Hilo_-_SECTION_C_doc_Plumbing_for_Hilo.docx

DOCX document 17 KB Posted

Attached to
Plumbing at Laupahoehoe Science and Education Center
Solicitation number
AG-9AD6-S-13-0004
Issued by

About this file

Statement of Work

View the file

Other files

File Type Posted
Hilo-_SECTION_M_Plumber.docx DOCX document
Hilo_-_Section_J-2 —
Hilo_-_SF_1442_(Plumbing).pdf PDF
Hilo_-_Part_II_Contrct_Clauses.docx DOCX document
Hilo_-_SECTION_E_plumping_contract.docx DOCX document
Hilo_-_Part_III_Plumbing.pdf PDF
Hilo_-_SECTION_G_plumber_contract.docx DOCX document
Hilo_-_SECTION_L_doc_plumbing.docx DOCX document
Hilo_-_SECTION_F_Plumbing.docx DOCX document
Hilo-PART_IV_doc_Section_K_plumbing.docx DOCX document
Hilo_-_Section_J-1.pdf PDF
Hilo_-_Section_J-3_Drawings.pdf PDF
Hilo_-_Section_B.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION C – DESCRIPTION/SPECIFICATONS/STATEMENT OF WORK

FOR

Excavation, Backfill and Compaction of Trench and Installation of Pipe

Statement of work/Specifications (AGAR 452.211-72)(FEB 1988) The contractor shall furnish the necessary personnel, material, equipment, services facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

Description of Work The work shall include, but not be limited to the excavation and backfill of approximately 1950 linear feet of trench; supply and installation of various water lines, 2 water catchment tanks, sewer lines, preparation and coordination for various electrical conduits, j-boxes, valve boxes, valves, and fittings as needed; complete pressure testing of all water lines prior to backfill. The contractor shall construct the water system to be a complete and functional system prior to final payment. There will be extensive coordination with other contractor’s work and connection of systems for functionality. All plumbing work shall be completed in compliance with local codes and requirements. All materials shall be National Sanitation Foundation approved.