About this file
This is a comprehensive set of construction documents for the Air Center Apron Expansion project at Punta Gorda Airport, prepared by Michael Baker International for the Charlotte County Airport Authority. The project involves expanding the asphalt aircraft parking ramp, constructing a new Taxilane G3, and performing associated site improvements across approximately 11.9 acres. The work includes clearing and grubbing, site demolition, earthwork, drainage improvements, pavement markings, taxiway edge lighting, taxiway signage, electrical duct banks, and turfing. The project is divided into multiple bid schedules (A, B, C, and D) with varying scopes, and is anticipated to start in November 2025, with construction durations ranging from 123 to 210 calendar days depending on the selected schedule.
The documents provide detailed specifications for bidding, including extensive electrical, civil, and site work requirements. The project is funded through the airport authority and involves multiple bid additive options that can expand the project's scope. Key technical elements include installing new LED taxiway edge lights, constructing aircraft-rated drainage structures, creating new pavement sections, and implementing comprehensive erosion control measures. The project requires precise coordination with airport operations, with strict safety and operational guidelines to minimize disruption to existing airport activities. Contractors will need to maintain radio communication with air traffic control, adhere to strict airfield access protocols, and follow comprehensive environmental and safety management plans.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Air Center Apron - Bid Documents - Vol 2 of 2.PDF | ||
| Air Center Apron - Bid Documents - Vol 1 of 2.PDF | ||
| Air Center Apron - Bid Schedule (Excel).XLSX | XLSX spreadsheet | |
| Air Center Apron - CSPP.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AIR CENTER APRON EXPANSION
PUNTA GORDA AIRPORT
4010 WEST BOY SCOUT BLVD., SUITE 400 ● TAMPA, FL 33607
CERTIFICATE OF AUTHORIZATION # 28861
MICHAEL BAKER INTERNATIONAL PROJ. NO. #205146
AUGUST 2025
CONSTRUCTION DOCUMENTS
FOR
G001
PREPARED FOR
BID NO. RFB X-X-20XX/XX
FDOT. PROJECT NO. TBD
AT
BID DOCUMENTS
CHARLOTTE COUNTY AIRPORT AUTHORITY
PEACE RIVER
PIPER RD
HENRY ST
PUNTA
GORDA
AIRPORT
VICINITY MAP
AIRPORT ADDRESS
28000 A-1 AIRPORT RD.
PUNTA GORDA, FL 33982
(941) 639-1101
CHARLOTTE COUNTY, FL
LOCATION OF PROJECT
LOCATION MAP
AI
R
C
EN
TE
R
A
PR
O N
E
XP
AN
SI
O N
AUGUST 2025
CH
AR
LO
TT
E
CO
UN
TY
AI
RP
OR
T
AU
TH
OR
IT
Y
PU
NT
A
GO
RD
A, F
LO
RI
DA
N o.
R
EV
IS
IO
N S
D
AT
E D
ES
C
R
IP
TI
O
N
BY
PR
O
JE
C
T N
AM
E
SH
EE
T
TI
TL
E
DESIGNED:
DRAWN:
CHECKED:
CCAA NO.:
JOB NO.:
DATE:
SHEET NO.:
B:
\T am pa
\P ro je ct s\ Pu nt a
G or da \2
6_ Ai r C en te r A pr on
E xp an si on \C
AD
D
-d w g\
_G
D
R
AW
IN
G
IN
D
EX
A
N D
S U
M M
AR
Y
O F
Q U
AN
TI
TI
ES
.d w g
BI
D
D O
C U
M
EN
TS
G002
205146
TBD
D R
AW
IN
G
IN
D
EX
NP
NM
NM
DRAWING INDEX
Sheet
Number Sheet Title
G001 COVER SHEET
G002 DRAWING INDEX
G003 SUMMARY OF QUANTITIES
G004 GENERAL NOTES (1 OF 2)
G005 GENERAL NOTES (2 OF 2)
G101 PROJECT LAYOUT, ACCESS, AND STAGING PLAN
G301 SURVEY CONTROL PLAN
G401 CONSTRUCTION PHASING PLAN
G402 CONSTRUCTION PHASING PLAN (SCHEDULE)
G451 CONSTRUCTION PHASING PLAN - SUBPHASE 1A
G452 CONSTRUCTION PHASING PLAN - SUBPHASE 1B
G453 CONSTRUCTION PHASING PLAN - SUBPHASE 2
G454 CONSTRUCTION PHASING PLAN - SUBPHASE 3
G455 CONSTRUCTION PHASING PLAN - SUBPHASE 4A
G456 CONSTRUCTION PHASING PLAN - SUBPHASE 4B
G457 CONSTRUCTION PHASING PLAN - SUBPHASE 4C
G458 CONSTRUCTION PHASING PLAN - SUBPHASE 5
G471 PHASING DETAILS
C101A EXISTING CONDITIONS & DEMOLITION PLAN (BASE BID)
C101B EXISTING CONDITIONS & DEMOLITION PLAN (BASE BID + ADDITIVE 1)
C101C EXISTING CONDITIONS & DEMOLITION PLAN (BASE BID + ADDITIVES 1-2)
C101D EXISTING CONDITIONS & DEMOLITION PLAN (BASE BID + ADDITIVES 1-3)
C401A PAVEMENT GEOMETRY PLAN (BASE BID)
C401B PAVEMENT GEOMETRY PLAN (BASE BID + ADDITIVE 1)
C401C PAVEMENT GEOMETRY PLAN (BASE BID + ADDITIVES 1-2)
C401D PAVEMENT GEOMETRY PLAN (BASE BID + ADDITIVES 1-3)
C451 TYPICAL PAVEMENT SECTIONS & PAVING DETAILS
C461 TAXIWAY CONNECTOR PROFILE
C601 CROSS-SECTIONS (1 OF 2)
C602 CROSS-SECTIONS (2 OF 2)
C701A GRADING & DRAINAGE PLAN (BASE BID)
C701B GRADING & DRAINAGE PLAN (BASE BID + ADDITIVE 1)
C701C GRADING & DRAINAGE PLAN (BASE BID + ADDITIVES 1-2)
C701D GRADING & DRAINAGE PLAN (BASE BID + ADDITIVES 1-3)
C711 DITCH LAYOUT PLAN
C721 STORM PROFILES
C731 EXISTING POND MODIFICATION PLAN
C751 GRADING AND DRAINAGE DETAILS (1 OF 3)
C752 GRADING AND DRAINAGE DETAILS (2 OF 3)
C753 GRADING AND DRAINAGE DETAILS (3 OF 3)
C801A EROSION CONTROL & TURFING PLAN (BASE BID)
C801B EROSION CONTROL & TURFING PLAN (BASE BID + ADDITIVE 1)
C801C EROSION CONTROL & TURFING PLAN (BASE BID + ADDITIVES 1-2)
C801D EROSION CONTROL & TURFING PLAN (BASE BID + ADDITIVES 1-3)
C851 EROSION CONTROL DETAILS
C871 STORMWATER POLLUTION PREVENTION PLAN
C901 PAVEMENT MARKING PLAN
C951 PAVEMENT MARKING DETAILS
DRAWING INDEX
Sheet
Number Sheet Title
E001 ELECTRICAL GENERAL NOTES
E002 ELECTRICAL LEGEND AND ABBREVIATIONS
E101A ELECTRICAL DEMOLITION PLAN (BASE BID)
E101B ELECTRICAL DEMOLITION PLAN (BASE BID + ADDITIVE 1)
E101C ELECTRICAL DEMOLITION PLAN (BASE BID + ADDITIVES 1-2)
E101D ELECTRICAL DEMOLITION PLAN (BASE BID + ADDITIVES 1,2,3)
E201A ELECTRICAL CIRCUITRY PLAN (BASE BID)
E201B ELECTRICAL CIRCUITRY PLAN (BASE BID + ADDITIVE 1)
E201C ELECTRICAL CIRCUITRY PLAN (BASE BID + ADDITIVE 2)
E201D ELECTRICAL CIRCUITRY PLAN (BASE BID + ADDITIVE 3)
E301A ELECTRICAL LAYOUT PLAN (BASE BID)
E301B ELECTRICAL LAYOUT PLAN (BASE BID + ADDITIVE 1)
E301C ELECTRICAL LAYOUT PLAN (BASE BID + ADDITIVES 1-2)
E301D ELECTRICAL LAYOUT PLAN (BASE BID + ADDITIVE 3)
E401 ELECTRICAL DETAILS (1 OF 3)
E402 ELECTRICAL DETAILS (2 OF 3)
E403 ELECTRICAL DETAILS (3 OF 3)
E601 LIGHTING SCHEDULE SHEETS
E602 LIGHTING SCHEDULE SHEETS
C
EN
TE
R
A
PR
O N
E
XP
AN
SI
O N
AUGUST 2025
CH
AR
LO
TT
E
CO
UN
TY
AI
RP
OR
T
AU
TH
OR
IT
Y
PU
NT
A
GO
RD
A, F
LO
RI
DA
N o.
R
EV
IS
IO
N S
D
AT
E D
ES
C
R
IP
TI
O
N
BY
PR
O
JE
C
T N
AM
E
SH
EE
T
TI
TL
E
DESIGNED:
DRAWN:
CHECKED:
CCAA NO.:
JOB NO.:
DATE:
SHEET NO.:
B:
\T am pa
\P ro je ct s\ Pu nt a
G or da \2
6_ Ai r C en te r A pr on
E xp an si on \C
AD
D
-d w g\
_G
D
R
AW
IN
G
IN
D
EX
A
N D
S U
M M
AR
Y
O F
Q U
AN
TI
TI
ES
.d w g
BI
D
D O
C U
M
EN
TS
G003
205146
TBD
SU
M
M
AR
Y O
F Q
U
AN
TI
TI
ES
NP
NM
NM
C
EN
TE
R
A
PR
O N
E
XP
AN
SI
O N
AUGUST 2025
CH
AR
LO
TT
E
CO
UN
TY
AI
RP
OR
T
AU
TH
OR
IT
Y
PU
NT
A
GO
RD
A, F
LO
RI
DA
N o.
R
EV
IS
IO
N S
D
AT
E D
ES
C
R
IP
TI
O
N
BY
PR
O
JE
C
T N
AM
E
SH
EE
T
TI
TL
E
DESIGNED:
DRAWN:
CHECKED:
CCAA NO.:
JOB NO.:
DATE:
SHEET NO.:
B:
\T am pa
\P ro je ct s\ Pu nt a
G or da \2
6_ Ai r C en te r A pr on
E xp an si on \C
AD
D
-d w g\
_G
G
EN
ER
AL
N
O
TE
S.
dw g
BI
D
D O
C U
M
EN
TS
G004
205146
TBD
G
EN
ER
AL
N O
TE
S
(1 O
F 2)
NP
NM
NM
GENERAL NOTES:
1. THIS PROJECT IS SUBJECT TO CONTRACTOR COORDINATION WITH CURRENT AIRFIELD
PROJECTS AS WELL AS FUTURE PROJECTS.
2. CONSTRUCTION STAKE-OUT SHALL BE PERFORMED BY CONTRACTOR IN ACCORDANCE WITH
SECTION C-107 OF THE PROJECT TECHNICAL SPECIFICATIONS. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ALL MEASUREMENTS THAT MAY BE
REQUIRED TO LAY OUT THE CONSTRUCTION. AN AS-BUILT SURVEY SHALL BE PROVIDED TO
THE OWNER AND ENGINEER AT THE CONCLUSION OF ALL WORK. THE COST OF STAKING AND
AS-BUILTS WILL BE PAID FOR UNDER SECTION C-106.
