAL

TYP TYPICAL

U.O.N. UNLESS OTHERWISE NOTED

V/VERT VERTICAL

W/ WITH

W/O WITHOUT

WSE WATER SURFACE ELEVATION

EXISTING GROUND

EXISTING CONTOUR5

ABBREVIATIONS

CL

WATER SURFACE ELEVATION

LEGEND

ENGINEERED FILL

1/2 TON ROCK SLOPE PROTECTION

FINAL GRADE CONTOUR5

FLOW

DIRECTION OF RIVER FLOW

1/4 TON SOIL-FILLED ROCK SLOPE

PROTECTION

STAGING AREA

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SA

N

F R

AN

C

IS

C

O D

IS

TR

IC

T

G O

LD

EN

G

AT

E

AV

E, TH

F

LO

O

R

SA

N F

R

AN

C

IS

C O

, C A

2-

W

2P

6C

A0

XX

M

AY

AN

SI

D

W

2P

6B A0

AL

AM

ED

A

C O

U N

TY

, C

AL

IF

O R

N

IA

ZO

N

E

FL

O

O D

C O

N

TR

O L

C H

AN

N

EL

S

PL

4-

R

EP

AI

R

S

PH

AS

E

(O

PT

IO

N T

AS

K)

SO

LI

C

IT

AT

IO

N C

:\P W

W O

R K\

D

1\

AZ

7_

G -0

.D

W G

:1

0:

A M

/2

3/

L3

ET

9S

IE

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

B.

W

AI

R

S.

E

LL

ER

SO

N

D . B

R

AU

D

J.

L

ER

A-

C H

AN

SUMMARY TABLE:

GRAVEL FILTER

HAUL ROUTE

SITE INGRESS (FROM FWY)

SITE EGRESS (TO FWY)

REPAIR SITE

ACCESS POINT

CHANNEL CONTROL LINE

G13

CONSTRUCTION LIMITS OF WORK

(E) FENCE

ZONE 7 FLOOD PROTECTION PARCEL

PLAN

NORTH

NORTH ARROW

EXISTING GRADE

JU

N

E

WATER LINEW

SANITATION LINESAN

STORM DRAINSD

ELECTRICALE

TURNAROUND POINT

TREE TO REMOVE

TREE TO REMAIN

NOTE: SUMMARY TABLE QUANTITIES PROVIDED FOR BIDDING PURPOSES ONLY.

0+

0+

0+

0+

0+

0+

0+

8+

.2

0+

10+00 20+00

+0

+0

+0

60+00

+0

+0

+2

4.

-0 +0

+0

+0

+0

+0

+0

+0

+9

SOUTH SAN R

AMON C

REEK

F31

F07

F32

J21

J20

F04

J30

J38

J06

J05

J17

J03

J18

J13

J36 J16

J12

J02

J01

J11

KI

M

BA

LL

A

VE

AMADOR VALLEY BLVD

D U

BL

IN

B

LV

D

ALAMO CANAL

ALAMO CANAL

VILLAGE PKWY

DOUGHERTY RD

CREEK

ALAMO

DUBLIN

HIGHWAY

H

IG

H W

A Y

IR

ON

HORSE

TRAIL

VILLAGE PKWY

O

VE

R

VI

EW

C

O N

ST

R

U C

TI

O

N L

IM

IT

S O

F W

O R

K H

AU

L

R O

U

TE

S, S

TA

G

IN

G

A R

EA

S, A N

D

G-130SCALE: 1" = 600'

HAUL ROUTES, STAGING AREAS, AND CONSTRUCTION LIMITS OF WORK - OVERVIEWA1

PLAN

NORTH

0 600' 1200'

LEGEND

HAUL ROUTE

SITE INGRESS (FROM FWY)

SITE EGRESS (TO FWY)

STAGING AREA

REPAIR SITEF14

ACCESS POINT

SCALE: NTS

PROJECT SITE LOCATIONJ1

CHANNEL ALIGNMENT

LINE K

LINE G

LINE E

LINE B

LINE F

LINE J

PLAN

NORTH

LINE F - ALAMO CANAL

LINE J - SOUTH SAN

RAMON CREEK

TURNAROUND POINT

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SA

N

F R

AN

C

IS

C

O D

IS

TR

IC

T

G O

LD

EN

G

AT

E

AV

E, TH

F

LO

O

R

SA

N F

R

AN

C

IS

C O

, C A

2-

W

2P

6C

A0

XX

M

AY

AN

SI

D

W

2P

6B A0

AL

AM

ED

A

C O

U N

TY

, C

AL

IF

O R

N

IA

ZO

N

E

FL

O

O D

C O

N

TR

O L

C H

AN

N

EL

S

PL

4-

R

EP

AI

R

S

PH

AS

E

(O

PT

IO

N T

AS

K)

SO

LI

C

IT

AT

IO

N C

:\P W

W O

R K\

D

1\

AZ

7_

G -1

.D

W G

:2

7:

A M

/2

3/

L3

ET

9S

IE

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

B.

W

AI

R

S.

E

LL

ER

SO

N

D . B

R

AU

D

J.

L

ER

A-

C H

AN

SEE SHEET G-134

SEE SHEET G-133

SEE SHEET G-131

CONSTRUCTION

LIMITS OF WORK

LINE F - ALAMO CREEK

0+

0+

D U

BL

IN

B

LV

D

F32 F31

F07

ALAMO CANAL

L1

L1

L102

L103

L104

L1

L106

L107 L108

L109

L1

L1

L112

L113

L114

L115

L1

L117 L118

L119

L120

L121 L122 L123

L124

L1

L1

L1

L128

L129

L130

L131 L132

L1

L134

L1

L1

L143

L144 L145

L146

L147

L148

L149

L150

L1

C100

L153L1

L155

L1

L1

L158

L159

L1

L1

L1

L163

L164

L165

L166

L1

L168

L1

L1

CLARK AVE

VI

LL

AG

E

PK

W

Y

CIVIC PLAZA

SIERRA CT

L1

L137

L1

L1

L1

L1

L1

VI

LL

AG

E

PK

W

Y

DUBLIN BLVD

SI

TE

S F3

1, F

, A

N D

F

C O

N

ST

R U

C

TI

O N

L

IM

IT

S

O F

W O

R K

H

AU

L R

O U

TE

S, S

TA

G

IN

G A

R

EA

S, A

N D

G-131

LEGEND

HAUL ROUTE

SITE INGRESS (FROM FWY)

SITE EGRESS (TO FWY)

REPAIR SITEF14

GATE ACCESS

CHANNEL ALIGNMENT

ZONE 7 FLOOD

PROTECTION PARCEL

SCALE: 1" = 100'

HAUL ROUTE, STAGING AREAS, AND CONSTRUCTION LIMITS OF WORK: SITES F31, F32, AND F07G1

PLAN

NORTH

100' 200'0

LINE F CONTROL LINE

GATE ACCESS

GATE ACCESS

GATE ACCESS

HAUL ROUTE

HAUL ROUTE

CONSTRUCTION

LIMITS OF WORK

DURING CONSTRUCTION

AT SITE F-07, CONTRACTOR

TO SET UP PEDESTRIAN/

BIKER DETOUR FOR ALAMO

CANAL TRAIL FROM DUBLIN

BLVD TO SOUTH SIDE OF

PUBLIC LIBRARY

PEDESTRIAN DETOUR

MATCH LINE

MATCH LINE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SA

N

F R

AN

C

IS

C

O D

IS

TR

IC

T

G O

LD

EN

G

AT

E

AV

E, TH

F

LO

O

R

SA

N F

R

AN

C

IS

C O

, C A

2-

W

2P

6C

A0

XX

M

AY

AN

SI

D

W

2P

6B A0

AL

AM

ED

A

C O

U N

TY

, C

AL

IF

O R

N

IA

ZO

N

E

FL

O

O D

C O

N

TR

O L

C H

AN

N

EL

S

PL

4-

R

EP

AI

R

S

PH

AS

E

(O

PT

IO

N T

AS

K)

SO

LI

C

IT

AT

IO

N C

:\P W

W O

R K\

D

1\

AZ

7_

G -1

-1

.D

W G

:3

1:

A M

/2

3/

L3

ET

9S

IE

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

B.

