Construction_and_Material_Specifications.pdf

PDF 184 KB Posted

Attached to
EWP Streambank Stabilization Measures, Harmon County, OK Federal contract opportunity
Solicitation number
AG-SPEC-S-16-0014
Issued by
Department of Agriculture National Resources Conservation Service Headquarters

About this file

Contractor Construction and Material Specifications

View the file

Other files for this federal contract opportunity

Other files attached to EWP Streambank Stabilization Measures, Harmon County, OK, newest first.
File Type Posted
AG-SPEC-S-16-0014_Site_Showing_Sign_In_Sheet.pdf PDF
AG-SPEC-S-16-0014_Amendment_00001.pdf PDF
AG-SPEC-S-16-0014.pdf PDF
Harmon_Co_Westside_Bridge_2015_Drawings.pdf PDF
Harmon_Co_Westside_Bridge_2015_Maps.pdf PDF
Wage_Determination_OK160036_01_08_2016__OK36.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WESTSIDE BRIDGE

HARMON COUNTY

Specifications Index

Construction Specifications

200E Mobilization and Demobilization 262E Rock Riprap Installed

Material Specifications

263E Rock for Riprap

CONSTRUCTION SPECIFICATION

200E. MOBILIZATION & DEMOBILIZATION

1. SCOPE

The work shall consist of the mobilization and demobilization of the contractor's forces and equipment necessary for performing the work required under the contract.

2. WORK ITEMS

Mobilization and demobilization shall consist of the following:

a. Transportation of personnel and equipment to and from the site.

b. Establishment and disassembly/removal of signage, storage facilities, sanitary facilities, utility service, and other necessary facilities at the site not covered in specific line items.

c. Other items as specified in Section 4 of this specification.

3. MEASUREMENT AND PAYMENT

For items of work for which specific lump sum prices are established in the contract, the quantity of mobilization will not be measured for payment.

Progress payments will be made only to the extent supported by invoice. If the total of such payments is less than the contract lump sum for mobilization, the unpaid balance will be included in the final contract payment. Total payment will be the lump sum contract price for mobilization, regardless of actual cost to the contractor.

Payment will not be made under this item for the purchase costs of materials having a residual value.

Payment of the lump sum contract price for mobilization will constitute full compensation for all labor, materials, equipment, and all other items necessary and incidental to completion of the work.

Compensation for any item of work described in the contract but not listed in the schedule of work will be included in the payment for the item of work to which it is made subsidiary. Such items and the items to which they are made subsidiary are identified in Section 4 of this specification.

NRCS-OKLA 200E-1 July 2010

NRCS-OKLA 200E-2 October, 2015 West Side Bridge

Harmon County, OK

4. ITEMS OF WORK AND CONSTRUCTION DETAILS

Items of work to be performed in conformance with this specification and the construction details are:

a. Mobilization

(1) The work shall consist of the mobilization and demobilization of the contractor’s forces and equipment necessary for performing the work required under the contract.

(2) The entire job site shall be considered a hardhat area. All persons including operators inside an enclosed cab are required to wear a hardhat properly labeled with a minimum certification of ANSI Z89.1 1997 Class G or E Type I or II and less than five years old. Signs at least 3 feet by 4 feet in size with red letters at least 6 inches high and a white background shall be erected at all access points. The signs shall read “CONSTRUCTION AREA - HARDHATS REQUIRED BEYOND THIS POINT”. Variances to the exact signage requirements listed above may be approved by the Government.

(3) This item shall also include providing an individual on the work crew who has a current first aid certificate from the Mine Safety and Health Administration, American Red Cross, or other state-approved organization.

(4) This item shall also include providing one moisture-proof, dust-tight, 16-unit American Red Cross approved first aid kit for every 25 employees. These first aid kits must be located in accessible, well-identified locations at the job site and be replenished as contents are used or become ineffective or outdated.

(5) This item shall also include providing a chemical toilet (port-a-potty) on each job site.

(6) To minimize the establishment of the Imported Fire Ant, Solenopsis invicta, Federal Regulation 7 CFR 301.81 and Oklahoma Administrative Rule OAC 35:30-13-3 have established a quarantine to regulate the movement of soil, hay or straw, plants with soil attached (including grass sod), and soil-moving equipment. All soil-moving equipment shall be properly washed and/or otherwise cleaned of all soil material before mobilizing to and demobilizing from the job site(s). Equipment cleaning is not required for site-to-site mobilization within a County on contracts which contain more than one job site. The movement of other regulated articles listed above may require an authenticated certificate or permit.

(7) The contractor shall be responsible for identifying the location of utilities prior to construction activities and shall notify the Oklahoma One-Call System at least 48 hours prior to starting work at the project site. If any unidentified utilities are encountered after work is initiated, the contractor shall discontinue work and notify the Government officer immediately.

(8) Construction activities shall be scheduled such that the Contractor will mobilize from site-to-site consecutively. Concurrent work on more than one site at a time will not be allowed.

NRCS-OKLA 200E-3 October, 2015 Westside Bridge

Harmon County, OK

(9) Payment will be made as the work proceeds, after presentation of paid invoices and/or documentation of direct costs by the Contractor showing specific mobilization and demobilization costs and supporting evidence of the charges of suppliers, subcontractors, and others. When the total of such payments is less than the lump sum contract, the balance remaining will be included in the final contract payment. Payment of the lump sum contract price for mobilization and demobilization will constitute full compensation for the completion of the work.

NRCS-OKLA 262E-1 June 2010

CONSTRUCTION SPECIFICATION

262E. ROCK RIPRAP INSTALLED

1. SCOPE

This work shall consist of furnishing and installing rock riprap as detailed in this specification and as shown on the drawings, including filter, bedding, or crushed rock as specified.

2. MATERIALS

Rock riprap, filter, bedding, and crushed rock materials shall conform to Material Specification 263E, Rock For Riprap.

3. SUBGRADE PREPARATION

The subgrade surfaces on which the rock riprap, filter, or bedding is to be placed shall be cut or filled and graded to the lines and grades shown on the drawings. When fill to subgrade is required, material shall be compacted in place to provide a firm surface for material placement.

Rock riprap, filter, or bedding shall not be placed until preparation for that area is completed and the subgrade surfaces have been inspected and approved.

4. EQUIPMENT PLACED ROCK RIPRAP

The rock riprap shall be placed by equipment on the surfaces and to the depths specified. The rock riprap shall be installed to the full course thickness in one operation and in such a manner as to avoid serious displacement of the underlying materials. The rock for riprap shall be delivered and placed in a manner that will ensure that the riprap in place shall be reasonably homogeneous with the larger rocks uniformly distributed and firmly in contact one to another with the smaller rocks and spalls filling the voids between the larger rocks.

Rock riprap shall be placed in a manner to prevent damage to structures. Hand placing will be required as necessary to prevent damage to any new and existing structures.

5. FILTER OR BEDDING

When the contract specifies filter or bedding beneath the rock riprap, the designated material shall be placed on the prepared subgrade surface as specified.

Compaction of filter or bedding aggregate will not be required, but the surface of such material shall be finished reasonably smooth and free of mounds, dips, or windrows.

NRCS-OKLA 262E-2 June 2010

6. CRUSHED ROCK

When the contract specifies crushed rock for the purpose of stabilizing wet foundation conditions, the Job Coordinator shall arrange for the placement of the material after consultation with the Government.

Compaction of the crushed rock will be with two complete passes of the equipment.

The surface of such material shall be finished reasonably smooth and free of mounds, dips, or windrows.

7. JOB COORDINATOR

The contractor shall provide a job coordinator to be available on each site at all times while work is in progress. The job coordinator shall coordinate the delivery and stockpile of materials, direct the contractor’s work operations, and coordinate activities with the Government and project sponsors. The job coordinator shall have a cellular telephone or other suitable method of communication at the job site to coordinate activities with the quarry, truckers, personnel, and emergency services, if needed. (If the contractor chooses to work on multiple sites concurrently, a job coordinator is required for each site.)

The job coordinator will NOT operate equipment.