3. THE CONTRACTOR SHALL PROVIDE RED LINE RECORD DRAWINGS TO THE ENGINEER FOR
DOCUMENTATION OF DEVIATIONS TO THE PLANS IN ELECTRONIC PDF FORMAT.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION AND IDENTIFICATION OF ALL
EXISTING UTILITIES AND UNDERGROUND PIPELINES IN CONSTRUCTION AREA. CONTACT
SUNSHINE 811 AND AIRPORT OPERATIONS FOR LOCATES. ANY DAMAGES TO UTILITIES,
RESULTING FROM CONTRACTOR ACTIVITIES, ON OR OFF AIRPORT PROPERTY, SHALL BE
REPAIRED BY THE CONTRACTOR. ALL REPAIR WORK SHALL MEET THE APPROVAL OF THE
OWNER OF THE DAMAGED UTILITY. NO REIMBURSEMENT WILL BE ALLOWED FOR UTILITY/PIPE
REPAIR OR REPLACEMENT. PRIOR TO DIGGING ANY TRENCHES, CONTRACTOR SHALL NOTIFY
ALL UTILITIES (ELECTRIC, GAS, TELEPHONE, WATER, SEWER, ETC.) AND OBTAIN LOCATIONS
OF UNDERGROUND UTILITIES.
5. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE CLEAN UP AND DISPOSAL OF ALL TRASH
AND DEBRIS CREATED BY HIS WORK OR PERSONNEL. ALL TRASH AND DEBRIS MUST BE
LEGALLY DISPOSED OF OFFSITE. THE CONTRACTOR SHALL WORK WITH THE RPR & PROVIDE
A 72 HOUR ADVANCE NOTICE BEFORE SCHEDULING ALL RUNWAY AND TAXIWAY
OPENINGS/CLOSINGS.
6. CONTRACTOR SHALL VISIT THE SITE TO DETERMINE EXISTING CONDITIONS PRIOR TO
SUBMITTING A BID. THE CONTRACTOR SHALL REPORT TO THE ENGINEER ANY KNOWN
VARIATIONS FROM THE INFORMATION SHOWN ON THE CONSTRUCTION PLANS PRIOR TO
BIDDING.
7. THE EXISTING AIRPORT PAVEMENTS, ACCESS ROADS, AND HAUL ROUTES MAY NOT BE
CAPABLE OF SUPPORTING CERTAIN TYPES OF CONSTRUCTION EQUIPMENT. PRIOR TO
BIDDING, THE CONTRACTOR SHALL FULLY SATISFY HIMSELF AS TO THE ABILITY OF THE
EXISTING SURFACES TO SUPPORT THE TYPE OF EQUIPMENT HE PLANS TO USE.
CONTRACTOR SHALL SIZE THE EQUIPMENT USED FOR CONSTRUCTION ACCORDINGLY. THE
CONTRACTOR SHALL PHOTOGRAPH AND/OR VIDEO THE HAUL ROUTE PRIOR TO THE START
OF ANY CONSTRUCTION ACTIVITIES AND SUBMIT A COPY TO THE ENGINEER PRIOR TO
STARTING WORK. ANY DAMAGE CAUSED BY HAULING OR ANY OTHER CONSTRUCTION
ACTIVITY TO EXISTING PAVEMENT SHALL BE REPAIRED BY THE CONTRACTOR AT NO
ADDITIONAL COST TO THE OWNER.
8. CONTRACTOR SHALL CONFINE OPERATIONS TO THE LIMITS OF CONSTRUCTION & ACCESS
ROUTES SHOWN ON THE PLANS. ALL AREAS THAT ARE DISTURBED BY THE CONTRACTOR'S
OPERATIONS, SUCH AS THE CONTRACTOR'S ACCESS ROAD, STOCKPILE AND STAGING
AREAS, HAUL ROUTES, TEMPORARY EQUIPMENT PARKING AREAS, ETC., SHALL BE
RESTORED TO THEIR ORIGINAL CONDITION AND GRASSED (IF APPLICABLE) UPON
COMPLETION OF THE PROJECT. IN ADDITION, ALL EXISTING ROADS, APRONS AND TAXIWAYS
THAT WILL BE USED AS THE CONTRACTOR'S HAUL ROUTE SHALL BE MAINTAINED DURING
CONSTRUCTION AND RESTORED TO THEIR PRE-CONSTRUCTION CONDITION. NO SEPARATE
MEASUREMENT OR PAYMENT WILL BE MADE FOR THESE REQUIREMENTS FOR THIS ITEM. NO
PAYMENT SHALL BE MADE FOR TURFING REQUIRED OUTSIDE THE LIMITS SHOWN ON THE
TURFING PLANS AS THIS WORK SHALL BE CONSIDERED A SUBSIDIARY OBLIGATION TO
MOBILIZATION.
9. ANY DAMAGE DONE TO AIRPORT PROPERTY, FACILITIES OR UTILITIES (SUCH AS PAVEMENTS, FENCING, SIGNS, LIGHTS, NAVAIDS AND EXISTING CABLES) SHALL BE QUICKLY REPAIRED BY
THE CONTRACTOR IN A MANNER THAT IS SATISFACTORY TO THE OWNER OF THE FACILITY.
THE CONTRACTOR WILL BEAR ALL COSTS FOR REPAIRS.
10.THE RPR SHALL DESIGNATE AREAS TO BE USED BY THE CONTRACTOR FOR THE PARKING OF
CONSTRUCTION EQUIPMENT AND VEHICLES WHEN NOT ENGAGED IN THE CONSTRUCTION
DURING NON- WORKING DAYS AND NIGHTS AS WELL AS AREAS FOR CONTRACTOR'S
EMPLOYEES AUTO PARKING.
11.STAGING AREAS AND CONTRACTOR UTILITIES: STAGING AREAS DO NOT HAVE UTILITIES.
ANY UTILITIES REQUIRED BY THE CONTRACTOR SHALL BE COORDINATED WITH THE UTILITY
COMPANIES AND SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. ALL STAGING
AREAS SHALL BE RESTORED TO A GRADED, TURFED, DRAINABLE CONDITION. CONTRACTOR
SHALL ACQUIRE AND MAINTAIN A CHEMICAL TOILET FOR USE BY CONTRACT WORKERS.
12.THE CONTRACTOR WILL BE RESPONSIBLE FOR THE STORAGE AND SECURITY OF HIS
MATERIAL AND EQUIPMENT AND SHALL ERECT STORAGE FACILITIES AND FENCING AS
NECESSARY. THE CONTRACTOR'S STORAGE AND STAGING AREA SHALL BE IN THE GENERAL
LOCATION SHOWN ON DRAWING G-101. FINAL LOCATION TO BE COORDINATED WITH RPR.
13.IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE OFF-SITE HAUL ROUTES
(STATE HIGHWAYS, COUNTY ROADS OR CITY STREETS) WITH THE APPROPRIATE OWNERS OF
THE AFFECTED ROADWAYS.
14. WASTE DISPOSAL AND BORROW AREAS: ALL WASTE MATERIAL MUST BE LEGALLY DISPOSED
OFFSITE. EXCESS EXCAVATED MATERIAL AND DEMOLISHED ITEMS SHALL BECOME
PROPERTY OF THE CONTRACTOR EXCEPT WHERE OTHERWISE NOTED IN THE PLANS AND
SPECIFICATIONS. SUITABLE EXCAVATED SOILS SHALL BE USED AS EMBANKMENT TO THE
MAXIMUM EXTENT POSSIBLE.
15.COORDINATION OF CONSTRUCTION ACTIVITIES: THE CONTRACTOR SHALL BE RESPONSIBLE
FOR MAINTAINING CONSTANT COORDINATION BETWEEN SUBCONTRACTORS, AIRPORT
FACILITIES, AIRPORT OPERATIONS, THE ENGINEER AND OTHER CONTRACTORS WORKING ON
ADJACENT PROJECTS. ALL CONSTRUCTION ACTIVITIES PLANNED BY THE CONTRACTOR
SHALL BE REVIEWED AND APPROVED BY THE ENGINEER, OPERATIONS, AND THE AIRPORT.
16. PROJECT PAY ITEMS: UNIT PRICE QUANTITIES PROVIDED IN THE BID ARE APPROXIMATE AND
ARE USED SOLELY FOR THE COMPARISON OF BIDS. PAYMENTS MADE BY THE AIRPORT
SHALL BE BASED ON THE ACTUAL QUANTITY OF WORK COMPLETED, MEASURED IN PLACE,
AND ACCEPTED.
17. QUALITY CONTROL PLAN: WITHIN 10 DAYS OF NOTIFICATION OF INTENT TO AWARD, THE
CONTRACTOR SHALL SUBMIT A WRITTEN QUALITY CONTROL PLAN. THE CONTRACTOR SHALL
DESIGNATE A QUALITY CONTROL OFFICER RESPONSIBLE FOR THE QUALITY OF
CONSTRUCTION AND SHALL INCLUDE AN ORGANIZATIONAL CHART DESIGNATING QUALITY
CONTROL RESPONSIBILITIES. THE PLAN SHALL ENCOMPASS A PROGRAM OF QUALITY
CONTROL ACTIVITIES FOR THE PROJECT AS A WHOLE, AS WELL AS SPECIFIED PROCEDURES
FOR EACH ELEMENT OF WORK. FOR EACH MAJOR ELEMENT OF WORK, THE CONTRACTOR
SHALL DESCRIBE IN THE QUALITY CONTROL PLAN PRELIMINARY INSPECTION PROCEDURES
TO BE ACCOMPLISHED PRIOR TO START UP, PROGRESS INSPECTION PROCEDURES TO
MONITOR THE WORK IN PROGRESS, AS WELL AS FINAL INSPECTIONS TO VERIFY ALL TESTS
HAVE BEEN PERFORMED AND ARE PASSING, AND ALL CONDITIONS OF THE SPECIFICATIONS
HAVE BEEN MET. FOR ADDITIONAL QUALITY CONTROL REQUIREMENTS, REFER TO SECTIONS
50 & 60 OF THE GENERAL PROVISIONS AS WELL AS TECHNICAL SPECIFICATION C-100.
SAFETY NOTES:
1. EACH CONTRACTOR SHALL OBTAIN, HAVE KNOWLEDGE OF, AND INCORPORATE THE
FOLLOWING SAFETY PROVISIONS INTO THE CONSTRUCTION PROJECT:
a. OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION - AC 150/5370-2G.
b. AIRPORT SAFETY SELF-INSPECTION - AC 150/5200-18C.
c. PAINTING, MARKING, AND LIGHTING OF VEHICLES USED ON AIRPORTS - AC 150/5210-5D.
2. NOTICE TO AIR MISSIONS (NOTAMS) - THE CONTRACTOR WILL PROVIDE THE NECESSARY
INFORMATION ON CONSTRUCTION CONDITIONS (AIRFIELD PAVEMENT CLOSURES, TIE-INS,
ETC.) TO THE OWNER A MINIMUM OF THREE (3) DAYS PRIOR SO THAT A NOTAM CAN BE
SCHEDULED AND ISSUED BY OWNER.
3. CONTRACTOR WILL NOT BE ALLOWED TO USE ANY OF THE EXISTING RUNWAY OR TAXIWAYS
AS PART OF THE HAUL ROAD UNLESS SPECIFICALLY AUTHORIZED BY THE RPR.