W

AI

R

S.

E

LL

ER

SO

N

D . B

R

AU

D

J.

L

ER

A-

C H

AN

DUBLIN CIVIC CENTER

100 CIVIC PLAZA

DUBLIN, CA 94568

DUBLIN PUBLIC LIBRARY

200 CIVIC PLAZA

DUBLIN, CA 94568

CONSTRUCTION LIMITS OF WORK

LINE #/ CURVE #

C100

L100

L101

L102

L103

L104

L105

L106

L107

L108

L109

L110

L111

L112

L113

L114

L115

L116

L117

L118

L119

L120

L121

L122

L123

L124

L125

L126

L127

L128

L129

L130

L131

L132

L133

L134

LENGTH

368.14

71.08

162.61

156.43

348.74

165.62

127.80

181.61

444.37

38.53

282.91

72.29

65.87

70.48

292.11

74.88

94.20

59.78

56.91

71.75

87.45

279.08

44.43

34.03

41.42

175.65

104.79

89.17

78.87

64.22

26.37

35.13

122.53

152.59

38.17

231.56

START NORTHING

2081405.18

2081930.92

2081883.78

2081827.02

2081801.72

2082106.16

2082260.80

2082221.71

2082053.28

2081665.50

2081674.36

2081812.12

2081772.67

2081754.31

2081759.57

2081909.60

2081961.56

2082042.82

2082024.09

2081974.78

2081918.92

2081859.41

2081727.46

2081683.65

2081651.16

2081622.02

2081533.57

2081574.94

2081629.79

2081685.20

2081653.45

2081642.60

2081636.12

2081529.59

2081392.35

2081409.53

START EASTING

6150549.58

6150677.72

6150730.91

6150883.30

6151037.67

6151207.78

6151267.06

6151388.74

6151320.83

6151103.82

6151141.32

6151388.42

6151448.99

6151512.25

6151582.53

6151833.17

6151887.08

6151934.72

6151991.49

6151963.09

6151918.06

6151853.98

6151608.05

6151615.41

6151605.30

6151575.86

6151424.11

6151327.84

6151257.53

6151201.41

6151145.59

6151121.56

6151087.03

6151026.49

6150959.80

6150925.71

END NORTHING

2081497.01

2081883.78

2081827.02

2081801.72

2082106.16

2082260.80

2082221.71

2082053.28

2081665.50

2081674.36

2081812.12

2081772.67

2081754.31

2081759.57

2081909.60

2081961.56

2082042.82

2082024.09

2081974.78

2081918.92

2081859.41

2081727.46

2081683.65

2081651.16

2081622.02

2081533.57

2081574.94

2081629.79

2081685.20

2081653.45

2081642.60

2081636.12

2081529.59

2081392.35

2081409.53

2081228.03

END EASTING

6150865.62

6150730.91

6150883.30

6151037.67

6151207.78

6151267.06

6151388.74

6151320.83

6151103.82

6151141.32

6151388.42

6151448.99

6151512.25

6151582.53

6151833.17

6151887.08

6151934.72

6151991.49

6151963.09

6151918.06

6151853.98

6151608.05

6151615.41

6151605.30

6151575.86

6151424.11

6151327.84

6151257.53

6151201.41

6151145.59

6151121.56

6151087.03

6151026.49

6150959.80

6150925.71

6150781.92

CONSTRUCTION LIMITS OF WORK

LINE #/ CURVE #

L135

L136

L137

L138

L139

L140

L141

L142

L143

L144

L145

L146

L147

L148

L149

L150

L151

L153

L154

L155

L156

L157

L158

L159

L160

L161

L162

L163

L164

L165

L166

L167

L168

L169

L170

LENGTH

782.67

1025.75

38.35

371.56

338.22

88.03

52.78

45.28

47.18

20.46

9.62

33.00

27.24

35.87

29.10

34.17

362.29

322.60

52.12

91.53

166.23

83.70

22.14

179.35

75.93

75.10

91.93

99.56

54.38

57.46

23.75

26.40

71.32

75.48

62.54

START NORTHING

2081228.03

2081649.62

2082510.51

2082524.50

2082219.02

2081928.06

2081851.43

2081805.89

2081767.92

2081729.80

2081713.96

2081706.82

2081680.66

2081663.98

2081640.40

2081622.67

2081603.35

2081497.01

2081778.84

2081791.58

2081803.45

2081864.14

2081916.31

2081785.43

2081696.98

2081643.11

2081596.75

2081562.96

2081616.51

2081639.59

2081686.21

2081709.95

2081732.57

2081729.36

2081749.57

START EASTING

6150781.92

6150122.50

6149564.79

6149600.50

6149812.01

6149984.45

6150027.79

6150054.47

6150079.15

6150106.95

6150119.90

6150126.34

6150146.47

6150168.00

6150195.03

6150218.11

6150246.29

6150865.62

6151022.58

6150972.05

6150881.29

6150726.53

6150661.08

6151383.76

6151227.74

6151281.25

6151340.33

6151425.83

6151509.76

6151558.99

6151592.59

6151592.59

6151578.97

6151507.72

6151435.00

END NORTHING

2081649.62

2082510.51

2082524.50

2082219.02

2081928.06

2081851.43

2081805.89

2081767.92

2081729.80

2081713.96

2081706.82

2081680.66

2081663.98

2081640.40

2081622.67

2081603.35

2081405.18

2081778.84

2081791.58

2081803.45

2081864.14

2081916.31

2081930.92

2081696.98

2081643.11

2081596.75

2081562.96

2081616.51

2081639.59

2081686.21

2081709.95

2081732.57

2081729.36

2081749.57

2081785.43

END EASTING

6150122.50

6149564.79

6149600.50

6149812.01

6149984.45

6150027.79

6150054.47

6150079.15

6150106.95

6150119.90

6150126.34

6150146.47

6150168.00

6150195.03

6150218.11

6150246.29

6150549.58

6151022.58

6150972.05

6150881.29

6150726.53

6150661.08

6150677.72

6151227.74

6151281.25

6151340.33

6151425.83

6151509.76

6151558.99

6151592.59

6151592.59

6151578.97

6151507.72

6151435.00

6151383.76

SI

TE

S F3

1, F

, A

N D

F

C O

N

ST

R U

C

TI

O N

L

IM

IT

S

O F

W O

R K

TA

BL

E

G-132

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SA

N

F R

AN

C

IS

C

O D

IS

TR

IC

T

G O

LD

EN

G

AT

E

AV

E, TH

F

LO

O

R

SA

N F

R

AN

C

IS

C O

, C A

2-

W

2P

6C

A0

XX

M

AY

AN

SI

D

W

2P

6B A0

AL

AM

ED

A

C O

U N

TY

, C

AL

IF

O R

N

IA

ZO

N

E

FL

O

O D

C O

N

TR

O L

C H

AN

N

EL

S

PL

4-

R

EP

AI

R

S

PH

AS

E

(O

PT

IO

N T

AS

K)

SO

LI

C

IT

AT

IO

N C

:\P W

W O

R K\

D

1\

AZ

7_

G -1

-1

.D

W G

:4

7:

A M

/2

3/

L3

ET

9S

IE

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

B.

W

AI

R

S.

E

LL

ER

SO

N

D . B

R

AU

D

J.

