AG-9702-S-10-0505 Part II.docx
DOCX document 90 KB Posted
- Attached to
- RECOVERY - Hey Joe Road Federal contract opportunity
- Solicitation number
- AG-9702-S-10-0505
About this file
Solicitation Terms Conditions
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-9702-S-10-0505-000002.pdf | ||
| Attachment 7 - Gabion Wall Layout.pdf | ||
| AG-9702-S-10-0505-000001.pdf | ||
| AG-9702-S-10-0505 Part I.pdf | ||
| AG-9702-S-10-0505 Attachment 2 - Plans and Drawings.pdf | ||
| AG-9702-S-10-0505 Attachment 6 - Response to Evaluation Factors.pdf | ||
| AG-9702-S-10-0505 Attachment 3 - Fire plan.pdf | ||
| AG-9702-S-10-0505 Attachment 4 - Wage Determination CA100009.pdf | ||
| AG-9702-S-10-0505 Attachment 5 - SF 24.pdf | ||
| AG-9702-S-10-0505 Attachment 1 - Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-9702-S-10-0505
Hey Joe Road & Brush/Slab Bridge, Eldorado NF
PART I – THE SCHEDULE
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
All Roads
| Item No. |
| Description |
| M/M |
| Unit |
| Qty |
| Unit Price |
| Price |
| 151(01) |
| Mobilization – Applies to Project |
| LSQ |
| LS |
| 1 |
| 621(01) |
| ARRA Funding Source Signs, Supply and Install 2 Signs |
| LSQ |
| LS |
| 1 |
SUBTOTAL
Brush Bridge
| Item No. |
| Description |
| M/M |
| Unit |
| Qty |
| Unit Price |
| Price |
| 201(05) |
| Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs-DECK, and Stumps-SCATTER |
| LSQ |
| LS |
| 1 |
| 203(05) |
| Removal of Structures and Obstructions |
| LSQ |
| LS |
| 1 |
| 204(04) |
| Unclassified Borrow, Compaction Method A, Finish Method 2 |
| CQ |
| CY |
| 32 |
| 209(01) |
| Structural Excavation, Compaction Method C |
| CQ |
| CY |
| 26 |
| 209(03) |
| Structural Backfill, Compaction Method C |
| CQ |
| CY |
| 23 |
| 253(14) |
| Gabions, Galvanized Welded Wire Baskets |
| CQ |
| CY |
| 24 |
| 253(19) |
| Geotextile, Type IV-C |
| CQ |
| SY |
| 45 |
| 556(01) |
| Timber Bridge Railing (Includes Wheel Guards) |
| CQ |
| LF |
| 73 |
| 557(03) |
| Treated Structural Timber and Lumber (Running Planks) |
| CQ |
| MFBN |
| .94 |
| 617(01) |
| Bridge Approach Rail System G4-CRT, Type II, Class B |
| CQ |
| LF |
| 100 |
| 617(02) |
| Terminal Selection, Type G4-crt with Concrete Anchor |
| CQ |
| EA |
| 4 |
| 617(06) |
| Connection to Bridge Rail System |
| CQ |
| EA |
| 4 |
| 633(06) |
| Object Markers, Type 3 |
| CQ |
| EA |
| 4 |
| 404(01) |
| Hot Bituminous Plant Mix – ½” Caltrans Spec. |
| CQ |
| Ton |
| 48 |
SUBTOTAL
Slab Bridge
| Item No. |
| Description |
| M/M |
| Unit |
| Qty |
| Unit Price |
| Price |
| 201(05) |
| Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs-DECK, and Stumps-SCATTER |
| LSQ |
| LS |
| 1 |
| 203(05) |
| Removal of Structures and Obstructions (includes Removal of Deck Asphalt Overlay) |
| LSQ |
| LS |
| 1 |
| 204(04) |
| Unclassified Borrow, Compaction Method A, Finish Method 2 |
| CQ |
| CY |
| 54 |
| 209(01) |
| Structural Excavation, Compaction Method C |
| CQ |
| CY |
| 37 |
| 209(03) |
| Structural Backfill, Compaction Method C |
| CQ |
| CY |
| 28 |
| 253(14) |
| Gabions, Galvanized Welded Wire Baskets |
| CQ |
| CY |
| 24 |
| 253(19) |
| Geotextile, Type IV-C |
| CQ |
| SY |
| 40 |
| 556(01) |
| Timber Bridge Railing (Includes Wheel Guards) |
| CQ |
| LF |
| 73 |
| 557(03) |
| Treated Structural Timber and Lumber (Running Planks) |
| CQ |
| MFBN |
| .94 |
| 557(04 |
| Treated Structural Timber and Lumber (Wing ‘D’ Ext.) |
| CQ |
| MFBN |
| 38 |
| 617(01) |
| Bridge Approach Rail System G4-CRT, Type II, Class B |
| CQ |
| LF |
| 87.5 |
| 617(02) |
| Terminal Selection, Type G4-crt with Concrete Anchor |
| CQ |
| EA |
| 4 |
| 617(06) |
| Connection to Bridge Rail System |
| CQ |
| EA |
| 4 |
| 633(06) |
| Object Markers, Type 3 |
| CQ |
| EA |
| 4 |
SUBTOTAL
South Big X Road
| Item No. |
| Description |
| M/M |
| Unit |
| Qty |
| Unit Price |
| Price |
| 301(01) |
| Aggregate Base, Grading B, Compaction Method D |
| CQ |
| Ton |
| 3,144 |
| 303(22) |
| Reconditioning of Roadbed, Roller Compaction – Method B |
| CQ |
| Mile |
| 1.7 |
SUBTOTAL
Forebay Road
| Item No. |
| Description |
| M/M |
| Unit |
| Qty |
| Unit Price |
| Price |
| 303(23) |
| Reconditioning of Roadbed, Grading & Watering Only, Compaction Method A |
| CQ |
| Mile |
| 3.6 |
SUBTOTAL
Butcher Knife Joe Road
| Item No. |
| Description |
| M/M |
| Unit |
| Qty |
| Unit Price |
