AIR_SPEC.docx
DOCX document 19 KB Posted
- Attached to
- UWARS Battery Kits Federal contract opportunity
- Solicitation number
- FA821324R3024
About this file
This document appears to be a set of technical specifications for an Air Force contract related to ammunition shipments. The key details are:
The contractor shall provide an advanced Report of Shipment (REPSHIP) to the consignee for all shipments, including Foreign Military Sales (FMS) deliveries. The contractor must contact the Defense Contract Management Agency (DCMA) for transportation guidance and provide a copy of the Notice of Availability (NOA) to the Air Force. The items are inert and must be marked according to the specified requirements. The contractor shall submit any Engineering Change Proposals (ECPs), Notices of Revisions (NORs), and Requests for Variances (RFVs) for review/disposition. Lot Acceptance Test requirements are detailed, including notification of failures and analysis reports. Strict requirements are provided for the age and traceability of energetic materials and components. The contractor is allowed to pre-select up to 30% of production lot test samples with minor cosmetic defects.
The related federal contract opportunity is for UWARS Battery Kits, which is restricted to the qualified sources of Stratus Systems and Mission Systems Davenport.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA821324R3024_______0001 amendment 1.pdf | ||
| REPSHIP.docx | DOCX document | |
| PHST_SOW.pdf | ||
| ITEM_DESCRIPTION_5022.pdf | ||
| ES7034.pdf | ||
| ITEM_DESCRIPTION_5244.pdf | ||
| CDRL.pdf | ||
| CADPAD_Item_Marking_Instruction.pdf | ||
| FA821324R3024.pdf | ||
| ADC_SOW.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AIR SPEC
FD2020-50019 FMS 24-50020 USAF
NSN 1377015715244 ALT 1377016525022 P/N 1914-031-02
20 DEC 2023
The contractor shall provide an advanced Report of Shipment (REPSHIP) to the consignee no later than 24 hours prior to the shipment arrival, and for ammunition shipments no later than two hours after shipment departure. A (REPSHIP) shall include all the following data in accordance with ATTACHMENT 1. CDRL (DI-SESS-82098)
Contractor shall contact their nearest Defense Contract Management Agency (DCMA) Office for transportation guidance and assistance for all Foreign Military Sales (FMS) deliveries prior to shipment; and ensure that the DCMA provides one information copy of completed Notice of Availability (NOA) including FMS case and requisition numbers by mail to: AFLCMC/EBHMB Attn: FMS Transportation 6043 Elm Lane, Hill AFB. UT 84056-5819, or Fax to: (801) 777-1089 or Email to ooalc.gacp.transportation@us.af.mil
Department of Defense Identification Code (DODIC) JN18
Ammuntion Data Cards (ADC) shall be filled out; input in accordance with Attachment 2, Statement of Work - Ammunition Data Cards; and sate quantity/serial number of lot acceptance test units in the remarks block. One hard copy of the ADC shall accompany shipments to each shipping location. CDRL (DI-MISC-80043B)
Items shall be marked in accordance with CAD/PAD Item Marking Instruction Version 1.6, 6 March 2023, and reference attachment.
Shelf-Life Code marking NOT required per MIL-STD-129R (C3).
Items are Inert
All Engineering Change Proposals (ECPs). Notice of Revisions (NORs), and Request For Variances (RFVs, formerly RFD/RFWs) affecting the approved product baseline configuration, acceptance test procedures, or manufacturing process of any item(s) on this contract shall be in accordance with EIA-649-1A. Major ECPs with NORs and Critical/Major RFVs shall be submitted to the responsible Government Engineering Authority for review/disposition by CCB.
Minor/Administrative ECPs with NORs and Minor RFVs shall be processed by the Government Engineer Contractor (Check Applicable CDRLs Below) ECPs - CDRL (DI-SESS-80639E) NORs - CDRL (DI-SESS-80642E) RFVs - CDRL(DI-SESS-80640E) Distribution Statement: B Reason: (ref. DoDI 5230.24) CONTROLLED TECHNICAL INFORMATION
Lot Acceptance Test Requirements Contractor The contractor shall furnish a Lot Acceptance Test/Inspection Report in the following System (s):
CDRL (DI-NDTI-80809B) WAWF
LOT ACCEPTANCE TEST: In the event of an end item failure, the contractor shall notify the PCO/ACO and Air Force Engineering Organization within 1 business day Air Force Engineering Organization:
E-mail: AYLSON.WEBER.CTR @us.af.mil
In the event of test failure(s), a Failure Summary and Analysis Report with proposed corrective actions/recommendations is required
CDRL (DI-SESS-80255B)
The age of the energetic materials and components (i.e.. ALL explosives. propellants, pyrotechnics, cartridges, and/or initiators) used in the manufacture of these items or subcomponents shall not exceed 24 months based on the original manufacturing date. All energetic materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121 (http://www.pmddtc.state.gov/regulations_laws/itar.html)
Raw (non-blended) ingredients & materials used in blended/mixed energetic materials such as, but not limited to: fuels, oxidizers, binders, curatives, sensitizers, plasticizers, stabilizers etc., shall not exceed 24 months since date of manufacture and comply with original manufacture's Specification or MIL-STD. The government may waive the energetic and constituent material requirements listed above or portions thereof, on a case-by-case basis (when acceptable to the government) provided the contractor furnishes all details of the reason for the variance and the age, lot numbers, traceability, and other pertinent information/ test data and Certificate of Analysis/Conformance (COA/COC) of the subject materials or components. The variance shall be submitted as a RFV and may be subject to. but not limited to, conditions such as sensitivity testing, stabilizer and analysis and/or dehumidification at vendor's cost; therefore, vendor must plan accordingly. RFV not required provided vendor has approved energetic material and constituent management and recertification plan approved by HAFB technical authority for this specific contract and contract is executed with materials in compliance with said plan. Recertification test data for materials shall be provided by vendor upon request at no additional charge to the government. All raw ingredients, materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121.
Percussion primers shall have been certified /recertified by performing sensitivity (all fire/no fire) and dud testing per applicable specification within the past months unless they are Navy certified and have a 2-year certification. Primers shall be stored in a temperature and humidity-controlled environment and in a sealed container with desiccant from time of primer manufacturing, shipping, storage and through final installation in end item.
All primers shall be X-rayed in top and side views for critical defects prior to use.
This item is designated as a Critical Safety Item (CSl). Documentation for critical characteristics may be found in the contract, TDP, assembly/inspection procedures or QALI. MRB approval authority shall be retained by government engineer. Other characteristics requiring inspection or special oversight from DCMA:
The contractor is allowed to pre-select no more than 30% of the required production lot test samples per lot which have external cosmetic defects such as nicks, dings, scratches, paint blemishes, plating blemishes, and small burs. These units can be used as pre-selected production lot test samples as long as the units do not create an interference with the test fixture. The selection of those samples shall be noted in a discrepancy report that shall identify the item part number, DODIC, contract, lot number, serial numbers of the preselected units, and the cosmetic defect of each serial number. DCMA shall be notified in advance by submission of the discrepancy report of the preselected production lot test samples with external cosmetic defects prior to submission of the production lot for random sample selection. LAT units preselected under this premise shall be noted in the Lot Acceptance Test Report.
These two fields are connected, so when I type in one, it copies to the other. The correct field is 'yes'
Any rework or repair on nonconforming material, beyond approved operation procedures and/or after product has been submitted to the government shall be approved by: EBH PROCUREMENT ENGINEERING AUTHORITY PRIOR TO REWORK AND REPAIR OF THE NONCONFORMING MATERIAL Prior to rework and repair of the nonconforming material. (See Attachment #5) (Engineer shall provide ATTACHMENT #5, ES7034 to Item Manager)
Contractor shall provide an Obsolescence Alert Notice that a pending and/or emergent obsolescence issue exists. CDRL (DI-MGMT-81941)
Contractor shall provide a Diminishing Manufacturing Sources and Material Shortages (DMSMS) Health Assessment Report to support DMSMS management activities as a part of the Department of Defense (DoD) Total System Life Cycle Management responsibilities. CDRL (DI-MGMT-82273)
Contractor shall provide a report of GFP inventory and end-item transactions as described in CDRL (di-mgmt-80442). Applies to all inventories that are intended to be returned to the government after repair or use. Excluded are new production and items intended for disposal or expenditure.
CDRL (DI-MGMT-80442)
PLEASE NOTE: THE SECTION ABOVE PERTAINS TO EXPLOSIVE AND HAZARDOUS
ITEMS ONLY. PLEASE INITIAL FOR CONCURRENCE WITH HAZARD CLASSIFICATION DATA LISTED IN BLOCK. SAFETY TO CONTACT ES IF ANY DISCREPANCIES NOTED.
Contracts involving ammunition and explosives (AE) will contain:
-DFARS Title 48 Part 252.223-7002, Safety Precautions for Ammunition and Explosives -DFARS Title 48 Part 252.223-7003, Change in Place of Performance - Ammunition and Explosives.
Additionally, if the scope of work includes air shipment of explosives, the safety specification should require contractor compliance with:
-AFMAN 24-201(I), Preparing Hazardous Materials for Military Air Shipments