35_KAISERBridge_sheet3_SitePlan-Model.pdf
PDF 2 MB Posted
- Solicitation number
- AG-9702-S-10-0107
About this file
site plan-model
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002 page 1.pdf | ||
| Amendment 0002 pgs 2-4.doc | DOC document | |
| 38_Amend 0001 pg 2 3.doc | DOC document | |
| 38_Amendment 0001 page 1.pdf | ||
| 38_Amend 0001 pg 2 3.docx | DOCX document | |
| 38_AG-9702-S-10-0107.doc | DOC document | |
| 35_KAISERBridge_sheet1_ Coversheet-Model.pdf | ||
| 35_KAISERBridge_sheet5_PavingDetails-Model.pdf | ||
| 35_KAISERBridge_sheet4_SitePlanDetais-Model.pdf | ||
| 35_KAISERBridge_sheet2_ VicinityMap-Model.pdf | ||
| 35_KAISERBridge_sheet6_TrafficSigns-Model.pdf | ||
| 38_AG-9702-S-10-0107.doc | DOC document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Construct Paved Spillway
30' Lenght W/12 C.Y. Riprap
Construct Paved Spillway
30' Lenght W/12 C.Y. Riprap
Construct Paved Spillway
40' Lenght W/12 C.Y. Riprap
Existing CMP With Drop Inlet
Existing Roadway Ditch
Existing Concrete Bridge
KAISER CREEK
20'
28' 28'
24'
30' 20'
140'
KAISER BRIDGE PAVEMENT PROJECT
Kaiser Creek
NOTE: HOT BITUMINOUS ASPHALT
PAVEMENT APPROACHES
ARE APPROXIMATELY
200 - FEET IN LENGTH
EACH SIDE OF BRIDGE
ASPHALT THICKNESS
IS 4-INCH COMPACTED DEPTH.
NOTE: ASPHALT CURB WILL BE STAKED BY THE
FOREST SERVICE, PAVED SPILLWAYS ARE
CONSIDERED INCIDENTAL TO CURB
PLACEMENT AND SHALL BE INCLUDED IN UNIT
COST OF ASPHALT CURB.
100'
New A gg reg ate S urf ac e
New Aggregate Surface
NOTE: PLACE 100-LINEAR FOOT
OF SURFACE COURSE
MATERIAL BEYOND ENDS
OF FINISHED ASPHALT
PAVEMENT APPROACHES,
FULL WIDTH OF EXISTING
ROADWAY 4-INCH
COMPACTED DEPTH.
100'
2 C. Y. Riprap
File details come from the government source that posted it. Updated .