| Price |
| 303(22) |
| Reconditioning of Roadbed, Roller Compaction – Method B |
| CQ |
| Mile |
| 1.42 |
| 301(01) |
| Aggregate Base, Grading B, Compaction Method D |
| CQ |
| Ton |
| 2,616 |
SUBTOTAL
TOTAL OF ALL BASE ITEMS
OPTIONS
South Big X Road – Option A
| Item No. |
| Description |
| M/M |
| Unit |
| Qty |
| Unit Price |
| Price |
| 201(06) |
| Clearing & Grubbing, Disposal of Tops and Limbs-SCATTER, Logs-DECK, and Stumps-SCATTER |
| LSQ |
| LS |
| 1 |
| 303(22) |
| Reconditioning of Roadbed, Roller Compaction – Method B |
| CQ |
| Mile |
| 3.63 |
SUBTOTAL
Slab Creek Road – Option B
| Item No. |
| Description |
| M/M |
| Unit |
| Qty |
| Unit Price |
| Price |
| 201(05) |
| Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs-DECK, and Stumps-SCATTER |
| LSQ |
| LS |
| 1 |
| 404(01) |
| Minor Hot Asphalt Concrete – Patching |
| CQ |
| Ton |
| 250 |
SUBTOTAL
TOTAL OF ALL OPTIONS
TOTAL (BASE & OPTIONS)
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
Scope of Contract This project includes the grading and shaping of an existing 6.72 miles of native surface roads with an optional 3.63 miles of native surface road. Work also includes the placement of 5,760 tons of ¾” road base with an optional 250 tons of AC patching on an existing chip seal surface, and, bridge rail replacement on two bridges.
Project Location Project is located north of Pollock Pines, California, in Eldorado County. Project may be accessed by traveling east of Placerville, CA, on Highway 50 to Sly Park Rd exit. Turn left on Sly Park Road then left on Pony Express Trail and then right on Forebay Rd. Travel approximately 9.6 miles on Forebay Rd, across the South Fork American River and up to top of ridge to first road on right, intersection 12N34. Project starts at intersection.
NOTE: Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all prospective bidders before submission of their bids. Oral explanations or instructions given before the award of a contract will not be binding. In no event shall failure to inspect the site constitute grounds for a claim after contract award. (See Section L, 52.236-27, SITE VISIT.)
Price Range
The Government's estimate is:
[ ] < $25,000 [ ] $25,000 to $100,000.
[ ] $100,000 and $250,000.
[X] $250,000 and $500,000.
[ ] $500,000 and $1,000,000.
[ ] $1,000,000 and $5,000,000.
[ ] $5,000,000 and $10,000,000 [ ] > $10,000,000
Estimated Start Date The estimated start date is August 15, 2010.
Contractor must begin work within 10 days of the effective date of the Notice to Proceed. See Section F for additional information.
Restrictions on Work Operations may not begin until August 15, 2010.
Worker's Compensation Insurance The Contractor shall provide evidence of Worker's Compensation Insurance or a written explanation as to why the Contractor is exempt from the requirement. NOTE: The Contractor working alone is not required to carry the insurance.
Camping and Housing (see also Section H, Camping Permit Compliance) Camping is not permitted in US Forest Service campgrounds. Contractor will not be permitted to camp elsewhere on US Forest Service land with proper permit from the Contracting Officer and the relative Ranger District. Camping on Forest Service land is not a right; permission may be revoked for failure to comply with the terms of the permit.
Maps
INCLUDED WITH DRAWINGS
AGAR 452.211-72 Statement of Work/Specifications (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
SECTION D – PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in the Section}
SECTION E – INSPECTION AND ACCEPTANCE
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting officer will make their full text available. Also the full text of the clause may be accessed electronically at this/these address(es):
www.arnet.gov/far (End of Clause)
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 Inspection of Construction (AUG 1996)
SECTION F – DELIVERIES OR PERFORMANCE
Work Timing Delays due to normal adverse weather, weekends, and holidays have been included in the calculation of contract time.
Winter Shutdown When winter weather sets in and the continuation of work is impractical, the Contracting Officer may authorize a total suspension until such time as work can proceed. During the period of total suspension, the calendar days elapsed will not be charged against the contract time specified.