4. CONTRACTOR SHALL MAINTAIN RADIO COMMUNICATION WITH THE AIR TRAFFIC CONTROL
TOWER (ATCT) TO ACCESS AND WORK WITHIN AIRCRAFT MOVEMENT AREAS WITHIN
MOVEMENT AREAS. CONTRACTOR WILL HAVE A WORKING RADIO ON SITE DURING
CONSTRUCTION AND SHALL ASSIGN RESPONSIBLE PERSONNEL INCLUDING ALL FLAGMEN TO
CONTINUOUSLY MONITOR THE APPROPRIATE FREQUENCY.
5. ALL EMPLOYEES, AGENTS VENDORS, INVITEES, ETC. OF THE CONTRACTOR OR
SUBCONTRACTORS REQUIRING ACCESS TO THE AIR OPERATIONS AREA (AOA) SITE SHALL BE
REQUIRED TO DISPLAY DRIVER'S LICENSE, AIRFIELD DRIVER'S TRAINING, AND IDENTIFICATION
OF COMPANY WORKED FOR UPON REQUEST. IDENTIFIABLE HARD HATS OR OTHER
IDENTIFICATION SHALL ALSO BE WORN AT ALL TIMES. THE PRIME CONTRACTOR SHALL BE
RESPONSIBLE FOR BACKGROUND CHECKS ON ALL OF ITS OWN AND ALL SUBCONTRACTOR
EMPLOYEES.
6. ALL ACTIVE AIRPORT OPERATIONAL AREAS WHICH ARE ADJACENT TO A CONSTRUCTION
WORK AREA SHALL BE SEPARATED BY LOW PROFILE BARRIERS WITH RED FLASHING LIGHTS.
NO CONSTRUCTION TRAFFIC WILL CROSS ACTIVE AIRPORT OPERATIONAL AREAS. THE
CONTRACTOR SHALL PROVIDE AND INSTALL THE BARRIERS.
7. ALL CONTRACTOR VEHICLES THAT ARE AUTHORIZED TO OPERATE ON THE AIRPORT IN THE
ACTIVE AIRCRAFT OPERATIONS AREA (AOA) SHALL MEET THE FAA REQUIREMENTS FOR
MARKING AND LIGHTING. UNAUTHORIZED VEHICLES ARE TO BE ESCORTED BY A RADIO
EQUIPPED CONTRACTOR VEHICLE OR A RADIO EQUIPPED SUB-CONTRACTOR VEHICLE AT ALL
TIMES WHILE ON AIRPORT PROPERTY. AN AUTHORIZED VEHICLE MAY ONLY ESCORT A SINGLE
UNAUTHORIZED VEHICLE AT A TIME. ANY VEHICLE OPERATING IN THE ACTIVE AOA DURING
THE HOURS OF DARKNESS SHALL UTILIZE ITS FLASHING AMBER (YELLOW) DOME LIGHT,
MOUNTED ON TOP OF THE VEHICLE AND OF SUCH INTENSITY TO CONFORM TO LOCAL CODES
FOR MAINTENANCE AND EMERGENCY VEHICLES. DURING DAYLIGHT HOURS ANY VEHICLE
OPERATING IN THE ACTIVE AOA IS TO BE EQUIPPED WITH A 3'X3', OR LARGER, ORANGE AND
WHITE CHEKERBOARD FLAG CLEARLY DISPLAYED AS WELL AS COMPANY LOGO (SEE FAA AC
150/5210-5D)
8. ALL NON-RADIO EQUIPPED CONTRACTOR VEHICLES THAT ARE REQUIRED TO OPERATE ON
OR ACROSS ACTIVE RUNWAYS, TAXIWAYS, APRONS AND RUNWAY APPROACH AND
PROTECTION ZONES SHALL DO SO UNDER THE DIRECT CONTROL OF A RADIO EQUIPPED
ESCORT VEHICLE OPERATED BY BADGED PERSONNEL ONLY. EQUIPPED VEHICLES SHALL
MONITOR GROUND CONTROL FREQUENCY. ALL AIRCRAFT TRAFFIC ON RUNWAYS, TAXIWAYS
AND APRONS SHALL HAVE PRIORITY OVER CONTRACTOR'S TRAFFIC.
9. ANY CONSTRUCTION ACTIVITY WITHIN AN ACTIVE RUNWAY SAFETY AREA (RSA) OR AN ACTIVE
TAXIWAY OBJECT FREE AREA (TOFA) OR OPEN EXCAVATIONS IN EXCESS OF THREE INCHES
DEEP WITHIN THE ABOVE AREAS, WILL REQUIRE CLOSURE OF THE AFFECTED RUNWAY OR
TAXIWAY, UNLESS OTHERWISE APPROVED BY AIRPORT OPERATIONS. CLOSURE REQUIRES
THE SAME PROVISIONS FOR NOTAMS.
10. OPEN TRENCHES, AND EXCAVATIONS LOCATED IN THE AOA SHALL BE PROMINENTLY MARKED
WITH FLAGS AND LIGHTED BY APPROVED LIGHT UNITS DURING HOURS OF RESTRICTED
VISIBILITY AND DARKNESS.
11. OPEN FLAME WELDING OR TORCH CUTTING OPERATIONS ARE PROHIBITED. BURNING OF
DEBRIS WILL NOT BE ALLOWED ON AIRPORT PROPERTY.
12. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO PREVENT MOVEMENT
RESULTING FROM AIRCRAFT JET BLAST OR WIND CONDITIONS. STOCKPILE HEIGHT SHALL BE
LESS THAN 25 FEET.
13. WHEN THE CONTRACTOR'S OPERATIONS CROSS ACTIVE TAXIWAYS, HE SHALL BE REQUIRED
TO PROVIDE A FLAGMAN ON EACH SIDE OF ACTIVE CROSSING ALONG WITH A BADGED, RADIO
EQUIPPED ESCORT TO DIRECT VEHICULAR TRAFFIC AND PROTECT AIRCRAFT TRAFFIC. THE
CONTRACTOR SHALL ALSO HAVE SUITABLE EQUIPMENT APPROVED BY THE ENGINEER AT
EACH CROSSING TO KEEP THE CROSSING CLEAN OF ALL DIRT AND DEBRIS SAFE FOR
AIRCRAFT TRAFFIC. TAXIWAYS AND EXISTING APRONS SHALL BE KEPT FREE OF ALL DEBRIS,
DIRT, ETC., AT ALL TIMES. ANY SPILLAGE OF EXCAVATION OR OTHER MATERIAL SHALL BE
CLEANED UP IMMEDIATELY BY THE CONTRACTOR WITH A MOTOR DRIVEN SWEEPER OR
VACUUM AS REQUIRED BY THE ENGINEER. A PROGRAM OF REGULAR TAXIWAY AND APRON
INSPECTION WILL BE PLANNED BY THE CONTRACTOR, AIRPORT OPERATIONS AND THE
ENGINEER.
14. DEBRIS, WASTE AND LOOSE MATERIAL SHALL NOT BE ALLOWED ON ACTIVE AIRCRAFT
MOVEMENT AREAS AS LOOSE MATERIAL IS CAPABLE OF CAUSING DAMAGE TO AIRCRAFT
LANDING GEAR, PROPELLERS OR BEING INGESTED IN JET ENGINES. ANY LOOSE MATERIAL
OBSERVED BY CONTRACTOR ON AIRFIELD PAVEMENTS SHALL BE IMMEDIATELY REMOVED BY
CONTRACTOR. CONTINUOUS SWEEPING AND WATERING SHALL BE PERFORMED BY
CONTRACTOR TO PROACTIVELY REMOVE LOOSE DEBRIS AND PREVENT DUST ON AND
AROUND AIRFIELD PAVEMENTS.
15. THE CONTRACTOR SHALL SCHEDULE AN INSPECTION WITH AIRPORT OPERATIONS PRIOR TO
OPENING WORK AREAS FOR AIRCRAFT USE. ANY AIRFIELD PAVEMENT THAT MAY HAVE BEEN
SUBJECTED TO FOREIGN OBJECT DEBRIS (FOD) FROM CONSTRUCTION SHALL BE INSPECTED
BY AIRPORT OPERATIONS PRIOR TO REOPENING TO AIRCRAFT TRAFFIC.
16. CONSTRUCTION DURING THE PROJECT MAY BE HALTED AT ANY TIME BY AIRPORT
OPERATIONS IF IT IS DETERMINED TO BE IN THE BEST INTEREST OF AIRPORT ACTIVITIES OR
SAFETY. THE CONTRACTOR MAY BE DIRECTED TO REMOVE EQUIPMENT AND/OR EVACUATE
THE SITE IN ORDER TO ENABLE AIRCRAFT OPERATIONS. NECESSARY EXTENSIONS IN
CONTRACT TIME WILL BE GRANTED OR A STOP WORK ORDER WILL BE ISSUED DUE TO THESE
DELAYS.
17. THE CONTRACTOR SHALL CEASE EXCAVATION AND CONTACT AIRPORT FACILITIES UPON THE
DISCOVERY OF ANY LINES, CONDUITS, OR PIPES THAT HAVE NOT BEEN PREVIOUSLY
IDENTIFIED. EXCAVATION SHALL NOT CONTINUE UNTIL THE ITEM IS IDENTIFIED AND/OR
APPROVAL IS GRANTED BY THE ENGINEER. ANY UNPLANNED, UNAPPROVED, OR
ACCIDENTAL SHUTDOWN OR INTERRUPTION OF SERVICE TO ANY LIGHTING CIRCUIT OR
NAVIGATIONAL AID REQUIRES IMMEDIATE NOTIFICATION TO THE ENGINEER BY THE
CONTRACTOR.
18. THE CONTRACTOR SHALL SUBMIT A WRITTEN SAFETY PLAN WITHIN 10 DAYS OF NOTIFICATION
OF INTENT TO AWARD. THE SAFETY PLAN SHALL INCLUDE CONTINGENCY PLANS FOR
ABNORMAL FAILURES AND UNEXPECTED DISASTERS. THE PLAN SHALL SUMMARIZE THE
CONTRACTOR'S ACTION TO PROMOTE, MAINTAIN, AND CONTROL ALL PROJECT WORK TO
ENSURE A SAFE WORK ENVIRONMENT AND TO MEET ALL LOCAL, STATE AND FEDERAL
CONSTRUCTION SAFETY REGULATIONS. THE FAA, FDOT, AND OWNER PROJECT NUMBERS
SHALL BE STATED ON THE COVER OF THE PLAN AS APPLICABLE. THE PLAN SHALL ADDRESS
HOW SITE SAFETY AND SECURITY WILL BE MAINTAINED IN ACCORDANCE WITH THE
REQUIREMENTS OF THE PLANS AND SPECIFICATIONS.
19. JET AIRCRAFT OPERATING ON THE AIRFIELD MAKE THE CONSTRUCTION AREA A ZONE OF
HIGH LEVEL NOISE. THE CONTRACTOR IS ADVISED TO TAKE THE NECESSARY PRECAUTIONS,
SUCH AS THE USE OF EAR PLUGS AND EAR MUFFS TO PREVENT EAR INJURY TO ANY
PERSONNEL WORKING IN THE AREA.
ACRONYMS:
RPR = RESIDENT PROJECT REPRESENTATIVE
FAA = FEDERAL AVIATION ADMINISTRATION
AC = ADVISORY CIRCULAR
CSI = CONSTRUCTION SPECIFICATION INSTITUTE
TOFA = TAXIWAY OBJECT FREE AREA
TSA = TAXIWAY SAFETY AREA
ROFA= RUNWAY OBJECT FREE AREA
RSA = RUNWAY SAFETY AREA
RPZ = RUNWAY PROTECTION ZONE
UTILITY OWNERS:
FLORIDA POWER AND LIGHT (FP&L) - ELECTRICAL SERVICE (941)423-4807
CITY OF PUNTA GORDA (CITY) - WATER AND SEWER (941)575-3339
TECO PEOPLE'S GAS - GAS (813)635-1500
CENTURY LINK - COMMUNICATION/FIBER (865)465-2313
C
EN
TE
R
A
PR
O N
E
XP
AN
SI
O N
AUGUST 2025
CH
AR
LO
TT
E
CO
UN
TY
AI
RP
OR
T
AU
TH
OR
IT
Y
PU
NT
A
GO
RD
A, F
LO
RI
DA
N o.
R
EV
IS
IO
N S
D
AT
E D
ES
C
R
IP
TI
O
N
BY
PR
O
JE
C
T N
AM
E
SH
EE
T
TI
TL
E
DESIGNED:
DRAWN:
CHECKED:
CCAA NO.:
JOB NO.:
DATE:
SHEET NO.:
B:
\T am pa
\P ro je ct s\ Pu nt a
G or da \2
6_ Ai r C en te r A pr on
E xp an si on \C
AD
D
-d w g\
_G
G
EN
ER
AL
N
O
TE
S.
dw g
BI
D
D O
C U
M
EN
TS
G005
205146
TBD
G
EN
ER
AL
N O
TE
S
(2 O
F 2)
NP
NM
NM
SECURITY NOTES:
1. GENRAL INTENT: CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS OF THE AIRPORT
SECURITY PLAN, THE SECURITY REQUIREMENTS NOTED HEREIN AND TO ANY REQUESTS
MADE BY AIRPORT OPERATIONS. THE CONTRACTOR SHALL DESIGNATE, IN WRITING, THE
NAME OF HIS "CONTRACTOR SECURITY OFFICER (CSO)." THE CSO SHALL REPRESENT THE
CONTRACTOR ON THE SECURITY REQUIREMENTS OF THE CONTRACT.
2. CONTRACTOR PERSONNEL SECURITY ORIENTATION: THE CSO SHALL BE RESPONSIBLE FOR
BRIEFING ALL CONTRACTOR AND SUBCONTRACTOR PERSONNEL ON SECURITY
REQUIREMENTS. ALL NEW CONTRACTOR EMPLOYEES SHALL BE BRIEFED ON SECURITY
REQUIREMENTS PRIOR TO WORKING IN THE CONSTRUCTION AREA.
3. ACCESS TO THE SITE: CONTRACTOR'S ACCESS TO THE SITE SHALL BE GENERALLY AS
SHOWN ON THE PROJECT LAYOUT PLAN. THE FINAL ACCESS/HAUL ROUTE(S) SHALL BE
COORDINATED IN THE FIELD WITH THE AIRPORT'S ONSITE REPRESENTATIVE. NO OTHER
ACCESS POINTS SHALL BE ALLOWED UNLESS APPROVED BY THE AIRPORT. ALL
CONTRACTOR TRAFFIC AUTHORIZED TO ENTER THE SITE SHALL BE ESCORTED BY A BADGED
CONTRACTOR EMPLOYEE OR AIRPORT STAFF. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR CONSTRUCTION TRAFFIC TO AND FROM THE VARIOUS CONSTRUCTION AREAS. THE
CONTRACTOR SHALL NOT PERMIT ANY UNAUTHORIZED CONSTRUCTION PERSONNEL OR
TRAFFIC ON THE SITE. IF THE CONTRACTOR CHOOSES TO LEAVE ANY ACCESS GATE OPEN,
IT SHALL BE ATTENDED BY BADGED CONTRACTOR EMPLOYEE WHO HAS PROPER TRAINING
OF THE AIRPORT OPERATIONS SECURITY PROGRAM. CONTRACTOR SHALL COORDINATE SITE
ACCESS WITH AIRPORT OPERATIONS FOR EACH GATE ACCESS LOCATION. AIRPORT
APPROVAL IS REQUIRED FOR ALL GATE ACCESS POINTS PRIOR TO ACCESSING ANY GATE.
4. MATERIALS DELIVERY TO THE SITE: ALL CONTRACTOR'S MATERIAL ORDERS FOR DELIVERY
TO THE WORK SITE WILL USE AS A DELIVERY ADDRESS, THE STREET NAME ASSIGNED TO
THE ACCESS POINT AT THE CONTRACTOR'S STAGING SITE AT THE AIRPORT. THE NAME
"PUNTA GORDA AIRPORT" SHALL NOT BE USED IN THE DELIVERY ADDRESS AT ANY TIME.
THIS WILL PRECLUDE DELIVERY TRUCKS FROM ENTERING INTO THE TERMINAL AREA, OR
TAKING SHORT CUTS THROUGH THE PERIMETER GATES AND ENTERING INTO AIRCRAFT
OPERATIONS AREA INAPPROPRIATELY.
5. CONSTRUCTION AREA LIMITS: THE LIMITS OF CONSTRUCTION, MATERIAL STORAGE AREAS,
PLANT SITE, EQUIPMENT STORAGE AREA, PARKING AREA AND OTHER AREAS DEFINED AS
REQUIRED FOR THE CONTRACTOR'S EXCLUSIVE USE DURING CONSTRUCTION SHALL BE
MARKED BY THE CONTRACTOR. THE CONTRACTOR SHALL ERECT AND MAINTAIN AROUND
THE PERIMETER OF THESE AREAS SUITABLE FENCING, MARKING AND/OR WARNING DEVICES
VISIBLE FOR DAY/NIGHT USE. TEMPORARY BARRICADES, FLAGGING AND FLASHING
WARNING LIGHTS WILL BE REQUIRED AT CRITICAL ACCESS POINTS. TYPE OF MARKING AND
WARNING DEVICES SHALL BE APPROVED BY AIRPORT OPERATIONS. CONTRACTOR SHALL
MAINTAIN ALL AIRFIELD SAFETY DEVICES SUCH AS STAKED LIMIT LINES AND BARRICADE
LIGHTS FOR THE DURATION OF THE PROJECT AS REQUIRED. DAMAGED STAKES OR
FLAGGING SHALL BE REPLACED IMMEDIATELY. CONTRACTOR TO SUBMIT PLAN SHOWING
LOCATION OF LIMIT LINES FOR EACH PHASE AND FOR PROJECT DURATION TO THE ENGINEER
FOR APPROVAL.
6. IDENTIFICATION-PERSONNEL: ALL EMPLOYEES, AGENTS VENDORS, INVITEES, ETC. OF THE
CONTRACTOR OR SUBCONTRACTORS REQUIRING ACCESS TO THE AIR OPERATIONS AREA
(AOA) SITE SHALL BE REQUIRED TO DISPLAY DRIVER'S LICENSE AS WELL AS IDENTIFICATION
OF COMPANY WORKED FOR UPON REQUEST. IDENTIFIABLE HARD HATS OR OTHER
IDENTIFICATION SHALL ALSO BE WORN AT ALL TIMES, WHEN OUTSIDE AUTHORIZED
VEHICLES, IF REQUIRED BY AIRPORT OPERATIONS. THE PRIME CONTRACTOR SHALL BE
RESPONSIBLE FOR BACKGROUND CHECKS ON ALL OF ITS OWN AND ALL SUBCONTRACTOR
EMPLOYEES. THE CONTRACTOR AND ITS STAFF ARE RESPONSIBLE FOR ATTENDING ALL
REQUIRED TRAINING BEFORE THE START OF WORK.
7. IDENTIFICATION-VEHICLES: THE CONTRACTOR, THROUGH THE CSO, SHALL ESTABLISH AND
MAINTAIN A LIST OF CONTRACTOR AND SUBCONTRACTOR VEHICLES AUTHORIZED TO
OPERATE ON THE SITE AND SHALL ISSUE A PERMIT TO EACH VEHICLE TO BE MADE
AVAILABLE UPON REQUEST BY AIRPORT OPERATIONS THE RESIDENT PROJECT
REPRESENTATIVE OR ANY AUTHORIZED AIRPORT REPRESENTATIVES. IN LIEU OF ISSUING
INDIVIDUAL VEHICLE PERMITS, THE CSO CAN REQUIRE EACH VEHICLE TO DISPLAY A LARGE
COMPANY SIGN ON BOTH SIDES OF THE VEHICLE AND ADVISE AIRPORT OPERATIONS AND
SECURITY OF A CURRENT LIST OF COMPANIES AUTHORIZED TO ENTER AND CONDUCT WORK
ON THE AIRPORT. CONTRACTOR EMPLOYEE VEHICLES SHALL BE RESTRICTED TO THE
CONTRACTOR'S EMPLOYEE PARKING AREA AND ARE NOT ALLOWED ON THE AOA AT ANY
TIME.
8. FINES: PAYMENT OF ALL FINES ASSESSED TO PUNTA GORDA AIRPORT DUE TO VIOLATIONS
BY THE CONTRACTOR OF FAA SECURITY OR SAFETY REQUIREMENTS SHALL BE THE SOLE
RESPONSIBILITY OF THE CONTRACTOR. AIRPORT OPERATIONS PERSONEL DO ISSUE
CONTROLLED MOVEMENT AREA (CMA) VIOLATIONS FOR INFRACTIONS BY AN INDIVIDUAL,
WHICH CAN RESULT IN REVOCATION OF THE BADGE AND POSSIBLE FINES.
9. AREAS OUTSIDE THE PROJECT LIMITS OR HAUL ROUTES ARE DESIGNATED AS RESTRICTED
AREAS. THE CONTRACTOR'S FORCES ARE PROHIBITED FROM ENTERING RESTRICTED
AREAS AT ANY TIME, UNLESS SPECIFICALLY AUTHORIZED BY THE RPR OR AIRPORT
OPERATIONS.
ACCESS, STAGING, AND HAUL ROUTE NOTES
1. THE CONTRACTORS SHALL MINIMIZE DISRUPTION OF STANDARD OPERATING
PROCEDURES FOR AERONAUTICAL ACTIVITY BY REMAINING WITHIN THE
PRESCRIBED STAGING, CONSTRUCTION, AND PHASING AREAS PRESENTED ON THE
PROJECT SAFETY AND PHASING PLANS.
2. CONTRACTOR EQUIPMENT, VEHICLES, AND PROJECT MATERIALS SHALL BE STORED
AT THE STAGING AREA SHOWN ON THE PLAN VIEW, EXCEPT AS OTHERWISE
PROVIDED FOR AT THE PRECONSTRUCTION CONFERENCE.
3. NO CONSTRUCTION MATERIAL STOCKPILES SHALL BE LOCATED WITHIN 400' OF A
RUNWAY CENTERLINE WHEN ACTIVE, OR WITHIN A TAXIWAY'S RESPECTIVE OBJECT
FREE AREA WHEN ACTIVE. ALSO, NO STOCKPILES SHALL PENETRATE A PART 77
IMAGINARY SURFACE (PROVIDED BY THE ENGINEER) EXTENDING OUT AND
UPWARDS FROM ALL SIDES OF AN ACTIVE RUNWAY. STOCKPILE HEIGHTS SHALL BE
LIMITED TO A MAXIMUM HEIGHT OF 25-FT AGL.
4. OPEN TRENCHES, EXCAVATIONS, AND STOCKPILED MATERIALS AT THE
CONSTRUCTION SITE SHOULD BE PROMINENTLY MARKED WITH ORANGE FLAGS AND
LIGHTED WITH FLASHING YELLOW LIGHTS DURING HOURS OF RESTRICTED
VISIBILITY AND/OR DARKNESS.
