About this file

Amendment 1 Standard Form 30

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY: Graphic Design Service, newest first.
File Type Posted
Attachment 2 Wage determination 05-2333.pdf PDF
AG-9702-S-10-0355 RFP.doc DOC document
Attachment 1 Map.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No AG-9702-S-10-0355 Amendment No 0001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE

PAGE OF PAGES

1 4

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

21 May 10

4. REQUISITION/PURCHASE REQ. NO.

371343

5. PROJECT NO. (if applicable)

6. ISSUED BY CODE

7. ADMINISTERED BY (if other than Item 6) CODE

US Forest Service

Pacific Southwest Region

Economic Recovery Operations Center

1323 Club Drive

Vallejo, CA 94592

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

(X)
9A. AMENDMENT OF SOLICITATION NO.

AG-9702-S-10-0355, Graphic Design Service, Inyo National Forest, Mammoth Lake Ranger District

X

11 May 10

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

(X) The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers ( ) is extended, ( X) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning __1____ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

Or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PALCE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT /ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE
A. THIS ORDER ID ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor ( ) is not, ( ) is required to sign this document and return _________ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

See page 2 for specifics.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

WILLIAM CANDELARIA, Contracting Officer

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED
16B. UNITED STATES OF AMERICA

/S/ William Candelaria

(Signature of Contracting Officer)

16C. DATE SIGNED

21 May 10

NSN 7540-01-152-8070 STANDARD FORM 30 (REV. 10-83)

Previous edition unusable Prescribed by GSA FAR (48 CFR) 53.243

Amendment no. 0001 is hereby issued as follows:

1. Page 4 of the solicitation, C.8.1 Specifications, the first sentence is changed as follows:

From: Panel Drawings shall be submitted full size on 24” x 36” sheets with at least 4 sets of each panel true color print

To: Submit one set of full size, 24” x 36” true color proofs and one set half size true color proofs for each graphic panel

2. Page 5 of the solicitation, Project Deliverables, the following is a list of anticipated deliverables is changed as follows:

From:

· Initial plans, renderings and/or electronic visual simulations and materials at the 10 percent completion level for workshops.

· Drawings for the workshop and information meetings at the 50 percent completion level.

· Coordination meetings and minute taking.

· 90 percent submittal with project specifications.

· 100 percent submittal with project specifications, reproducible specifications.

· Shop drawing review comments from fabricator.

· Attendance field inspection To:

· Initial plans, and materials at the 10 percent completion level for workshops.

· Drawings for the workshop and information meetings at the 50 percent completion level.

· Coordination meetings and minute taking.

· 90 percent submittal with project specifications.

· 100 percent submittal with project specifications, reproducible specifications.

3. A list of questions and answers regarding this solicitation is provided below:

Question: On number 5 timing requirements, do you mean a time schedule?

Answer: Yes. Provide a project schedule.

Question: Do you desire to see graphic samples of past interpretive panel designs?

If so does the electronic system allow for uploading pdf graphic files or would it be better to send a hard copy in the mail with graphic samples?

Answer: Yes, pdf Graphic files can be uploaded to FBO. You may also choose to mail the entire proposal with the Graphic samples if encountering difficulty uploading in FBO

Question: Are original illustrations required to be created for these panels?

If so please state the number of illustrations and type of illustrations. For example, will the illustrations be of a bird, wildflower, or an ecosystem? Ecosystem drawings can cost $3,000 to produce. Illustrations are very expensive to produce and/or purchase.

Answer: Background illustrations, graphic artist designs, and photographs will be prepared by the Forest Service.

Question: Can photos be used instead of illustrations? Does the Forest Service have good photos for use or would the contractor have to purchase rights for photos or take the photos?

Answer: Contractor to use a combination of photographs and illustrations. All illustrations and photos will be provided by the Forest Service.

Question: Will the Forest Service provide maps for the panels that the contractor can edit or will the contractor need to create maps from scratch? How many maps are required?

Answer: Yes. The Forest Service will provide all map files for editing by the contractor.

Question: Phase 1 and Phase 2 use the term "schematic" design. This term is usually used in the exhibit design field and not in the graphic design field. For graphic design of panels usually a conceptual graphic design is provided. Is this what is wanted?

Answer: Yes. Conceptual design is schematic design.

Question: In Phase 2 it says "develop panel exhibit design". Do you mean develop panel graphic design?

Answer: Yes. Prepare panel design including overall theme.

Question: Phase 3 says "prepare panel exhibit drawings". Do you mean prepare panel graphic design?

Answer: All panels are to be graphic designs.

Question: Under phase 4 deliverable "full size color panel proofs and digital files". Section C.8-1 specifications says "panel drawings shall be submitted full size on 24" x 36" sheets with at least 4 sets of each panel true color print." Full size proofs are asked for in the solicitation but not in the budget. Can I include the price for these as a separate line item since 4 sets of 16 panels or 64 full size proofs will be very expensive. The fabricator who I work with (KVO Industries) always provides one half size proof of each panel as part of their panel production costs. Just wanting to verify that you indeed want to spend the money on 64 full size proofs?

Answer: CHANGE. Page 4 C.8.1 to provide one set full size true color proofs and one set half size true color proofs for each graphic panel.

Question: Under project deliverables it says "initial plans, renderings and/or electronic visual simulations and materials". This seems to refer to exhibit design and planning. Renderings are usually a part of exhibit design. In graphic design for panels the contractor will provide conceptual graphic designs for each panel. Is this what you meant?

Answer: Yes. Conceptual draft and final proofs, no renderings or exhibits.

CHANGE, Delete reference to renderings and electronic visual simulations in first bullet of “Project Deliverables”.

Question: Under deliverables the reference to drawings, project specifications, and shop drawing review comments from fabricator, in my experience, relate to exhibit design and fabrication. These are not applicable to graphic design for panels, are they? All that is required is the graphic design on a CD for the fabricator to produce the panels. Please clarify why you mentioned these exhibit terms for this contract.

Answer: Shop drawing review and attendance to field inspection is not required for the contract.

CHANGE, Delete last two bullets under “Project Deliverables” i.e. “Shop drawing review comments form fabricator” and “Attendance field inspection”.

Question: Could images of any existing kiosks that are similar in construction be provided?

Answer: There are no existing photos of existing interpretive kiosks that can be provided

Question: Could images of any existing kiosks that are similar in construction be provided?

Answer: All interpretive panels are of equal importance