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting officer will make their full text available. Also the full text of the clause may be accessed electronically at this/these address(es):
www.arnet.gov/far
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984)
FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 calendar days. The time stated for completion shall include final cleanup of the premises.
SECTION G – CONTRACT ADMINISTRATION DATA
GOVERNMENT-FURNISHED PROPERTY
NONE
Invoices Payment will be processed using Form FS-6300-30, Contract Pay Estimate and Invoice, prepared by the C.O.R. The Contractor need not submit any other invoice.
Payment for Materials Off Site In accordance with Clause 52.232-5, progress payments may include payment for materials stored off site. Contractor shall provide a copy of the paid invoice; provide evidence that the material will be included in the finished project; and identify the location where the materials are stored, so that the government may make visual inspection if the Contracting Officer deems it necessary. The Contractor shall be liable for loss, damage, or destruction of the materials until such time as the materials are physically in the possession and control of the government. The Contractor will not be held liable to the extent that the Contracting Officer determines that the loss, damage, or destruction occurred through the fault or negligence of the government or its agents.
Incidental Items The intent of the contract is to provide for the completion of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment of items shown.
Preconstruction Conference This required conference will be scheduled by the COR. (See also Section I, Clause 52.236-26.)
SECTION H – SPECIAL CONTRACT REQUIREMENTS
Emergencies Fire Plan [ X]See Section J, Fire Plan [ ]Not applicable; however, Contractors are required to comply with State law during fire season.
Area of Responsibility for Fire. Unless otherwise noted elsewhere in the contract, the following define the limits of a contractor's area of responsibility for fire under the terms of the Fire Plan (Section J):
[ ](a) Trail Construction - 100 meters on either side of the centerline [ ](b) Construction of Structures - 100 meters around the perimeter of the project [X ](c) Road Construction - 300 meters on either side of the centerline [ ](d) Special for this project:
Utility Services
NONE
Superintendence by Contractor In addition to Clause 52.236-6, the following applies: The name and the specific authorities of the foreman or superintendent must be designated in writing to the Contracting Officer. The Contractor may use his/her own prepared letterhead stationery or a "Designation of Contractor's Representative" form available from the Contracting Officer. If the Contractor or the designee is not present when work is being performed on the contract, a Suspend Work Order may be issued with contract time continuing to run. The Contractor shall have a person on-site that is fully conversant in the English language.
Loss, Damage or Destruction Equipment Furnished with Operator. The Government shall not be liable for loss, damage, or destruction of equipment furnished under this contract except for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) while acting within the scope of their employment.
Other. Even though this contract may provide for performing services at the direction of Government personnel, the contract is not for personal services, and neither the Contractor nor his or her personnel are Government employees. The Government assumes no liability for injury occurring to Contractor personnel or to third parties, or for loss, damage, or destruction involving third parties' property as a result of the Contractor's operation. Except that the Government is liable for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) acting within the scope of their employment.
Camping Permit Compliance Contractor shall comply with all terms and conditions of any camping permit issued to allow use of premises. Any non-compliance will result in suspension of work until compliance is achieved.
Archaeological and Historic Sites Location of known archaeological, historic, or pre-historic materials--such as Amerind artifacts and/or historic mining, logging, or fur trapping remains protected by the American Antiquities Act (l6 USC 433)--will be identified for the contractor before work commences.
Spill Plan If the total oil or oil products storage exceeds 1,320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare and implement a Spill Prevention and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112), including certification by a registered professional engineer. The Contractor under the direction of the Contracting Officer, or in the absence of said officer, acting independently, shall immediately take action to contain and clean up, without expense to the Government, all petroleum products spills on or in the vicinity of the project which are caused by the Contractor's employees directly or indirectly as a result of contract operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation deemed necessary by the Government for the containment and clean up of petroleum products spills caused by Contractor's employees or resulting from contract operations. The Contractor shall immediately report all petroleum products spills to the Contracting Officer.
Equipment Cleaning All off-road equipment used on this project shall be washed before moving into the project area so that the equipment is free of soil, seeds, vegetative material, or other debris that could contain or hold seeds of noxious weeds. “Off-road equipment” includes all logging and construction equipment and such brushing equipment as brush hogs, masticators, and chippers; it does not include log trucks, chip vans, service vehicles, water trucks, pickup trucks, and similar vehicles not intended for off-road use.
Equipment will be considered clean when visual inspection does not reveal soil, seeds, plant material, or other such debris. Disassembly of equipment components or specialized inspection equipment is not required. Contractor shall notify the Contracting Officer at least five days in advance of moving equipment in so that arrangements can be made for inspection.
If the project area is known to contain noxious weeds, the equipment shall be cleaned before moving to other Forest Service system lands which do not contain noxious weeds.
