AG-9AC7-S-15-0107_QA_1.pdf

PDF 80 KB Posted

Attached to
Harrison Gulch Roof Replacement Federal contract opportunity
Solicitation number
AG-9AC7-S-15-0107
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

Question and Answer Document Version 1

View the file

Other files for this federal contract opportunity

Other files attached to Harrison Gulch Roof Replacement, newest first.
File Type Posted
AG-9AC7-S-15-0107_Amendment01.pdf PDF
Site_Plan_and_Photos.pdf PDF
WD_CA-9_17Apr15.pdf PDF
AG-9AC7-S-15-0107.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Harrison Gulch Roof Replacement Q&A Document Page 1 of 1

Harrison Gulch Roof Replacement (AG-9AC7-S-15-0107)

Questions and Answers Document

Version 1: 5/08/2015

Subsequent versions of this document will contain questions from all previous versions.

Q1. What should Contractors do with the existing insulation between the purlins?

A1. The insulation may be left in place. If it needs to be removed to install roofing or perform other tasks of the contract, it is to be neatly stacked in a place designated by the Government. If it falls down on its own during the contract, the insulation is picked up and also neatly stacked in the designated area. The insulation does not need to be reinstalled as part of the contract.