5. SOIL, DEBRIS, AND LOOSE MATERIAL DROPPED OR TRUCKED ONTO AIRPORT ROADS,
TAXIWAYS, AND SOD SURFACES, OR WHICH CAN BE BLOWN ONTO SUCH SURFACES,
SHALL BE IMMEDIATELY SWEPT, PICKED UP AND REMOVED, OR PLACED INTO
CLOSED CONTAINERS. ANY DAMAGE TO AIRPORT PROPERTY SHALL BE REPAIRED
IMMEDIATELY AT NO COST TO THE OWNER.
6. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND MAINTAINING
AIRPORT LIGHTING AND NAVIGATIONAL ELECTRICAL SYSTEMS DURING
CONSTRUCTION. A CONTACT PERSON AND TELEPHONE NUMBER FOR 24 HOUR
EMERGENCY AND IMMEDIATE REPAIR SHALL BE SUBMITTED TO THE AIRPORT
MANAGER AND ENGINEER OR RPR. HAUL ROUTES CROSSING PAVEMENT, DRAINAGE
AREAS, MISCELLANEOUS STRUCTURES AND/OR AIRFIELD CABLES SHALL BE
PROTECTED FROM DAMAGE.
7. THE CONTRACTOR SHALL UTILIZE WATER AND/OR CHEMICALS APPROVED BY THE
ENGINEER AS NECESSARY TO CONTROL DUST. CONTRACTOR SHALL PROCURE A
TEMPORARY WATER METER FROM UTILITY AND IS RESPONSIBLE FOR PAYMENT FOR
ONSITE HYDRANT USE.
8. CONTRACTOR IS REQUIRED TO MAINTAIN RADIO COMMUNICATIONS WITH AIR
TRAFFIC CONTROL (ATCT) AT ALL TIMES, FREQUENCY 119.550 (PUNTA GORDA
GROUND) FROM 06:00-21:00, 121.000 (CTAF) FROM 21:00-06:00. PERSONNEL IN NON
COMPLIANCE MAY BE REMOVED FROM THE SITE AND THEIR ACCESS PRIVILEGES
MAY BE REMOVED.
9. UNLESS SPECIFIED OTHERWISE, COST FOR THE ABOVE IS TO BE CONSIDERED
INCIDENTAL TO THE PROJECT. SEPARATE PAYMENT SHALL NOT BE MADE.
10. THE CONTRACTOR'S STAGING AREA, SHOWN ON G101, SHALL BE FENCED AND
SCREENED. THE CONTRACTOR SHALL MAKE PROVISIONS FOR ANY REQUIRED
UTILITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RETURNING THE
STAGING AREA TO ITS ORIGINAL CONDITION AT THE COMPLETION OF THE PROJECT.
RPZ
RPZ
RPZ
RPZ
RPZ
RPZ
RPZ
N
S
WE
RPZ
RPZ
RPZ
RPZ
RPZ
RPZ
X X
X X
X
X
X
X
N
S
WE
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
TSA
EXIST. MES DOUBLE
INV. = ±16.48' (S)
INV. = 16.86' 12" PVC @ 2.25%
INV. = 17.31'
EXIST. MES DOUBLE
INV. = 15.98' (N)
J
ROFA
RSA
EXIST. MES
INV. = 16.30'
X X
X
X X
X X
X X
X
THREE (3) EXISTING ROAD
END SIGNS TO BE REMOVED
AND REINSTALLED (COST
INCIDENTAL TO MOBILIZATION)
CONTRACTOR'S
EMPLOYEE
PARKING
TRUCKS ENTERING
ROADWAY SIGN
TRUCKS ENTERING
ROADWAY SIGN
CONSTRUCTION
ENTRANCE
EXISTING
SECURITY
FENCE
NO CONSTRUCTION TRUCK
TRAFFIC IS PERMITTED
NORTH OF CHALLENGER BLVD.
ON GOLF COURSE BLVD.
RUNWAY 9-27
RUNW
AY 15-33
G O
LF
C
O
UR
SE
B
LV
D.
HENRY STREET
CHALLENGER BLVD.
TL
E
AS
T
TL
W
ES
T
T/ W
E
EXISTING AIRFIELD
SECURITY FENCE
TAXILANE 3 TAXIWAY G
EXISTING T-HANGARS
EXISTING T-HANGARS
EXISTING T-HANGARS
EXISTING T-HANGARS
EXISTING T-HANGARS
TAXIWAY E
AIR CENTER
BUILDING
TA
XI
LA
N
E G
TA
XI
LA
N
E G
H
AN
G
AR
S
EXISTING SECURITY GATE
EXISTING SWING GATE
CONTRACTOR'S
STOCKPILE AREA
EXISTING HYDRANT TO BE PROTECTED.
MAY BE USED FOR WATER ACCESS (SEE NOTE 8)
TRUCKS ENTERING
ROADWAY SIGN
RUNWAY 9-27 RUNWAY 9-27
6' CHAIN LINK FENCE
6' CHAIN LINK FENCE
6' CHAIN LINK FENCE
GATE
G
AT
E
ELECTRIC OUTLET
ELECTRIC
VAULT
ELECTRIC VAULT
CP
CP
TRANS
TRANS
RP
Z
ELECTRIC
VAULT
ELECTRIC
VAULT
ELECTRIC
VAULT
ELECTRIC
VAULT
ELECTRIC
VAULT
ELECTRIC
VAULT
N
S
WE
6' CHAIN LINK FENCE
N
S
WE
DITCH
TOP OF BANK
TOP OF BANK
EDGE OF PAVEMENT
EDGE OF PAVEMENT
DITCH
TOP OF BANK
TOP OF BANK
TOP OF BANK
DITCH
TOP OF BANK
TOP OF BANK
DITCH
TO
P
O F
BA
N
K
TO
P
O F
BA
N
K
D
IT
C H
DITCH
TOP OF BANK
TOP OF BANK
HENRY STREET
EXIST. MES DOUBLE
INV. = ±16.48' (S)
INV. = 16.86' 12" PVC @ 2.25%
INV. = 17.31'
EXIST. MES DOUBLE
INV. = 15.98' (N)
JJ
EXIST. MES
INV. = 16.30'
AI
R
C
EN
TE
R
A
PR
O N
E
XP
AN
SI
O N
AUGUST 2025
CH
AR
LO
TT
E
CO
UN
TY
AI
RP
OR
T
AU
TH
OR
IT
Y
PU
NT
A
GO
RD
A, F
LO
RI
DA
N o.
R
EV
IS
IO
N S
D
AT
E D
ES
C
R
IP
TI
O
N
BY
PR
O
JE
C
T N
AM
E
SH
EE
T
TI
TL
E
DESIGNED:
DRAWN:
CHECKED:
CCAA NO.:
JOB NO.:
DATE:
SHEET NO.:
B:
\T am pa
\P ro je ct s\ Pu nt a
G or da \2
6_ Ai r C en te r A pr on
E xp an si on \C
AD
D
-d w g\
_G
PR
O
JE
C T
LA
YO
U T, A C
C
ES
S, A
N D
S
TA
G
IN
G P
LA
N
.d w g
BI
D
D O
C U
M
EN
TS
GRAPHIC SCALE IN FEET
100 200 400
AIRPORT PROPERTY
BOUNDARY
RUNWAY SAFETY AREA
RUNWAY OBJECT FREE AREA
TAXIWAY SAFETY AREA
ACCESS / HAUL ROUTE
RSA
ROFA
SOIL TRACKING
PREVENTION DEVICE (SEE DETAIL
3, SHEET C851)
TAXIWAY OBJECT FREE AREATOFA
EXISTING SECURITY FENCE
NOTES:
LEGEND
EXISTING ASPHALT
CONTRACTOR'S STAGING AREA
PROJECT LIMITS
TSA
G101
205146
TBD
PR
O
JE
C
T
LA
YO
U
T, A
C C
ES
S, A N
D
ST
AG
IN
G P
LA
N
NP
NM
NM
1. CONTRACTOR TO USE RUBBER WHEELED VEHICLES ON ALL
PAVED AREAS TO BE PROTECTED. ALL TRACKED VEHICLES
SHALL BE CARRIED ON A LOWBOY TRAILER. ALL FOD SHALL
BE REMOVED CONTINUOUSLY FROM PAVEMENTS.
CONTRACTOR IS RESPONSIBLE FOR THE INTEGRITY OF
EXISTING HAUL ROAD THROUGHOUT THE CONSTRUCTION
CONTRACT.
2. CONTRACTOR STAGING AREAS, HAUL ROUTES AND
STOCKPILE LOCATIONS INDICATED ARE APPROXIMATE AND
SUBJECT TO CHANGE. MULTIPLE STAGING AREAS AND HAUL
ROUTES MAY BE SELECTED (PENDING OWNER APPROVAL)
TO BETTER SERVE ALL PHASES OF WORK. FINAL STAGING,
ACCESS AND HAUL ROUTES SHALL BE COORDINATED WITH
AIRPORT OPERATIONS.
3. CONTRACTOR SHALL MAINTAIN TEMPORARY CONSTRUCTION
ENTRANCES AND SOIL TRACKING PREVENTION DEVICES
THROUGHOUT CONSTRUCTION.
4. WHERE THE HAUL / ACCESS ROUTE REQUIRES CONTRACTOR
VEHICULAR TRAFFIC TO OPERATE WITHIN AN ACTIVE
TAXIWAY OR TAXILANE OBJECT FREE AREA THE
CONTRACTOR WILL KEEP CLOSE, DIRECT AND CONTINUOUS
CONTACT WITH AIRCRAFT GROUND CONTROL FREQUENCY.
CONTRACTOR WILL COORDINATE WITH AIRPORT FOR
CORRECT FREQUENCY. AIRCRAFT AND CONTRACTOR
VEHICLES CANNOT OPERATE SIMULTANEOUSLY WITHIN ANY
ACTIVE ROFA OR TOFA.
5. CONTRACTOR SHALL ACCESS THE SITE BY UTILIZING
EXISTING ENTRANCE ROADS OFF OF CHALLENGER
BOULEVARD AS SHOWN ON THIS PLAN. AT NO TIME SHALL
THE CONTRACTOR USE THE EXISTING SECURITY GATE ON
HENRY STREET OR THE TAXILANES AROUND THE EXISTING
T-HANGARS ON THE WEST SIDE OF THE PROJECT.
6. CONTRACTOR EQUIPMENT SHALL NOT EXCEED A HEIGHT OF
25' AGL. CONTRACTOR'S STOCKPILE AREA NOT TO EXCEED A
HEIGHT OF 25' AGL. A CRANE SHALL NOT BE PERMITTED ON
THIS PROJECT UNLESS APPROVED IN WRITING BY THE
AIRPORT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
SUBMITTING A 7460 AND OBTAINING FAA APPROVAL IF A
CRANE IS TO BE USED.
7. CONTRACTOR IS RESPONSIBLE FOR THE MAINTENANCE OF
ALL TRAFFIC ON CHALLENGER BOULEVARD AND GOLF
COURSE BOULEVARD IMPACTED BY CONSTRUCTION
OPERATIONS.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR PROCURING AND
MAINTAINING CONSTRUCTION METER FOR FIRE HYDRANT
CONNECTION. CONTRACTOR SHALL PAY FOR ALL EXPENSES
RELATED TO CONSTRUCTION METER.
PROPOSED ASPHALT
KEY MAPKEY MAP
G101
TEMPORARY HAUL ROUTE ACROSS
EXISTING SWALE WITH 18" PIPE
CULVERT TO MAINTAIN DRAINAGE
(COST INCIDENTAL TO MOBILIZATION)
N
S
WE
N
S
WE
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
EXIST. MES DOUBLE
INV. = ±16.48' (S)
INV. = 16.86' 12" PVC @ 2.25%
INV. = 17.31'
EXIST. MES DOUBLE
INV. = 15.98' (N)
ROFA
RSA
RSA
EXIST. MES
INV. = 16.30'
24" RCP
(4) 29" x 45"
ERCP
(4) 29" x 45"
ERCP
(2 )1
4" x
3"
E R
C P
3A
APPROXIMATE
AIRPORT BOUNDARY
BENCHMARK 4
5/8" IRON ROD LB6690
ELEVATION=15.46'
BENCHMARK "M751" 5
FDEP ALUMINUM DISK
ELEVATION=15.53'
CHALLENGER BLVD.