L

ER

A-

C

10+00

D O

U G

H

ER

TY R

D

IRON

HORSE

TRAIL

F04

ALAMO CREEK

L201 L202 L203

L204 L205

L2

L207 L208

L2

C200 L211

L212

L2

L214 L215

L216

L2

L218

L219

C201L221

L200

CONSTRUCTION LIMITS OF WORK

LINE #/ CURVE #

C200

C201

L200

L201

L202

L203

L204

L205

L206

L207

L208

L209

L211

L212

L213

L214

L215

L216

L217

L218

L219

L221

LENGTH

9.66

35.17

80.74

17.09

280.04

75.67

23.90

21.33

37.61

119.14

42.32

50.33

15.73

248.06

20.81

275.00

18.44

20.93

69.17

15.00

3.40

394.87

START NORTHING

2085773.65

2085644.77

2085667.78

2085732.54

2085741.00

2085745.50

2085763.50

2085766.16

2085786.48

2085823.99

2085826.91

2085822.88

2085764.11

2085749.22

2085743.62

2085722.82

2085726.56

2085708.13

2085708.80

2085641.38

2085644.62

2085657.50

START EASTING

6153255.23

6153178.15

6152751.38

6152703.16

6152718.00

6152998.00

6153071.50

6153095.25

6153101.77

6153104.50

6153223.60

6153265.73

6153255.40

6153260.47

6153508.46

6153507.99

6153233.01

6153232.60

6153211.68

6153196.20

6153181.55

6153146.11

END NORTHING

2085764.11

2085657.50

2085732.54

2085741.00

2085745.50

2085763.50

2085766.16

2085786.48

2085823.99

2085826.91

2085822.88

2085773.65

2085749.22

2085743.62

2085722.82

2085726.56

2085708.13

2085708.80

2085641.38

2085644.62

2085644.77

2085667.78

END EASTING

6153255.40

6153146.11

6152703.16

6152718.00

6152998.00

6153071.50

6153095.25

6153101.77

6153104.50

6153223.60

6153265.73

6153255.23

6153260.47

6153508.46

6153507.99

6153233.01

6153232.60

6153211.68

6153196.20

6153181.55

6153178.15

6152751.38

SI

TE

F

C O

N

ST

R U

C

TI

O N

L

IM

IT

S

O F

W O

R K

H

AU

L R

O U

TE

, S

TA

G

IN

G

P

LA

N A

N D

G-133

SCALE: 1" = 100'

HAUL ROUTE AND CONSTRUCTION LIMITS OF WORK: SITE F04G1

100' 200'0

LEGEND

HAUL ROUTE

SITE INGRESS (FROM FWY)

SITE EGRESS (TO FWY)

REPAIR SITEF14

GATE ACCESS

CHANNEL ALIGNMENT

TURNAROUND POINT

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SA

N

F R

AN

C

IS

C

O D

IS

TR

IC

T

G O

LD

EN

G

AT

E

AV

E, TH

F

LO

O

R

SA

N F

R

AN

C

IS

C O

, C A

2-

W

2P

6C

A0

XX

M

AY

AN

SI

D

W

2P

6B A0

AL

AM

ED

A

C O

U N

TY

, C

AL

IF

O R

N

IA

ZO

N

E

FL

O

O D

C O

N

TR

O L

C H

AN

N

EL

S

PL

4-

R

EP

AI

R

S

PH

AS

E

(O

PT

IO

N T

AS

K)

SO

LI

C

IT

AT

IO

N C

:\P W

W O

R K\

D

1\

AZ

7_

G -1

.D

W G

:5

1:

A M

/2

3/

L3

ET

9S

IE

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

B.

W

AI

R

S.

E

LL

ER

SO

N

D . B

R

AU

D

J.

L

ER

A-

C H

AN

ZONE 7 FLOOD

PROTECTION PARCEL

PLAN

NORTH

LINE F CONTROL LINE

HAUL ROUTE

GATE ACCESS

CONSTRUCTION

LIMITS OF WORK

CONTRACTOR MAY

TEMPORARILY REMOVE AND

REPLACE PORTION OF CHAIN

LINK FENCING NEAR SITE F04

FOR ACCESS

CONSTRUCTION LIMITS OF WORK

LINE #

L311

L312

L313

L314

L315

L316

L317

L318

L319

L320

L321

L322

LENGTH

145.73'

4699.67'

163.22'

379.10'

828.78'

2060.43'

1401.35'

46.48'

63.49'

158.23'

498.26'

52.21'

DIRECTION

N73° 25' 00.81"E

S34° 38' 50.02"E

S55° 14' 00.61"W

N34° 22' 17.56"W

N35° 08' 09.15"W

N34° 45' 44.59"W

N34° 45' 31.93"W

N63° 37' 30.84"W

S71° 17' 03.32"W

S74° 51' 46.80"W

S74° 07' 23.02"W

N32° 21' 19.89"W

START NORTHING

2090203.62

2090245.21

2086378.94

2086285.86

2086598.77

2087276.54

2088969.23

2090120.53

2090141.17

2090120.80

2090079.49

2089943.18

START EASTING

6149116.85

6149256.52

6151928.39

6151794.30

6151580.28

6151103.30

6149928.49

6149129.55

6149087.91

6149027.78

6148875.04

6148395.79

END NORTHING

2090245.21

2086378.94

2086285.86

2086598.77

2087276.54

2088969.23

2090120.53

2090141.17

2090120.80

2090079.49

2089943.18

2089987.28

END EASTING

6149256.52

6151928.39

6151794.30

6151580.28

6151103.30

6149928.49

6149129.55

6149087.91

6149027.78

6148875.04

6148395.79

6148367.85

CONSTRUCTION LIMITS OF WORK

LINE #

L323

L324

L325

L326

L327

L328

L329

L330

L331

L332

LENGTH

779.62'

616.71'

330.35'

243.93'

34.49'

60.63'

28.28'

586.86'

536.57'

111.89'

DIRECTION

N73° 53' 22.63"E

S34° 49' 09.61"E

S35° 16' 17.27"E

S16° 36' 40.03"W

N83° 04' 34.74"W

S15° 35' 49.36"W

N89° 19' 46.59"W

N18° 04' 57.82"W

N34° 31' 51.18"W

N55° 16' 23.63"E

START NORTHING

2089987.28

2086322.59

2085816.29

2085546.59

2085312.84

2085316.99

2085258.60

2085258.93

2085816.81

2086258.84

START EASTING

6148367.85

6151980.05

6152332.18

6152522.94

6152453.21

6152418.97

6152402.67

6152374.39

6152192.24

6151888.08

END NORTHING

2090203.62

2085816.29

2085546.59

2085312.84

2085316.99

2085258.60

2085258.93

2085816.81

2086258.84

2086322.59

END EASTING

6149116.85

6152332.18

6152522.94

6152453.21

6152418.97

6152402.67

6152374.39

6152192.24

6151888.08

6151980.05

+0

+0

+0

+0

+0

63+90

J30

J38

J06

J05 J17

J03

J18

J13 J36

J16

J12

J02

J01 J11

HAUL ROUTE

HAUL ROUTE

STAGING

AREA

SOUTH SAN RAMON CREEK

L3

L312

L315

L316

L317

L318L3

L3

L3

L322

L3

528+17.20

10+00

-0+00

+0

+0

J21

J20

HAUL ROUTE

STAGING

AREA

L313

L314

L324 L325

L326

L327

L328

L3

L330

L331

L3

LI

N

E J

AN

D

C O

N

ST

R U

C

TI

O N

L

IM

IT

S

O F

W O

R K

H

AU

L R

O U

TE

S, S

TA

G

IN

G A

R

EA

S, G-134

SCALE: 1" = 200'

HAUL ROUTE, STAGING AREAS AND CONSTRUCTION LIMITS OF WORK: LINE JC1

PLAN

NORTH

400'0 200'

LEGEND

HAUL ROUTE

SITE INGRESS (FROM FWY)

SITE EGRESS (TO FWY)

STAGING AREA

REPAIR SITEF14

GATE ACCESS

CHANNEL ALIGNMENT

TURNAROUND POINT

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SA

N

F R

AN

C

IS

C

O D

IS

TR

IC

T

G O

LD

EN

G

AT

E

AV

E, TH

F

LO

O

R

SA

N F

R

AN

C

IS

C O

, C A

2-

W

2P

6C

A0

XX

M

AY

AN

SI

D

W

2P

6B A0

AL

AM

ED

A

C O

U N

TY

, C

AL

IF

O R

N

IA

ZO

N

E

FL

O

O D

C O

N

TR

O L

C H

AN

N

EL

S

PL

4-

R

EP

AI

R

S

PH

AS

E

(O

PT

IO

N T

AS

K)

SO

LI

C

IT

AT

IO

N C

:\P W

W O

R K\

D

1\

AZ

7_

G -1

.D

W G

:0

3:

P M

/2

3/

L3

ET

9S

IE

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

B.