PART II – CONTRACT CLAUSES
SECTION I—CONTRACT CLAUSES
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting officer will make their full text available. Also the full text of the clause may be accessed electronically at this/these address(es):
www.arnet.gov/far www.usda.gov/procurement/policy/agar.html
(End of Clause)
FEDERAL ACQUISITION REGULATION (48 CFR Chapter 1) CLAUSES
| 52.202-1 | Definitions (JUL 2004) |
| 52.203-3 | Gratuities (APR 1984) |
| 52.203-5 | Covenant Against Contingent Fees (APR 1984) |
| 52.203-6 | Restrictions on Subcontractor Sales to the Government (SEP 2006) |
| 52.203-7 | Anti-Kickback Procedures (JUL 1995) |
| 52.203-8 | Cancellation, Rescission, and Recovery of Funds for Illegal |
or Improper Activity (JAN 1997) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (JAN 1997)
| 52.203-12 | Limitation on Payments to Influence Certain Federal Transactions (SEP 2007) |
| 52.204-4 | Printed or Copied Double-Sided on Recycled Paper (AUG 2000) |
| 52.209-6 | Protecting the Government's Interest when Subcontracting |
with Contractors Debarred, Suspended, or Proposed for Debarment (MAY 2008)
| 52.211-18 | Variation in Estimated Quantity (APR 1984) |
| 52.219-4 | Notice of Price Evaluation Preference for HUBZone Small Business |
Concerns (JUL 2005)
| 52.219-8 | Utilization of Small Business Concerns (MAY 2004) |
| 52.222-3 | Convict Labor (JUN 2003) |
| 52.222-4 | Contract Work Hours and Safety Standards Act -- Overtime |
Compensation (JUL 2005)
| 52.222-6 | Davis-Bacon Act (JUL 2005) |
| 52.222-7 | Withholding of Funds (FEB 1988) |
| 52.222-8 | Payrolls and Basic Records (FEB 1988) |
| 52.222-9 | Apprentices and Trainees (JUL 2005) |
| 52.222-10 | Compliance with Copeland Act Requirements (FEB 1988) |
| 52.222-11 | Subcontracts (Labor Standards) (JUL 2005) |
| 52.222-12 | Contract Termination - Debarment (FEB 1988) |
| 52.222-13 | Compliance with Davis-Bacon and Related Act Regulations (FEB 1988) |
| 52.222-14 | Disputes Concerning Labor Standards (FEB 1988) |
| 52.222-15 | Certification of Eligibility (FEB 1988) |
| 52.222-21 | Prohibition of Segregated Facilities (FEB 1999) |
| 52.222-26 | Equal Opportunity (MAR 2007) |
| 52.222-27 | Affirmative Action Compliance Requirements for Construction (FEB 1999) |
| 52.222-35 | Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and other Eligible Veterans (SEP 2006) |
| 52.222-36 | Affirmative Action for Workers with Disabilities (JUN 1998) |
| 52.222-37 | Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and other Eligible Veterans (SEP 2006) |
| 52.222-50 | Combating Trafficking in Persons (SEP 2007) |
| 52.222-54 | Employment Eligibility Verification (Jan 2009) |
| 52.223-2 | Affirmative Procurement of Biobased Products Under Service and Construction Contracts (DEC 2007) |
| 52.223-6 | Drug-Free Workplace (MAY 2001) |
| 52.223-14 | Toxic Chemical Release Reporting (AUG 2003) |
| 52.223-15 | Energy Efficiency in Energy-Consuming Products (DEC 2007) |
| 52.225-13 | Restrictions on Certain Foreign Purchases (JUN 2008) |
| 52.227-1 | Authorization and Consent (DEC 2007) |
| 52.227-2 | Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007) |
| 52.227-4 | Patent Indemnity -- Construction Contracts (DEC 2007) |
| 52.228-2 | Additional Bond Security (OCT 1997) |
| 52.228-11 | Pledges of Assets (FEB 1992) |
| 52.228-12 | Prospective Subcontractor Requests for Bonds (OCT 1995) |
| 52.228-14 | Irrevocable Letter of Credit (DEC 1999) |
| 52.228-15 | Performance and Payment Bonds – Construction (NOV 2006) |
| 52.229-3 | Federal, State, and Local Taxes (APR 2003) |
| 52.232-5 | Payments Under Fixed-Price Construction Contracts (SEP 2002) |
| 52.232-17 | Interest (OCT 2008) |
| 52.232-23 | Assignment of Claims (JAN 1986) |
| 52.232-27 | Prompt Payment for Construction Contracts (OCT 2008) |
| 52.232-33 | Payment by Electronic Funds Transfer – Central Contractor |
Registration (OCT 2003)
| 52.233-1 | Disputes (JULY 2002) |
| 52.233-3 | Protest After Award (AUG 1996) |
| 52.233-4 | Applicable Law for Breach of Contract Claim (OCT 2004) |
| 52.236-2 | Differing Site Conditions (APR 1984) |
| 52.236-3 | Site Investigation and Conditions Affecting the Work (APR 1984) |
| 52.236-5 | Material and Workmanship (APR 1984) |
| 52.236-6 | Superintendence by the Contractor (APR 1984) |
| 52.236-7 | Permits and Responsibilities (NOV 1991) |
| 52.236-8 | Other Contracts (APR 1984) |
| 52.236-9 | Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984) |
| 52.236-10 | Operations and Storage Areas (APR 1984) |
| 52.236-11 | Use and Possession Prior to Completion (APR 1984) |
| 52.236-12 | Cleaning Up (APR 1984) |