G O
LF
C
O
UR
SE
B
LV
D.
RUNWAY 9-27
RUNW
AY 15-33
HENRY STREET
BENCHMARK 3
5/8" IRON ROD LB6690
ELEVATION=18.18'
BENCHMARK 2
5/8" IRON ROD LB6690
ELEVATION=17.54'
BENCHMARK 1
5/8" IRON ROD LB6690
ELEVATION=18.84'
BENCHMARK 8
NAIL & DISK LB6690
ELEVATION=20.06'
BENCHMARK 6
NAIL & DISK LB6690
ELEVATION=16.95'
BENCHMARK 7
NAIL & DISK LB6690
ELEVATION=18.56'
TAXIWAY G
TAXIWAY E
AIR CENTER
APRON
GATE
G
AT
E
ELECTRIC OUTLET
ELECTRIC
VAULT
ELECTRIC VAULT
CP
CP
TRANS
TRANS
ELECTRIC
VAULT
ELECTRIC
VAULT
ELECTRIC
VAULT
ELECTRIC
VAULT
ELECTRIC
VAULT
ELECTRIC
VAULT
N
S
WE
N
S
WE
ROFA
ROFA
DITCH
TOP OF BANK
TOP OF BANK
EDGE OF PAVEMENT
EDGE OF PAVEMENT
DITCH
TOP OF BANK
TOP OF BANK
TOP OF BANK
DITCH
TOP OF BANK
TOP OF BANK
DITCH
TO
P
O F
BA
N
K
TO
P
O F
BA
N
K
D
IT
C H
DITCH
TOP OF BANK
TOP OF BANK
HENRY STREET
EXIST. MES DOUBLE
INV. = ±16.48' (S)
INV. = 16.86' 12" PVC @ 2.25%
INV. = 17.31'
EXIST. MES DOUBLE
INV. = 15.98' (N)
EXIST. MES
INV. = 16.30'
3A
N = 942649.1534 E = 652865.9590
AI
R
C
EN
TE
R
A
PR
O N
E
XP
AN
SI
O N
AUGUST 2025
CH
AR
LO
TT
E
CO
UN
TY
AI
RP
OR
T
AU
TH
OR
IT
Y
PU
NT
A
GO
RD
A, F
LO
RI
DA
N o.
R
EV
IS
IO
N S
D
AT
E D
ES
C
R
IP
TI
O
N
BY
PR
O
JE
C
T N
AM
E
SH
EE
T
TI
TL
E
DESIGNED:
DRAWN:
CHECKED:
CCAA NO.:
JOB NO.:
DATE:
SHEET NO.:
B:
\T am pa
\P ro je ct s\ Pu nt a
G or da \2
6_ Ai r C en te r A pr on
E xp an si on \C
AD
D
-d w g\ b_ G
SU
R
VE
Y
C O
N
TR
O L
PL
AN
.d w g
BI
D
D O
C U
M
EN
TS
LEGEND
BENCHMARK
N = 941721.5353
E = 658773.3667BENCH MARK # 1
N = 941704.7771
E = 658191.6971BENCH MARK # 2
N = 941701.7798
E = 657598.4759BENCH MARK # 3
N = 941686.9056
E = 656742.0025BENCH MARK # 4
N = 941636.2172
E = 655986.7170BENCH MARK # 5
N = 943206.6326
E = 657587.1050BENCH MARK # 6
N = 943198.4521
E = 658484.3640BENCH MARK # 7
N = 943191.0483
E = 659277.6116BENCH MARK # 8
KEY MAP
KEY MAP
G301
G301
205146
TBD
SU
R
VE
Y
C O
N
TR
O L
PL
AN
NP
MC
MC
400200100
NOTES:
1. SURVEY AND BENCHMARK DATA PROVIDED BY BANKS ENGINEERING IN JANUARY OF 2019.
2. CONTRACTOR TO VERIFY ELEVATION OF BENCHMARKS PROVIDED PRIOR TO THE START OF
CONSTRUCTION.
3. HORIZONTAL DATUM: NORTH AMERICAN DATUM OF 1983 NATIONAL GEODETIC SURVEY,
FLORIDA WEST ZONE, STATE PLANE COORDINATE SYSTEM.
4. VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM OF 1988.
EXIST. MES DOUBLE
INV. = ±16.48' (S)
JJ CXCXCXCXCX
C X
C X
C X
C X
C X
(2 )1
4" x
3"
E R
C P
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
XX
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
XX
X
X
TAXILANE 3
PHASE 1A
TAXILANE 8
PHASE 1B
TAXILANE 6
TAXILANE 7
PHASE 2
TAXILANE 9
TAXILANE 3
TAXILANE 10
PHASE 4A
PHASE 4B
TAXIWAY G
TA
XI
LA
N
E G
TA
XI
LA
N
E G
TA
XI
LA
N
E
TA
XI
LA
N
E G
AI
R
C
EN
TE
R
A
PR
O N
E
XP
AN
SI
O N
AUGUST 2025
CH
AR
LO
TT
E
CO
UN
TY
AI
RP
OR
T
AU
TH
OR
IT
Y
PU
NT
A
GO
RD
A, F
LO
RI
DA
N o.
R
EV
IS
IO
N S
D
AT
E D
ES
C
R
IP
TI
O
N
BY
PR
O
JE
C
T N
AM
E
SH
EE
T
TI
TL
E
DESIGNED:
DRAWN:
CHECKED:
CCAA NO.:
JOB NO.:
DATE:
SHEET NO.:
B:
\T am pa
\P ro je ct s\ Pu nt a
G or da \2
6_ Ai r C en te r A pr on
E xp an si on \C
AD
D
-d w g\
_G
C
O N
ST
R
U C
TI
O
N P
H
AS
IN
G
P
LA
N .d w g
BI
D
D O
C U
M
EN
TS
GRAPHIC SCALE IN FEET
30 60 120
PHASE 1B MON -SAT
7A - 6P
EXCAVATION, GRADING, DRAINAGE, TRENCH AND REPLACE
THROUGH TAXILANE G2, NEW APRON PAVEMENT, AND
AIRFIELD ELECTRICAL.
WORK ELEMENTS INCLUDEDFACILITY IMPACT
OR CLOSURE
WORK
HOURSPHASE
PHASE 1A
TAXILANE G1 AND TAXILANE 3. WEST HALF
OF TAXILANE 6. CONTRACTOR SUPERVISED
CROSSINGS ON TAXILANE G2
PHASE 3
PHASE 2
G401
205146
TBD
C O
N
ST
R U
C
TI
O N
P H
AS
IN
G P
LA
N
NP
NM
NM
NOTES:
1. WORK SHALL BE SEQUENCED TO MINIMIZE THE IMPACT OF CONSTRUCTION ON
AIRFIELD & AIR CENTER OPERATIONS.
2. FINAL PAVEMENT MARKINGS AND SEALCOATING SHALL BE PERFORMED AFTER ALL
PAVEMENT HAS CURED FOR AT LEAST 30-DAYS.
3. FOLLOWING THE AWARD OF A BID SCHEDULE, CERTAIN PHASES WILL BE COMBINED IN
THE CONFORMED CONSTRUCTION DOCUMENTS. REFER TO G402 FOR INFORMATION
REGARDING PHASE DURATION. THE FOLLOWING PHASES WOULD BE COMBINED:
· SCHEDULE A - NO CHANGE
· SCHEDULE B - PHASES 1B AND 2 WOULD BE COMBINED.
· SCHEDULE C - PHASES 1B, 2, AND 3 WOULD BE COMBINED.
· SCHEDULE D - PHASES 1B, 2, AND 3 WOULD BE COMBINED.
PHASE 4A
PHASE 4B
PHASE 4C
LEGEND
TAXIWAY SAFETY AREA CONTRACTOR'S STAGING AND
STOCKPILE AREA
TAXIWAY OBJECT FREE AREAFINAL PAVEMENT MARKINGS AND SEAL COATING.PHASE 5
MON -SAT
9P - 6A
MON -SAT
9P - 6A
MON -SAT
9P - 6A
MON -SAT
7A - 6P
MON -SAT
7A - 6P
MON -SAT
7A - 6P
MON -SAT
7A - 6P
EXCAVATION, GRADING, DRAINAGE, NEW APRON PAVEMENT,
AND AIRFIELD ELECTRICAL.
EXCAVATION, GRADING, DRAINAGE, NEW APRON PAVEMENT,
AND AIRFIELD REFELCTORS.
FINAL LIFT OF ASPHALT ACROSS THE FULL LENGTH OF
PHASE 4 TAXIWAY CONNECTOR PAVEMENT, AND INITIAL
MARKINGS.
EXCAVATION, GRADING, DRAINAGE, NEW APRON PAVEMENT,
AND AIRFIELD REFLECTORS.
EXCAVATION, GRADING, DRAINAGE, FIRST 2 INCH LIFT OF
CONNECTOR PAVEMENT, AND AIRFIELD ELECTRICAL.
EXCAVATION, GRADING, DRAINAGE, FIRST 2 INCH LIFT OF
CONNECTOR PAVEMENT, AND AIRFIELD ELECTRICAL.
TAXILANE 3 AND TAXILANE G2.
EAST HALF OF TAXILANE 6.
TAXILANE 7 AND TAXILANE G2
TAXILANE G2 AND TAXILANE 9
TAXIWAY GOLF (NIGHTLY
CLOSURE AND REOPENING),
TAXILANE 10
TAXILANE 10
TAXIWAY GOLF (NIGHTLY
CLOSURE AND REOPENING),
TAXILANE 10, AND TAXILANE 11
TAXIWAY GOLF (NIGHTLY
CLOSURE AND REOPENING),
TAXILANE 11
PROJECT AREA LIMITS
BID SCHEDULE
BASE BID
BASE BID + ADDITIVE 1
BASE BID + ADDITIVES 1-2
ALL SCHEDULES
BASE BID + ADDITIVES 1-3
PROPOSED DRAINAGE PIPE
PROPOSED DRAINAGE STRUCTURE
ALL SCHEDULES PHASE 0 MOBILIZATION, SUBMITTALS, AND MATERIAL PROCUREMENT.NONE.
MON -SAT
7A - 6P
C
EN
TE
R
A
PR
O N
E
XP
AN
SI
O N
AUGUST 2025
CH
AR
LO
TT
E
CO
UN
TY
AI
RP
OR
T
AU
TH
OR
IT
Y
PU
NT
A
GO
RD
A, F
LO
RI
DA
N o.