W

AI

R

S.

E

LL

ER

SO

N

D . B

R

AU

D

J.

L

ER

A-

C H

AN

ZONE 7 FLOOD

PROTECTION PARCEL

LINE J CONTROL LINE

GATE ACCESS

GATE ACCESS

TURNAROUND POINT

NO TRUCKS

ON BRIDGE

CONSTRUCTION

LIMITS OF WORK

NO TRUCKS

ON BRIDGE

PEDESTRIAN/BIKER ACCESS

MUST REMAIN OPEN TO PUBLIC

DURING CONSTRUCTION.

CONTRACTOR TO SET UP DETOURS

GATE ACCESS

M

AT

C H

L

IN

E

ST

A

+0

M

AT

C H

L

IN

E

ST

A

+0

DUBLIN HIGH SCHOOL

CONTRACTOR MAY

TEMPORARILY REMOVE

AND REPLACE PORTION

OF CHAIN LINK FENCING

NEAR SITE J21 FOR

ACCESS, IF NEEDED.

CNTRL ZONE 7 DISK 1

N 2090411.47 E 6149267.75

EL 352.20

CNTRL ZONE 7 DISK 2

N 2081387.70 E 6150929.86

EL 331.37

CNTRL ZONE 7 DISK 3

N 2072288.13 E 6152881.27

EL 323.38

CNTRL ZONE 7 DISK 4

N 2074975.95 E 6159443.48

EL 330.52

NGS PID HS5109 (GOLD CREEK)

N 2075186.40 E 6146924.81

EL 564.84

H

IG

H W

AY

W LAS POSITAS BLVD

H O

PY

AR

D R

D

H

AC

IE

N

D A

D R

ARROYO MOCHO

AL

AM

O C

AN

AL

TA

SS

AJA

RA C

REE

K

STONERIDGE DR

HIGHW

AY 680

HIGHWAY 580

STONERIDGE DR

STONERIDGE DR

FO

O

TH

IL

L R

D

FO

O

TH

IL

L R

D

AMADOR VALLEY BLVDVI

LL

AG

E

PK

W

Y

ST

AG

EC

O

AC

H

R D

SOUTH SAN RAMON CREEK

AL

AM

O C

AN

AL

SU

R

VE

Y

C O

N

TR

O L

V-130

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SA

N

F R

AN

C

IS

C

O D

IS

TR

IC

T

G O

LD

EN

G

AT

E

AV

E, TH

F

LO

O

R

SA

N F

R

AN

C

IS

C O

, C A

2-

W

2P

6C

A0

XX

M

AY

AN

SI

D

W

2P

6B A0

AL

AM

ED

A

C O

U N

TY

, C

AL

IF

O R

N

IA

ZO

N

E

FL

O

O D

C O

N

TR

O L

C H

AN

N

EL

S

PL

4-

R

EP

AI

R

S

PH

AS

E

(O

PT

IO

N T

AS

K)

SO

LI

C

IT

AT

IO

N C

:\P W

W O

R K\

D

1\

AZ

7_

V-

0.

D

W G

:3

9:

P M

/2

3/

L3

ET

9S

IE

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

B.

W

AI

R

S.

E

LL

ER

SO

N

D . B

R

AU

D

J.

L

ER

A-

C H

AN

SCALE: 1" = 1000'

SURVEY CONTROLA1

PLAN

NORTH

0 2000'1000'

1. SURVEY CONTROL HORIZONTAL DATUM IS CALIFORNIA NAD83 (2011)

EPOCH 2010, STATE PLANE ZONE 3, U.S. SURVEY FEET.

2. SURVEY CONTROL VERTICAL DATUM IS NAVD 88, U.S. SURVEY FEET.

NOTES:

0.00 F3

0.00 F4

+0

+5

+0

SD

SD

LI

N

E F

- A

LA

M O

C R

EE

K

EX

IS

TI

N

G T

R

EE

D

EM

O

LI

TI

O

N S

IT

E

PL

AN

S

CD131

SCALE: 1" = 20'

EXISTING TREE DEMOLITION PLAN - SITE F04J1

20' 40'0

PLAN

NORTH

APPROX EXTENTS OF

SITE F4 DAMAGE

FLOW

ALAMO CREEK

RIGHT BANK

LEFT BANK

NOTES:

1. EXISTING TREES TO BE PROTECTED IN PLACE TO MAXIMUM EXTENT

PRACTICABLE. ACTUAL TREES THAT ARE REMOVED ARE TO BE TRACKED AND

REPORTED TO THE ENVIRONMENTAL MANAGER.

2. TREE LOCATIONS ARE APPROXIMATE AND TO BE CONFIRMED BY CONTRACTOR.

TREE REMOVAL #1

TREE REMOVAL #2

TREE REMOVAL #3

TREE REMOVAL TABLE:

TREE TO REAMAIN, TYP

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SA

N

F R

AN

C

IS

C

O D

IS

TR

IC

T

G O

LD

EN

G

AT

E

AV

E, TH

F

LO

O

R

SA

N F

R

AN

C

IS

C O

, C A

2-

W

2P

6C

A0

XX

M

AY

AN

SI

D

W

2P

6B A0

AL

AM

ED

A

C O

U N

TY

, C

AL

IF

O R

N

IA

ZO

N

E

FL

O

O D

C O

N

TR

O L

C H

AN

N

EL

S

PL

4-

R

EP

AI

R

S

PH

AS

E

(O

PT

IO

N T

AS

K)

SO

LI

C

IT

AT

IO

N C

:\P W

W O

R K\

D

1\ C

-B

AS

E-

LI

N E-

F.

D

W G

:5

8:

P M

/2

3/

L3

ET

9S

IE

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

B.

W

AI

R

S.

E

LL

ER

SO

N

D . B

R

AU

D

J.

L

ER

A-

C

8+

.2

0+

0+

0+

0+

0+

0+

10+00

20+00

+0

+0

+0

60+00

+0

+0

+9

-0 +0

+0

+0

+0

+0

+0

+0

SOUTH SAN R

AMON C

REEK

F31

F07

F32

J21

J20

F04

J30

J38

J06

J05

J17

J03

J18

J13

J36

J16 J12

J02

J01

J11

KI

M

BA

LL

A

VE

AMADOR VALLEY BLVD

D U

BL

IN

B

LV

D

ALAMO CANAL

VILLAGE PKWY

DOUGHERTY RD

CREEK

ALAMO

H

IG

H W

A Y

IR

ON

HORSE

TRAIL

VILLAGE PKWY

STAGECOACH RD

HIGHWAY

PR

O

EC

T

VI

C

IN

IT

Y

AN

D K

EY

M

AP

C-130SCALE: 1" = 400'

PROJECT VICINITY AND KEY MAPA1

PLAN

NORTH

800'0 400'

LINE F - ALAMO CANAL

LINE J - SOUTH SAN

RAMON CREEK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SA

N

F R

AN

C

IS

C

O D

IS

TR

IC

T

G O

LD

EN

G

AT

E

AV

E, TH

F

LO

O

R

SA

N F

R

AN

C

IS

C O

, C A

2-

W

2P

6C

A0

XX

M

AY

AN

SI

D

W

2P

6B A0

AL

AM

ED

A

C O

U N

TY

, C

AL

IF

O R

N

IA

ZO

N

E

FL

O

O D

C O

N

TR

O L

C H

AN

N

EL

S

PL

4-

R

EP

AI

R

S

PH

AS

E

(O

PT

IO

N T

AS

K)

SO

LI

C

IT

AT

IO

N C

:\P W

W O

R K\

D

1\

AZ

7_

C -1

.D

W G

:4

3:

P M

/2

3/

L3

ET

9S

IE

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

B.

