DBA WD 03-12-10.pdf
PDF 29 KB Posted
- Attached to
- RECOVERY - South Fork Feather River Bridge Federal contract opportunity
- Solicitation number
- AG-9702-S-10-0115
About this file
DBA WD
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-9702-S-10-0115-0002.pdf | ||
| AG-9702-S-10-0115-0002 Questions and Answers.pdf | ||
| Amendment 1.zip | ZIP file | |
| 1_Fire Plan_Rev_8_09.pdf | ||
| SF 1442 - South Fork Feather River-Truss Bridge pages 1 - 3.pdf | ||
| SFTB_SPSpecs.pdf | ||
| SF 1442 - South Fork Feather River-Truss Bridge pages 4 - 47.pdf | ||
| SF 24 Bid Bond.pdf | ||
| SFT_Painting_1109.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONLY USED DAVIS-BACON WAGES
Plumas National Forest
Page1
Decision No. CA20080009 updated as of 03/12/2010 West Plumas County in Plumas National Forest
PLUMAS COUNTY - SKILLED LABOR / TRADES
BASIC
HOURLY
RATES
FRINGE
BENEFITS
TOTAL WAGES &
BENEFITS
Bricklayer (Area 1) 33.49 16.00 49.49
Mason Tender (Brick) 27.03 14.93 41.96
Carpenter (Area 4) 29.27 20.96 50.23
- Shingler, Scaffold & Shoring Erector 29.42 20.96 50.38
- Bridge Builder 36.50 20.96 57.46
- Millwright 31.77 22.55 54.32
Cement Mason, Concrete Finisher: 25.88 15.03 40.91
Drywall Installer/Lather (Area 4) 29.77 21.40 51.17
Drywall Finisher/Taper 36.53 14.78 51.31
Electrician: 38.43 3% + 12.45 52.03
Glazier 33.53 16.20 49.73 Ironworkers:
- Fence Erector 26.58 15.24 41.82
- Ornamental, Reinforcing, Structural 33.00 23.17 56.17
Plasterer (Area 295) 32.82 15.10 47.92
Plasterer Tender 26.17 12.68 38.85
Painter 29.82 12.72 42.54
- Spray /Sandblast ($0.50 additional/hr.) 30.32 12.72 43.04
Painter, High Time 50' - 100' 31.82 12.72 44.54
Plumber : 35.70 19.28 54.98
Roofer : 26.77 13.93 40.70 Sheet Metal Worker :
- Metal decking and siding only 27.90 20.89 48.79
- Mechanical jobs ($200,000 and under) 27.90 20.89 48.79
Underground Utility Worker / Landscape Fitter 27.35 6.85 34.20
APPLICABILITY OF COMPLETE WAGE RATE DECISION: In addition to the wage rates in this solicitation, the complete decision of the Secretary of Labor contains wage rates for other classes of laborers and mechanics. Because it does not appear that the work called for by this solicitation will require the use of such other classes, the wage rates applicable to them have not been reprinted herein. However, if any such classes of laborers or mechanics actually are employed to perform work under the contract resulting from this solicitation, payment will be required as specified in this clause entitled "Davis-Bacon Act" at wage rates contained in the complete decision of the Secretary of Labor. Offerors desiring the complete decision may request it from the Contracting Officer.
Page2
Decision No. CA20080009 updated as of 03/12/2010 West Plumas County in Plumas National Forest
HIGHWAY IMPROVEMENT
BASIC
HOURLY
RATES
FRINGE
BENEFITS
TOTAL WAGES &
BENEFITS
Parking Lot Striping / Highway Marking
GROUP 1: STRIPER: Layout & application of painted traffic stripes & marking;
hot thermo plastic, tape, traffic stripes & markings 29.44 12.51 41.95
GROUP 2: GAME COURT AND PLAYGROUND INSTALLER: 24.23 12.51 36.74
GROUP 3: PROTECTIVE COATING, PAVEMENT SEALING: 24.86 12.51 37.37
TRAFFIC CONTROL / LANE CLOSURE (AREA B)
BASIC
HOURLY
RATES
FRINGE
BENEFITS
TOTAL WAGES &
BENEFITS
Escort Driver, Flag Person, Area B) 25.89 14.93 40.82 TRAFFIC CONTROL PERSON I, Layout of traffic control, crash cushiond, construction area & roadside signage 26.19 14.93 41.12 TRAFFIC CONTROL PERSON II, installation & removal of temporary/permanent signs, markers, delineators & crash cushions. 23.69 14.93 38.62
CONSTRUCTION CRAFT LABORERS (AREA B)
BASIC
HOURLY
RATES
FRINGE
BENEFITS
TOTAL WAGES &
BENEFITS