R
EV
IS
IO
N S
D
AT
E D
ES
C
R
IP
TI
O
N
BY
PR
O
JE
C
T N
AM
E
SH
EE
T
TI
TL
E
DESIGNED:
DRAWN:
CHECKED:
CCAA NO.:
JOB NO.:
DATE:
SHEET NO.:
B:
\T am pa
\P ro je ct s\ Pu nt a
G or da \2
6_ Ai r C en te r A pr on
E xp an si on \C
AD
D
-d w g\ b_ G
C O
N
ST
R U
C
TI
O N
P H
AS
IN
G P
LA
N
_G an tt.
dw g
BI
D
D O
C U
M
EN
TS
G402
205146
TBD
C O
N
ST
R U
C
TI
O N
P H
AS
IN
G P
LA
N
(S C
H
ED
U
LE
NP
MC
MC
ANTICIPATED START: NOVEMBER 2025 PGD AIR CENTER APRON EXPANSION
ID ACTIVITY WORK HOURS DURATION
0 MOBILIZATION N/A 60
1 PHASE 1A MON - SAT;
7A - 6P 35
2 PHASE 1B MON - SAT;
7A - 6P 28
TOTAL CONSTRUCTION DURATION 123
123 DAYS
BID SCHEDULE A
BID SCHEDULE B
ANTICIPATED START: NOVEMBER 2025 PGD AIR CENTER APRON EXPANSION
ID ACTIVITY WORK HOURS DURATION
0 MOBILIZATION N/A 60
1 PHASE 1A MON - SAT;
7A - 6P 35
2 PHASE 1B MON - SAT;
7A - 6P 45
3 PHASE 2 MON - SAT;
7A - 6P 45
4 PHASE 5 MON - SAT;
9P - 6A 1
TOTAL CONSTRUCTION DURATION 141
141 DAYS
BID SCHEDULE D
ANTICIPATED START: NOVEMBER 2025 PGD AIR CENTER APRON EXPANSION
ID ACTIVITY WORK HOURS DURATION
0 MOBILIZATION N/A 60
1 PHASE 1A MON - SAT;
7A - 6P 35
2 PHASE 1B MON - SAT;
7A - 6P 66
3 PHASE 2 MON - SAT;
7A - 6P 66
4 PHASE 3 MON - SAT;
7A - 6P 66
5 PHASE 4A MON - SAT;
9P - 6A 20
6 PHASE 4B MON - SAT;
7A - 6P 25
7 PHASE 4C MON - SAT;
9P - 6A 3
8 PHASE 5 MON - SAT;
9P - 6A 1
TOTAL CONSTRUCTION DURATION 210
210 DAYS
N O
VE
M
BE
R
0, (E
ST
JA
N
U
AR
Y
, 2
(E
ST
N O
VE
M
BE
R
0, (E
ST
JA
N
U
AR
Y
, 2
(E
ST
BID SCHEDULE C
ANTICIPATED START: NOVEMBER 2025 PGD AIR CENTER APRON EXPANSION
ID ACTIVITY WORK HOURS DURATION
0 MOBILIZATION N/A 60
1 PHASE 1A MON - SAT;
7A - 6P 35
2 PHASE 1B MON - SAT;
7A - 6P 66
3 PHASE 2 MON - SAT;
7A - 6P 66
4 PHASE 3 MON - SAT;
7A - 6P 66
5 PHASE 5 MON - SAT;
9P - 6A 1
TOTAL CONSTRUCTION DURATION 162
162 DAYS
N O
VE
M
BE
R
0, (E
ST
JA
N
U
AR
Y
, 2
(E
ST
N O
VE
M
BE
R
0, (E
ST
JA
N
U
AR
Y
, 2
(E
ST
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
XX
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
XX
X
X
BEECHCRAFT BARON 58
WINGTIP CLEARANCE
BEECHCRAFT
BARON 58 WINGTIP
77'
Baron 58
Ba ro n
Baron 58
Baron 58
BR
0A
BR
0A
G
0( G
V-
SP
G 550(G
V-SP)TAXILANE 3
PHASE 1A
TAXILANE 6
TAXILANE 7
TA
XI
LA
N
E G
TA
XI
LA
N
E G
64'
G550 WINGTIP CLEARANCE
G550 WINGTIP
TAXIWAY E
TAXIWAY G
BARRICADES IN PLACE
ONLY DURING SIGN
INSTALLATION WORK.
SEE NOTES 4 AND 5.
BARRICADES IN PLACE ONLY DURING
TAWIWAY G SIGN INSTALLATION. BARRICADES
SHALL BE PLACED AT TAXIWAY A TSA
WORK ON THIS SIGN
SHALL BE COMPLETED
IN PHASE 1B
BARRICADES IN PLACE
ONLY DURING SIGN
INSTALLATION WORK.
SEE NOTES 4 AND 5.
BARRICADES IN PLACE ONLY DURING
TAWIWAY G SIGN INSTALLATION. BARRICADES
SHALL BE PLACED AT TAXIWAY G HOLD BAR
BARRICADES IN PLACE ONLY IF BOTH
TAXIWAY G AND TAXILANE G2 ARE CLOSED
FOR SIGN REPLACEMENT/NEW SIGN WORK.
SEE NOTES 4 AND 5.
AI
R
C
EN
TE
R
A
PR
O N
E
XP
AN
SI
O N
AUGUST 2025
CH
AR
LO
TT
E
CO
UN
TY
AI
RP
OR
T
AU
TH
OR
IT
Y
PU
NT
A
GO
RD
A, F
LO
RI
DA
N o.
R
EV
IS
IO
N S
D
AT
E D
ES
C
R
IP
TI
O
N
BY
PR
O
JE
C
T N
AM
E
SH
EE
T
TI
TL
E
DESIGNED:
DRAWN:
CHECKED:
CCAA NO.:
JOB NO.:
DATE:
SHEET NO.:
B:
\T am pa
\P ro je ct s\ Pu nt a
G or da \2
6_ Ai r C en te r A pr on
E xp an si on \C
AD
D
-d w g\
_G
C
O N
ST
R
U C
TI
O
N P
H
AS
IN
G
P
LA
N
IN
D
IV
ID
U
AL
P
H
AS
ES
.d w g
BI
D
D O
C U
M
EN
TS
G451
205146
TBD
C O
N
ST
R U
C
TI
O N
P H
AS
IN
G P
LA
N
SU
BP
H
AS
E
1A
NP
NM
NM
35 CALENDAR
DAYS
MON -SAT
7A - 6P
WORK ELEMENTS INCLUDEDFACILITY IMPACT
OR CLOSURE
WORK
HOURS DURATIONPHASEBID SCHEDULE
BASE BID PHASE 1A
TAXILANE G1 AND TAXIWAY E. WEST HALF
OF TAXILANE 6. CONTRACTOR
SUPERVISED CROSSINGS ON TAXILANE G2
EXCAVATION, GRADING, DRAINAGE, NEW APRON PAVEMENT,
AND AIRFIELD ELECTRICAL.
GRAPHIC SCALE IN FEET
LEGEND
TAXIWAY SAFETY AREA
CROSSING GUARD LOCATION
CG
LOW PROFILE
AIRFIELD BARRICADE
(NOT DRAWN TO SCALE),
SEE DETAIL 2, G004
TAXIWAY OBJECT FREE AREA
1206030
CG
NOTES:
1. ALL PHASING LIMITS SHOWN ARE BASED ON ACCOMMODATING NO LARGER
THAN THE FOLLOWING AIRCRAFT:
TAXILANE G2 (WEST) = G550 (ADG III)
TAXILANE G1 = BEECHCRAFT BARON 58 (ADG I)
2. CROSSING GUARDS ARE TO CONTROL CONTRACTOR EQUIPMENT ONLY.
3. CENTERLINE REMAINS UNCHANGED. AIRCRAFT MUST TREAT THIS
NON-MOVEMENT AREA AS OPEN APRON DUE TO BARRICADE ENCROACHMENT.
4. TAXILANES G1 AND G2 MAY NOT BE SIMULTANEOUSLY CLOSED. APRON MUST
REMAIN ACCESSIBLE AT ALL TIMES. REPLACEMENT OF SIGNS AND NEW SIGN
PAD INSTALLATION AND SUBSEQUENT TAXILANE CLOSURES SHALL BE
SEQUENCED ACCORDINGLY AND SHALL BE LIMITED TO TWO CALENDAR DAYS.
5. REPLACEMENT OF EXISTING SIGN PANELS SHALL NOT REQUIRE ANY ADDITIONAL
CLOSURES AND WILL BE DONE ON A PULL-BACK BASIS.
ACCESS HAUL ROUTE
PROJECT AREA LIMITS
AIRCRAFT TAXI ROUTES
CG
CONTRACTOR'S STAGING AND
STOCKPILE AREA
TEMPORARY LOW PROFILE AIRFIELD
BARRICADE RELATED TO SIGNAGE WORK
(NOT DRAWN TO SCALE), SEE DETAIL 2,
G004. ALSO SEE NOTES 4 AND 5 AND
CALLOUTS ON THIS SHEET.
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA
TSA
TSA
TSA
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
XX
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
XX
X
X
G550 WINGTIP CLEARANCE
G550 WINGTIP
BR
0A
BR
0A
G
0( G
V-
SP
G 550(G
V-SP)TAXILANE 3
PHASE 1A
TAXILANE 8
PHASE 1B
TAXILANE 6
TAXILANE 7
TA
XI
LA
N
E G
TA
XI
LA
N
E G
TAXIWAY E
99'
73'
TAXIWAY G
AI
R
C
EN
TE
R
A
PR
O N
E
XP
AN
SI
O N
AUGUST 2025
CH
AR
LO
TT
E
CO
UN
TY
AI
RP
OR
T
AU
TH
OR
IT
Y
PU
NT
A
GO
RD
A, F
LO
RI
DA
N o.
R
EV
IS
IO
N S
D
AT
E D
ES
C
R
IP
TI
O
N
BY
PR
O
JE
C
T N
AM
E
SH
EE
T
TI
TL
E
DESIGNED:
DRAWN:
CHECKED:
CCAA NO.:
JOB NO.:
DATE:
SHEET NO.:
B:
\T am pa
\P ro je ct s\ Pu nt a
G or da \2
6_ Ai r C en te r A pr on
E xp an si on \C
AD
D
-d w g\
_G
C
O N
ST
R
U C
TI
O
N P
H
AS
IN
G
P
LA
N
IN
D
IV
ID
U
AL
P
H
AS
ES
.d w g
BI
D
D O
C U
M
EN
TS
GRAPHIC SCALE IN FEET
30 60 120
G452
205146
TBD
C O
N
ST
R U
C
TI
O N
P H
AS
IN
G P
LA
N
SU
BP
H
AS
E
1B
NP
NM
NM
LEGEND
TAXIWAY SAFETY AREA
ACCESS HAUL ROUTE
CROSSING GUARD LOCATION
CG
LOW PROFILE
AIRFIELD BARRICADE
(NOT DRAWN TO SCALE),
SEE DETAIL 2, G004
TAXIWAY OBJECT FREE AREA PROJECT AREA LIMITS
NOTES:
1. ALL PHASING LIMITS SHOWN ARE BASED ON ACCOMMODATING NO LARGER
THAN THE FOLLOWING AIRCRAFT:
TAXIWAY E (WEST) AND TAXILANE G1 = G550 (ADG III)
TW G CLOSED TO ALL AIRCRAFT WITH A WINGSPAN GREATER THAN 100'
35 CALENDAR
DAYSPHASE 1B MON -SAT
7A - 6P
EXCAVATION, GRADING, DRAINAGE, TRENCH AND REPLACE
THROUGH TAXILANE G2, NEW APRON PAVEMENT, AND
AIRFIELD ELECTRICAL.
WORK ELEMENTS INCLUDEDFACILITY IMPACT
OR CLOSURE
WORK
HOURS DURATIONPHASE
TAXILANE 3 AND TAXILANE G2.
EAST HALF OF TAXILANE 6.