W

AI

R

S.

E

LL

ER

SO

N

D . B

R

AU

D

J.

L

ER

A-

C H

AN

SEE SHEET C-131

SEE SHEET C-132

LINE F - ALAMO CREEK

SEE SHEET C-133

SEE SHEET C-133

SEE SHEET C-134

SEE SHEET C-134

F3

0.00 F4

9+

+0

+5

+0

+5

+0

+5

13+00

13+50

14+00

N: 2085705.62 E: 6153042.31

N: 2085702.68 E: 6152990.24

N: 2085724.65 E: 6152989.54

N: 2085728.29 E: 6153040.57

SA

N

SA

N

SAN

SAN

SAN

SA

N

SAN

SAN

SAN

SAN

SAN

SD

SD

SD

SD

SD

SD

LI

N

E F

- A

LA

M O

C R

EE

K

PL

AN

S

C-131

SCALE: 1" = 40'

PLAN - SITE F04K1 40' 80'0

PLAN

NORTH

APPROX EXTENTS OF

SITE F4 DAMAGE

FLOW

AL

AM

O CREEK

A1 C-331

RIGHT BANK

LEFT BANK

CONTRACTOR MAY TEMPORARILY REMOVE

AND REPLACE PORTION OF CHAIN LINK

FENCING NEAR SITE F04 FOR ACCESS

PROTECT IN PLACE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SA

N

F R

AN

C

IS

C

O D

IS

TR

IC

T

G O

LD

EN

G

AT

E

AV

E, TH

F

LO

O

R

SA

N F

R

AN

C

IS

C O

, C A

2-

W

2P

6C

A0

XX

M

AY

AN

SI

D

W

2P

6B A0

AL

AM

ED

A

C O

U N

TY

, C

AL

IF

O R

N

IA

ZO

N

E

FL

O

O D

C O

N

TR

O L

C H

AN

N

EL

S

PL

4-

R

EP

AI

R

S

PH

AS

E

(O

PT

IO

N T

AS

K)

SO

LI

C

IT

AT

IO

N C

:\P W

W O

R K\

D

1\ C

-B

AS

E-

LI

N E-

F.

D

W G

:5

4:

P M

/2

3/

L3

ET

9S

IE

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

B.

W

AI

R

S.

E

LL

ER

SO

N

D . B

R

AU

D

J.

L

ER

A-

C

F7

0.00 F31

0.00

F32

0.00

F33

9+

9+

0+

0+

1+

1+

2+

2+

3+

3+

4+

N: 2081737.75 E: 6151113.22

N: 2081752.78 E: 6151088.29

N: 2081730.89 E: 6151054.99

N: 2081736.72 E: 6151043.42

N: 2081614.63 E: 6150986.14

N: 2081621.48 E: 6150974.21

N: 2081456.82 E: 6150894.75

N: 2081463.74 E: 6150882.39

SA

N

SD

SD

SD

SD

SDSDSDSD

SD

SD

SD

N: 2081675.41 E: 6151077.13

N: 2081689.72 E: 6151050.67

N: 2081573.50 E: 6150963.25 N: 2081579.42 E: 6150951.98

LI

N

E F

- A

LA

M O

C

AN

AL

PL

AN

S

C-132

SCALE: 1" = 40'

PLAN - SITES F07, F31, AND F32J1

40' 80'0

PLAN

NORTH

APPROX EXTENTS

OF SITE F31 DAMAGE

APPROX EXTENTS

OF SITE F32 DAMAGE

APPROX EXTENTS OF

SITE F7 DAMAGE

FLOWALAMO CANAL

D1 C-332

A1 C-332

A8 C-332

RIGHT BANK

LEFT BANKPROTECT IN PLACE

PROTECT IN PLACE

PROTECT IN PLACE

EXISTING AC TRAIL;

MAINTAIN OPEN TRAIL,

DETOUR REQUIRED

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SA

N

F R

AN

C

IS

C

O D

IS

TR

IC

T

G O

LD

EN

G

AT

E

AV

E, TH

F

LO

O

R

SA

N F

R

AN

C

IS

C O

, C A

2-

W

2P

6C

A0

XX

M

AY

AN

SI

D

W

2P

6B A0

AL

AM

ED

A

C O

U N

TY

, C

AL

IF

O R

N

IA

ZO

N

E

FL

O

O D

C O

N

TR

O L

C H

AN

N

EL

S

PL

4-

R

EP

AI

R

S

PH

AS

E

(O

PT

IO

N T

AS

K)

SO

LI

C

IT

AT

IO

N C

:\P W

W O

R K\

D

1\ C

-B

AS

E-

LI

N E-

F.

D

W G

:5

5:

P M

/2

3/

L3

ET

9S

IE

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

B.

W

AI

R

S.

E

LL

ER

SO

N

D . B

R

AU

D

J.

L

ER

A-

C

34534

345345

350350

355355

+5

+0

+5

+0

+5

+0

+5

+0

+5

+0

+5

+0

+5

+0

+5

+0

N: 2088710.71 E: 6150209.75

N: 2088692.91 E: 6150189.53

N: 2088722.17 E: 6150169.07

N: 2088737.42 E: 6150191.16

N: 2088858.84 E: 6150106.80

N: 2088839.34 E: 6150085.48

N: 2088892.64 E: 6150087.94

N: 2088875.28 E: 6150059.49

N: 2089080.65 E: 6149950.94

N: 2089059.76 E: 6149933.38

N: 2089118.45 E: 6149924.74

N: 2089103.58 E: 6149903.23

N: 2089115.55 E: 6149888.63 N: 2089056.21

E: 6149924.50

N: 2089036.96 E: 6149899.71

N: 2089096.77 E: 6149860.86

N: 2088542.65 E: 6150291.23

W W

W W

W W

W W W W W W W W W W W W W W W W W W W W W W

W W

W W

SD

SD

SD

SD

SD

EEEEEEEEEEEEEEEEEEEEEEEEEEEEE

+0

+5

+0

+5

+0

+5

+0

+5

+0

+5

+0

+5

+0

+5

+0

+5

+0

+5

+0

+5

+0

+5

+0

N: 2089874.38 E: 6149398.30N: 2089885.71

E: 6149388.44 N: 2089854.35 E: 6149380.75N: 2089876.91

E: 6149364.68

N: 2089437.37 E: 6149709.97

N: 2089414.35 E: 6149683.05

N: 2089437.18 E: 6149666.78

N: 2089456.56 E: 6149695.79

W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W

SD

SD

SD

SD

EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

SI

TE

S J0

1, J

, J

, J

, J

A

N D

J

LI

N

E J

- S O

U

TH

S

AN

R

AM

O N

C R

EE

K

PL

AN

S

C-133

SCALE: 1" = 40'

PLAN - SITES J01 AND J11J1

40' 80'0

PLAN

NORTH

APPROX EXTENTS OF

SITE J11 DAMAGE

APPROX EXTENTS OF

SITE J01 DAMAGE

FLOW

SCALE: 1" = 40'

PLAN - SITES J02, J12, J16, AND J36B1

40' 80'0

PLAN

NORTH

APPROX EXTENTS OF

SITE J12 DAMAGE APPROX EXTENTS OF

SITE J16 DAMAGE

APPROX EXTENTS OF

SITE J36 DAMAGE

APPROX EXTENTS OF

SITE J02 DAMAGE

FLOWSOUTH SAN RAMON CREEK

SOUTH SAN RAMON CREEK

D8 C-333

H14 C-303

D1 C-333

D14 C-333

H1 C-333

H8 C-333

RIGHT BANK

LEFT BANK

RIGHT BANK

LEFT BANK

PROTECT IN PLACE

PROTECT IN PLACE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SA

N

F R

AN

C

IS

C

O D

IS

TR

IC

T

G O

LD

EN

G

AT

E

AV

E, TH

F

LO

O

R

SA

N F

R

AN

C

IS

C O

, C A

2-

W

2P

6C

A0

XX

M

AY

AN

SI

D

W

2P

6B A0

AL

AM

ED

A

C O

U N

TY

, C

AL

IF

O R

N

IA

ZO

N

E

FL

O

O D

C O

N

TR

O L

C H

AN

N

EL

S

PL

4-

R

EP

AI

R

S

PH

AS

E

(O

PT

IO

N T

AS

K)

SO

LI

C

IT

AT

IO

N C

:\P W

W O

R K\

D

1\ C

-B

AS

E-

LI

N E-

J.

