Drawings_-_Batterson_Road_Paving_Project.pdf

PDF 479 KB Posted

Attached to
Batterson road paving project
Solicitation number
AG-9AB5-S-17-0015
Issued by

About this file

Maps and Drawings

View the file

Other files

File Type Posted
AG-9AB5-S-17-0015_mod_1.pdf PDF
Solicitation_AG-9AB5-S-17-0015.pdf PDF
PPQ.docx DOCX document
ection_C-Scope_-_Batterson_Road_Paving_Project.pdf PDF
WDOL_Road_Pavement_Sierra_NF.txt TXT text file
Fire_Plan_2013_-_Batterson_Paving_Project.pdf PDF
Supplemental_Specs_-_Batterson_Paving_Project.pdf PDF
Schedule_of_Items_-_Batterson_Paving_Project.pdf PDF
fp-03usc.pdf PDF
Project_Experience_Questionnaire.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOUTHWEST

PACIFIC

REGION

DISTRICT RANGER

FOREST SUPERVISOR

FOREST ROAD MANAGER

DATE:

DATE:

DATE:

DATE:

FOREST

USDA

SERVICE

B A

T T

E R

S O

N

R

O A

D

P

A V

I N

G

P

R O

J E

C T

S I E

R R

A

N

A T

I O

N A

L

F

O R

E S

T

APPROVED BY:

T I T

L E

S

H E

E T

DESIGNED BY:

ENGINEERING

DATE:

DRAWN BY:

DATE:

REVIEWED BY:

ENGINEERING

DATE:

SCALE :

R5

NTS

SHEET NO.

F O

R E

S T

P R

O J E

C T

N A

M E

S H

E E

T

N A

M E

FOREST ENGINEER

ENGINEERING

UNITED STATES DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REGION 5

SIERRA NATIONAL FOREST

CONSTRUCTION DRAWINGS FOR

BATTERSON ROAD PAVING PROJECT

STATE VICINITY MAP

LOCAL VICINITY MAP

SHEET ____ of ____

1 2

NOTES:

1. ALL IMPROVEMENTS SHALL MEET FP-03 STANDARDS.

2. CONTRACTOR SHALL NOTIFY THE CO OF ANY AND ALL CONFLICTS BETWEEN CONTRACT DRAWINGS

AND THE ACTUAL SITE CONDITIONS PRIOR TO COMMENCING ANY WORK IN QUESTION.

3. CONTRACTOR SHALL INSTALL APPROVED TRAFFIC CONTROL SIGNS PRIOR TO COMMENCEMENT OF

ANY WORK

4. CONTRACTOR SHALL PERFORM ALL WORK NECESSARY TO COMPLETE THE CONTRACT IN

SATISFACTORY MANNER PROVIDING ALL MATERIALS, LABOR, EQUIPMENT AND INCIDENTALS

NECESSARY TO COMPLETE THE WORK UNLESS SPECIFIED OTHERWISE.

5. CONTRACTOR SHALL NOTIFY THE COR AT LEAST 8 DAYS PRIOR TO COMMENCING WORK TO PRESERVE

MONUMENTS, BENCH MARKS AND CONTROL POINTS, WHICH MAY NOT BE DISTURBED WITHOUT THE

COR CONSENT.

6. THE LOCATION OF EXISTING UNDERGROUND UTILITIES AS SHOWN ON THESE PLANS ARE BASED ON

THE BEST INFORMATION AVAILABLE; HOWEVER, THE FOREST SERVICE AND THE ENGINEER ASSUME NO

RESPONSIBILITY FOR THE ACCURACY OF THE INFORMATION SHOWN, OR FOR THE INADVERTENT

OMISSION OF ANY SUCH INFORMATION. THE CONTRACTOR SHALL COOPERATE WITH ALL UTILITY

COMPANIES AND OTHER CONTRACTORS WORKING WITHIN THE LIMITS OF THIS PROJECT.

7. CONTRACTOR SHALL NOTIFY PABLO GONZALEZ AT (559) 392-0423 A MINIMUM OF 48 HOURS PRIOR TO

BEGINNING CONSTRUCTION.

ABBREVIATIONS

ANG. PT.

A.C.

A.B.

B.V.C.

C.

C.L.

CL

CONC.

DBL.

D.I.

ELEV.

E.P.

E.V.C.

EXIST.

F.H.

F.L.

FT.

G.

H.

I.D.

J.P.

L.

L.F.

LT.

ANGLE POINT

ASPHALT CONCRETE

AGGREGATE BASE

BEGIN VERTICAL CURVE

CURB

CROWN LINE

CLASS

CONCRETE

DOUBLE

DROP INLET

ELEVATION

EDGE OF PAVEMENT

END VERTICAL CURVE

EXISTING

FIRE HYDRANT

FLOW LINE

FEET

GUTTER

HEIGHT

INSIDE DIAMETER

JOINT POLE

LENGTH

LINEAL FEET

LEFT

LAT.

L.P.

MH

O.G.

P.L.

P.P.

PVT.

RT.

R&S

R/W

S.D.

S.L.

STA.

STD.

SWK.

T.B.R.

T.S.

TYP.

VERT.

W.V.

XING

LATERAL

LIGHT POLE

MANHOLE

ORIGINAL GROUND

PROPERTY LINE

POWER POLE

PAVEMENT

RIGHT

REMOVE AND SALVAGE

RIGHT OF WAY

STORM DRAIN

SECTION LINE

STATION

STANDARD

SIDEWALK

TO BE REMOVED

TRAFFIC SIGN

TYPICAL

VERTICAL

CROSSING

W

WIDTH

WATER VALVE

CO CONTRACTING OFFICER

CMP CORRUGATED METL PIPE

OSD OVER SIDE DRAIN

COR CONTRACTING OFFICER REPRESENTATIVE

PROJECT LOCATION

PROJECT LOCATION

37.374868, -119.627504

INDEX TO SHEETS

SHEET No. DESCRIPTION

Title Sheet

Roadway Layout

HIGHWAY 41

SOUTHWEST

PACIFIC

REGION

DISTRICT RANGER

FOREST SUPERVISOR

FOREST ROAD MANAGER

DATE:

DATE:

DATE:

DATE:

FOREST

USDA

SERVICE

B A

T T

E R

S O

N

R

O A

D

P

A V

I N

G

P

R O

J E

C T

S I E

R R

A

N

A T

I O

N A

L

F

O R

E S

T

APPROVED BY:

R O

A D

W A

Y

L

A Y

O U

T

DESIGNED BY:

ENGINEERING

DATE:

DRAWN BY:

DATE:

REVIEWED BY:

ENGINEERING

DATE:

SCALE :

R5

AS SHOWN

SHEET NO.

F O

R E

S T

P R

O J E

C T

N A

M E

S H

E E

T

N A

M E

FOREST ENGINEER

ENGINEERING

SHEET ____ of ____

2 2

Batterson title sheet
Roadway Layout

File details come from the government source that posted it. Updated .