Construction Specialist Group: Asphalt Ironer and Raker / Chainsaw, Blaster, Diamond Driller 26.84 14.93 41.77
GROUP 1: Faller, Log Loader, Bucker / Jack Hammer, Compactors, Hydro Seeder, Pipe Layer, Post Hole Digger, Form Raiser, Asphalt Spreader Boxes, Kettle Tender 26.14 14.93 41.07
GROUP 1(a): Rock Drillers (All Types), Mech. Pipe Layer, All working/placing/and blasting of all powder and explosives 26.36 14.93 41.29
GROUP 1(b): Sewer Cleaner ($4.00 per day above GROUP 1 wages) 30.64 14.93 45.57
GROUP 1(c): Burning and Welding 26.19 14.93 41.12 x GROUP 1(e): Work on bell hole footings and shafts, and work on deep footings (15 ft. or more in depth) 26.69 14.93 41.62
GROUP 1(f): Wire winding machine in connection with guniting or shot crete 26.72 14.93 41.65
GROUP 2: Asphalt Shoveler,Cement Laborer, Chipper Feeder, Choker Setter & Rigger (clearing work), all pneumatic, air, gas, and eletric tools not in GROUPS 1 - 1(f) 25.99 14.93 40.92
GROUP 3: Construction Laborers, including, Dump Load Spotter, Flagman, Fire Watcher, Fence/Guardrail Erector, Brush Loader/Plier, Maintenance and repair of tract and roadbeds 25.89 14.93 40.82
GROUP 4: Cleanup Work of debris, grounds, and buildings 19.58 14.93 34.51
Page3
Decision No. CA20080009 updated as of 03/12/2010 West Plumas County in Plumas National Forest
POWER EQUIPMENT OPERATORS
BASIC
HOURLY
RATES
FRINGE
BENEFITS
TOTAL WAGES &
BENEFITS
AREA 1
GROUP 1: Power Shovel, Excavator (> 7 CY), Helicopter Oper.erection work 37.77 21.69 59.46
GROUP 2: Power Blade Operator (finish), Power Shovels (1-7 CY), Hydralic Excavator (3 1/2 - 7 CY), Highline Cableway 36.24 21.69 57.93
GROUP 3: Excavator (up to 3 ½ CY), Loader (4 CY+), Combo Backhoe - Loader (> 3/4CY), Dozer / Multi. Engine Scraper (push-pull), Power Shovels (up to and incl.14CY), Asphalt Milling Machine, Wheel Excavator (up to 750 CY/hr.) 34.76 21.69 56.45
GROUP 4: Asphalt Plant Engineer, Combo. Backhoe-Loader (up to 3/4 CY), Concrete Batch Plant (wet/dry), Dozer and/or Push Cat, Timber Skidder, Loader (< 4 CY), Roller Operator (AC), Scraper, Track Loader (up to 4 CY), Welder, Lube & Service Engineer, Grade Setter & Grade Checker 33.38 21.69 55.07
GROUP 5: Cast-in-place Pipe Laying Machine, Drilling Equipment, Trenching Mach.(max.>5' in depth), Concrete Mixer/Finisher, Portable Crusher 32.11 21.69 53.80
GROUP 6: Self Loading Chipper/Chip Spreading Machine, Assist. Plant & Bridge Deck Engineer, Soils & Materials Tester 30.79 21.69 52.48
GROUP 7: Roller (except AC) Chip Seal Automatic Curing Machine, Self- Propelled Compactor (w/o Dozer), Boom Truck (under 15 Ton) 29.65 21.69 51.34
GROUP 8: Compressor Oper., Deckhand, Forklift Oper., Self-Propelled Power Sweeper, Tar Pot Firetender 28.51 21.69 50.20
GROUP 8-A: Mini-Excavator (backhoe, trencher (< 25 h.p.), Skidster Loader/Bobcat 743 series or smaller (w/o attachments), Tub Grinder, Wood Chipper 28.30 21.69 49.99
TRUCK DRIVERS
BASIC
HOURLY
RATES
FRINGE
BENEFITS
TOTAL WAGES &
BENEFITS
GROUP 1: Dump Truck (< 6 CY), Forklift, Comcrete Pump Truck, Fuel & Greese truck, Single Unit Flat Rack (2-Axle), Bus or Person-Haul Driver 27.13 18.99 46.12
GROUP 2: Dump Truck (6 CY & under 8 CY), Transit mixer (thru 10 CY), Water Trucksa < 7000 Gal.), Single Unit Flat Rack (3-axle), Highbed Heavy Duty Transit, Road Oil Truck or Bootman 27.43 18.99 46.42
GROUP 3: Dump truck (8-35 CY), Water Truck (> 7000 gal.), Lowbed Heavy Duty Transport, Self Loading truck, Boom Truck, Snow Plow 27.73 18.99 46.72
GROUP 4: Dump Truck (over 35-65 CY), Helicopter Pilot (when transporting men/materials), Lowboy Heavy Duty Transport 28.08 18.99 47.07
GROUP 5: Dump Truck (65CY and over), Lowbed Trqnsport (> 7-axles) 28.43 18.99 47.42