8. MEASUREMENT AND PAYMENT

For items of work for which specific unit prices are established in the contract, the quantity of each type of rock riprap delivered and placed within the specified limits will be computed to the nearest 0.1 ton by actual weight. For each load of rock riprap placed as specified, the Contractor shall furnish to the Government a statement-of-delivery ticket showing the weight to at least the nearest 0.1 ton.

The quantity of each type of filter or bedding aggregate delivered and placed within the specified limits will be computed to the nearest 0.1 ton by actual weight. For each load of filter or bedding aggregate, the Contractor shall furnish to the Government a statement-of-delivery ticket showing the weight to at least the nearest

0.1 ton.

The quantity of crushed rock delivered and placed in accordance with this specification will be computed to the nearest 0.1 ton by actual weight. For each load of crushed rock, the Contractor shall furnish to the Government a statement-of-delivery ticket showing the weight to at least the nearest 0.1 ton.

For all materials - If delivery tickets show weight to the nearest 0.01 ton, the actual weights shown will be added together and rounded to the nearest 0.1 ton at the conclusion of the project.

NRCS-OKLA 262E-3 June 2010

Payment will be made at the contract unit price for each type of rock riprap, filter, bedding, or crushed rock. Such payment will be considered full compensation for completion of the work.

NRCS-OKLA 262E-4 October 2015

Harmon County, OK

9. ITEMS OF WORK AND CONSTRUCTION DETAILS

Unloading of riprap or bedding materials from trailers via belly-dump mechanisms will not be allowed.

The Sponsor will provide one front-end loader (w/operator) to assist with rock placement and one dozer (w/operator) to assist with site smoothing, leveling, and stock pile control. The Job Coordinator will be required to coordinate contractor activities with the Sponsor to allow for efficient management of the project. No additional equitable adjustment in contract price or performance time will be allowed due to failure of contractor to effectively coordinate such activity. Use of the sponsor's equipment by the contractor is not allowed.

Items of work to be performed in conformance with this specification and the construction details are:

a. Rock Riprap, Installed

(1) This item shall consist of furnishing and installing rock riprap on the slopes to a thickness of 24” and in the keyway footings to the extent shown on the drawings and as described in this specification. Upstream and downstream cutoff trenches will be installed at locations and to the extents marked in the field by the Government. All excavation of keyway footings and cutoff trenches shall be included in this line item.

(2) Quantities in the schedule of work are estimates. The Job Coordinator shall coordinate activities with the Government to ensure that the proper quantity of riprap needed to complete the work is delivered to the site.

(3) The Job Coordinator will be responsible for taking weight delivery tickets and making copies available to the Government. The Job Coordinator will also keep daily totals and running totals of all rock riprap delivered to the site.

(4) Measurement and payment for rock riprap installed and meeting specifications will be to the nearest 0.1 ton based upon weight delivery tickets.

b. Riprap Bedding, Installed

(1) This item shall consist of furnishing and installing riprap bedding to a 6” thickness on the slopes to the extent shown on the drawings and as described in this specification. All cut and fill required to achieve the specified bank slope and prepare the subgrade for placement of rock as shown on the drawings shall be included in this line item.

NRCS-OKLA 262E-5 October 2015

Harmon County, OK

(2) Bedding will be placed on the slope as shown as work proceeds and covered with rock riprap at the conclusion of each work day.

(3) Quantities in the schedule of work are estimates. The Job Coordinator shall coordinate activities with the Government to ensure that the proper quantity of riprap bedding needed to complete the work is delivered to the site.

(4) The Job Coordinator will be responsible for taking weight delivery tickets and making copies available to the Government. The Job Coordinator will also keep daily totals and running totals of riprap bedding delivered to the site.

(5) Measurement and payment for riprap bedding installed and meeting specifications will be to the nearest 0.1 ton based upon weight delivery tickets.

c. Crushed Rock, Installed

(1) This item shall consist of furnishing crushed rock to the site and dumping it as directed by the Engineer for the purpose of supporting the rock dumping area.

(2) Quantities in the bid schedule are estimated quantities. The Job Coordinator shall coordinate activities with the Contracting Officer’s Representative to ensure that the proper quantity of crushed rock needed to complete the work is delivered to the site. No crushed rock shall be delivered to the site until the Contracting Officers Representative verifies that foundation conditions warrant the use of such material.