| 52.236-13 | Accident Prevention (NOV 1991) |
| 52.236-15 | Schedules for Construction Contracts (APR 1984) |
| 52.236-16 | Quantity Surveys (APR 1984) |
| 52.236-17 | Layout of Work (APR 1984) |
| 52.236-21 | Specifications and Drawings for Construction (FEB 1997) |
Alternate I (APR 1984)
| 52.236-26 | Preconstruction Conference (FEB 1995) |
| 52.242-13 | Bankruptcy (JUL 1995) |
| 52.243-4 | Changes (AUG 1987) |
| 52.244-6 | Subcontracts for Commercial Items (MAR 2009) |
| 52.245-1 | Property Records (JUN 2007) |
| 52.246-21 | Warranty of Construction (MAR 1994) |
| 52.248-3 | Value Engineering – Construction (SEP 2006) |
| 52.249-2 | Termination for Convenience of the Government (Fixed-Price) (MAY 2004)--Alternate I (SEP 1996) |
| 52.249-10 | Default (Fixed-Price Construction) (APR 1984) |
| 52.253-1 | Computer Generated Forms (JAN 1991) |
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996)
| 452.236-71 | Prohibition Against the Use of Lead-Paint (NOV 1996) |
| 452.236-72 | Use of Premises (NOV 1996) |
| 452.236-73 | Archeological or Historic Sites (FEB 1988) |
| 452.236-74 | Control of Erosion, Sedimentation and Pollution (NOV 1996) |
| 452.236-76 | Samples and Certificates (FEB 1988) |
| 452.236-77 | Emergency Response (NOV 1996) |
52.203-15 Whistleblower Protections Under The American Recovery And Reinvestment Act of 2009 (Mar 2009)
(a) The Contractor shall post notice of employees rights and remedies for whistleblower protections provided under section 1553 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5).
(b) The Contractor shall include the substance of this clause including this paragraph (b) in all subcontracts.
(End of clause)
52.204-7 Central Contractor Registration (APR 2008)
(a) Definitions. As used in this clause—
“Central Contractor Registration (CCR) database” means the primary Government repository for Contractor information required for the conduct of business with the Government.
“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.
“Data Universal Numbering System+4 (DUNS+4) number” means the DUNS number means the number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same concern.
“Registered in the CCR database” means that—
(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the CCR database; and
(2) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS), and has marked the record “Active”. The Contractor will be required to provide consent for TIN validation to the Government as a part of the CCR registration process.
(b)
(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the CCR database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS or DUNS+4 number that identifies the offeror’s name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the CCR database.
(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.
(1) An offeror may obtain a DUNS number—
(i) Via the internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or
(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.
(2) The offeror should be prepared to provide the following information:
(i) Company legal business name.
(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(iii) Company physical street address, city, state and Zip Code.
(iv) Company mailing address, city, state and Zip Code (if separate from physical).
(v) Company telephone number.
(vi) Date the company was started.
(vii) Number of employees at your location.
(viii) Chief executive officer/key manager.
(ix) Line of business (industry).
(x) Company Headquarters name and address (reporting relationship within your entity).
(d) If the Offeror does not become registered in the CCR database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.
(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.
(f) The Contractor is responsible for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.
(g)
(1)
(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to:
(A) Change the name in the CCR database;
(B) Comply with the requirements of Subpart 42.12 of the FAR;
(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.
(ii) If the Contractor fails to comply with the requirements of paragraph (g)(1)(i) of this clause, or fails to perform the agreement at paragraph (g)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.
(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims (see FAR Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the CCR database. Information provided to the Contractor’s CCR record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.
(h) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the Internet at http://www.ccr.gov or by calling 1-888-227-2423, or 269-961-5757.
(End of Clause)
52.204-11 American Recovery and Reinvestment Act—Reporting Requirements (Mar 2009)
| (a) Definitions. As used in this clause— |
| “Contract”, as defined in FAR 2.101, means a mutually binding legal relationship obligating the seller to furnish the supplies or services (including construction) and the buyer to pay for them. It includes all types of commitments that obligate the Government to an expenditure of appropriated funds and that, except as otherwise authorized, are in writing. In addition to bilateral instruments, contracts include (but are not limited to) awards and notices of awards; job orders or task letters issued under basic ordering agreements; letter contracts; orders, such as purchase orders, under which the contract becomes effective by written acceptance or performance; and bilateral contract modifications. Contracts do not include grants and cooperative agreements covered by 31 U.S.C. 6301, et seq. For discussion of various types of contracts, see FAR Part 16. |
| “First-tier subcontract” means a subcontract awarded directly by a Federal Government prime contractor whose contract is funded by the Recovery Act. |
| “Jobs created” means an estimate of those new positions created and filled, or previously existing unfilled positions that are filled, as a result of funding by the American Recovery and Reinvestment Act of 2009 (Recovery Act). This definition covers only prime contractor positions established in the United States and outlying areas (see definition in FAR 2.101). The number shall be expressed as “full-time equivalent” (FTE), calculated cumulatively as all hours worked divided by the total number of hours in a full-time schedule, as defined by the contractor. For instance, two full-time employees and one part-time employee working half days would be reported as 2.5 FTE in each calendar quarter. |
| “Jobs retained” means an estimate of those previously existing filled positions that are retained as a result of funding by the American Recovery and Reinvestment Act of 2009 (Recovery Act). This definition covers only prime contractor positions established in the United States and outlying areas (see definition in FAR 2.101). The number shall be expressed as “full-time equivalent” (FTE), calculated cumulatively as all hours worked divided by the total number of hours in a full-time schedule, as defined by the contractor. For instance, two full-time employees and one part-time employee working half days would be reported as 2.5 FTE in each calendar quarter. |
| “Total compensation” means the cash and noncash dollar value earned by the executive during the contractor’s past fiscal year of the following (for more information see 17 CFR 229.402(c)(2)): |
| (1) Salary and bonus. |
| (2) Awards of stock, stock options, and stock appreciation rights. Use the dollar amount recognized for financial statement reporting purposes with respect to the fiscal year in accordance with the Statement of Financial Accounting Standards No. 123 (Revised 2004) (FAS 123R), Shared Based Payments. |
| (3) Earnings for services under non-equity incentive plans. Does not include group life, health, hospitalization or medical reimbursement plans that do not discriminate in favor of executives, and are available generally to all salaried employees. |
| (4) Change in pension value. This is the change in present value of defined benefit and actuarial pension plans. |
| (5) Above-market earnings on deferred compensation which is not tax-qualified. |
| (6) Other compensation. For example, severance, termination payments, value of life insurance paid on behalf of the employee, perquisites or property if the value for the executive exceeds $10,000. |
| (b) This contract requires the contractor to provide products and/or services that are funded under the American Recovery and Reinvestment Act of 2009 (Recovery Act). Section 1512(c) of the Recovery Act requires each contractor to report on its use of Recovery Act funds under this contract. These reports will be made available to the public. |
| (c) Reports from contractors for all work funded, in whole or in part, by the Recovery Act, and for which an invoice is submitted prior to June 30, 2009, are due no later than July 10, 2009. Thereafter, reports shall be submitted no later than the 10th day after the end of each calendar quarter. |
| (d) The Contractor shall report the following information, using the online reporting tool available at www.FederalReporting.gov. |
| (1) The Government contract and order number, as applicable. |
| (2) The amount of Recovery Act funds invoiced by the contractor for the reporting period. A cumulative amount from all the reports submitted for this action will be maintained by the government’s on-line reporting tool. |
| (3) A list of all significant services performed or supplies delivered, including construction, for which the contractor invoiced in this calendar quarter. |
| (4) Program or project title, if any. |
| (5) A description of the overall purpose and expected outcomes or results of the contract, including significant deliverables and, if appropriate, associated units of measure. |
| (6) An assessment of the contractor’s progress towards the completion of the overall purpose and expected outcomes or results of the contract (i.e., not started, less than 50 percent completed, completed 50 percent or more, or fully completed). This covers the contract (or portion thereof) funded by the Recovery Act. |
| (7) A narrative description of the employment impact of work funded by the Recovery Act. This narrative should be cumulative for each calendar quarter and only address the impact on the contractor’s workforce. At a minimum, the contractor shall provide— |
| (i) A brief description of the types of jobs created and jobs retained in the United States and outlying areas (see definition in FAR 2.101). This description may rely on job titles, broader labor categories, or the contractor’s existing practice for describing jobs as long as the terms used are widely understood and describe the general nature of the work; and |
| (ii) An estimate of the number of jobs created and jobs retained by the prime contractor, in the United States and outlying areas. A job cannot be reported as both created and retained. |
| (8) Names and total compensation of each of the five most highly compensated officers of the Contractor for the calendar year in which the contract is awarded if— |
| (i) In the Contractor’s preceding fiscal year, the Contractor received— |
| (A) 80 percent or more of its annual gross revenues from Federal contracts (and subcontracts), loans, grants (and sub grants) and cooperative agreements; and |
| (B) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and sub grants) and cooperative agreements; and |
| (ii) The public does not have access to information about the compensation of the senior executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986. |
| (9) For subcontracts valued at less than $25,000 or any subcontracts awarded to an individual, or subcontracts awarded to a subcontractor that in the previous tax year had gross income under $300,000, the Contractor shall only report the aggregate number of such first tier subcontracts awarded in the quarter and their aggregate total dollar amount. |
