Revised_Sch_of_Items.doc

DOC document 64 KB Posted

Attached to
GREENVILLE BARRACKS - RECONSTRUCTION, DEMOLITION AND REPLACEMENT OF SEVERAL BUILDING COMPONENTS
Solicitation number
AG-9JGP-S-16-0044
Issued by

About this file

Revised Schedule of Items

View the file

Other files

File Type Posted
m0d2.pdf PDF
COMBINED_SPECIFICATIONS_3_29_2016.pdf PDF
sf30greenville.pdf PDF
COMBINED_SPECIFICATIONS3_24_2016.pdf PDF
Barracks_Drawings.pdf PDF
COMB_SPECS_Summary_of_work.pdf PDF
Fire_Plan.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART 1, SCHEDULE OF ITEMS

SECTION B

SUPPLIES OR SERVICES, AND PRICES/COSTS

PROJECT
Greenville Barracks Mudsill Reconstruction
UNIT
Plumas National Forest
SOL. #
AG-9JGP-S-16-0044

METHOD OF

ITEM NO.
DESCRIPTION
MEASURE
UNIT
QUANTITY
UNIT PRICE
TOTAL PRICE
01010(01)
Mobilization (Including bonds, if required)
LSQ
LS
1.
$ __________
$________________
01010(02)
Pest Abatement
LSQ
LS
1.
$ __________
$________________
01010(03)
Shop Drawings
LSQ
LS
1.
$ __________
$________________
06100(s)
Rough Carpentry (Removal, Replacement,

Repair of all elements, EXCEPT FLOOR JOISTS)

AQ
LF
56.
$___________
$________________
06100(b)
Rough Carpentry (Repair of Floor Joists only)
AQ
EA
5.
$___________
$________________
15400
Building Utilities
LSQ
LS
1.
$___________
$________________
TOTAL
$_____________________
NOTES:
1) Respondent must price each item to be considered for award.

2) Responses for quantities less than those listed may be rejected.

3) If award is made in excess of $30,000, bonds will be required. (See Section I.)

4) If response is greater than $150,000, include bid bond =20% of the total price.

(5) Following are abbreviation definitions from FP-03, Section 109 that may appear in the "Unit" column of the Schedule of Items; AC=Acre, CQ=Contract Quanitity, CY= Cubic Yard, EA=Each, GAL=Gallon, HR=Hour, LF=Linear Foot, LS=Lump Sum, MI=Mile, LB=Pound, SF=Square Foot, SY=Square yard, ST=Station, TON=Ton. CQ and LS will be measured and paid as stated in FP-03, Section 109-02. All other Units will be paid according to FAR clause 52.211-18, Variation in Estimated Quanitity.

PRICE SUBMITTED BY:

Signature

Phone

Vendor Name

FAX

Address

Email

File details come from the government source that posted it. Updated .