COMBINED_SPECIFICATIONS3_24_2016.pdf

PDF 580 KB Posted

Attached to
GREENVILLE BARRACKS - RECONSTRUCTION, DEMOLITION AND REPLACEMENT OF SEVERAL BUILDING COMPONENTS
Solicitation number
AG-9JGP-S-16-0044
Issued by

About this file

Revised Comb_Specs

View the file

Other files

File Type Posted
m0d2.pdf PDF
COMBINED_SPECIFICATIONS_3_29_2016.pdf PDF
sf30greenville.pdf PDF
Revised_Sch_of_Items.doc DOC document
Barracks_Drawings.pdf PDF
COMB_SPECS_Summary_of_work.pdf PDF
Fire_Plan.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GREENVILLE BARRACKS 3/25/16

pg. 1

SECTION 01010

SUMMARY OF WORK

PART 1 - GENERAL

1.01 PROJECT DESCRIPTION

A. This project consists of removal and replacement of siding, insulation, building paper, flashing, and mudsill of one portion of a barracks. Remove and replace only the minimum amount of each of these items in order to access and replace the sill plate.

Work may also include addition of support to potentially compromised floor joists.

Install new T1-11 siding on the three walls identified as needing the mudsill replaced.

New T1-11 shall be painted to match the T1-11 siding on the rest of the building. Ensure that the space behind the T1-11 siding is furred out using a solid covering of tongue and groove lumber to match original siding or approved equal (See Detail C, Sheet 5 of the drawings). In order to replace the sill plate it is assumed that the building will be lifted using jacks and proper support. It is also assumed that the contractor will need to access the crawl space of the building. TECHNICAL PROPOSALS SHALL INCLUDE

DESCRIPTION OF METHOD(S) TO BE USED. There are, at a minimum, black widow spiders residing within the crawl space. It shall be the responsibility of the contractor to eliminate all pests prior to entering the crawl space. Pest abatement shall be completed in such a manner as to not cause an infestation of the barracks living space.

B. The project is located in Greenville, CA on a Forest Service Work Center within the Plumas

National Forest.

C. The work includes, scheduling, coordinating with government in order to accommodate barracks residents, shop drawings for temporary building supports, proper disconnection and reconnection of building utilities (including, but not limited to water supply (copper or PVC), cast iron drain, HVAC ducting, electrical supply and conduit, communication, copper LPG supply), carpentry, concrete, insulation and coordination of all sub-contractors and material suppliers. It shall be the responsibility to furnish all labor and supplies and to dispose of all excess and removed materials.

D. The work shall conform to the specifications and the Contract Drawings identified on the following index of drawings:

Cover Sheet

1 Title Sheet

2 Floor Plan

3 Structural Plan

4 Detail Sheet

pg. 2

5 Construction Notes

1.02 METHOD OF MEASUREMENT:

A. Units: Units will vary by item as per the SCHEDULE OF ITEMS.

A. Payment: Payment will be made at the Contract price, as indicated in the Bid Schedule, and will include full compensation for the work described in the Contract. Payment under this item will be as follows:

1.04 CONTRACTOR USE OF PREMISES

A. General: During the construction period the Contractor will have full use of the barracks site for construction operations. The Contractor's use of the premises is limited to the barracks site and adjacent areas agreed upon by the Contracting Officer for storage of equipment and materials. No overnight camping by the Contractor’s personnel will be allowed.

B. Sanitation: Sanitation facilities are to be provided by contractor.

C. Utilities: Water is available and may be used by the Contractor’s personnel. Electrical power is available at the construction site.

D. While performing the work the Contractor shall take reasonable precautions to protect adjacent properties from damage. The Contractor at no additional cost to the Government shall restore any damage or injury caused by the Contractor in the course of this work.

PART 2 – PRODUCTS

A. Pest abatement shall be completed by a licensed pest control contractor utilizing only products that are approved for that specific use in the state of California.

B. Contractor shall allow 21 days for review of shop drawings.

PART 3 - EXECUTION

3.01 REQUIREMENTS OF REGULATORY AGENCIES

A. All work performed shall comply with health, safety and fire codes, OSHA regulations, and/or applicable regulations established by local, county and state codes.

PART 4- PAYMENT

Pay Item Pay Unit

pg. 3

01 MOBILIZATION Lump Sum

02 PEST ABATEMENT Lump Sum

03 SHOP DRAWINGS Lump Sum

END OF SECTION 01010

pg. 4

SECTION 06100

ROUGH CARPENTRY

1.01 SCOPE

A. The scope of this Section includes the following: Raising building and replacing the building to anchored position on the foundation, replacing mudsill, reinforcing floor joists which exhibit signs of rot, replacing insulation where deemed necessary by the government, replacing sheathing, replacing flashing along bottom of siding, replacing siding, replacing and repairing any interior damage which results from exposing the mudsill, and painting.

B. Obtaining access to the mudsill, presumably by elevating and lowering the building using jacks and proper structure stabilization.

C. Related Sections: The following Sections contain requirements that relate to this Section:

1. Section 06200 – Finish Carpentry

2. Section 07190 – Building Paper

3. Section 07210 - Building Insulation

4. Section 07620 - Flashing and Sheet Metal

5. Section 09250 – Gypsum Board

6. Section 09900 - Painting

1.02 DEFINITIONS

A. Rough carpentry includes carpentry work not specified as part of other Sections and generally not exposed, unless otherwise specified.

1.03 SUBMITTALS

A. General: Submit the following in accordance with Specification Section 1300 – Shop

Drawings and Submittals.

B. Wood treatment data as follows including chemical treatment manufacturer's instructions for handling, storing, installation, and finishing of treated material:

1. For each type of preservative treated wood product include certification by treating plant stating type of preservative solution and pressure process used, net

pg. 5 amount of preservative retained, and compliance with applicable standards.

