AG-9AC7-S-15-0107_QA_1.pdf
PDF 80 KB Posted
- Attached to
- Harrison Gulch Roof Replacement Federal contract opportunity
- Solicitation number
- AG-9AC7-S-15-0107
About this file
Question and Answer Document Version 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-9AC7-S-15-0107_Amendment01.pdf | ||
| Site_Plan_and_Photos.pdf | ||
| WD_CA-9_17Apr15.pdf | ||
| AG-9AC7-S-15-0107.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Harrison Gulch Roof Replacement Q&A Document Page 1 of 1
Harrison Gulch Roof Replacement (AG-9AC7-S-15-0107)
Questions and Answers Document
Version 1: 5/08/2015
Subsequent versions of this document will contain questions from all previous versions.
Q1. What should Contractors do with the existing insulation between the purlins?
A1. The insulation may be left in place. If it needs to be removed to install roofing or perform other tasks of the contract, it is to be neatly stacked in a place designated by the Government. If it falls down on its own during the contract, the insulation is picked up and also neatly stacked in the designated area. The insulation does not need to be reinstalled as part of the contract.