AG-9702-S-10-0183-0002.pdf

PDF 130 KB Posted

Attached to
RECOVERY--McCloud Office Building 2 Federal contract opportunity
Solicitation number
AG-9702-S-10-0183
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Southwest

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY--McCloud Office Building 2, newest first.
File Type Posted
AG-9702-S-10-0183-0003.pdf PDF
AG-9702-S-10-0183-0001.pdf PDF
McCloud Office Building 2 Site Visit Notes.pdf PDF
McCloud Office 2 Site Visit Sign-in Sheet.pdf PDF
RFP Package.zip ZIP file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0002 05/27/2010

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

USDA Forest Service EROC-SW Contracting (Attn: Charles Wallach) 1323 Club Drive Vallejo, CA 94592

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

AG-9702-S-10-0183

9B. DATED (SEE ITEM 11)

04/30/2010

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return one (1) copy to the issuing office. Submit signed solicitation amendments in the same manner as offers, in accordance with Section L instructions.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

See attached SUMMARY OF CHANGES.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT - Attachment to SF 30 2 3

ISSUANCE DATE: 05/27/2010 PROJECT NAME: McCloud Office Building 2

AMENDMENT NUMBER: 0002

List below (or on attached sheet, if necessary) each proposed modification identified by Item Number, location of station, etc., giving the reasons for the modifications.

SUMMARY OF CHANGES:

A. Reference SF 1442, page 1 of 43, block 13 a: Offers due date is hereby changed from 06/01/2010 at 2:00 pm to 06/07/2010 at 2:00 pm.

B. The purpose of this amendment is to provide the below Questions and Answers (Q&A).

Q1. Reference Spec section 2411, 3.02 HAZARDOUS MATERIALS: Does the USFS intend to abate the ACBMs itself (per the conversation at the walk through) and, if it does not, will the Contractor be given a change order to abate them as part of the project?

A1. All known asbestos will be removed from the Fuels Office, Garage and Conference Room prior to the start of the contract by Forest Service approved personnel. Any other hazardous materials that need abatement including lead paint is part of the overall contract and is not intended to be under a separate contract. The list of prospective bidders and those that signed up at the pre-bid meeting are available at FedBizOpps if you would like to offer them your services if they are the winning bidder. It is not for us to suggest or say who they need to subcontract with.

Q2. Are the light poles shown on E5.0 part of Option A (this question from a sub)? Unless I hear differently from you, I will assume they are part of the base bid?

A2. The light poles near the parking lots are part of the base bid.

Q3. What work is intended in the areas of stamped/colored concrete if Option C is not awarded (plansheet C2.0)? Unless I hear differently from you, I will assume that no work is required there?

A3. If the stamped/colored concrete is not awarded, only rough grading would be required. This would be necessary to ensure the surrounding benches and sidewalks would be at the correct elevation. No finish grading or concrete would be placed in this area.

Q4. Is the bench wall on C2.0 part of Option C or the base bid? Unless I hear differently from you, I will assume it is part of the base bid?

A4. The bench wall is part of the base bid.

Q5. Where are the 2 drainpipes that lead to the bioswale to be daylighted if Option B is not awarded (sht C2.0, bottom left)? Unless I hear differently from you, I will choose to daylight them south of the parking lot at a spot of our choosing.

A5. The storm drains are to be at the design elevations, grade and alignment, as shown on the plans. If the bioswale is not awarded, then the lines will terminate a minimum of 5' past the edge of the parking lot. The ends will be capped with temporary caps and their locations marked.

Q6. Please confirm that all capping above the lava stone is poured-in-place concrete, not lava stone?

A6. The elevations call out note #4 which states stone veneer with C.I.P. concrete cap. C.I.P. stands for Cast In place, so yes it is poured in place and not lava stone.

Q7. I am looking at the third page of the SF-1442 form and am unsure what to fill in on this sheet. It seems to be a re-hash of Section B. Does this form need to be filled out by the GC? If so, are there instructions available somewhere for this form?

A7. SF 1442, page 3 of 43 requires no action--Offerors are required to complete Section B.

Q8.

A8. One four foot length of sidewalk to be stamped should be sufficient and if approved can be left in place.

Q9. There is a discrepancy on sheet e-5 and sheet c-2, 4 light poles or 3 light poles?

A9. Lights: Both sheet C2 and E5 show 4 lights, however the note for the call out on sheet E5 states "typ of 3". This note is incorrect. There are 4 lights required. Three are located at the parking lot south of the new building and one light is located near where the sidewalk from the existing trailers meet the parking lot to the north. All four locations are shown graphically on the plan sheets.

Q10. Please provide confirmation as to whether the wiring in the new office will be in either romex or mc cable?

A10. Electrical wire: Specification 16050, section 2.05(G) states that NM will only be allowed when approved by the Contracting Officer. Romex is allowed for concealed spaces only.

C. Submit all questions in writing via e-mail to the following technical POC: jstreuber@fs.fed.us

D. All other terms and conditions remain unchanged.

(End of Amendment)

PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT - Attachment to SF 30 3 3

ISSUANCE DATE: 05/27/2010 PROJECT NAME: McCloud Office Building 2

AMENDMENT NUMBER: 0002

List below (or on attached sheet, if necessary) each proposed modification identified by Item Number, location of station, etc., giving the reasons for the modifications.