2. For water-borne treated products include statement that moisture content of treated materials was reduced to levels indicated prior to shipment to project site.

C. Product data. Unless otherwise indicated, submit the following for each type of product provided under work of this Section:

1. Recycled Content:

a. Engineered Wood Products

1) Indicate recycled content; indicate percentage of pre-consumer and post-consumer recycled content per unit of product.

2) Indicate relative dollar value of recycled content product to total dollar value of product included in project.

3) If recycled content product is part of an assembly, indicate the percentage of recycled content product in the assembly by weight.

4) If recycled content product is part of an assembly, indicate relative dollar value of recycled content product to total dollar value of assembly.

1.04 DELIVERY, STORAGE, AND HANDLING

A. Delivery and Storage: Keep materials under cover and dry. Protect against exposure to weather and contact with damp or wet surfaces. Stack lumber as well as plywood and other panels; provide for air circulation within and around stacks and under temporary coverings including polyethylene and similar materials.

1. For lumber and plywood pressure treated with waterborne chemicals, place spacers between each bundle to provide air circulation.

1.05 QUALITY CONTROL

A. Codes and Standards

1. International Building Code, 2006 Edition.

2. Industry Standards and inspection services.

a. WCLIB Standard Grading Rules No. 16, for Lumber.

b. WWPA Western Lumber Grading Rules.

c. U.S. Bureau of Standards PS-1, for plywood.

pg. 6

d. Redwood Inspection Service Standard Specifications.

e. National Design Specification (NDS) for wood construction, 2005 Edition

f. American Wood Association

B. Quality of products and installation shall conform to codes and standards referenced above, as applicable.

C. Moisture Content: Air-dry untreated lumber, with sticking both horizontally and vertically, for not less than 30 days prior to installation. Kiln-dry treated lumber percent moisture content as per WCLIB.

D. Grade Stamps: All lumber and plywood shall be grade-stamped.

PART 2 - PRODUCTS

2.01 LUMBER, GENERAL

A. Lumber Standards: Furnish lumber manufactured to comply with PS 20 "American

Softwood Lumber Standard" and with applicable grading rules of inspection agencies certified by American Lumber Standards Committee's (ALSC) Board of Review.

B. Grade Stamps: Provide lumber with each piece factory-marked with grade stamp of inspection agency evidencing compliance with grading rule requirements and identifying grading agency, grade, species, moisture content at time of surfacing, and mill.

C. Nominal sizes are indicated, except as shown by detail dimensions. Provide actual sizes as required by PS 20, for moisture content specified for each use.

1. Provide dressed lumber, S4S, unless otherwise indicated.

2. Provide seasoned lumber with 19 percent maximum moisture content at time of dressing and shipment for sizes 2 inches or less in nominal thickness, unless otherwise indicated.

2.02 DIMENSION LUMBER

A. All dimension lumber shall be graded as indicated on the drawings.

B. Sill plates in contact with concrete shall be pressure treated douglas fir - No. 1 for structural walls and construction grade for non-structural walls. Or at non-structural walls, foundation grade redwood may be substituted.

2.03 MISCELLANEOUS LUMBER

pg. 7

A. General: Provide lumber for support or attachment of other construction including cant strips, bucks, nailers, blocking, furring, grounds, stripping, and similar members.

B. Fabricate miscellaneous lumber from dimension lumber of sizes indicated and into shapes shown.

C. Moisture content: 19 percent maximum for lumber items not specified to receive wood preservative treatment.

D. Grade: As shown on structural drawings.

2.04 CONSTRUCTION PANELS, (PLYWOOD), GENERAL

A. Construction Panel Standards: Comply with PS 1 "U.S. Product Standard for

Construction and Industrial Plywood" for plywood construction panels and, for products not manufactured under PS 1 provisions, with APA PRP-108.

B. Trademark: Furnish construction panels that are each factory-marked with APA trademark evidencing compliance with grade requirements.

C. Radiant Barriers: Roof sheathing and panels covering gable end walls in attics shall contain a radiant barrier applied to the inside face. The emissivity of the radiant barrier shall not exceed 0.05 according to ASTM text method C-1371-97. The product and installation shall meet all the requirements for radiant barriers contained in the Building

Energy Efficiency Standards, California Title 24.

2.05 CONCEALED PERFORMANCE-RATED CONSTRUCTION PANELS

A. General: Where construction panels are indicated for the following concealed types of applications, provide APA Performance-Rated Panels complying with requirements designated under each application for grade designation, span rating, exposure durability classification, edge detail (where applicable), and thickness.

B. Trademarks: Factory-mark each construction panel with APA trademark evidencing compliance with grade requirements.

C. Structural Plywood wall sheathing shall be Structural I, Grade C-D, exterior glue, thickness as shown on drawings. Span rating of roof sheathing shall be no less than 16/0.

D. Structural plywood for substrate at second floor shall be Structural I, Grade C-C, plugged exposure 1, thickness as shown on drawings.

2.06 CONSTRUCTION PANELS FOR BACKING

A. Not applicable.

pg. 8

2.07 AIR INFILTRATION BARRIER

2.08 FASTENERS

A. General: Provide fasteners of size and type indicated that comply with requirements specified in this article for material and manufacturer.

1. Where rough carpentry is exposed to weather, in ground contact, or in area of high relative humidity, provide fasteners with a hot-dip zinc coating per ASTM A

153 or of AISI Type 304 stainless steel.

B. Nails, Wire, Brads, and Staples: FS FF-N-105.

C. Power Driven Fasteners: National Evaluation Report NER-272.

D. Wood Screws: ANSI B18.6.1.

E. Lag Bolts: ANSI B18.2.1.

F. Bolts: Steel bolts complying with ASTM A 307, Grade A, with ASTM A 563 hex nuts and where indicated, flat washers.

2.09 METAL FRAMING ANCHORS

2.10 MISCELLANEOUS MATERIALS

2.11 PRESERVATIVE WOOD TREATMENT BY PRESSURE PROCESS

A. General: Where lumber or plywood is indicated as preservative-treated wood or is specified herein to be treated, comply with applicable requirements of AWPA Standards

C2 (Lumber) and C9 (Plywood). Mark each treated item with the AWPB Quality Mark

Requirements.