D

W G

1:

:2

PM

/2 3/

L3

ET

9S

IE

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

B.

W

AI

R

S.

E

LL

ER

SO

N

D . B

R

AU

D

J.

L

ER

A-

C H

AN

PROTECT IN PLACE

EXISTING AC TRAIL;

MAINTAIN OPEN TRAIL,

DETOUR REQUIRED

PROTECT IN PLACE

EXISTING AC TRAIL;

MAINTAIN OPEN TRAIL,

DETOUR REQUIRED

330330

+0

+5

+0

+5

+0

+5

+0

+5

+0

+5

+0

N: 2087211.01 E: 6151259.26 N: 2087170.34

E: 6151286.41 N: 2087198.62 E: 6151236.93 N: 2087158.45

E: 6151263.72

N: 2087065.12 E: 6151304.07

N: 2087056.83 E: 6151288.33

N: 2086901.12 E: 6151415.66

N: 2086891.79 E: 6151400.71

W W W W W W W W W W W W W W W W W W

SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN

EEEEEEEEEEEEEEEEEEEE

2+ 002+

503+

3+

4+

4+

5+

5+

6+

6+

7+

7+

N: 2085645.45 E: 6152296.07

N: 2085635.33 E: 6152263.96

N: 2085567.14 E: 6152321.84

N: 2085556.35 E: 6152291.49

N: 2085430.95 E: 6152359.34 N: 2085347.95

E: 6152386.66

N: 2085339.68 E: 6152362.81

N: 2085422.06 E: 6152334.67

SD

SD

SD

E E

E

345345

350350

355355

+0

+5

+0

+5

+0

+5

+0

+5

+0

+5

+0

+5

+0

+5

+0

+5

+0

+5

+0

+5

+0

+5

+0

+5

N: 2087936.64 E: 6150701.82

N: 2087905.82 E: 6150722.21

N: 2087897.33 E: 6150696.42

N: 2087915.69 E: 6150684.23

N: 2088056.51 E: 6150626.77

N: 2087981.55 E: 6150679.13

N: 2087963.79 E: 6150643.44

N: 2088031.93 E: 6150598.84

N: 2088093.58 E: 6150559.41

N: 2088107.70 E: 6150583.74

N: 2088131.17 E: 6150567.56

N: 2088115.17 E: 6150544.46

N: 2088560.56 E: 6150323.64

N: 2088511.59 E: 6150355.60

N: 2088542.65 E: 6150291.23

N: 2088486.57 E: 6150374.91

N: 2088457.51 E: 6150396.25

N: 2088435.62 E: 6150370.92

N: 2088466.48 E: 6150347.79

W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W

EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

N: 2088491.22 E: 6150326.73

SI

TE

S J0

3, J

, J

, J

, J

, J

, J

, J

, J

A

N D

J

LI

N

E J

- S O

U

TH

S

AN

R

AM

O N

C R

EE

K

PL

AN

S

C-134

SCALE: 1" = 40'

PLAN - SITES J03, J13, J18, J17, J05, AND J06B1

40' 80'0

PLAN

NORTH

APPROX EXTENTS OF

SITES J13 AND J18

DAMAGE

APPROX EXTENTS OF

SITE J03 DAMAGE

APPROX EXTENTS OF

SITE J17 DAMAGE

APPROX EXTENTS OF

SITE J05 DAMAGE

APPROX EXTENTS OF

SITE J06 DAMAGE

FLOW

SCALE: 1" = 40'

PLAN - SITES J38 AND J30H1

40' 80'0

PLAN

NORTH

SCALE: 1" = 40'

PLAN - SITES J20 AND J21H11

40' 80'0

PLAN

NORTH

APPROX EXTENTS OF

SITE J38 DAMAGE

APPROX EXTENTS OF

SITE J30 DAMAGE

APPROX EXTENTS OF

SITE J20 DAMAGE APPROX EXTENTS OF

SITE J21 DAMAGE

FLOW

FLOW

SOUTH SAN RAMON CREEK

SOUTH SAN RAMON CREEK

SOUTH SAN RAMON CREEK

D1 C-334

A8 C-334

A14 C-334 A1

C-334

A1 C-333

A8 C-333

A14 C-333

H1 C-334 D8

C-334 D14 C-334

RIGHT BANK

LEFT BANK

RIGHT BANK

LEFT BANK

RIGHT BANK

LEFT BANK

STORM DRAIN CONCRETE

OUTLET STRUCTURE REPAIR

SEE DETAIL SHEET

CONTRACTOR MAY TEMPORARILY

REMOVE AND REPLACE PORTION

OF CHAIN LINK FENCING NEAR SITE

J21 FOR ACCESS, IF NEEDED

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SA

N

F R

AN

C

IS

C

O D

IS

TR

IC

T

G O

LD

EN

G

AT

E

AV

E, TH

F

LO

O

R

SA

N F

R

AN

C

IS

C O

, C A

2-

W

2P

6C

A0

XX

M

AY

AN

SI

D

W

2P

6B A0

AL

AM

ED

A

C O

U N

TY

, C

AL

IF

O R

N

IA

ZO

N

E

FL

O

O D

C O

N

TR

O L

C H

AN

N

EL

S

PL

4-

R

EP

AI

R

S

PH

AS

E

(O

PT

IO

N T

AS

K)

SO

LI

C

IT

AT

IO

N C

:\P W

W O

R K\

D

1\ C

-B

AS

E-

LI

N E-

J.

D

W G

1:

:2

PM

/2 3/

L3

ET

9S

IE

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

B.

W

AI

R

S.

E

LL

ER

SO

N

D . B

R

AU

D

J.

L

ER

A-

C H

AN

PROTECT IN PLACE

EXISTING AC TRAIL;

MAINTAIN OPEN TRAIL,

DETOUR REQUIRED PROTECT IN PLACE

EXISTING AC TRAIL;

MAINTAIN OPEN TRAIL,

DETOUR REQUIRED

PROTECT IN PLACE

EXISTING AC TRAIL;

MAINTAIN OPEN TRAIL,

DETOUR REQUIRED

11+50

020406080100120140 0 -20 -40 -60 -80 -100 -120 -140

REPAIR TYPE 1

APPROX SLOPE 1.7:1

APPROX EG

(SEE NOTE 1)

10-YEAR WSE

345.9

PROPOSED TOE EL 335.8

LI

N

E F

- A

LA

M O

C R

EE

K

TY

PI

C

AL

S

EC

TI

O

N S

C-331SCALE: 1" = 40' HORIZ., 1" = 40' VERT.

TYPICAL SECTION - F04A1 40' 80'0

RIGHT BANKLEFT BANK

K1 C-131

NOTES:

1. BOTTOM OF CHANNEL PROFILE IS ASSUMED / APPROXIMATE.

EXISTING GRADES BELOW WATER SURFACE IS INTERPRETED

FROM AS-BUILTS / HISTORICAL DRAWINGS.

