AHEC-26702-D Sharp Equipment Addendum 1.pdf

PDF 20 KB Posted

Attached to
Sharp industries equipment
Solicitation number
DQ1 GMAA 2026000422 2
Issued by
Denver County, Denver City, Colorado

About this file

This is an Addendum 1 Questions and Answers document for AHEC-26702-D, a Sharp Industries equipment procurement in Colorado. The addendum clarifies the scope of work regarding installation responsibilities for the equipment being procured. Specifically, the document addresses a bidder question concerning whether the installation line item refers to equipment installation on campus or the installation of specialized controls (DRO and G-2 control systems) onto the equipment itself.

The addendum establishes that the installation line item covers the placement and setup of equipment on the Colorado campus, while the DRO and G-2 control installations are to be completed by Sharp Industries at their factory prior to delivery. This clarification delineates the responsibilities between the equipment manufacturer and the institution, with Sharp Industries responsible for factory-level control system installations and the purchasing agency responsible for on-campus equipment installation and integration.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AHEC-26702-D Sharp Industries Equipment Addendum 1 Questions and Answers Document

Q1: For the installation line item, do you mean the equipment installed into your facility or do you mean the install of the DRO and G-2 control, etc on to the equipment?

A1: The installation line item is for installation of the equipment on campus. The DRO and

G-2 control should be installed at the factory by Sharp Industries.

File details come from the government source that posted it. Updated .