B. Pressure-treat above-ground items with water-borne preservatives to a minimum retention of 0.25 pcf. For interior uses, after treatment, kiln-dry lumber and plywood to a maximum moisture content, respectively, of 19 percent and 15 percent. Treat indicated items and the following:

pg. 9

1. Wood cants, nailers, curbs, equipment support bases, blocking, stripping, and similar members in connection with roofing, flashing, vapor barriers, and waterproofing.

2. Wood sills, sleepers, blocking, furring, stripping, and similar concealed members in contact with masonry or concrete.

C. Complete fabrication of treated items prior to treatment, where possible. If cut after treatment, coat cut surfaces to comply with AWPA M4. Inspect each piece of lumber or plywood after drying and discard damaged or defective pieces.

3.01 INSTALLATION AND WORKMANSHIP, GENERAL

A. Members shall be accurately cut to required dimensions and shall be firmly secured with metal connectors true to the lines, levels, and dimensions indicated, all in accordance with the IBC.

B. Where there is a significant variation in moisture content between individual members, shrinkage shall be allowed for and final connections shall not be made until moisture content of adjacent members has been stabilized. Allow no construction over framing members until final connections and/or adjustments have been made to achieve maximum strength at connections and minimum future movement from shrinkage or expansion.

C. Discard units of material with defects that impair quality of rough carpentry construction and that are too small to use in fabricating rough carpentry with minimum joints or optimum joint arrangement.

D. Fit rough carpentry to other construction; scribe and cope as required for accurate fit.

Correlate location of furring, nailers, blocking, grounds, and similar supports to allow attachment of other construction.

E. Securely attach rough carpentry work to substrate by anchoring and fastening as indicated.

F. Bore bolt holes true to line and of 1/16 inch greater diameter than bolts. Drive bolts into place with a tight fit and provide with plates or washers as indicated on the Drawings.

Turn up and make tight all nuts, bolts, and lag screws at time of installation and again just before enclosed with other fixed materials, or at the completion of the work, to ensure that shrinkage has been overcome and the fastenings are tight.

G. No lubricant of any kind shall be used on any fastener depending on friction for holding.

pg. 10

H. Screws shall not be driven by hammering.

I. Countersink nail heads on exposed carpentry work and fill holes.

J. Use common wire nails, unless otherwise indicated. Use finishing nails for finish work.

Select fasteners of size that will not penetrate members where opposite side will be exposed to view or will receive finish materials. Make tight connections between members. Install fasteners without splitting of wood; predrill as required.

K. Members (other than all heart Redwood) which are in contact with concrete exposed to weather, shall be treated a distance of 2'-0" along their length from point of contact with two flowing coats or copper napthenate solution, if not to be stained.

L. Coordinate installation of open web trusses, glue laminated beams, plate connected wood trusses.

M. Tolerances:

1. Framing Members: 1/4 inch maximum from true position.

2. Surface Flatness of Floor: 1/4 inch in 10 feet maximum.

3.02 WOOD GROUNDS, NAILERS, BLOCKING, AND SLEEPERS

A. Provide and install wood grounds, nailers, blocking, and sleepers where shown and where required for screening or attachment of other work. Form to shapes as shown and cut as required for true line and level of work to be attached. Coordinate location with other work involved.

B. Attach to substrates as required to support applied loading. Countersink bolts and nuts flush with surfaces, unless otherwise indicated. Where possible, anchor to formwork before concrete placement.

3.03 WOOD FRAMING, GENERAL

A. Framing Standard: Comply with National Forest Products Association (N.F.P.A.)

"Manual for House Framing," unless otherwise indicated.

B. Install framing members of size and spacing indicated. Coordinate with other framing and to other trades prior to actual construction.

C. Anchor and nail as shown, and to comply with the following:

1. National Evaluation Report No. NER-272 for pneumatic or mechanical driven

pg. 11 staples, P-Nails, and allied fasteners.

2. Published requirements of manufacturer of metal framing anchors.

3. "Recommended Nailing Schedule" of referenced framing standard and with

N.F.P.A. "National Design Specifications for Wood Construction."

D. Do not splice structural members between supports.

E. Provide solid blocking at all joist or truss supports (2x framing depth), unless otherwise noted. Install shims where indicated or where required to set work in proper alignment.

F. Install blocking where indicated on the Drawings, where required on gypsum board edges, at plywood panel joints where not over a framing member, and wherever required for support of items specified in other sections.

G. Cutting of wood girders, beams, or joists for electrical and mechanical lines shall be limited to cuts and bored holes not deeper than one-fifth of the beam depth from the top and located not further from the support than three times the beam depth and not less than the beam depth. Cuts in excess of this or single bored holes with diameter of more than 1

1/2 inch are not permitted without special provisions. Location of cuts or holes in framing shall receive review by the Contracting Officer prior to approval of holes.

H. Fire stop concealed spaces of wood framed walls and partitions at each floor level and at the ceiling line of the top story. Where fire stops are not automatically provided by the framing system used, use closely fitted wood blocks of nominal 2-inch-thick lumber of the same width as framing members.

3.04 STUD FRAMING

A. Cut studs and posts with square ends, unless otherwise shown, and erect plumb.

B. Studs in walls shall be 2X4, 2X6, or 3X6 as indicated on Drawings.

C. Double studs on each side of all openings, unless noted otherwise.

D. Construct corners and intersections with not less than 3 studs. Install miscellaneous blocking and framing as shown and as required for support of facing materials, fixtures, specialty items, and trim.

E. Openings in stud walls and partitions shall be framed with headers across the top with a minimum size of 6 inches deep x stud width resting on cripple studs, unless otherwise noted.

F. Top plates shall be double, set one at a time; sill plates single, secured as indicated on

pg. 12

Drawings. Corners where stud wall or partitions meet shall be framed solid. Double top plates shall be lapped at corners. Where openings are cut through plates, install 16-gauge steel strap ties 1-1/4 inches wide at single plate, and 2-5/16 inches wide at double plate extending minimum 9 inches past each cut.

G. Walls and partitions containing plumbing, heating, or other pipes shall be framed to give proper clearances for piping without notching or hacking of studs.

H. Holes through studs exceeding 1/3 the width of the stud are not permitted without review by the Contracting Officer.

3.05 FLOOR JOIST FRAMING

A. General: Install floor joists with crown edge up and support ends of each member over full bearing area unless otherwise noted. Attach floor joists as follows:

1. To wood bearing members by toe nailing or metal framing anchors.

2. To wood supporting members with wood ledgers as shown, or if not shown, with metal joist hangers.

B. Frame openings with headers and trimmers supported by metal joist hangers, double headers and trimmers where span of header exceeds 4 feet.

C. See Section 3.03 and plans for notches or holes in wood members. Install solid blocking

(2 inches thick by depth of joist) at ends of joists unless nailed to header or bearing member or unless otherwise indicated on the plans.

D. Lap member framing from opposite sides of beams, girders or partitions not less than 1 foot and securely nail opposing members together. Install solid blocking over supports, 2 inches thick by depth of joist unless otherwise noted.

E. Under jamb studs at openings, install solid blocking between joists.

F. Under non-load-bearing partitions, install double joists separated by solid blocking equal to depth of studs.

G. Install bridging type indicated below between joists where nominal depth to thickness ratio exceeds 6, at intervals of 8 feet.

1. Solid wood bridging 2 inches thick by depth of joist, end nailed to joist.

3.06 TIMBER FRAMING

pg. 13

A. Install timber framing with crown edge up and provide not less than 4 inches of bearing on supports. Install continuous members unless shown; tie together over supports if not continuous.

B. Where beams or girders are framed into pockets of exterior concrete or masonry walls, provide 1/2-inch air space between sides and ends of wood members and supporting wall.

C. Install wood posts using metal anchoring and attachment devices indicated.

D. Seal ends of timber exposed to weather with a water-repellent preservative.

3.07 STAIR FRAMING

A. Install stair framing members of size, space, and configuration indicated or, if not otherwise indicated, to comply with the following requirements.

1. Stringer Size: 2 inches by 14 inches minimum.

3.08 INSTALLATION OF CONSTRUCTION PANELS (PLYWOOD)

A. General: Comply with applicable recommendations contained in Form No. E30, "APA

Design/Construction Guide - Residential & Commercial”, for types of construction panels and applications indicated.

B. Layout and Fastening: Plywood shall be nailed to framing as indicated on the drawings.

Sheathing on walls, roofs, and floors shall be supported on framing or blocking on all four edges of each sheet. Joint layout shall be staggered. Butt panel ends and edges to a close, but not tight fit (allow 1/16-inch space). All panels as indicated on the drawings.

C. Wall sheathing may be installed with face grain either perpendicular to or parallel to the studs. No piece shall be less than 2 feet wide.

D. Roof and floor sheathing shall be installed with face grain perpendicular to the framing members. No piece shall be smaller than 2 feet by 4 feet.

3.09 AIR INFILTRATION BARRIER

A. Cover sheathing with air infiltration barrier as follows:

1. Apply layer of self-adhering polymer modified bituminous sheet material over plywood sheathing at rough openings and outside corners, extending minimum 18 inches from penetrations and corners.

2. Apply two layers of asphalt-saturated organic felt horizontally over entire surface of wall sheathing, and around doors, windows and other openings, with 2-inch overlap and 6-inch end lap; fasten to sheathing with corrosion-resistant staples.

pg. 14

ROUGH CARPENTRY LF

END OF SECTION 06100

pg. 15

SECTION 06200

FINISH CARPENTRY

A. This Section includes the following:

1. Exterior standing and running trim, posts and rails.

2. Siding.

B. Related Sections: The following Sections contain requirements that relate to this Section:

1. Division 6 Section "Rough Carpentry" for furring, blocking, and other carpentry work that is not exposed to view.

2. Division 7 Section "Building Insulation" for insulation under siding.

3. Division 7 Section "Flashing and Sheet Metal" for flashing and other sheet metal work.

4. Division 7 Section "Joint Sealants" for sealants.

5. Division 7 Section "Cementious Siding" for siding.

6. Division 9 Section "Painting" for back priming and finishing of finish carpentry.

1.02 DELIVERY, STORAGE, AND HANDLING

A. Delivery and Storage: Keep materials under cover and dry. Protect against exposure to weather and contact with damp or wet surfaces. Stack lumber as well as plywood and other panels. Provide for air circulation within and around stacks and under temporary coverings including polyethylene and similar materials.

1.03 PROJECT CONDITIONS

A. Environmental Conditions: Obtain and comply with finish carpentry manufacturer's and installer's coordinated advice for optimum temperature and humidity conditions for finish carpentry during its storage and installation.

B. Weather Conditions: Proceed with finish carpentry only when existing and forecasted

pg. 16 weather conditions will permit exterior finish carpentry to be installed in compliance with manufacturer's recommendations and when substrate is completely dry.

2.01 MATERIALS, GENERAL

A. Softwood Lumber Standards: Comply with PS 20 "American Softwood Lumber

Standard" for lumber and with applicable grading rules of inspection agencies certified by American Lumber Standards Committee Board of Review.

B. Hardwood Lumber Standards: Comply with National Hardwood Lumber Association

(NHLA) rules.

C. Plywood Standards: Comply with PS 1 "U.S. Product Standard for Construction and

Industrial Plywood" for plywood and, for products not manufactured under PS 1, with

APA PRP-108.

D. Inspection Agencies: Inspection agencies and the abbreviations used to reference them with lumber grades and species include the following:

1. WCLIB - West Coast Lumber Inspection Bureau.

2. WWPA - Western Wood Products Association.

E. Grade Stamps: Provide lumber with each piece factory-marked with grade stamp of inspection agency evidencing compliance with grading rule requirements and identifying grading agency, grade, species, moisture content at time of surfacing, and mill.

1. For exposed lumber furnish pieces with grade stamps applied to ends or back of each piece, or omit grade stamps entirely and provide certificates of grade compliance issued by inspection agency.

2.02 EXTERIOR FINISH CARPENTRY

A. Standing and Running Trim: For trim and rails in form of boards and worked products, provide lumber complying with the following requirements including those of the grading agency listed with species.

1. Species: Redwood.

a. Redwood Inspection Services Grade: Construction Heart.

2. Texture: Surfaced (smooth).

pg. 17

B. For exterior soffits:

1. Species: Exterior plywood (1/2 inch)

2. Texture: Plain rough sawn.

2.03 EXTERIOR SIDING

Use T1-11 siding.

Submit proposed siding material for approval by the government to ensure best match to existing siding.

2.04 MISCELLANEOUS MATERIALS

A. Fasteners for Exterior Finish Carpentry: Stainless steel, noncorrosive aluminum or hot-dip galvanized nails, in sufficient length to penetrate minimum of 1-1/2 inches into substrate unless recommended otherwise by manufacturer.

1. Provide prefinished nails for face nailing of material to receive stain in color to match where face nailing is unavoidable.

2. Nailing schedule shall be 6 inches on center along edges and 12” on center in the field.

B. Fasteners for Interior Finish Carpentry: Not expected to be necessary

C. Adhesives: Comply with manufacturer's recommendations for adhesives.

2.07 FABRICATION

A. Wood Moisture Content: Comply with requirements of specified inspection agencies and manufacturer's recommendations for moisture content of finish carpentry in relation to relative humidity conditions existing during time of fabrication and in installation areas.

Provide finish carpentry with moisture content that is compatible with Project requirements.

B. Fabricate finish carpentry to dimensions, profiles and details indicated.

3.01 EXAMINATION

A. Examine substrates for compliance with requirements for installation tolerances and other

pg. 18 conditions affecting installation and performance of finish carpentry. Do not proceed with installation until unsatisfactory conditions have been corrected.

3.02 PREPARATION

A. Clean substrates of projections and substances detrimental to application.

B. Condition finish carpentry to average prevailing humidity conditions in installation areas before installation for a minimum of 24 hours unless longer conditioning recommended by manufacturer.

3.03 INSTALLATION, GENERAL

A. Do not use finish carpentry materials that are unsound, warped, bowed, twisted, improperly treated or finished, not adequately seasoned, or too small to fabricate with proper jointing arrangements.

1. Do not use manufactured units with defective surfaces, sizes, or patterns.

B. Install finish carpentry plumb, level, true, and aligned with adjacent materials. Use concealed shims where required for alignment.

1. Scribe and cut finish carpentry to fit adjoining work. Refinish and seal cuts as recommended by manufacturer.

2. Install to tolerance of 1/8 inch in 8 feet for plumb and level. Install adjoining finish carpentry with 1/16 inch maximum offset for flush installation and 1/8 inch maximum offset for reveal installation.

3. Coordinate finish carpentry with materials and systems that may be in or adjacent to standing and running trim and rails. Provide cutouts for mechanical and electrical items that penetrate exposed surfaces of trim and rails.

C. Finish in accordance with specified requirements.

3.04 STANDING AND RUNNING TRIM AND RAILS

A. Install with minimum number of joints practical, using full-length pieces from maximum lengths of lumber available. Stagger joints in adjacent and related standing and running trim and rails. Cope at returns and miter at corners to produce tight-fitting joints with full-surface contact throughout length of joint. Use scarf joints for end-to-end joints.

Plane back of casings to provide uniform thickness across joints if required.

pg. 19

Fit exterior joints to exclude water.

3.06 ADJUSTING

A. Repair damaged or defective finish carpentry where possible to eliminate functional or visual defects. Where not possible to repair, replace finish carpentry. Adjust joinery for uniform appearance.

3.07 CLEANING

A. Clean finish carpentry on exposed and semi exposed surfaces. Touch up factory-applied finishes to restore damaged or soiled areas.

3.08 PROTECTION

A. Provide final protection and maintain conditions that ensure finish carpentry is without damage or deterioration at time of Substantial Completion.

PART 4 - PAYMENT

THIS ITEM SHALL BE CONSIDERED INCIDENTAL TO “06100-ROUGH CARPENTRY”

END OF SECTION 06200

pg. 20

SECTION 07190

BUILDING PAPER

1.1 DESCRIPTIONS

A. Provide building paper underlayment and flashing, with related concealed metal flashings and accessories as required for complete watertight installation.

B. Provide self adhering polymer modified bituminous sheet flashing system with low

VOC primer and accessories as required for complete watertight seal at window penetrations, door penetrations, and other penetrations through building paper.

1.2 SECTION REQUIREMENTS

A. Submit Product Data for type of building paper product and accessories specified.

B. Submit shop drawings for metal flashings, as related to underlayment.

1. Clearly indicate general construction, configurations, jointing methods and locations, fastening methods and locations and installation details.

C. Provide for correcting failure of building paper to resist penetration of water.

D. Repair building paper and pay for or replace damaged materials or surfaces.

E. Warranty Period: Two years.

2.1 MATERIALS

A. Building Paper:

1. Siding Underlay: Unperforated asphalt saturated organic felt, conforming to

ASTM D226, Type I, commonly referred to as No. 15.

2. Fasteners: Type as recommended by system manufacturer or as required by applicable codes; minimum hot dipped galvanized.

pg. 21

B. Self-Adhering Polymer Modified Bituminous Sheet Membrane (Water Barrier

Membrane): Conform ASTM D1970.

1. Type: Grace Construction Products/Vycor Ice and Water Shield typical, Vycor

Ultra where under metal flashing.

2. Primers and Edge Sealers: Types as recommended by system manufacturer for specific applications and as required to achieve complete watertight installation.

C. Metal Flashings: Refer to Section 07620 Sheet Metal Flashing and Trim

D. Plastic Cement: Cutback asphaltic type with mineral fiber components, for sealing and coating flashings in buildings; free of toxic solvents and free of asbestos.

1. Capable of setting within 24 hours at temperatures of approximately 75 degrees F and 50% R.H.

E. Joint Sealers Integral with Building Paper: One part polyurethane or bitumen modified polyurethane, gun grade; types suitable for applications indicated.

3.1 PREPARATION

A. Install building paper over surfaces which are dry, free of ridges, warps and voids which could damage paper.

B. Coordinate installation with installation of components and items projecting through building paper.

3.2 TYPICAL UNDERLAYMENT INSTALLATION

A. Install building paper in accordance with recommendations of building paper manufacturer and of manufacturers of products to cover building paper; comply with applicable code requirements.

1. Apply layer of self-adhering polymer modified bituminous sheet material over plywood sheathing at rough openings and outside corners, extending minimum

18-inches from penetrations and corners.

2. Layer: Provide two layers building paper underlayment at siding applications;

weatherlap joints.

3. Secure underlayment in place, stagger joints between layers; lap ends minimum

pg. 22

6-inches; stagger end joints.

B. Apply lap cement at rate of approximately 1-1/4 gallons per square on underlayment starter strip.

C. Weatherlap items projecting through building paper and seal with plastic cement.

PART 4 – PAYMENT

END OF SECTION 07190

pg. 23

SECTION 07210

BUILDING INSULATION

A. This work consists of providing roof and wall insulation as indicated.

B. Applications of insulation specified in this section include the following:

1. Building insulation in batt form.

2. Closed-cell polyurethane spray foam insulation.

3. Polyisocyanurate rigid foam board insulation.

C. Related Sections: The following sections contain requirements that relate to this section:

1. Division 9 Section indicated below sound attenuation insulation installed as part of wood stud wall and partition assemblies:

a. "Gypsum Drywall."

A. Thermal Resistivity: Where the thermal resistivity of insulation products are designated by "r-values," they represent the reciprocal of thermal conductivity (k-values). Thermal conductivity is the rate of heat flow through a homogenous material exactly 1 inch thick.

Thermal resistivities are expressed by the temperature difference in degrees F between the two exposed faces required to cause one BTU to flow through one square foot per hour at mean temperatures indicated.

1.03 QUALITY ASSURANCE

A. Fire Performance Characteristics: Provide insulation materials identical to those whose indicated fire performance characteristics have been determined per the ASTM test method indicated below, by UL or other testing and inspecting organizations acceptable to authorities having jurisdiction. Identify products with appropriate markings of applicable testing and inspecting organization.

1. Surface Burning Characteristic: ASTM E 84.

2. Fire Resistance Ratings: ASTM E 119.

3. Combustion Characteristics: ASTM E 136.

pg. 24

B. Single-Source Responsibility for Insulation Products: Obtain each type of building insulation from a single source with resources to provide products of consistent quality in appearance and physical properties without delaying progress of the Work.

1.04 DELIVERY, STORAGE, AND HANDLING

A. General Protection: Protect insulation materials from physical damage and from deterioration by moisture, soiling, and other sources. Store inside and in a dry location. Comply with manufacturer's recommendations for handling, storage, and protection during installation.

2.01 ACCEPTABLE MANUFACTURERS

A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering insulation products that may be incorporated in the work include, but are not limited to, the following:

1. Manufacturers of Insulation:

a. CertainTeed Corp.

b. Manville: Building Insulations Div., Manville Sales Corp.

c. Owens/Corning Fiberglas Corp.

d. Or approved equal.

2.02 INSULATING MATERIALS

A. General: Provide insulating materials that comply with requirements and with referenced standards.

1. Preformed Units: Sizes to fit applications indicated, selected from manufacturer's standard thickness, widths, and lengths.

B. Unfaced Mineral Fiber Blanket/Batt Insulation: To be located at exterior walls (below top plates) in cold locations (California Climate Zone 16) and interior walls at bathrooms, bedrooms, and utility room. Thermal insulation produced by combining mineral fibers of type described below with thermosetting resins to comply with ASTM C 665 for Type I

(blankets without membrane facing); and as follows:

1. Mineral Fiber Type: Fibers manufactured from glass or slag.

2. Surface Burning Characteristics: Maximum flame spread and smoke developed

pg. 25 values of 25 and 50, respectively.

3. Combustion Characteristics: Passes ASTM E 136 test.

4. Recycled content: Minimum 25 percent total recycled content. Provide glass cullet recovered from municipal waste in accordance with ASTM

D5359.

C. Kraft Faced Mineral Fiber Blanket/Batt Insulation: To be located at exterior walls

(below top plates) in mild locations (California Climate Zone 15 and below).

Thermal insulation produced by combining mineral fibers of type described below with thermosetting resins to comply with ASTM C 665 for Type II, Class C (blankets with

Kraft facing with flame spread of 25 or less); and as follows:

2. Surface Burning Characteristics: Maximum flame spread and smoke developed values of 25 and 50, respectively.

3. Recycled content: Minimum 25 percent total recycled content. Provide glass cullet recovered from municipal waste in accordance with ASTM

D5359.

D. Closed-cell spray foam insulation: To be located from the exterior wall: top plates to the roof sheathing at truss heels, gable end walls and all beam pockets and exterior wall penetrations. Utilize closed-cell polyurethane foam: R 6.2 per inch with a minimum total

R-value of 38. The product will contain NO FORMALDEYHIDE or CFC’s.

1. Closed Cell Content: 88-95 percent when tested in accordance with ASTM

D2842.

2. Flame Spread: Less than 25 when tested in accordance with ASTM E 84.

3. Smoke: Less than 450 when tested in accordance with ASTM E 84.

E. Rigid insulation: Roof insulation to be R-38 minimum rigid, foam plastic, thermal insulation board composed of polyisocyanurate foam core bonded to glass fiber/organic mat facers on each side such as that manufactured by RMAX. Rigid foam may be installed in a maxiumum of two layers equal or exceeding R-38 but shall not exceed a total thickness of 6.5 inches.

1. Recycled content: Minimum 9 percent total recycled content.

pg. 26

2.03 VAPOR BARRIER

A. Vapor barrier shall be 6-mil clear polyethylene film

3.01 INSPECTION AND PREPARATION

A. Examine substrates and conditions with Installer present, for compliance with requirements of the Sections in which substrates and related work are specified and to determine if other conditions affecting performance of insulation are satisfactory. Do not proceed with installation of insulation until unsatisfactory conditions have been corrected.

B. Clean substrates of substances harmful to insulations or vapor barrier, including removal of projections that might puncture vapor barrier.

3.02 INSTALLATION, GENERAL

A. Comply with insulation manufacturer's instructions applicable to products and application indicated. If printed instructions are not available or do not apply to project conditions, consult manufacturer's technical representative for specific recommendations before proceeding with installation of insulation.

B. Extend insulation full thickness as indicated to envelop entire area to be insulated. Cut and fit tightly around obstructions, and fill voids with insulation. Remove projections that interfere with placement.

C. Apply a single layer of insulation of required thickness, unless otherwise shown or required to make up total thickness.

3.03 INSTALLATION OF GENERAL BUILDING INSULATION

A. Set vapor-retarder faced units with vapor-retarder to warm side of construction, except as otherwise indicated. Do not obstruct ventilation spaces, except for firestopping.

1. Tape tears and ruptures in vapor-retarder, and seal each continuous area of insulation to surrounding construction to ensure airtight installation.

2. For securing floor insulation install netting on the under side of floor joist and install metal insulation support wires between floor joists were netting is not applicable.

B. Unfaced units shall fit snugly between studs and be held in place by friction.

C. In cold locations (California Climate Zone 16), upon completion of the insulation of the

pg. 27 outside walls install the vapor barrier. Vapor barrier shall be installed on the inside surface of all exterior walls to create an airtight barrier from floor to ceiling. Staple vapor barrier securely at top and bottom plates and around door and window openings.

3.04 PROTECTION

A. General: Protect installed insulation and vapor barrier from damage due to harmful weather exposures, physical abuse, and other causes. Provide temporary coverings or enclosures where insulation will be subject to abuse and cannot be concealed and protected by permanent construction immediately after installation.

END OF SECTION 07210

pg. 28

SECTION 07620

FLASHING AND SHEET METAL

A. This work consists of providing all flashing and sheet metal and accessories as shown on drawings.

1.02 DESCRIPTION OF WORK:

A. This Section includes the following:

1. Metal counter flashing and base flashing (if any).

2. Metal wall flashing.

1.03 PROJECT CONDITIONS

A. Coordinate work of this section with interfacing and adjoining work for proper sequencing of each installation. Ensure best possible weather resistance and durability of work and protection of materials and finishes.

2.01 SHEET METAL FLASHING AND TRIM MATERIALS

A. Zinc-Coated Steel: Commercial quality with 0.20 percent copper, ASTM A 526 except

ASTM A 527 for lock-forming, G90 hot-dip galvanized, mill phosphatized where indicated for painting; 0.0359-inch thick (20 gage) except as otherwise indicated.

2.02 MISCELLANEOUS MATERIALS AND ACCESSORIES:

A. Solder: For use with steel or copper, provide 50 - 50 tin/lead solder (ASTM B 32), with rosin flux.

B. Fasteners: Same metal as flashing/sheet metal or other non-corrosive metal as recommended by sheet manufacturer. Match finish of exposed heads with material being fastened.

C. Elastomeric Sealant: Generic type recommended by manufacturer of metal and fabricator of components being sealed and complying with requirements for joint sealants as specified in Division 7 Section "Joint Sealers."

pg. 29

D. Adhesives: Type recommended by flashing sheet manufacturer for waterproof/weather-resistant seaming and adhesive application of flashing sheet.

E. Paper Slip Sheet: 5-lb. rosin-sized building paper.

F. Metal Accessories: Provide sheet metal clips, straps, anchoring devices, and similar accessory units as required for installation of work, matching or compatible with material being installed, noncorrosive, size and gage required for performance.

G. Elastic Flashing Filler: Closed-cell polyethylene or other soft closed-cell material recommended by elastic flashing manufacturer as filler under flashing loops to ensure movement with minimum stress on flashing sheet.

3.01 INSTALLATION REQUIREMENTS

A. General: Except as otherwise indicated, comply with manufacturer's installation instructions and recommendations and with SMACNA "Architectural Sheet Metal

Manual." Anchor units of work securely in place by methods indicated, providing for thermal expansion of metal units; conceal fasteners where possible, and set units true to line and level as indicated. Install work with laps, joints, and seams that will be permanently watertight and weatherproof.

B. Bed flanges of work in a thick coat of bituminous roofing cement where required for waterproof performance.

3.02 CLEANING AND PROTECTION

A. Clean exposed metal surfaces, removing substances that might cause corrosion of metal or deterioration of finishes.

END OF SECTION 07620

pg. 30

SECTION 09250

GYPSUM BOARD

A. This work consists of providing all gypsum board and related work. If the process of raising the building or repairing the joists, studs, or sill causes a need for installation of gypsum board the work shall be as per this specification.

1.02 DESCRIPTION OF WORK

A. This Section includes the following type of gypsum board construction:

1. Gypsum board screw-attached to either wood framing or metal furring members.

B. Wood framing is specified in the following Division 6 sections:

1. Section 06100 "Rough Carpentry."

1.03 DEFINITIONS

A. Gypsum Board Construction Terminology: Refer to ASTM C 11 and GA 505 for definitions of terms for gypsum board construction not otherwise defined in this section or other referenced standards.

1.04 QUALITY ASSURANCE

A. Fire-Resistance Ratings: Where indicated, provide materials and construction which are identical to those of assemblies whose fire resistance rating has been determined per ASTM E 119 by a testing and inspecting organization acceptable to authorities having jurisdiction.

1.05 DELIVERY, STORAGE, AND HANDLING

A. Deliver materials in original packages, containers or bundles bearing brand name and identification of manufacturer or supplier.

B. Store materials inside under cover and keep them dry and protected against damage from weather, direct sunlight, surface contamination, corrosion,

pg. 31 construction traffic and other causes. Neatly stack gypsum boards flat to prevent sagging.

C. Handle gypsum boards to prevent damage to edges, ends and surfaces. Do not bend or otherwise damage metal corner beads and trim.

1.06 PROJECT CONDITIONS

A. Environmental Conditions, General: Establish and maintain environmental conditions for application and finishing gypsum board to comply with ASTM C

840 and with gypsum board manufacturer's recommendations.

2.01 MANUFACTURERS

A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated in the Work, include the following or approved equal:

1. Gypsum Boards and Related Products:

a. Georgia-Pacific Corp.

b. Gold Bond Building Products Div., National Gypsum Co.

c. United States Gypsum Co.

2.02 GYPSUM BOARD

A. General: Provide gypsum board of types indicated in maximum lengths available to minimize end-to-end joints.

B. Gypsum Wallboard: ASTM C 36, and as follows:

1. Type: Regular, unless otherwise indicated.

2. Type: Type X for fire-resistance-rated assemblies.

3. Edges: Tapered.

4. Thickness: 5/8", unless otherwise indicated.

2.03 TRIM ACCESSORIES

A. Corner Bead and Edge Trim for Interior Installation: Provide corner beads, edge trim and control joints which comply with ASTM C 1047 and requirements

pg. 32 indicated below:

1. Material: Formed metal, plastic or metal combined with paper, with metal complying with the following requirement:

a. Sheet steel zinc-coated by hot-dip process.

2. Edge trim shapes indicated below by reference to designations of Fig. 1 in

ASTM C 1047:

a. "LC Bead", unless otherwise indicated.

b. "L" Bead where indicated.

c. "U" Bead where indicated.

2.04 GYPSUM BOARD JOINT TREATMENT MATERIALS

A. General: Provide materials complying with ASTM C 475, ASTM C 840, and recommendations of manufacturer of both gypsum board and joint treatment materials for the application indicated.

B. Joint Tape: Paper reinforcing tape, unless otherwise indicated.

C. Setting-Type Joint Compounds: Factory-prepackaged, job-mixed, chemical-hardening powder products formulated for uses indicated.

1. Where setting-type joint compounds are indicated for use as taping and topping compounds, use formulation for each which develops greatest bond strength and crack resistance and is compatible with other joint compounds applied over it.

2. For prefilling gypsum board joints, use formulation recommended by gypsum board manufacturer for this purpose.

3. For filling joints and treating fasteners of water-resistant gypsum backing board behind base for ceramic tile, use formulation recommended by gypsum board manufacturer for this purpose.

D. Drying-Type Joint Compounds: Factory-prepackaged vinyl-based products complying with the following requirements for formulation and intended use.

1. Ready-Mix Formulation: Factory-premixed product.

2. Taping compound formulated for embedding tape and for first coat over fasteners and flanges of corner beads and edge trim.

pg. 33

3. Topping compound formulated for fill (second) and finish (third) coats.

4. All-purpose compound formulated for use as both taping and topping compound.

2.05 MISCELLANEOUS MATERIALS

A. General: Provide auxiliary materials for gypsum drywall construction that comply with referenced standards and the recommendations of the manufacturer of the gypsum board.

B. Gypsum Board Fasteners: All fasteners shall be type “W” screws with minimum length of 1 1/4 inches long for all interior walls and ceilings.

C. Asphalt Felt: ASTM D 226, Type I (No. 15).

D. Concealed Acoustical Sealant: Nondrying, nonhardening, nonskinning, nonstaining, nonbleeding, gunnable sealant complying with requirement specified in Division-7 section "Joint Sealers."

E. Sound Attenuation Blankets: Unfaced mineral fiber blanket insulation produced by combining mineral fibers of type described below with thermosetting resins to comply with ASTM C 665 for Type I (blankets without membrane facing); and as follows:

2.06 GLASS MESH MORTAR UNIT FINISHING MATERIALS

A. Tape and joint compounds as recommended by glass mesh mortar unit manufacturer.

A. Examine substrates to which drywall construction attaches or abuts, preset hollow metal frames, cast-in-anchors, and structural framing, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of drywall construction. Do not proceed with installation until unsatisfactory conditions have been corrected.

pg. 34

3.02 APPLICATION AND FINISHING OF GYPSUM BOARD, GENERAL

A. Gypsum Board Application and Finishing Standard: Install and finish gypsum board to comply with ASTM C 840.

B. Locate exposed end-butt joints as far from center of walls and ceilings as possible, and stagger…