Q A_6-1-16_Humbug.docx

DOCX document 15 KB Posted

Attached to
Humbug Stormproofing Federal contract opportunity
Solicitation number
AG-9AC7-S-16-0058
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

Q A 6/1/16 Humbug

View the file

Other files for this federal contract opportunity

Other files attached to Humbug Stormproofing, newest first.
File Type Posted
Q A_6-15-16_Humbug.docx DOCX document
A1_Humbug_AG-9AC7-S-16-0058_Amd_000001.pdf PDF
3._Fire_Plan.pdf PDF
2._Maps_and_Drawings.pdf PDF
5._SF_24_BID_BOND.pdf PDF
1._Special_Project_Specs.pdf PDF
4._CA9 _mod_5_Dated_030416.pdf PDF
AG-9AC7-S-16-0058_Solicitation_pkg.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-9AC7-S-16-0058 Humbug Road Stormproofing 6/1/2016

Questions and Answers

1. Is there sufficient material on site at the pit, or do we need to bring in a crusher?

Yes, there is a sufficient quantity of aggregate material and class 3 rip rap stockpiled in the pit. Borrow material for culvert installations will need to be excavated out of the embankment at the pit, but no crusher will be needed. A sufficient quantity of outlet rip rap material for the rolling dip construction will most likely be generated on site, but can also be loaded from the government pit if needed.