BID SCHEDULE
BASE BID
AIRCRAFT TAXI ROUTES
CONTRACTOR'S STAGING AND
STOCKPILE AREA
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X
XX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
XX
X
X
TAXILANE 3
PHASE 1A
TAXILANE 8
PHASE 1B
TAXILANE 6
TAXILANE 7
PHASE 2
TAXILANE 9
TA
XI
LA
N
E G
TA
XI
LA
N
E G
AVAILABLE AIRCRAFT
PARKING
TAXIWAY E
TAXIWAY G
AI
R
C
EN
TE
R
A
PR
O N
E
XP
AN
SI
O N
AUGUST 2025
CH
AR
LO
TT
E
CO
UN
TY
AI
RP
OR
T
AU
TH
OR
IT
Y
PU
NT
A
GO
RD
A, F
LO
RI
DA
N o.
R
EV
IS
IO
N S
D
AT
E D
ES
C
R
IP
TI
O
N
BY
PR
O
JE
C
T N
AM
E
SH
EE
T
TI
TL
E
DESIGNED:
DRAWN:
CHECKED:
CCAA NO.:
JOB NO.:
DATE:
SHEET NO.:
B:
\T am pa
\P ro je ct s\ Pu nt a
G or da \2
6_ Ai r C en te r A pr on
E xp an si on \C
AD
D
-d w g\
_G
C
O N
ST
R
U C
TI
O
N P
H
AS
IN
G
P
LA
N
IN
D
IV
ID
U
AL
P
H
AS
ES
.d w g
BI
D
D O
C U
M
EN
TS
GRAPHIC SCALE IN FEET
30 60 120
G453
205146
TBD
C O
N
ST
R U
C
TI
O N
P H
AS
IN
G P
LA
N
SU
BP
H
AS
E
NP
NM
NM
NOTES:
1. WORK SHALL BE SEQUENCED TO MINIMIZE THE IMPACT OF CONSTRUCTION ON
AIRPORT OPERATIONS AND EXISTING ROADWAYS.
2. FINAL PAVEMENT MARKINGS SHALL BE PERFORMED AFTER ALL PAVEMENT HAS CURED
FOR AT LEAST 30-DAYS.
3. ANY TEMPORARY PAVEMENT MARKING REQUIRED FOR PHASING SHALL BE
CONSIDERED INCIDENTAL TO LINE ITEM CONSTRUCTION SAFETY, PHASING, SECURITY,
AND MOT.
35 CALENDAR
DAYS
MON -SAT
7A - 6P
WORK ELEMENTS INCLUDEDFACILITY IMPACT
OR CLOSURE
WORK
HOURS DURATIONPHASEBID SCHEDULE
PHASE 2 EXCAVATION, GRADING, DRAINAGE, NEW APRON PAVEMENT,
AND AIRFIELD REFLECTORS.TAXILANE 7 AND TAXILANE G2BASE BID + ADDITIVE 1
LEGEND
TAXIWAY SAFETY AREA
CROSSING GUARD LOCATION
CG
LOW PROFILE
AIRFIELD BARRICADE
(NOT DRAWN TO SCALE),
SEE DETAIL 2, G004
TAXIWAY OBJECT FREE AREA
ACCESS HAUL ROUTE
PROJECT AREA LIMITS
AIRCRAFT TAXI ROUTES
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X
XX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
XX
X
X
AVAILABLE AIRCRAFT
PARKING
TAXILANE 3
PHASE 1A
TAXILANE 8
PHASE 1B
TAXILANE 6
TAXILANE 7
PHASE 2
TAXILANE 9
TAXILANE 3
TAXILANE 10
TA
XI
LA
N
E G
TA
XI
LA
N
E G
TA
XI
LA
N
E
TAXIWAY E
26'
TAXIWAY G
AI
R
C
EN
TE
R
A
PR
O N
E
XP
AN
SI
O N
AUGUST 2025
CH
AR
LO
TT
E
CO
UN
TY
AI
RP
OR
T
AU
TH
OR
IT
Y
PU
NT
A
GO
RD
A, F
LO
RI
DA
N o.
R
EV
IS
IO
N S
D
AT
E D
ES
C
R
IP
TI
O
N
BY
PR
O
JE
C
T N
AM
E
SH
EE
T
TI
TL
E
DESIGNED:
DRAWN:
CHECKED:
CCAA NO.:
JOB NO.:
DATE:
SHEET NO.:
B:
\T am pa
\P ro je ct s\ Pu nt a
G or da \2
6_ Ai r C en te r A pr on
E xp an si on \C
AD
D
-d w g\
_G
C
O N
ST
R
U C
TI
O
N P
H
AS
IN
G
P
LA
N
IN
D
IV
ID
U
AL
P
H
AS
ES
.d w g
BI
D
D O
C U
M
EN
TS
G454
205146
TBD
C O
N
ST
R U
C
TI
O N
P H
AS
IN
G P
LA
N
SU
BP
H
AS
E
NP
NM
NM
WORK ELEMENTS INCLUDEDFACILITY IMPACT
OR CLOSURE
WORK
HOURS DURATIONPHASEBID SCHEDULE
BASE BID + ADDITIVES 1-2 PHASE 3
MON -SAT
7A - 6P
42 CALENDAR
DAYS
EXCAVATION, GRADING, DRAINAGE, NEW APRON PAVEMENT,
AND AIRFIELD REFLECTORS.
TAXILANE G2 AND TAXILANE 9BASE BID + ADDITIVES 1-2
GRAPHIC SCALE IN FEET
LEGEND
TAXIWAY SAFETY AREA
CROSSING GUARD LOCATION
CG
LOW PROFILE
AIRFIELD BARRICADE
(NOT DRAWN TO SCALE),
SEE DETAIL 2, G004
TAXIWAY OBJECT FREE AREA
1206030ACCESS HAUL ROUTE
PROJECT AREA LIMITS
AIRCRAFT TAXI ROUTES
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X
XX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
XX
X
X
AVAILABLE AIRCRAFT
PARKING
TAXILANE 3
PHASE 1A
TAXILANE 8
PHASE 1B
TAXILANE 6
TAXILANE 7
PHASE 2
TAXILANE 9
TAXILANE 3
TAXILANE 10
PHASE 4A
TA
XI
LA
N
E G
TA
XI
LA
N
E G
TA
XI
LA
N
E
TAXIWAY E
6'
TAXIWAY G
AI
R
C
EN
TE
R
A
PR
O N
E
XP
AN
SI
O N
AUGUST 2025
CH
AR
LO
TT
E
CO
UN
TY
AI
RP
OR
T
AU
TH
OR
IT
Y
PU
NT
A
GO
RD
A, F
LO
RI
DA
N o.
R
EV
IS
IO
N S
D
AT
E D
ES
C
R
IP
TI
O
N
BY
PR
O
JE
C
T N
AM
E
SH
EE
T
TI
TL
E
DESIGNED:
DRAWN:
CHECKED:
CCAA NO.:
JOB NO.:
DATE:
SHEET NO.:
B:
\T am pa
\P ro je ct s\ Pu nt a
G or da \2
6_ Ai r C en te r A pr on
E xp an si on \C
AD
D
-d w g\
_G
C
O N
ST
R
U C
TI
O
N P
H
AS
IN
G
P
LA
N
IN
D
IV
ID
U
AL
P
H
AS
ES
.d w g
BI
D
D O
C U
M
EN
TS
G455
205146
TBD
C O
N
ST
R U
C
TI
O N
P H
AS
IN
G P
LA
N
SU
BP
H
AS
E
4A
NP
NM
NM
WORK ELEMENTS INCLUDEDFACILITY IMPACT
OR CLOSURE
WORK
HOURS DURATIONPHASEBID SCHEDULE
BASE BID + ADDITIVES 1-3 PHASE 4A MON -SAT
9P - 6A
28 CALENDAR
DAYS
EXCAVATION, GRADING, DRAINAGE, FIRST 2 INCH LIFT OF
CONNECTOR PAVEMENT, AND AIRFIELD ELECTRICAL.
TAXIWAY GOLF (NIGHTLY
CLOSURE AND REOPENING),
TAXILANE 10
GRAPHIC SCALE IN FEET
LEGEND
TAXIWAY SAFETY AREA
CROSSING GUARD LOCATION
CG
LOW PROFILE
AIRFIELD BARRICADE
(NOT DRAWN TO SCALE),
SEE DETAIL 2, G004
TAXIWAY OBJECT FREE AREA
1206030
NOTES:
1. CONTRACTOR SHALL ADD BARRICADES TO THE EASTERN INTERSECTION ON
TAXIWAY G.
2. PRIOR TO REOPENING TAXIWAY G, AIRFIELD BARRICADES ARE TO BE PICKED UP
AT THE END OF EACH SHIFT. ADDITIONALLY, WORK AREA MUST BE GRADED TO
COMPLIANCE.
3. WORK NEAR TAXILANE 5 SHALL BE PERFORMED ON A PULL-BACK BASIS TO GIVE
RIGHT OF WAY TO ALL AIRCRAFT.
ACCESS HAUL ROUTE
PROJECT AREA LIMITS
AIRCRAFT TAXI ROUTES
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X
XX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
XX
X
X
112.5'
62'
70'
TAXILANE 3
PHASE 1A
TAXILANE 8
PHASE 1B
TAXILANE 6
TAXILANE 7
PHASE 2
TAXILANE 9
TAXILANE 3
TAXILANE 10
PHASE 4A
PHASE 4B
TA
XI
LA
N
E G
TA
XI
LA
N
E G
TA
XI
LA
N
E
TAXIWAY E
47'
TAXIWAY G
AI
R
C
EN
TE
R
A
PR
O N
E
XP
AN
SI
O N
AUGUST 2025
CH
AR
LO
TT
E
CO
UN
TY
AI
RP
OR
T
AU
TH
OR
IT
Y
PU
NT
A
GO
RD
A, F
LO
RI
DA
N o.
R
EV
IS
IO
N S
D
AT
E D
ES
C
R
IP
TI
O
N
BY
PR
O
JE
C
T N
AM
E
SH
EE
T
TI
TL
E
DESIGNED:
DRAWN:
CHECKED:
CCAA NO.:
JOB NO.:
DATE:
SHEET NO.:
B:
\T am pa
\P ro je ct s\ Pu nt a
G or da \2
6_ Ai r C en te r A pr on
E xp an si on \C
AD
D
-d w g\
_G
C
O N
ST
R
U C
TI
O
N P
H
AS
IN
G
P
LA
N
IN
D
IV
ID
U
AL
P
H
AS
ES
.d w g
BI
D
D O
C U
M
EN
TS
G456
205146
TBD
C O
N
ST
R U
C
TI
O N
P H
AS
IN
G P
LA
N
SU
BP
H
AS
E
4B
NP
NM
NM
WORK ELEMENTS INCLUDEDFACILITY IMPACT
OR CLOSURE
WORK
HOURS DURATIONPHASEBID SCHEDULE
BASE BID + ADDITIVES 1-3
28 CALENDAR
DAYSPHASE 4B MON -SAT
7A - 6P
EXCAVATION, GRADING, DRAINAGE, FIRST 2 INCH LIFT OF
CONNECTOR PAVEMENT, AND AIRFIELD ELECTRICAL.
TAXILANE 10
GRAPHIC SCALE IN FEET
LEGEND
TAXIWAY SAFETY AREA
CROSSING GUARD LOCATION
CG
LOW PROFILE
AIRFIELD BARRICADE
(NOT DRAWN TO SCALE),
SEE DETAIL 2, G004
TAXIWAY OBJECT FREE AREA
1206030ACCESS HAUL ROUTE
PROJECT AREA LIMITS
AIRCRAFT TAXI ROUTES
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X
XX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
XX
X
X
TAXILANE 3
PHASE 1A
TAXILANE 8
PHASE 1B
TAXILANE 6
TAXILANE 7
PHASE 2
TAXILANE 9
TAXILANE 3
TAXILANE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .