Section_C-_Installation_of_Aquion_Energy's_Aqueous_Hybrid_Ion_(AHI) _PV_Solar_Batteries.docx

DOCX document 15 KB Posted

Attached to
Installation of Aquion Energy's Aqueous Hybrid Ion Salt Water Batteries and Removal/Disposal of Existing Lead Acid Batteries
Solicitation number
AG-9AD6-S-16-0003
Issued by

About this file

Section C Statement of Work

View the file

Other files

File Type Posted
PART_IV.Section_K.Installation_of_Aquion_Energy's_Aqueous_Hybrid_Ion_(AHI) _Salt_Water_Batteries_and_Removal_and_Disposal_of_the_Existing_Lead_Acid_Batteries.docx DOCX document
SECTION_G.Installation_of_Aquion_Energy's_Aqueous_Hybrid_Ion_(AHI) _Salt_Water_Batteries_and_Removal_and_Disposal__of_12_Existing_Lead_Acid_Batteries.docx DOCX document
SF1449.Installing_Aquion_Energy's_Aqueous_Hybrid_Ion_(AHI) _Salt_Water_Batteries_and_Removal_and_Disposal_of_the_Existing_Lead_Acid_Batteries.pdf PDF
Section_J_-_Installation_of_Aquion_Batteries.pdf PDF
SECTION_F.Installation_of_Aquion_Energy's_Aqueous_Hybrid_Ion_(AHI) _Salt_Water_Batteries_and_Removal_and_Disposal_of_12_Lead_Acid_Batteries.docx DOCX document
SECTION_M.Installation_of_Aquion_Energy's_Aqueous_Hybrid_Ion_(AHI) _Salt_Water_Batteries_and_Removal_and_Disposal_of_the_Existing_Lead_Acid_Batteries.docx DOCX document
SECTION_L.Installation_of_Aquion_Energy's_Aqueous_Hybrid_Ion_(AHI) _Salt_Water_Batteries_and_Removal_and_Disposal_of_the_Existing_Lead_Acid_Batteries.docx DOCX document
Section_I.Installation_of_Aquion_Energy's_Aqueous_Hybrid_Ion_(AHI) _Salt_Water_Batteries_and_Remove_and_Dispose_of_12_Existing_Lead_Acid_Batteries.docx DOCX document
Section_J_-__Table_of_Contents_for_Installation_of_Aquion_Energy's_Aqueous_Hybrid_Ion.docx DOCX document
SECTION_E.Installation_of_Aquion_Energy's_Aqueous_Hybrid_Ion_(AHI) _Salt_Water_Batteries_and_Remove_and_Dispose_of_12_Existing_Lead_Acid_Batteries.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section C- Description/Specification/Statement of Work For Installation of Aquion Energy’s Aqueous Hybrid Ion (AHI), Salt Water Batteries and Removal/Disposal of the Existing Lead Acid Batteries

SUMMARY OF WORK/SPECIFICATIONS

(AGAR 452.211-72) (FEB 1988)

The contractor shall furnish the necessary personnel, material, equipment, services facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

DESCRIPTION OF WORK

The intent of this project is to provide the USDA Forest Service, Institute of Pacific Islands Forestry LSEC located in Laupahoehoe, Hawaii 96764 with an efficient new battery power supply replacing existing lead acid batteries for PV power system.

The contractor shall supply all labor, tools and equipment.

DISPOSAL

The contractor shall remove the existing lead acid batteries and recycle them or dispose of in accordance with local, state and federal guidelines, MATERIAL AND EQUIPMENT SPECIFICATIONS

SEE SECTION J – LIST OF ATTACHMENTS

A. Aquion document for battery specifications or contact Aquion Energy Inc. Telephone Number 412-904-6400 or online at aquionenergy.com.

B. Removal of existing FLA battery specification: See attachment or contract Rolls Battery Engineering at: http://www.rollsbattery.com/catalog/ (12 each) 209S4KS25PS / Rolls 4-KS-25PS Flooded Lead Acid Battery.

C. Existing “Outback” charging system includes the Mate Controller, 4 Inverters, and 5 FM 80 charge controllers.

Project Location Pacific Southwest Research Station Institute of Pacific Islands Forestry LSEC 36-645 Spencer Road Laupahoehoe, Hawaii 96764

Contractor Representative The contractor shall provide a Contract Representative for the performance of the work. The name of this person and any alternate(s) who shall act for the Contractor when the Contractor is absent shall be designated in writing to the Contracting officer. The Contractor Representative or alternate shall have full authority to act for the contractor on all contract matters relating daily operation of this contract. The Contractor Representative and alternates(s) must be able to read, write, speak and understand English.

Submittal of Proposal Contractor must be registered in the System for Award Management (SAM). If not registered, you may register at http://www.sam.gov.

DUNS number must be submitted with quotation.