This document is an Addendum No. 1 issued by the State of Maryland Department of General Services for the Design, Construction & Energy Project No. AH-000-240-003 regarding the Loading Dock Entrance Enhancement at the Maryland School for the Deaf in Columbia, MD. The addendum clarifies and changes the Invitation to Bid (ITB) documents, including a pre-bid sign-in sheet, pre-bid meeting minutes, changes to specifications, a wall picture, and contractors' questions and answers. The project involves removing the existing curb and topsoil system, including the sidewalk, and providing and installing a new concrete apron system with bollards and associated components in the rear of the Steiner building at the Maryland School for the Deaf in Ellicott City, MD.
The addendum addresses several contractor questions regarding the project, including the lack of architectural drawings, the scope of work for sprinkler, piping, and electrical, the damaged masonry wall that needs to be removed, the small sidewalk that is to be removed, and the building's damaged side panel that does not need repair or replacement. The addendum also clarifies that there is no painting in the scope of work. All other terms, conditions, and specifications remain unchanged.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 1
April 18, 2024
STATE OF MARYLAND
DEPARTMENT OF GENERAL SERVICES
Design, Construction & Energy
PROJECT NO. AH-000-240-003
Loading Dock Entrance Enhancement
Maryland School for the deaf
Columbia, Md.
TO ALL PROSPECTIVE BIDDERS: This Addendum is issued to clarify, add to, delete from, correct and/or change the Invitation to Bid (ITB) documents to the extent indicated and is hereby made a part of the said (ITB) documents of which the contract will be based. By submitting a bid for this solicitation, you acknowledge receipt of this addendum. All questions must be in writing and addressed to Lakecia Dingle at lakecia.dingle@maryland.gov and Samantha Delp at samantha.delp@maryland.gov
This Addendum includes the following:
1. Pre -Bid Sign-in Sheet:
2. Pre-Bid Meeting Minutes:
3. Changes to Specifications:
4. Wall Pic:
5. Contractors Questions and Answers:
Contractors Question: Is there any architectural drawing for this Bid.
Project Answer: No architectural drawings are provided for this project.
Contractors Question: There is a note for sprinkle, piping, electrical what is the scope for that?
Project Answer: There is no sprinkler, piping, or electrical in this scope.
Contractors Questions: There is a damaged masonry wall on loading dock is that to be repaired or replaced?
Project Answer: There is a damaged wall that needs to be removed. Addendum #1 addresses that scope.
Contractors Question: I saw the small sidewalk up to building – is that part of the 37 lf ft of curb system repair?
Project Answer: The sidewalk is to be removed.
Contractors Question: There is damaged side panel of building- is that to be included to be repaired?
Project Answer: There is no repair or replacement of damaged building panels.
Contractors Question: Does the building front need to be painted?
Project Answer: There is no painting in the scope of work.
All other terms, conditions and specifications remain unchanged.
END OF ADDENDUM NO. 1
Issued by: Wayne Howell
Department of General Services
State of Maryland mailto:lakecia.dingle@maryland.gov mailto:samantha.delp@maryland.gov%20%20d
301 West Preston St.
Baltimore, MD 21201
Design, Construction & Energy Division
Project Manager: Wayne Howell
File details come from the government source that posted it. Updated .