2. CONTRACTOR TO VERIFY ELEVATIONS IN THE FIELD PRIOR TO

CONSTRUCTION.

3. PROPOSED TOE LOCATION IS TO BE VERIFIED BY CONTRACTOR

MARKING LOCATION IN THE FIELD AND SUBSEQUENT APPROVAL

BY CONTRACTING OFFICER REPRESENTATIVE.

4. REPAIR SLOPE LOCATIONS SHOWN ARE APPROXIMATE.

5. THE FINAL SLOPE OF THE REPAIRS MUST MATCH EXISTING

ADJACENT SLOPES. ENSURE GENTLE TRANSITIONS AND AVOID

ABRUPT CHANGES. THE FINAL SURFACE SHALL BE UNIFORM AND

FREE OF ANY IRREGULARITIES THAT WOULD PREVENT THE

SMOOTH FLOW OF WATER OR CREATE AN UNNATURAL

APPEARANCE. FINAL GRADES TO BE APPROVED BY

CONTRACTING OFFICER REPRESENTATIVE.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SA

N

F R

AN

C

IS

C

O D

IS

TR

IC

T

G O

LD

EN

G

AT

E

AV

E, TH

F

LO

O

R

SA

N F

R

AN

C

IS

C O

, C A

2-

W

2P

6C

A0

XX

M

AY

AN

SI

D

W

2P

6B A0

AL

AM

ED

A

C O

U N

TY

, C

AL

IF

O R

N

IA

ZO

N

E

FL

O

O D

C O

N

TR

O L

C H

AN

N

EL

S

PL

4-

R

EP

AI

R

S

PH

AS

E

(O

PT

IO

N T

AS

K)

SO

LI

C

IT

AT

IO

N C

:\P W

W O

R K\

D

1\ C

-B

AS

E-

LI

N E-

F.

D

W G

:5

6:

P M

/2

3/

L3

ET

9S

IE

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

B.

W

AI

R

S.

E

LL

ER

SO

N

D . B

R

AU

D

J.

L

ER

A-

C

492+80

020406080100120140 0 -20 -40 -60 -80 -100 -120 -140

REPAIR TYPE 1

APPROX SLOPE 2:1

APPROX EG

(SEE NOTE 1)

10-YEAR WSE

325.9

PROPOSED TOE EL 312.8

492+00

020406080100120140 0 -20 -40 -60 -80 -100 -120 -140

REPAIR TYPE 1

APPROX SLOPE 2:1

APPROX EG

(SEE NOTE 1)

10-YEAR WSE

325.8

PROPOSED TOE EL 312.8

490+20

020406080100120140 0 -20 -40 -60 -80 -100 -120 -140

REPAIR TYPE 1

APPROX SLOPE 2:1

APPROX EG

(SEE NOTE 1)

10-YEAR WSE

325.7

PROPOSED TOE EL 312.8

LI

N

E F

- A

LA

M O

C

AN

AL

TY

PI

C

AL

S

EC

TI

O N

S

C-332SCALE: 1" = 40' HORIZ., 1" = 40' VERT.

TYPICAL SECTION - F32A1 40' 80'0 SCALE: 1" = 40' HORIZ., 1" = 40' VERT.

TYPICAL SECTION - F31A8 40' 80'0

SCALE: 1" = 40' HORIZ., 1" = 40' VERT.

TYPICAL SECTION - F07D1 40' 80'0

RIGHT BANKLEFT BANK

RIGHT BANKLEFT BANKRIGHT BANKLEFT BANK

J1 C-132

J1 C-132

J1 C-132

NOTES:

1. BOTTOM OF CHANNEL PROFILE IS ASSUMED / APPROXIMATE.

EXISTING GRADES BELOW WATER SURFACE IS INTERPRETED

FROM AS-BUILTS / HISTORICAL DRAWINGS.

2. CONTRACTOR TO VERIFY ELEVATIONS IN THE FIELD PRIOR TO

CONSTRUCTION.

3. PROPOSED TOE LOCATION IS TO BE VERIFIED BY CONTRACTOR

MARKING LOCATION IN THE FIELD AND SUBSEQUENT APPROVAL

BY CONTRACTING OFFICER REPRESENTATIVE.

4. REPAIR SLOPE LOCATIONS SHOWN ARE APPROXIMATE.

5. THE FINAL SLOPE OF THE REPAIRS MUST MATCH EXISTING

ADJACENT SLOPES. ENSURE GENTLE TRANSITIONS AND AVOID

ABRUPT CHANGES. THE FINAL SURFACE SHALL BE UNIFORM AND

FREE OF ANY IRREGULARITIES THAT WOULD PREVENT THE

SMOOTH FLOW OF WATER OR CREATE AN UNNATURAL

APPEARANCE. FINAL GRADES TO BE APPROVED BY

CONTRACTING OFFICER REPRESENTATIVE.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SA

N

F R

AN

C

IS

C

O D

IS

TR

IC

T

G O

LD

EN

G

AT

E

AV

E, TH

F

LO

O

R

SA

N F

R

AN

C

IS

C O

, C A

2-

W

2P

6C

A0

XX

M

AY

AN

SI

D

W

2P

6B A0

AL

AM

ED

A

C O

U N

TY

, C

AL

IF

O R

N

IA

ZO

N

E

FL

O

O D

C O

N

TR

O L

C H

AN

N

EL

S

PL

4-

R

EP

AI

R

S

PH

AS

E

(O

PT

IO

N T

AS

K)

SO

LI

C

IT

AT

IO

N C

:\P W

W O

R K\

D

1\ C

-B

AS

E-

LI

N E-

F.

D

W G

:5

7:

P M

/2

3/

L3

ET

9S

IE

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

B.

W

AI

R

S.

E

LL

ER

SO

N

D . B

R

AU

D

J.

L

ER

A-

C

57+60

020406080100120140 0 -20 -40 -60 -80 -100 -120 -140

REPAIR TYPE 1

APPROX SLOPE 2:1 APPROX EG

(SEE NOTE 1)

10-YEAR WSE

341.9

PROPOSED TOE EL 331.3

52+35

020406080100120140 0 -20 -40 -60 -80 -100 -120 -140

REPAIR TYPE 2

APPROX SLOPE 2:1 APPROX EG

(SEE NOTE 1)

10-YEAR WSE

340.9

PROPOSED TOE EL 329.7

48+44

020406080100120140 0 -20 -40 -60 -80 -100 -120 -140

REPAIR TYPE 2

APPROX SLOPE 2:1

APPROX EG

(SEE NOTE 1) 10-YEAR WSE

340.5

PROPOSED TOE EL 329.4

48+14

020406080100120140 0 -20 -40 -60 -80 -100 -120 -140

REPAIR TYPE 2

APPROX SLOPE 2:1 APPROX EG

(SEE NOTE 1)

10-YEAR WSE

340.4

PROPOSED TOE EL 329.4

45+30

020406080100120140 0 -20 -40 -60 -80 -100 -120 -140

REPAIR TYPE 2

APPROX SLOPE 2:1 APPROX EG

(SEE NOTE 1)

10-YEAR WSE

340.1

PROPOSED TOE EL 329.3

43+50

020406080100120140 0 -20 -40 -60 -80 -100 -120 -140

REPAIR TYPE 1

APPROX SLOPE 2:1 APPROX EG

(SEE NOTE 1)

10-YEAR WSE

340.0

PROPOSED TOE EL 328.9

41+40

020406080100120140 0 -20 -40 -60 -80 -100 -120 -140

380380

REPAIR TYPE 2

APPROX SLOPE 2:1 APPROX EG

(SEE NOTE 1)

10-YEAR WSE

339.6

PROPOSED TOE EL 328.7

40+50

020406080100120140 0 -20 -40 -60 -80 -100 -120 -140

REPAIR TYPE 2

APPROX SLOPE 2:1 APPROX EG

(SEE NOTE 1)

10-YEAR WSE

339.6

PROPOSED TOE EL 328.7

SI

TE

S J0

1, J

, J

, J

, J

, J

, J

, J

, A

N D

J

LI

N

E J

- S O

U

TH

S

AN

R

AM

O N

C R

EE

K

TY

PI

C

AL

S

EC

TI

O

N S

C-333

SCALE: 1" = 40' HORIZ., 1" = 40' VERT.

