Revised_Sch_of_Items.doc
DOC document 64 KB Posted
- Attached to
- GREENVILLE BARRACKS - RECONSTRUCTION, DEMOLITION AND REPLACEMENT OF SEVERAL BUILDING COMPONENTS
- Solicitation number
- AG-9JGP-S-16-0044
About this file
Revised Schedule of Items
View the file
Other files
| File | Type | Posted |
|---|---|---|
| m0d2.pdf | ||
| COMBINED_SPECIFICATIONS_3_29_2016.pdf | ||
| sf30greenville.pdf | ||
| COMBINED_SPECIFICATIONS3_24_2016.pdf | ||
| Barracks_Drawings.pdf | ||
| COMB_SPECS_Summary_of_work.pdf | ||
| Fire_Plan.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART 1, SCHEDULE OF ITEMS
SECTION B
SUPPLIES OR SERVICES, AND PRICES/COSTS
| PROJECT |
| Greenville Barracks Mudsill Reconstruction |
| UNIT |
| Plumas National Forest |
| SOL. # |
| AG-9JGP-S-16-0044 |
METHOD OF
| ITEM NO. |
| DESCRIPTION |
| MEASURE |
| UNIT |
| QUANTITY |
| UNIT PRICE |
| TOTAL PRICE |
| 01010(01) |
| Mobilization (Including bonds, if required) |
| LSQ |
| LS |
| 1. |
| $ __________ |
| $________________ |
| 01010(02) |
| Pest Abatement |
| LSQ |
| LS |
| 1. |
| $ __________ |
| $________________ |
| 01010(03) |
| Shop Drawings |
| LSQ |
| LS |
| 1. |
| $ __________ |
| $________________ |
| 06100(s) |
| Rough Carpentry (Removal, Replacement, |
Repair of all elements, EXCEPT FLOOR JOISTS)
| AQ |
| LF |
| 56. |
| $___________ |
| $________________ |
| 06100(b) |
| Rough Carpentry (Repair of Floor Joists only) |
| AQ |
| EA |
| 5. |
| $___________ |
| $________________ |
| 15400 |
| Building Utilities |
| LSQ |
| LS |
| 1. |
| $___________ |
| $________________ |
| TOTAL |
| $_____________________ |
| NOTES: |
| 1) Respondent must price each item to be considered for award. |
2) Responses for quantities less than those listed may be rejected.
3) If award is made in excess of $30,000, bonds will be required. (See Section I.)
4) If response is greater than $150,000, include bid bond =20% of the total price.
(5) Following are abbreviation definitions from FP-03, Section 109 that may appear in the "Unit" column of the Schedule of Items; AC=Acre, CQ=Contract Quanitity, CY= Cubic Yard, EA=Each, GAL=Gallon, HR=Hour, LF=Linear Foot, LS=Lump Sum, MI=Mile, LB=Pound, SF=Square Foot, SY=Square yard, ST=Station, TON=Ton. CQ and LS will be measured and paid as stated in FP-03, Section 109-02. All other Units will be paid according to FAR clause 52.211-18, Variation in Estimated Quanitity.
PRICE SUBMITTED BY:
Signature
Phone
Vendor Name
FAX
Address