| (10) For any first-tier subcontract funded in whole or in part under the Recovery Act, that is over $25,000 and not subject to reporting under paragraph 9, the contractor shall require the subcontractor to provide the information described in (i), (ix), (x), and (xi) below to the contractor for the purposes of the quarterly report. The contractor shall advise the subcontractor that the information will be made available to the public as required by section 1512 of the Recovery Act. The contractor shall provide detailed information on these first-tier subcontracts as follows: |
| (i) Unique identifier (DUNS Number) for the subcontractor receiving the award and for the subcontractor’s parent company, if the subcontractor has a parent company. |
| (ii) Name of the subcontractor. |
| (iii) Amount of the subcontract award. |
| (iv) Date of the subcontract award. |
| (v) The applicable North American Industry Classification System (NAICS) code. |
| (vi) Funding agency. |
| (vii) A description of the products or services (including construction) being provided under the subcontract, including the overall purpose and expected outcomes or results of the subcontract. |
| (viii) Subcontract number (the contract number assigned by the prime contractor). |
| (ix) Subcontractor’s physical address including street address, city, state, and country. Also include the nine-digit zip code and congressional district if applicable. |
| (x) Subcontract primary performance location including street address, city, state, and country. Also include the nine-digit zip code and congressional district if applicable. |
| (xi) Names and total compensation of each of the subcontractor’s five most highly compensated officers, for the calendar year in which the subcontract is awarded if— |
| (A) In the subcontractor’s preceding fiscal year, the subcontractor received— |
| (1) 80 percent or more of its annual gross revenues in Federal contracts (and subcontracts), loans, grants (and sub grants), and cooperative agreements; and |
| (2) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and sub grants), and cooperative agreements; and |
| (B) The public does not have access to information about the compensation of the senior executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986. |
(End of clause)
52.215-2 Audit and Records—Negotiation (Mar 2009) Alternate 1 (Mar 2009)
| (a) As used in this clause, “records” includes books, documents, accounting procedures and practices, and other data, regardless of type and regardless of whether such items are in written form, in the form of computer data, or in any other form. |
| (b) Examination of costs. If this is a cost-reimbursement, incentive, time-and-materials, labor-hour, or price re-determinable contract, or any combination of these, the Contractor shall maintain and the Contracting Officer, or an authorized representative of the Contracting Officer, shall have the right to examine and audit all records and other evidence sufficient to reflect properly all costs claimed to have been incurred or anticipated to be incurred directly or indirectly in performance of this contract. This right of examination shall include inspection at all reasonable times of the Contractor’s plants, or parts of them, engaged in performing the contract. |
| (c) Cost or pricing data. If the Contractor has been required to submit cost or pricing data in connection with any pricing action relating to this contract, the Contracting Officer, or an authorized representative of the Contracting Officer, in order to evaluate the accuracy, completeness, and currency of the cost or pricing data, shall have the right to examine and audit all of the Contractor’s records, including computations and projections, related to— |
| (1) The proposal for the contract, subcontract, or modification; |
| (2) The discussions conducted on the proposal(s), including those related to negotiating; |
| (3) Pricing of the contract, subcontract, or modification; or |
| (4) Performance of the contract, subcontract or modification. |
| (d) Comptroller General or Inspector General. (1) The Comptroller General of the United States, an appropriate Inspector General appointed under section 3 or 8G of the Inspector General Act of 1978 (5 U.S.C. App.), or an authorized representative of either of the foregoing officials, shall have access to and the right to— |
(i) Examine any of the Contractor’s or any subcontractor’s records that pertain to and involve transactions relating to this contract or a subcontract hereunder; and
| (ii) Interview any officer or employee regarding such transactions. | (2) This paragraph may not be construed to require the Contractor or subcontractor to create or maintain any record that the Contractor or subcontractor does not maintain in the ordinary course of business or pursuant to a provision of law. |
| (e) Reports. If the Contractor is required to furnish cost, funding, or performance reports, the Contracting Officer or an authorized representative of the Contracting Officer shall have the right to examine and audit the supporting records and materials, for the purpose of evaluating— |
(1) The effectiveness of the Contractor’s policies and procedures to produce data compatible with the objectives of these reports; and
| (2) The data reported. | |
| (f) Availability. The Contractor shall make available at its office at all reasonable times the records, materials, and other evidence described in paragraphs (a), (b), (c), (d), and (e) of this clause, for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in Subpart 4.7, Contractor Records Retention, of the Federal Acquisition Regulation (FAR), or for any longer period required by statute or by other clauses of this contract. In addition— |
(1) If this contract is completely or partially terminated, the Contractor shall make available the records relating to the work terminated until 3 years after any resulting final termination settlement; and
(2) The Contractor shall make available records relating to appeals under the Disputes clause or to litigation or the settlement of claims arising under or relating to this contract until such appeals, litigation, or claims are finally resolved.
(g) The Contractor shall insert a clause containing all the terms of this clause, including this paragraph (g), in all subcontracts under this contract that exceed the simplified acquisition threshold, and—
(1) Except as provided in paragraph (g)(2) of this clause, the Contractor shall insert a clause containing all the terms of this clause, including this paragraph (g), in all subcontracts under this contract. The clause may be altered only as necessary to identify properly the contracting parties and the Contracting Officer under the Government prime contract.
(2) The authority of the Inspector General under paragraph (d)(1)(ii) of this clause does not flow down to subcontracts.
(3) That require the subcontractor to furnish reports as discussed in paragraph (e) of this clause.
The clause may be altered only as necessary to identify properly the contracting parties and the Contracting Officer under the Government prime contract.
52.222-39 Notification Of Employee Rights Concerning Payment Of Union Dues Or Fees (Dec 2004)
(a) Definition. As used in this clause- "United States" means the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, and Wake Island.
(b) Except as provided in paragraph (e) of this clause, during the term of this contract, the Contractor shall post a notice, in the form of a poster, informing employees of their rights concerning union membership and payment of union dues and fees, in conspicuous places in and about all its plants and offices, including all places where notices to employees are customarily posted. The notice shall include the following information (except that the information pertaining to National Labor Relations Board shall not be included in notices posted in the plants or offices of carriers subject to the Railway Labor Act, as amended (45 U.S.C. 151-188)).
Notice to Employees Under Federal law, employees cannot be required to join a union or maintain membership in a union in order to retain their jobs. Under certain conditions, the law permits a union and an employer to enter into a union-security agreement requiring employees to pay uniform periodic dues and initiation fees. However, employees who are not union members can object to the use of their payments for certain purposes and can only be required to pay their share of union costs relating to collective bargaining, contract administration, and grievance adjustment.
If you do not want to pay that portion of dues or fees used to support activities not related to collective bargaining, contract administration, or grievance adjustment, you are entitled to an appropriate reduction in your payment. If you believe that you have been required to pay dues or fees used in part to support activities not related to collective bargaining, contract administration, or grievance adjustment, you may be entitled to a refund and to an appropriate reduction in future payments.
For further information concerning your rights, you may wish to contact the National Labor Relations Board (NLRB) either at one of its Regional offices or at the following address or toll free number:
National Labor Relations Board Division of Information 1099 14th Street, N.W.
Washington, DC 20570 1-866-667-6572
1-866-316-6572 (TTY)
To locate the nearest NLRB office, see NLRB's website at http://www.nlrb.gov.
(c) The Contractor shall comply with all provisions of Executive Order 13201 of February 17, 2001, and related implementing regulations at 29 CFR part 470, and orders of the Secretary of Labor.
(d) In the event that the Contractor does not comply with any of the requirements set forth in paragraphs (b), (c), or (g), the Secretary may direct that this contract be cancelled, terminated, or suspended in whole or in part, and declare the Contractor ineligible for further Government contracts in accordance with procedures at 29 CFR part 470, Subpart B-Compliance Evaluations, Complaint Investigations and Enforcement Procedures. Such other sanctions or remedies may be imposed as are provided by 29 CFR part 470, which implements Executive Order 13201, or as are otherwise provided by law.
(e) The requirement to post the employee notice in paragraph (b) does not apply to-
(1) Contractors and subcontractors that employ fewer than 15 persons;
(2) Contractor establishments or construction work sites where no union has been formally recognized by the Contractor or certified as the exclusive bargaining representative of the Contractor's employees;
(3) Contractor establishments or construction work sites located in a jurisdiction named in the definition of the United States in which the law of that jurisdiction forbids enforcement of union-security agreements;
(4) Contractor facilities where upon the written request of the Contractor, the Department of Labor Deputy Assistant Secretary for Labor-Management Programs has waived the posting requirements with respect to any of the Contractor's facilities if the Deputy Assistant Secretary finds that the Contractor has demonstrated that-
(i) The facility is in all respects separate and distinct from activities of the Contractor related to the performance of a contract; and
(ii) Such a waiver will not interfere with or impede the effectuation of the Executive order; or
(5) Work outside the United States that does not involve the recruitment or employment of workers within the United States.
(f) The Department of Labor publishes the official employee notice in two variations; one for contractors covered by the Railway Labor Act and a second for all other contractors. The Contractor shall-
(1) Obtain the required employee notice poster from the Division of Interpretations and Standards, Office of Labor-Management Standards, U.S. Department of Labor, 200 Constitution Avenue, NW, Room N-5605, Washington, DC 20210, or from any field office of the Department's Office of Labor-Management Standards or Office of Federal Contract Compliance Programs;
(2) Download a copy of the poster from the Office of Labor-Management Standards website at http://www.olms.dol.gov; or
(3) Reproduce and use exact duplicate copies of the Department of Labor's official poster.
(g) The Contractor shall include the substance of this clause in every subcontract or purchase order that exceeds the simplified acquisition threshold, entered into in connection with this contract, unless exempted by the Department of Labor Deputy Assistant Secretary for Labor-Management Programs on account of special circumstances in the national interest under authority of 29 CFR 470.3(c). For indefinite quantity subcontracts, the Contractor shall include the substance of this clause if the value of orders in any calendar year of the subcontract is expected to exceed the simplified acquisition threshold. Pursuant to 29 CFR part 470, Subpart B-Compliance Evaluations, Complaint Investigations and Enforcement Procedures, the Secretary of Labor may direct the Contractor to take such action in the enforcement of these regulations, including the imposition of sanctions for noncompliance with respect to any such subcontract or purchase order. If the Contractor becomes involved in litigation with a subcontractor or vendor, or is threatened with such involvement, as a result of such direction, the Contractor may request the United States, through the Secretary of Labor, to enter into such litigation to protect the interests of the United States.
52.225-21 Required Use of American Iron, Steel, and Manufactured Goods-Buy American Act-Construction Materials (Mar 2009)
(a) Definitions. As used in this clause— “Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States; or
(2) A construction material manufactured in the United States.
“Foreign construction material” means a construction material other than a domestic construction material.
“Manufactured construction material” means any construction material…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .