This is an Airmunition Specification document for KC-46 aircraft ammunition items (NSNs 1377016765135ES, 1377016765136ES, 1377016821910ES) issued on 22 January 2026 under contract FD2020-25-50057. The specification establishes comprehensive manufacturing, testing, quality assurance, and documentation requirements for three ammunition line items with Department of Defense Identification Codes JN87, JN88, and JN98.

The contractor must comply with strict material control requirements, including ensuring all energetic materials and components do not exceed 24 months from original manufacturing date and are traceable to DoD-qualified manufacturers in compliance with ITAR Parts 120 and 121. Percussion primers require certification/recertification within 24 months for sensitivity and dud testing, must be stored in temperature and humidity-controlled sealed containers with desiccant, and shall be X-rayed for critical defects prior to use. Raw ingredients used in blended energetic materials are subject to the same 24-month age limit unless the contractor maintains an approved energetic material management and recertification plan. The item is designated as a Critical Safety Item with government-retained MRB approval authority. Lot Acceptance Testing must comply with the latest government-approved Acceptance Test Plan, with a Lot Acceptance Test Plan submission required 90 days prior to testing commencement to allow 30 days for Hill AFB engineering approval. Test failures must be reported to the PCO/ACO and Air Force Engineering (alyson.weber.ctr@us.af.mil) within one business day, accompanied by a Failure Summary and Analysis Report with proposed corrective actions. Contractor must provide monthly production status reports, Ammunition Data Cards with each shipment, advanced Reports of Shipment (24 hours pre-arrival; 2 hours post-departure for ammunition), and submit Engineering Change Proposals, Notices of Revision, and Request for Variances in accordance with EIA-649-1A. Additionally, contractors must submit Obsolescence Alert Notices, Diminishing Manufacturing Sources and Material Shortages Life Cycle Management data, and maintain compliance with CAD/PAD Item Marking Instructions Version 1.6 and hazard classification requirements specific to each NSN's explosive classification (1.4C or 1.4S).

View the file

Other files

File Type Posted
SOW_Packaging.pdf PDF
FA821326R3031.pdf PDF
SPIS.pdf PDF
ID.pdf PDF
AIR_SPEC.docx DOCX document
REPSHIP.pdf PDF
ADC SOW Jan 2018.docx DOCX document
ES7034.pdf PDF
CDRLs.pdf PDF
CADPAD Item Marking Instruction - Ver 1.6.pdf PDF
Sow_ADC.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

(Version 6 Feb 2024)

AIRMUNITION SPECIFICATION

DATE: 22 JAN 2026

FD2020-25-50057

KC-46 NSNs 1377016765135ES, 1377016765136ES, 1377016821910ES

1. The contractor shall provide an advanced Report of Shipment (REPSHIP) to the consignee no later than 24 hours prior to the shipment arrival, and for ammunition shipments no later than two hours after shipment departure. A (REPSHIP) shall include all the following data in accordance with Attached REPSHIP.

2. Department of Defense Identification Code (DODIC): JN87, JN88, JN98

3. Ammunition Data Cards (ADC) shall be filled out; input in accordance with Attachment 2, Statement of Work – Ammunition Data Cards; and state quantity/serial number of lot acceptance test units in the remarks block. One hard copy of the ADC shall accompany shipments to each shipping location. CDRL (DI-MISC-80043B)

4. Items shall be marked in accordance with CAD/PAD Item Marking Instruction Version 1.6, dated 6 March 2023, reference attachment.

5. Shelf Life Code marking NOT required per MIL-STD-129R (C3).

6. Hazard Classification Information: 1377016765135ES, 1377016765136ES

Hazard Class/Division: 1.4

Compatibility Group: C

DOT Marking/EX Number: 1377016765135 EX2025092527 1377016765136 EX2025092526

DOT Shipping Labels: EXPLOSIVES 1.4C

UN Number: 0276

Proper Shipping Name: EXPLOSIVE 1.4

Net Explosive Weight per item (NEW): 0.000800

NEW Unit of Measurement: LBs

Hazard Classification Information: 1377016821910ES

Hazard Class/Division: 1.4

Compatibility Group: S

DOT Marking/EX Number: IHC H25-047

DOT Shipping Labels: EXPLOSIVES 1.4S

UN Number: 454

Proper Shipping Name: EXPLOSIVE 1.4

Net Explosive Weight per item (NEW): 0.000800

NEW Unit of Measurement: LBs

NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or IHC.

If NEW is altered to adjust item performance and is greater than the weight listed, an ECP shall be submitted to the government prior to manufacturing or at least 60 days prior to shipping and shall include the SDS (formerly MSDS) and applicable supporting documentation.

7. All Engineering Change Proposals (ECPs), Notice of Revisions (NORs), and Request For

Variances (RFVs formerly RFD/RFWs) affecting the approved product baseline configuration, acceptance test procedures, or manufacturing process of any item(s) on this contract shall be in accordance with EIA-649-1A. Major ECPs with NORs and Critical/Major RFVs shall be submitted to the responsible Government Engineering Authority for review/disposition by CCB.

Minor/Administrative ECPs with NORs and Minor RFVs shall be processed by the:

COGNIZANT GOVERNMENT ENGINEER

ECPs -- CDRL (DI-SESS-80639E)

NORs – CDRL (DI-SESS-80642E)

RFVs – CDRL (DI-SESS-80640E)

Distribution Statement: B, Reason: Controlled Technical Information (ref. DoD 5230.24)

8. Item(s) must pass both gross and fine leak checks. MIL-STD-883L, Method 1014.18 may be used as guidance. The existing leak rate limit established for this item(s) will remain the same.

Contractor shall generate a Lot Acceptance Test Plan (LATP/ATP) with an analysis or test results showing compliance for Hill AFB engineering approval at least 90 days prior to commencement of Lot Acceptance Testing allowing for 30 days approval time after submission.

CDRL (DI-QCIC-80553A)

9. Lot Acceptance Test Requirements are: USAF IAW with latest government-approved ATP

10. The contractor shall furnish a Lot Acceptance Test/Inspection Report in the following system(s): WAWF

CDRL: (DI-NDTI-80809B)

11. LOT ACCEPTANCE TEST: In the event of an end item failure, the contractor shall notify the

PCO/ACO and Air Force Engineering Organization within 1 business day.

Air Force Engineering Organization:

Organization E-mail: alyson.weber.ctr@us.af.mil

12. In the event of test failure(s), a Failure Summary and Analysis Report with proposed corrective actions/recommendations is required. CDRL: (DI-SESS-80255B)

13. If Hexanitrostilbene (HNS) explosive material is used in the manufacture of this item, the HNS shall meet the requirements of Government Document WS5003F (or latest revision), Purchase

Description of HNS Explosive; and maximum particle size shall not exceed 250 microns.

14. The age of the energetic materials and components (i.e. ALL explosives, propellants, pyrotechnics, cartridges, and/or initiators) used in the manufacture of these items or sub-components shall not exceed 24 months based on the original manufacturing date. All energetic materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121

(http://www.pmddtc.state.gov/regulations_laws/itar.html).

15. Raw (non-blended) ingredients & materials used in blended/mixed energetic materials such as, but not limited to: fuels, oxidizers, binders, curatives, sensitizers, plasticizers, stabilizers etc, shall not exceed 24 months since date of manufacture and comply with original manufacture’s

Specification or MIL-STD. The government may waive the energetic and constituent material requirements listed above or portions thereof, on a case-by-case basis (when acceptable to the government) provided the contractor furnishes all details of the reason for the variance and the age, lot numbers, traceability, and other pertinent information/ test data and Certificate of

Analysis/ Conformance (COA/COC) of the subject materials or components. The variance shall be submitted as a RFV and may be subject to, but not limited to, conditions such as sensitivity testing, stabilizer and analysis and/or dehumidification at vendor’s cost; therefore, vendor must plan accordingly. RFV not required provided vendor has approved energetic material and constituent management and recertification plan approved by HAFB technical authority for this specific contract and contract is executed with materials in compliance with said plan.

Recertification test data for materials shall be provided by vendor upon request at no additional charge to the government. All raw ingredients, materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121.

16. Percussion primers shall have been certified /recertified by performing sensitivity (all-fire/no fire) and dud testing per applicable specification within the past 24 months unless they are Navy certified and have a 2-year certification. Primers shall be stored in a temperature and humidity-controlled environment and in a sealed container with desiccant from time of primer manufacturing, shipping, storage and through final installation in end item.

All primers shall be X-rayed in top and side views for critical defects prior to use.

17. This item is designated as a Critical Safety Item (CSI). Documentation for critical characteristics may be found in the contract, TDP, assembly/inspection procedures or QALI.

MRB approval authority shall be retained by government engineer. Other characteristics requiring inspection or special oversight from DCMA: SECTION E – PRODUCTION LOT

TEST

18. The contractor is allowed to pre-select no more than 30% of the required production lot test samples per lot which have external cosmetic defects such as nicks, dings, scratches, paint blemishes, plating blemishes, and small burrs. These units can be used as pre-selected production lot test samples as long as the units do not create an interference with the test fixture.

The selection of those samples shall be noted in a discrepancy report that shall identify the item part number, DODIC, contract, lot number, serial numbers of the pre-selected units, and the cosmetic defect of each serial number. DCMA shall be notified in advance by submission of the discrepancy report of the preselected production lot test samples with external cosmetic http://www.pmddtc.state.gov/regulations_laws/itar.html defects prior to submission of the production lot for random sample selection. LAT units preselected under this premise shall be noted in the Lot Acceptance Test Report.

19. Any Rework or repair on nonconforming material, beyond approved operation procedures and/ or after product has been submitted to the government shall be approved by EBH procurement engineering authority prior to rework and repair of the nonconforming material. (See

Attachment #5, ES7034).

20. Contractor shall provide an Obsolescence Alert Notice that a pending and/or emergent obsolescence issue exists. CDRL (DI-MGMT-81941)

21. Contractor shall provide Diminishing Manufacturing Sources and Material Shortages

(DMSMS) Life Cycle Management data to support DMSMS management activities. Those activities may require collecting Bill of Materials, DMSMS notifications, DMSMS case datam

DMSMS health information, DMCMC cost and budgeting information, and DMSMS case mitigation data as a part of the Department of Defense (DoD) Total System Life Cycle

Management responsibilities. CDRL (DI-MGMT-82273)

22. Contractor shall prepare and submit monthly production status reports documenting production delivery status, production build status, quality testing status. Explanation of deviations from the schedule and plans to recover schedule delays. Initial production status report is due with planned schedule to completion tof the contract order within 14 days of First Article Test approval or within 14 days of notification of waiving FAT requirement. CDRL (DI-MGMT-

80442)