(3) The Job Coordinator will be responsible for making delivery ticket copies available to the Government Inspector. The Job Coordinator will also keep a running total of crushed rock delivered to the site.

(4) Measurement and payment for crushed rock dumped on site shall be to the nearest 0.1 ton based upon weight delivery tickets.

NRCS-OKLA 263E-1 June 2010

MATERIAL SPECIFICATION

263E. ROCK FOR RIPRAP

1. SCOPE

This specification covers the quality and gradation of rock and aggregate to be used on this project.

2. QUALITY

Individual rock fragments shall be dense, sound and free from cracks, seams and other defects conducive to accelerated weathering. The rock fragments shall be angular to subrounded in shape. The least dimension of an individual rock fragment shall be not less than one-third the greatest dimension of the fragment.(Less than 5% of the individual rocks larger than five pounds shall be flat or elongated to the extent that they will not meet this criteria.)

Loads that arrive on the job that appear to have a significant deviation from the specification, as determined by a cursory inspection by the Government, will be rejected and the supplier will remove the questionable material. If the material is unloaded on the site and the Government determines there is a significant deviation from the specification, the weight ticket will be noted as objectionable and can be handled one of two ways as determined by the supplier's Job Coordinator:

a. The supplier can reload the material and remove it from the job. No compensation will be made for the material.

b. The Government can note on the ticket that the material does not meet specifications, the reason it does not meet specifications in his opinion, and the weight of the questionable load will be reduced by 50%. The material will then be utilized in some form or fashion on the job.

The source of rock for riprap must be approved by the Government and material shall meet or exceed the criteria of NRCS Rock Type 3, which are detailed below:

Bulk specific gravity (saturated surface-dry basis)—Not less than 2.3 when tested in accordance with ASTM C 127 on samples prepared as described for soundness testing.

Absorption—Not more than 4 percent when tested in accordance with ASTM C 127 on samples prepared as described for soundness testing.

NRCS-OKLA 263E-2 June 2010

Soundness—The weight loss in 5 cycles shall be not less than 20 percent when sodium sulfate is used or more than 25 percent when magnesium sulfate is used.

In lieu of the above criteria, rock sources which possess a current Oklahoma Department of Transportation Stone for Riprap certification may be accepted.

3. GRADATION

a. Riprap-Bedding Gradation - (Approximate)

Size % Passing 4" 100 2" 60-90 1" 40-70 #4 0-15

b. Riprap Gradation - (Approximate)

Riprap Max Max Avg Avg Not More than 20% Thickness Wt Size Wt Size Lighter Smaller (inches) (lbs) (in) (lbs) (in) Than Than

12 150 12 30-50 8-9 20 lbs. 6 in.

18 350 18 70-125 10-12 30 lbs. 8 in.

24 1000 24 225-400 15-18 40 lbs. 9 in.

30 1000 24 225-400 15-18 40 lbs. 9 in.

36 2000 30 450-800 19-23 80 lbs. 10 in.

c. Surge

Rock Material - Maximum Size - 6" <10% (by weight) smaller than 1/2"

d. Crushed Rock

1-1/2" Crusher Run

1_Specification Index
1a_200E Mobilization
CONSTRUCTION SPECIFICATION 200E. MOBILIZATION & DEMOBILIZATION
2. WORK ITEMS
3. MEASUREMENT AND PAYMENT
2_200E IOW
10_262E Rock Riprap Installed
CONSTRUCTION SPECIFICATION 262E. ROCK RIPRAP INSTALLED
2. MATERIALS
3. SUBGRADE PREPARATION
4. EQUIPMENT PLACED ROCK RIPRAP
5. FILTER OR BEDDING
6. CRUSHED ROCK
7. JOB COORDINATOR
8. MEASUREMENT AND PAYMENT
11_262E IOW
a. Rock Riprap, Installed
b. Riprap Bedding, Installed
c. Crushed Rock, Installed

12_263E Rock for Riprap

File details come from the government source that posted it. Updated .