Pre-Bid Questions and Answers

View the file

Other files

File Type Posted
100601_agave_information.pdf PDF
0421 amend 003.PDF PDF
List of Attachments.pdf PDF
amend 0421.PDF PDF
carr_barn_map_and_directions.pdf PDF
AG-9702-S-10-0421 Signed Solicitation Amend 001.pdf PDF
D3_DOL WAGE DECISION NO AZ20080005.pdf PDF
D3_Water_SOW_100326.pdf PDF
D3_Water_Drawings_100423.pdf PDF
D3_Water_Maps_100326.pdf PDF
D3_SF 24 Bid Bond.pdf PDF
D3_SOLICIATION PAGES 4 - 47.pdf PDF
D3_Water_Specs_100402.pdf PDF
D3_SF 1442_SOLICIATION PAGES 1 - 3.pdf PDF
D3_Water_SOI_100326.pdf PDF
General_Fire_Plan.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D3 WATER SYSTEMS UPGRADES – IAS REQ #379235

PRE‐BID MEETING – MAY 26, 2010 – 10 AM – CARR BARN ADMINISTRATIVE SITE

NOTES

ITEM # TOPIC

1 BIDDING PROCESS

This is the pre‐bid meeting for the D3 Water Systems Recovery Act project. The information presented here today is taken directly from the documents supplied on the www.fbo.gov website. Any information that is new or different will be posted after this meeting at that same website. Specific questions about how the bids will be evaluated and awarded should be directed to the Contract Specialist listed on the website – Tanjia Harris‐Davis. All bids are due June 11, 2010, in electronic form, by 2 pm Pacific time. (Please note that the bid due date has been revised to June 21, 2010.)

The field visit today includes review of three projects in the package: Carr Barn, Carr House, and Canelo. If there are questions on the other project (Lakeview), we can entertain those today as well.

2 HIGHLIGHTS FROM SPECIFICATIONS

GENERAL

Contractor is to furnish all materials, equipment, transportation, labor, and supervision necessary to complete the work.

All work on each water system must comply with ADEQ standards as a public water system.

Garbage service and electricity is not available for use at any of the sites.

The well at Canelo can only support 1 load of water per day; for Carr House and Carr Barn should be obtained from a source in Sierra Vista; water for Lakeview may be obtained from the existing well, and possibly the lake.

Staying in campgrounds other than as a member of the public (paying fees, 14‐day contract) is not allowed; use of the restroom facilities during the duration of the contract will be possible.

It is the Contractor’s responsibility to familiarize themselves with the existing conditions and notify the Government of any discrepancies shown in the bid documents.

The Contractor shall provide safety fencing around the work area to protect the public, employees, and concessionaires.

A pre‐work meeting will be held at each site after project award for further clarification of the projects.

2 HIGHLIGHTS FROM SPECIFICATIONS

GENERAL (continued)

A schedule for all work must be submitted and approved by the Government prior to commencement of construction.

AGAVE: must be protected during construction – may have to transplant if it is in the direct line of a utility alignment. Please see attached photos of a representative plant and a link to the University of Arizona website on how to transplant the agave.

All work shall be completed within 120 days from NTP.

Protection of natural resources is required and NEPA documentation must be followed. Contractor to clearly stake limits of construction for Government approval and maintain those stakes.

Upon completion of the project, all demolished improvements become the property of the Contractor. They must be disposed of off Forest Service land.

Safety and security of the Contractor’s equipment and materials at the construction site is not guaranteed. The Contractor is responsible for proving the necessary security for equipment, materials, and work until final acceptance by the Government.

No live trees are to be cut without Government permission.

Best Management Practices, including the use of wattle and silt fence, will need to be followed.

Submittals are required, including shop drawings, manufacturer’s literature, and samples, and must be approved by the Government prior to their use on the project

– please review the requirements listed in the Specifications.

Quality control, including water line pressure testing, is required and outlined in detail in the specifications. Compaction and concrete tests are required for well building and road crossings.

As‐built drawings will be required – they do not need to be sealed by a Registered Land Surveyor.

Salvage of usable equipment is required. Transport to Carr Barn Administrative Site is needed.

2 HIGHLIGHTS FROM SPECIFICATIONS

UTILITIES

All utility lines are required to be installed with marking tape AND tracer wire.

Locations of new utilities will need to be staked by Contractor and approved by Government.

There are some very specific inspection points called out in Section 2510, including approval of trenching, pipe placement, etc – please note and review this section before preparing your bid.

Utility line locations will be as per the drawings or as staked in the field.

Minimum cover for water lines – 2 feet, unless otherwise noted.

Thrust blocks will be required as necessary and as indicated in the supplied details.

Contractor is to cap/plug all existing utility connections associated with removals.

Suitable fill material from required excavations shall be exhausted before using imported fill material, except in the case of the water operations shed and road crossings.

3 CARR BARN ADMINSTRATIVE SITE

The site is used for pasture, storage, fire events, and training.

It is served by an on‐site well.

Both potable and non‐potable systems are needed for site.

This is a semi‐active administrative site–vehicle traffic and personnel access will be present during construction.

Water service interruptions to wildlife pond and livestock need to be kept to a minimum.

Project is a complete replacement of the existing system. Task items include:

Refurbishment of the existing well with a new submersible pump.

Replacement of the 10,000 fiberglass tank with a new bolted 20,000 steel tank with float switch system.

Installation of a new 2” PVC fill line from the well to the tank along the existing pipe alignment.

Installation of a 4” PVC distribution line from the tank back to the well operations shed.

3 CARR BARN ADMINSTRATIVE SITE (continued)

Installation of PVC piping from the existing line from the tank to the wildlife drinker.

Installation of a potable water system to serve trailer pads and a spigot.

Potable system storage will be accomplished by means of a pressure tank.

Fire pump and fire fill standpipe has been included in the package.

Construction of a hose rack required.

Specific items include yard hydrants/spigots, fire hydrants.

Ball valves are to be brass or stainless steel – all to be located in valve boxes (no traffic‐rated lids anticipated).

4 CARR HOUSE ADMINSTRATIVE SITE

The site is used as base of operations for Friends of the Huachuca Mountains and staging for road and fire crews.

It is served by an on‐site well.

Only potable systems needed for the site; we are currently experiencing pressure problems at the shed.

Project is a complete replacement of the existing system. Task items include:

Refurbishment of the existing well with a new submersible pump.

Removal of the existing steel tank near the house.

Replacement of system equipment, including chlorinator, backflow prevention device, and pressure tank.

Installation of a new 2” PVC supply line from the well to house and out‐ building distribution system. Please note soils present on site.

Replacement of the distribution network to resolve the pressure issue.

Specific items include yard hydrants/spigots, fire hydrants.

5 CANELO ADMINSTRATIVE SITE

The site is used as government housing, engine station, and crew staging during road work and fire events.

It is served by an on‐site well.

Only potable systems are needed for site.

5 CANELO ADMINSTRATIVE SITE (continued)

Project is a complete replacement of the existing system. Task items include:

Refurbishment of the existing well with a new submersible pump.

Addition of a 10,000‐gallon bolted steel tank next to the existing tank.

Replacement of system equipment, including chlorinator, meter, and pressure tank.

Installation of a new 2” PVC fill line from the well to the tanks.

Installation of a 4” PVC distribution line from the tanks to the branches of the distribution system.

Backflow prevention, fire pump and fire fill standpipe has been included in the package.

Replacement of the distribution network to the houses, office, and barn.

Specific items include yard hydrants/spigots, and fire hydrants.

6 LAKEVIEW CAMPGROUND

We are seeking to establish a new well location for the Lakeview Campground water system. Anticipated location is near to the existing tank to limit supply line lengths.

Requires the drilling of a new well. If the well is not successful, it will need to be abandoned following State regulations. If the well is successful, additional work will be needed, including:

Installation of a solar power source and solar well pump.

Construction of a water operations shed to house chlorination equipment and riser assembly.

Connection of the well to the existing tank.

Installation of fencing and associated gates around the well, water operations shed, and tank.

Abandonment of the existing well located near the lake.

7 QUESTIONS AND ANSWERS

a DOES THE PIPE NEED TO BE INSPECTED BEFORE BACKFILL? Yes – please refer to Section 2510 for inspection requirements.

b DO ARCHAEOLOGICAL SITES EXIST IN THE PROJECT AREAS? It is currently not anticipated, but possible. If archaeological artifacts are found, project work will need to halt until the Forest Archaeologist clears the site.

c DO ANY EXISTING LINES CONTAIN ASBESTOS (TRANSITE)? Not to our knowledge.

d DOES THE EXISTING LINE TO THE TANK, POND, AND DRINKERS NEED TO STAY IN SERVICE DURING CONSTRUCTION? The potable water system and most of the non‐ potable system can be taken out of service. The one area that will need close coordination on when it can be decommissioned is the existing 10,000 gallon tank that serves the wildlife pond. The tank must be kept in service as long as possible so as to provide water to the pond.

e DOES THE DRINKER AT CARR BARN GET REPLACED? No, the drinker remains in place ‐ the float for the drinker will be replaced as specified in the Statement of Work.

f DO WE USE COMPRESSION FITTINGS? Acceptable fittings are listed in the specifications.

g DO ALL OF THE MATERIALS NEED TO BE AMERICAN‐MADE? The FAR clauses attached to the solicitation documents outline which materials are required to be American‐ made.

h CAN THE TANK AT CARR BARN BE PLACED IN THE SAME PLACE, OR NEXT TO IT? Both options are acceptable.

i IS THE EXISTING TANK TO BE SALVAGED? No, the existing tank will be removed and disposed of off Forest Service property.

j IS THE TANK AT A CARR BARN POTABLE? The tank will need to be NSF‐61 compliant even though it is holding raw water.

k IS THERE A FLOW TEST REQUIREMENT FOR THE WELL AT CARR BARN? No.

l WHAT IF THERE IS SEDIMENT IN THE CARR BARN WELL, OR OTHER WELLS? We do not anticipate having to surge the wells or otherwise refurbish them at this time.

m WILL THE SIGN‐IN SHEET BE AVAILABLE? Yes.

7 QUESTIONS AND ANSWERS (continued) n DOES THE CONCRETE BELOW THE TANK AT CARR HOUSE GET REMOVED? The concrete stays.

o HOW DEEP IS THE EXISTING CARR BARN WELL? According to Arizona Department of Water Resources records, 175 feet.

p DOES THE TANK STAY IN SERVICE AT CARR HOUSE? The steel tank is not longer in service. The pressure tank will not have to remain in service during construction.

q ARE THERE TORCH REQUIREMENTS FOR FIRE DANGER? Please review the general fire plan that was supplied on www.fbo.gov. Additionally, torch cutting will be prohibited during periods of fire restrictions.

r CAN THE FENCING COME DOWN NORTH OF THE OUTBUILDING AT CARR HOUSE? Yes, the fencing (which is located approximately 2’ from the building face) can be taken down and the materials salvaged on site.

s ARE WE TRANSITIONING FROM 2” TO 4” FOR THE NEW SEWER LINE AT THE CARR HOUSE LAUNDRY? Carry the 2” line from the outlet at the building wall, and tap into the existing 4” inlet to the septic tank. We do not anticipate coring a new inlet into the tank.

t WHAT IS THE CONNECTION TO THE SEPTIC TANK IDENTIFIED AT THE CARR HOUSE OUTBUILDING? It is to connect the graywater from the laundry facility to the existing septic tank.

u WHERE IS THE ALIGNMENT OF THE NEW SUPPLY LINE FOR THE CARR HOUSE? It will be placed along the existing alignment, which follows the trail path from the house down to the well house.

v WHAT ARE THE DIMENSIONS OF THE NEW PRESSURE TANK AT CARR HOUSE – WILL IT FIT THROUGH THE DOOR? We will accept pressure tanks in parallel of sufficient size and quantity to match what is called out on the plan. Dimensions for the proposed tanks should be sized to allow installation through the well house door.

w IS THE WELL HOUSE BUILDING HISTORIC? Yes, however limited modifications can be made to enable access.

7 QUESTIONS AND ANSWERS (continued) x WHAT SIZE VEGETATION IS CONSIDERED A TREE? WILL THE FOREST SERVICE CLEAR A PATH FOR THE WATER ALIGNMENTS? The alignment/trail path will need to be brushed and cleared to an appropriate width by the Contractor. The Forest Service will coordinate with appropriate staff and observe operations to make sure we remain within NEPA parameters.

y CAN HDPE PIPE BE USED? Yes, you have the option of using HDPE (of equivalent strength) instead of PVC for cross‐county lines where joints will be limited. PVC will still need to be installed in the immediate vicinity of the Carr House and outbuildings. In addition to the base bid which assumes PVC, please provide an alternate bid that details this change.

z THE SPECIFICATIONS SAY TO INSTALL A NEW PRESSURE TANK AT CANELO – IS THIS ACCURATE? No, the well will pump directly to the tank.

aa WHERE IS THE TANK SITE AND WHERE DOES THE WATER COME FROM AT CANELO?

The new tank will be set next to the existing tank, and will receive water from the well.

bb HOW DOES THE CANELO WELL NEED TO BE ABANDONED? The well can be filled with gravel, the concrete cap removed, and natural grade restored to the area. Please note, the well is not registered with the Arizona Department of Water Resources.

cc HOW BIG IS THE CASING FOR THE CANELO WELL TO BE ABANDONED? The vertical culvert/well is 3’ in diameter and 26’ deep – water level is at 12’ below ground.

dd HOW MANY ATTEMPTS DO WE HAVE TO FIND WATER AT LAKEVIEW? One.

ee CAN PVC BE USED INSTEAD OF STAINLESS STEEL FOR THE DOWNPIPE AT THE WELL?

Yes, you have the option of using PVC instead of stainless steel for the downpipe. In addition to the base bid which assumes stainless steel, please provide an alternate bid that details this change.