About this file

D3 Water SOI

View the file

Other files

File Type Posted
100601_agave_information.pdf PDF
100526_prebid_notes_D3_water_systems.pdf PDF
0421 amend 003.PDF PDF
List of Attachments.pdf PDF
amend 0421.PDF PDF
carr_barn_map_and_directions.pdf PDF
AG-9702-S-10-0421 Signed Solicitation Amend 001.pdf PDF
D3_DOL WAGE DECISION NO AZ20080005.pdf PDF
D3_Water_SOW_100326.pdf PDF
D3_Water_Drawings_100423.pdf PDF
D3_Water_Maps_100326.pdf PDF
D3_SF 24 Bid Bond.pdf PDF
D3_SOLICIATION PAGES 4 - 47.pdf PDF
D3_Water_Specs_100402.pdf PDF
D3_SF 1442_SOLICIATION PAGES 1 - 3.pdf PDF
General_Fire_Plan.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pay

Item Description

Method of

Measurement

Est.

Quantity

Pay

Unit

Unit

Price Total

1 Mobilization / Bonding LSQ 1 LS

LAKEVIEW CAMPGROUND

2 Well Drilling ‐ For 12" Casing AQ 20 LF

3 Well Drilling ‐ For 6" Casing AQ 420 LF

4 Steel Surface Casing, First 24 Feet AQ 24 LF

5 6" Blank Casing, PVC Schedule 40 AQ 100 LF

6 6" Perforated Casing, PVC Schedule 40 AQ 310 LF

7 Development and Testing LSQ 1 LS

8 Sanitary Grout Seal AQ 1 EA

9 Abandon Well (if drilling is unsuccessful) AQ 110 CF

10 Well Pump, Complete LSQ 1 LS

11 Pole Mount for Solar Array and PV Array LSQ 1 LS

12 Trench and Conductors from Solar Array to Well LSQ 1 EA

13 Water Operations Shed and Pad, Complete LSQ 1 EA

14 Chlorinator AQ 1 EA

15 Supply Line Between Tank and Well AQ 100 LF

16 Outflow Meter at Tank AQ 1 EA

17 Chain Link Security Fencing w/ Gates AQ 250 LF

18 Abandon Existing Well (if drilling is successful) LSQ 1 LS

LAKEVIEW CAMPGROUND ‐ SUBTOTAL

CARR BARN ADMINISTRATIVE SITE

20,000‐Gallon Steel Bolted Water Storage Tank w/

Foundation and Earthwork Prep and Materials

LSQ 1 LS

20 Water Tanker Filler Assembly with Area Lighting LSQ 1 LS 21 Water Operations Shed and Pad, Complete LSQ 1 LS

22 12'‐6" x 30'‐0" Reinforced Concrete Pad LSQ 1 LS

23 Chain Link Security Fencing w/ Gates AQ 200 LF

24 Valve Assy w/ Concrete Box & Steel Lid AQ 13 EA

25 Air Relase Valve Assy w/ Concrete Box & Steel Lid AQ 1 EA

26 4‐1/2" Fire Hydrant Assembly AQ 1 EA

27 3/4" Hose Bibb Faucet Assembly AQ 2 EA

28 Well Refurb. w/ Pitless, Well Pump, etc. LSQ 1 LS

29 Wash Rack Assembly LSQ 1 LS

30 Fire Pump & Riser Assembly AQ 1 EA

31 Chlorinator, Pump and Control Assembly AQ 1 EA

Water System Equipment, Complete (Pressure Tank, Jet

Pump, Float Switch w/Leads to Tank, Chlorinator Tank and

Pump, etc.)

LSQ 1 LS

33 Electric and Automatic Controls LSQ 1 LS

34 Replace Float Valves @ Pond and Drinkers LSQ 1 LS

35 4‐inch PVC Pipe, Installed AQ 850 LF

36 2‐inch PVC Pipe, Installed AQ 1,100 LF

37 1‐inch PVC Pipe, Installed AQ 100 LF

38 Remove and Salvage Water System Equip LSQ 1 LS

39 Connections to Existing Water System LSQ 1 LS

40 Connections to Existing Sewer System LSQ 1 LS

CARR BARN ADMINISTRATIVE SITE ‐ SUBTOTAL

D3 Water Systems Upgrades

SCHEDULE OF ITEMS (SOI)

Pay

Item Description

Method of

Measurement

Est.

Quantity

Pay

Unit

Unit

Price Total

CARR HOUSE ADMINSTRATIVE SITE

Demolish and Remove Existing Steel Water Storage Tank, Re‐Grade Area

LSQ 1 LS

42 Chain Link Security Fencing w/ Gates AQ 100 LF

43 Ball Valve Assy w/ Concrete Box & Steel Lid AQ 3 EA

44 Well Refurb. w/ Pitless, Well Pump, etc. LSQ 1 LS

Water System Equipment (Pressure Tank, Chlorinator Tank and Pump, etc)

LSQ 1 LS

46 2‐inch PVC Pipe, Installed AQ 1,200 LF

47 Connections to Existing Water System LSQ 1 LS

48 Connections to Existing Sewer System LSQ 1 LS

CARR HOUSE ADMINISTRATIVE SITE ‐ SUBTOTAL

CANELO ADMINISTRATIVE SITE

10,000‐Gallon Steel Bolted Water Storage Tank w/

Foundation and Earthwork Prep and Materials

LSQ 1 LS

50 Demolish and Remove Existing Well Head Building LSQ 1 LS

51 Water Tanker Filler Assembly LSQ 1 LS

52 Water Operations Shed and Pad, Complete LSQ 1 LS

53 12'‐6" x 30'‐0" Reinforced Concrete Pad LSQ 1 LS

54 Chain Link Security Fencing w/ Gates AQ 200 LF

55 Valve Assy w/ Concrete Box & Steel Lid AQ 13 EA

56 4‐1/2" Fire Hydrant Assembly AQ 2 EA

57 3/4" Hose Bibb Faucet Assembly AQ 4 EA

58 Well Refurb. w/ Pitless, Well Pump, etc. LSQ 1 LS

59 Backflow Prevention Valve Assembly w/Box AQ 1 EA

60 Pump and Chlorinator Control Riser Assembly AQ 1 EA

61 Fire Pump & Riser Assembly AQ 1 EA

62 Electric and Automatic Controls LSQ 1 LS

Water System Equipment (Pressure Tank, Chlorinator Tank and Pump, etc)

LSQ 1 LS

64 4‐inch PVC Pipe, Installed AQ 1,650 LF

65 2‐inch PVC Pipe, Installed AQ 600 LF

66 Concrete Encased Sewer Crossing LSQ 1 LS

67 Remove and Salvage Water System Equip LSQ 1 LS

68 New Water Trough LSQ 1 LS

69 Connection to Existing Tank and Water System LSQ 1 LS

70 Connections to Existing Water System @ Buildings LSQ 1 LS

CANELO ADMINISTRATIVE SITE ‐ SUBTOTAL

TOTAL =

Designated Method of Measurement:

DQ ‐ designated quantities; AQ ‐ actual quantities; LSQ ‐ lump sum quantities

NOTE: Required work shown on the drawings and described in the specifications and not listed on this Schedule of Items shall be considered incidental to other pay items.

File details come from the government source that posted it. Updated .