TYPICAL SECTION - SITE J11H1 40' 80'0

RIGHT BANKLEFT BANK

SCALE: 1" = 40' HORIZ., 1" = 40' VERT.

TYPICAL SECTION - SITE J01H8 40' 80'0

RIGHT BANK LEFT BANK

SCALE: 1" = 40' HORIZ., 1" = 40' VERT.

TYPICAL SECTION - SITE J02H14 40' 80'0

RIGHT BANK LEFT BANK

SCALE: 1" = 40' HORIZ., 1" = 40' VERT.

TYPICAL SECTION - SITE J12D1 40' 80'0

RIGHT BANKLEFT BANK

SCALE: 1" = 40' HORIZ., 1" = 40' VERT.

TYPICAL SECTION - SITE J16D8 40' 80'0

RIGHT BANK LEFT BANK

SCALE: 1" = 40' HORIZ., 1" = 40' VERT.

TYPICAL SECTION - SITE J36D14 40' 80'0

RIGHT BANK LEFT BANK

SCALE: 1" = 40' HORIZ., 1" = 40' VERT.

TYPICAL SECTION - SITE J13 AND J18A1 40' 80'0

RIGHT BANKLEFT BANK RIGHT BANK

SCALE: 1" = 40' HORIZ., 1" = 40' VERT.

TYPICAL SECTION - SITE J03A14 40' 80'0

LEFT BANK

B1 C-134

J1 C-133

J1 C-133

D1 C-133

D1 C-133

D1 C-133

D1 C-133

B1 C-134

NOTES:

1. BOTTOM OF CHANNEL PROFILE IS ASSUMED / APPROXIMATE.

EXISTING GRADES BELOW WATER SURFACE IS INTERPRETED

FROM AS-BUILTS / HISTORICAL DRAWINGS.

2. CONTRACTOR TO VERIFY ELEVATIONS IN THE FIELD PRIOR TO

CONSTRUCTION.

3. PROPOSED TOE LOCATION IS TO BE VERIFIED BY CONTRACTOR

MARKING LOCATION IN THE FIELD AND SUBSEQUENT APPROVAL

BY CONTRACTING OFFICER REPRESENTATIVE.

4. REPAIR SLOPE LOCATIONS SHOWN ARE APPROXIMATE.

5. THE FINAL SLOPE OF THE REPAIRS MUST MATCH EXISTING

ADJACENT SLOPES. ENSURE GENTLE TRANSITIONS AND AVOID

ABRUPT CHANGES. THE FINAL SURFACE SHALL BE UNIFORM AND

FREE OF ANY IRREGULARITIES THAT WOULD PREVENT THE

SMOOTH FLOW OF WATER OR CREATE AN UNNATURAL

APPEARANCE. FINAL GRADES TO BE APPROVED BY

CONTRACTING OFFICER REPRESENTATIVE.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SA

N

F R

AN

C

IS

C

O D

IS

TR

IC

T

G O

LD

EN

G

AT

E

AV

E, TH

F

LO

O

R

SA

N F

R

AN

C

IS

C O

, C A

2-

W

2P

6C

A0

XX

M

AY

AN

SI

D

W

2P

6B A0

AL

AM

ED

A

C O

U N

TY

, C

AL

IF

O R

N

IA

ZO

N

E

FL

O

O D

C O

N

TR

O L

C H

AN

N

EL

S

PL

4-

R

EP

AI

R

S

PH

AS

E

(O

PT

IO

N T

AS

K)

SO

LI

C

IT

AT

IO

N C

:\P W

W O

R K\

D

1\ C

-B

AS

E-

LI

N E-

J.

D

W G

1:

:2

PM

/2 3/

L3

ET

9S

IE

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

B.

W

AI

R

S.

E

LL

ER

SO

N

D . B

R

AU

D

J.

L

ER

A-

C

36+50

020406080100120140 0 -20 -40 -60 -80 -100 -120 -140

REPAIR TYPE 2

APPROX SLOPE 2:1

APPROX EG

(SEE NOTE 1)

10-YEAR WSE

339.2

PROPOSED TOE EL 328.6

35+00

020406080100120140 0 -20 -40 -60 -80 -100 -120 -140

REPAIR TYPE 2

APPROX SLOPE 2:1

APPROX EG

(SEE NOTE 1)

10-YEAR WSE

339.1

PROPOSED TOE EL 328.6

34+05.79

020406080100120140 0 -20 -40 -60 -80 -100 -120 -140

REPAIR TYPE 2

APPROX SLOPE 2:1

APPROX EG

(SEE NOTE 1)

10-YEAR WSE

339.0

PROPOSED TOE EL 328.6

24+40

020406080100120140 0 -20 -40 -60 -80 -100 -120 -140

REPAIR TYPE 1

APPROX SLOPE 2:1

APPROX EG

(SEE NOTE 1)

10-YEAR WSE

339.0

PROPOSED TOE EL 328.6

22+50

020406080100120140 0 -20 -40 -60 -80 -100 -120 -140

REPAIR TYPE 1

APPROX SLOPE 2:1

APPROX EG

(SEE NOTE 1)

10-YEAR WSE

338.1

PROPOSED TOE EL 328.5

5+80

020406080100120140 0 -20 -40 -60 -80 -100 -120 -140

REPAIR TYPE 1

APPROX SLOPE 2:1

APPROX EG

(SEE NOTE 1)

10-YEAR WSE

333.6

PROPOSED TOE EL 326.7

3+50

020406080100120140 0 -20 -40 -60 -80 -100 -120 -140

REPAIR TYPE 1

APPROX SLOPE 2:1

APPROX EG

(SEE NOTE 1)

10-YEAR WSE

332.8

PROPOSED TOE EL 326.6

SI

TE

S J0

5, J

, J

, J

, J

, J

, A

N D

J

LI

N

E J

- S O

U

TH

S

AN

R

AM

O N

C R

EE

K

TY

PI

C

AL

S

EC

TI

O

N S

C-334

SCALE: 1" = 40' HORIZ., 1" = 40' VERT.

TYPICAL SECTION - SITE J17H1 40' 80'0

RIGHT BANKLEFT BANK

SCALE: 1" = 40' HORIZ., 1" = 40' VERT.

TYPICAL SECTION - SITE J05D8 40' 80'0

RIGHT BANKLEFT BANK

SCALE: 1" = 40' HORIZ., 1" = 40' VERT.

TYPICAL SECTION - SITE J06D14 40' 80'0

RIGHT BANK

LEFT BANK

SCALE: 1" = 40' HORIZ., 1" = 40' VERT.

TYPICAL SECTION - SITE J38D1 40' 80'0

RIGHT BANKLEFT BANK

SCALE: 1" = 40' HORIZ., 1" = 40' VERT.

TYPICAL SECTION - SITE J30A8 40' 80'0

RIGHT BANKLEFT BANK

SCALE: 1" = 40' HORIZ., 1" = 40' VERT.

TYPICAL SECTION - SITE J20A14 40' 80'0

RIGHT BANK LEFT BANK

SCALE: 1" = 40' HORIZ., 1" = 40' VERT.

TYPICAL SECTION - SITE J21A1 40' 80'0

RIGHT BANKLEFT BANK

B1 C-134

B1 C-134

B1 C-134

H1 C-134

H1 C-134

H11 C-134

H11 C-134

NOTES:

1. BOTTOM OF CHANNEL PROFILE IS ASSUMED /…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .