Additional_Bonding_Requirements.pdf
PDF 20 KB Posted
- Attached to
- Lower Cow Creek Bridge Repair
- Solicitation number
- AG-9A40-S-17-0010
- Issued by
-
Department of Agriculture Forest Service
About this file
Additional Bonding Requirements
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF-30.pdf | ||
| bridge_pics.pdf | ||
| SF-30.pdf | ||
| Revised_Drawings_Lower_Cow_Creek_2017-6-13.pdf | ||
| Lower_Cow_Ck._RFI.pdf | ||
| Schedule_of_Item.pdf | ||
| Schedule_of_Item.xls | XLS spreadsheet | |
| AGAR_452.228-71..pdf | ||
| Amendment_No._1.pdf | ||
| Fire_Plan.pdf | ||
| Wage_Determination.pdf | ||
| Construction_Drawings.pdf | ||
| Solicitation.pdf | ||
| Bridge_Specification.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ AG-9A40-S-17-0010
Amendment No. 2
ADDITIONAL BONDING REQUIREMENTS
BID GUARANTEE (FAR 52.228-1) (SEPT. 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of 100the United States. The Contracting Officer will return bid guarantees, other than bid bonds-
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
ALTERNATIVE PAYMENT PROTECTIONS (FAR 52.228-13) (JULY 2000)
(a) The Contractor shall submit one of the following payment protections:
(i) A payment bond.
(ii) An irrevocable letter of credit (ILC).
(iii) A tripartite escrow agreement. The prime contractor establishes an escrow account in a federally insured financial institution and enters into a tripartite escrow agreement with the financial institution, as escrow agent, and all of the suppliers of labor and material. The escrow agreement shall establish the terms of payment under the contract and of resolution of disputes among the parties. The Government makes payments to the contractor’s escrow account, and the escrow agent distributes the payments in accordance with the agreement, or triggers the disputes resolution procedures if required.
(iv) Certificates of deposit. The contractor deposits certificates of deposit from a federally insured financial institution with the contracting officer, in an acceptable form, executable by the contracting officer.
RFQ AG-9A40-S-17-0010
Amendment No. 2
(v) A deposit of the types of security listed in 28.204-1 and 28.204-2.
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within 10 days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
(End of clause) https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2028_2.html#wp1073428 https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2028_2.html#wp1073432