AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE
Page
of
Pages
1
3
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req. No.
5. Project No.
Amendment No. 1
See Block 16C
440808
6. Issued By:
Code
7. Administered By:
Code

IBET Acquisitions 631 Coyote Street

Nevada City, CA 95959 Voice: 530-478-6121 Fax: 530-478-6121 See Block 6

8. Name and Address of Contractor
(X)
9A. Amendment of Solicitation No.

N/A

AG-9A63-S-10-0089 (Kenzie Ravine Water Storage Tank Construction)

9B. Dated (See Item 11)

X
August 24, 2010

10A. Modification of Contract No.

10B. Date Issued (See Item 13)

Code
Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FORMCHECKBOX

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning one (1) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (If required) Not Applicable.

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE

CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. This Change Order is issued pursuant to: (specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.

B. The above numbered contract/order is modified to reflect the administrative changes set forth in Item 14. pursuant to the authority of FAR 43.103(b).

C. This supplemental agreement is entered into pursuant to authority of:

D. Other (specify type of modification and authority)

E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return one (1) copies to the issuing office.

14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

A) Delete the original Sheet 4 and replace it with the attached Sheet “02-Kenzie Ravine Amendment No. 1 REVISION 1 DRAWING PAGE 4 (1page).” Removed misprint stating incorrect line size beneath tank.

B) Delete the original Sheet 5 and replace it with the attached Sheet “03-Kenzie Ravine Amendment No.1 REVISION 1 DWG PAGE 5 (1 page)”. Changed wording on pipe type to “PVC” or “GSP” where applicable on existing valve box. Changes do not affect new construction.

C) The specification Section 13208 Bolted Steel Water Storage Tank, Part 2.2 Tank Appurtenances, Section G “Gaskets”, states that EPDM or Neoprene Gaskets and Tape Type Sealer shall not be used. The government is waiving the disallowance of gaskets as described above, however all aspects of tank construction must meet AWWA D103-97 Factory-Coated Bolted Steel Tanks for Water Storage.

By signature in Block 15B Contractor releases the Government from all claims relating to this modification. This settlement is complete accord and satisfaction. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name and Title of Signer
16A. Name and Title of Contracting Officer
Andrea Seiler, Facilities Engineer
ALAN M. JAMES, Contracting Officer
15B. Contractor/Offeror
Date Signed
16B. United States of America

/s/ ALAN M. JAMES 16C.Date Signed

August 30, 2010

(Authorized Signature)

(Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105
STANDARD FORM 30 (REV.10-83)

PRESCRIBED BY GSA FAR (48CFR) 53.243

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .