AIRSTA Savannah - Hangar Air Compressor SOW.pdf
PDF 145 KB Posted
- Attached to
- USCG Air Station Savannah Compressor Replacement
- Solicitation number
- 70Z036-25-Q-0077
About this file
This document is a Scope of Work for replacing an air compressor at the U.S. Coast Guard Air Station in Savannah, GA, located at Hunter Army Airfield. The project requires removing and disposing of the existing Saylor-Beall Pressure Lubricated Duplex 15 HP 240-Gal 3 Phase air compressor and replacing it with an equivalent model capable of continuously providing at least 80 CFM. Specific requirements include a 10 HP, 240 Gallon Tank, 102 CFM, 3 Phase, Pressure Lubricated compressor that will be installed in the same location as the current system.
The contractor must coordinate closely with the Air Station Facilities Engineering Department, minimizing disruptions to normal operations, and work during hours of 7:00 am to 5:00 pm, Monday through Friday. The contractor is responsible for complete installation, including mounting, connecting to the existing compressed air system, and electrical hookup, with a full functional test upon completion. Additional requirements include complying with Hunter Army Airfield security regulations, maintaining a clean work area, providing operation and maintenance manuals, and coordinating all work with facility personnel.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AIRSTA Savannah - Hangar Air Compressor SOW rev1.pdf | ||
| Wages.txt | TXT text file | |
| RFQ SF-1449.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work for Replacing Hangar Air Compressor
At Air Station Savannah, GA
1.1 SCOPE
The scope of work for this project includes: the removal, disposal and replacement of the installed hangar air compressor.
1.2 LOCATION OF SITE
USCG AirSta Savannah is located at: Hunter Army Airfield, 1297 North Lightning Road, Savannah, GA . Phone: 912-652-4646.
1.3 EXAMINATION OF SITE
It is recommended that bidders carefully inspect the work in place and verify the amount of work necessary to complete the job. Prospective bidders may schedule a site visit by emailing the Air
Station Facilities Engineer Department LT Justin Lovell justin.r.lovell@uscg.mil, or LCDR Jon
Sapundjieff at jonathan.s.sapundjieff@uscg.mil.
1.4 GENERAL REQUIREMENTS
The Contractor shall provide all labor and equipment to accomplish the scope of this work. The
Contractor shall coordinate with the Air Station Facilities Engineering Department, LT Justin
Lovell (justin.r.lovell@uscg.mil) or LCDR Jon Sapundjieff (jonathan.s.sapundjieff@uscg.mil) to ensure that disruptions to the normal operations of Air Station Savannah are minimized.
1.5 PRODUCTS
1.5.1 Vendor must follow the following list of requirements when providing the air compressor and services replacing current model Saylor-Beall Pressure Lubricated
Duplex 15 HP 240-Gal 3 Phase Model X-PL-451524 with same or equivalent model:
• Industry standards are capable of continuously providing no less than 80
CFM.
• 10 HP, 240 Gallon Tank, 102 CFM, 3 Phase, Pressure Lubricated.
1.6 INSTALLATION
The contractor shall provide and install the air compressor unit in the same location as the existing system including mounting, connecting to the installed hangar compressed air system, and electrical hook up with a full functional test at the completion of the installation.
1.7 WORK COORDINATION
All work shall be coordinated with the Facilities Engineering Department
(justin.r.lovell@uscg.mil, jonathan.s.sapundjieff@uscg.mil), and the Public Works department so there is minimal disruption to USCG Air Station Savannah during work.
1.8 WORK HOURS
Unless otherwise negotiated, all other work called for by this specification shall be coordinated during the hours of 7:00 am to 5:00 pm, Monday through Friday.
1.9 CONTRACTOR USE OF PREMISES
mailto:justin.r.lovell@uscg.mil mailto:jonathan.s.sapundjieff@uscg.mil mailto:justin.r.lovell@uscg.mil mailto:jonathan.s.sapundjieff@uscg.mil mailto:jonathan.s.sapundjieff@uscg.mil
The Contractor will be working on a Coast Guard operational military installation. Become familiar with and obey station fire, traffic, and security regulations. Personnel shall not stray from the immediate area of work without the escort of the Air Station Facilities Engineer or other
Public Works department personnel, except for the use of the restrooms.
1.10 CLEANUP
The Contractor shall keep the work area, including storage area, free from accumulation of waste materials and comply with all federal, state, and local regulations pertaining to storage, transport, and disposal of wastes. The Contractor shall not use Coast Guard waste disposal facilities including garbage cans, trash piles, or dumpsters. Any equipment or material removed, unless otherwise directed by the Air Station Public Works department, shall become the property of the
Contractor and shall be transported from the site.
1.11 SECURITY
The Contractor shall comply with all regulations set forth by Hunter Army Airfield. A full list of requirements to access base can be found at https://home.army.mil/stewart/about/Garrison/DES/visitor-information
1.12 IDENTIFICATION
All personnel shall carry proper identification (ID) when on site. Proper ID is as defined by
Hunter Army Airfield at https://home.army.mil/stewart/about/Garrison/DES/visitor-information
1.13 FINAL INSPECTION AND ACCEPTANCE
When the work is complete and ready for final inspection, contact the Air Station Facilities
Engineering Officer, LT Justin Lovell, at justin.r.lovell@uscg.mil or, LCDR Jon Sapundjieff at jonathan.s.sapundjieff@uscg.mil.
1.14 DELIVERY, STORAGE, AND HANDLING
Deliver materials to, store at site, and handle in a manner that will maintain the materials in their original manufactured or fabricated condition until ready for use.
1.15 OPERATION AND MAINTENANCE MANUALS
Furnish an operation and maintenance manual for each item of equipment. The manual should be complete in all respects for equipment, controls, accessories, and associated appurtenances provided. A copy of the equipment warranties must also be provided.
mailto:jonathan.s.sapundjieff@uscg.mil
File details come from the government source that posted it. Updated .