Harmon_Co_Westside_Bridge_2015_Drawings.pdf

PDF 180 KB Posted

Attached to
EWP Streambank Stabilization Measures, Harmon County, OK Federal contract opportunity
Solicitation number
AG-SPEC-S-16-0014
Issued by
Department of Agriculture National Resources Conservation Service Headquarters

About this file

Harmon Co Westside Bridge 2015 Drawings

View the file

Other files for this federal contract opportunity

Other files attached to EWP Streambank Stabilization Measures, Harmon County, OK, newest first.
File Type Posted
AG-SPEC-S-16-0014_Site_Showing_Sign_In_Sheet.pdf PDF
AG-SPEC-S-16-0014_Amendment_00001.pdf PDF
Harmon_Co_Westside_Bridge_2015_Maps.pdf PDF
AG-SPEC-S-16-0014.pdf PDF
Construction_and_Material_Specifications.pdf PDF
Wage_Determination_OK160036_01_08_2016__OK36.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

charlie.colvin Text Box

Charlie.Colvin Line

Charlie.Colvin Text Box

PLAN VIEW

NOT TO SCALE

Charlie.Colvin Text Box COUNTY ROAD (Westside Road)

Charlie.Colvin Text Box

WESTSIDE BRIDGE

HARMON COUNTY, OK

Charlie.Colvin Text Box

CGC

Charlie.Colvin Text Box 10/22/15

Charlie.Colvin Text Box

Charlie.Colvin Text Box

Charlie.Colvin Line

Charlie.Colvin Line

Charlie.Colvin Line

Charlie.Colvin Polygon

Charlie.Colvin Polygon

Charlie.Colvin Line

Charlie.Colvin Line

Charlie.Colvin Callout Riprap

Charlie.Colvin Callout Riprap

Charlie.Colvin Callout Riprap to extend under bridge deck. Hand placing may be necessary

Charlie.Colvin Text Box 110' (Approx.)

Charlie.Colvin Line

Charlie.Colvin Line

Charlie.Colvin Text Box 160' (Approx)

Charlie.Colvin Line

Charlie.Colvin Line

Charlie.Colvin Polygonal Line

60.00

65.00

70.00

75.00

80.00

85.00

90.00

95.00

100.00

105.00

0.00 10.00 20.00 30.00 40.00 .00

Cross-Section View - Reach 1 Oklahoma EWP

Charlie Colvin 10/22/15

All cut and fill required for subgrade preparation is subsidiary to the installation of riprap bedding.

EARTHWORK QUANTITIES*

Earthfill: ____________ CY

Excavation: ____________ CY

Waste: ____________ CY

*These quantities are estimates only and will not be measured.

Westside Bridge Harmon Co, OK

Charlie.Colvin Line

Charlie.Colvin Rectangle

Charlie.Colvin Polygon

Charlie.Colvin Line

Charlie.Colvin Line

Charlie.Colvin Line

Charlie.Colvin Text Box 4'

Charlie.Colvin Text Box 8'

Charlie.Colvin Callout Fill Area

Charlie.Colvin Callout 24" Thick Riprap

Charlie.Colvin Callout Existing Ground

Charlie.Colvin Line

Charlie.Colvin Line

Charlie.Colvin Line

Charlie.Colvin Line

Charlie.Colvin Line

Charlie.Colvin Line

Charlie.Colvin Line

Charlie.Colvin Line

Charlie.Colvin Text Box

Charlie.Colvin Text Box

Charlie.Colvin Text Box

Charlie.Colvin Line

Charlie.Colvin Text Box 2:1

Charlie.Colvin Line

Charlie.Colvin Text Box Channel

Charlie.Colvin Text Box Sheet 1 of 3

Charlie.Colvin Text Box

SHEET 1 OF 4

Charlie.Colvin Text Box Sec. 3&4 - T2N - R19W

Charlie.Colvin Line

Charlie.Colvin Line

Charlie.Colvin Callout 6" Thick Bedding

Charlie.Colvin Text Box

TYPICAL SECTION

NOT TO SCALE

WESTSIDE BRIDGE

HARMON COUNTY, OK

Section 4 & NW 1/4 Section 3 of - T2N -

24''

160 ft

7 ft

6'' Thick Bedding

4 ft

8 ft

Tons 7 ft

Tons Tons

Total Bedding =

Slope & Footing Riprap = 563

16Keyway Riprap =

Tons 3' 14 ft 0 ftTotal Riprap = 579

Keyway Detail

Riprap Thick

24''

Charlie.Colvin Text Box

SHEET 2 OF 4

Charlie.Colvin Text Box

LEFT BANK

(LOOKING UPSTREAM)

WESTSIDE BRIDGE

HARMON COUNTY, OK

4 Section 4 & NW 1/4 Section 3 of - T2N -

24''

110 ft

10 ft

6'' Thick Bedding

4 ft

8 ft

Tons 10 ft

Tons Tons

Total Bedding =

Slope & Footing Riprap = Keyway Riprap =

0 ft 20 ft 512 TonsTotal Riprap =3'

Keyway Detail

Riprap

Thick

24''

Charlie.Colvin Text Box

SHEET 3 OF 4

Charlie.Colvin Text Box

RIGHT BANK

LOOKING UPSTREAM

Plan View
Riprap Section
Rock Sketch