Amendment 0002 pgs 2-4.doc
DOC document 5 MB Posted
- Solicitation number
- AG-9702-S-10-0107
About this file
Amendment 0002 pages 2 through 4
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002 page 1.pdf | ||
| 38_Amend 0001 pg 2 3.doc | DOC document | |
| 38_Amendment 0001 page 1.pdf | ||
| 38_Amend 0001 pg 2 3.docx | DOCX document | |
| 38_AG-9702-S-10-0107.doc | DOC document | |
| 35_KAISERBridge_sheet1_ Coversheet-Model.pdf | ||
| 35_KAISERBridge_sheet5_PavingDetails-Model.pdf | ||
| 35_KAISERBridge_sheet4_SitePlanDetais-Model.pdf | ||
| 35_KAISERBridge_sheet2_ VicinityMap-Model.pdf | ||
| 35_KAISERBridge_sheet6_TrafficSigns-Model.pdf | ||
| 35_KAISERBridge_sheet3_SitePlan-Model.pdf | ||
| 38_AG-9702-S-10-0107.doc | DOC document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-9702-S-10-0107 AMEND 0002
52.228-1 Bid Guarantee.
As prescribed in 28.101-2, insert a provision or clause substantially as follows:
Bid Guarantee (Sept 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be __20%__ percent of the bid price or $__100,000.00__, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of provision)
52.228-15 Performance and Payment Bonds—Construction.
As prescribed in 28.102-3(a), insert a clause substantially as follows:
Performance and Payment Bonds—Construction (Nov 2006)
(a) Definitions. As used in this clause—
“Original contract price” means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.
(b) Amount of required bonds. Unless the resulting contract price is $100,000 or less, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:
(1) Performance bonds (Standard Form 25). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.
(2) Payment Bonds (Standard Form 25A). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
(3) Additional bond protection.
(i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.
(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.
(c) Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.
(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the:
U.S. Department of the Treasury Financial Management Service Surety Bond Branch 3700 East West Highway, Room 6F01 Hyattsville, MD 20782.
Or via the internet at http://www.fms.treas.gov/c570/.
(e) Notice of subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of the contract.
(End of clause) Drawing titled Site Plan, sheet 3 incorporated into the solicitation is replaced by the drawing listed below. The note on the upper left side of the drawing is revised to 2 inch compacted depth in lieu of 4 inch compacted depth.
_1325056370.pdf
Construct Paved Spillway
30' Lenght W/12 C.Y. Riprap
30' Lenght
40' Lenght
Existing CMP With Drop Inlet
Existing Roadway Ditch
Existing Concrete Bridge
KAISER CREEK
20'
28' 28'
24'
30' 20'
140'
KAISER BRIDGE PAVEMENT PROJECT
Kaiser Creek
NOTE: HOT BITUMINOUS ASPHALT
PAVEMENT APPROACHES
ARE APPROXIMATELY
200 - FEET IN LENGTH
EACH SIDE OF BRIDGE
ASPHALT THICKNESS
IS 4-INCH COMPACTED DEPTH.
NOTE: ASPHALT CURB WILL BE STAKED BY THE
FOREST SERVICE, PAVED SPILLWAYS ARE
CONSIDERED INCIDENTAL TO CURB
PLACEMENT AND SHALL BE INCLUDED IN UNIT
COST OF ASPHALT CURB.
100'
New A gg reg ate S urf ac e
New Aggregate Surface
NOTE: PLACE 100-LINEAR FOOT
OF SURFACE COURSE
MATERIAL BEYOND ENDS
OF FINISHED ASPHALT
PAVEMENT APPROACHES,
FULL WIDTH OF EXISTING
ROADWAY 2-INCH
COMPACTED DEPTH.
100'
2 C. Y. Riprap
File details come from the government source that posted it. Updated .