AG-9702-S-09-0032

OMB APPROVAL NO. 2700-0042

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

AG-9702-S-09-0032

2. TYPE OF SOLICITATION

FORMCHECKBOX

SEALED BID (IFB)

FORMCHECKBOX

NEGOTIATED (RFP)

3. DATE ISSUED

10 Sep 2009

PAGE OF PAGES

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

309729/309730/309731/309732

6. PROJECT NO.

CIM-05-05R

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

U.S. Forest Service EROC-SW Contracting

1323 Club Dr.

Vallejo, CA 94592 *See Instructions, Conditions and Notices to Offerors or Respondents for offer submittal requirements

9. FOR INFORMATION

CALL:

A. NAME

Yvonne Crist B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) 707-562-8828

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

Price Range The Government's estimate is: between $250,000 and $500,000.

SPECIAL NOTICE

*RECOVERY* - This solicitation is funded in whole or part by funds from the American Recovery and Reinvestment Act (ARRA).

**This solicitation is being conducted under the terms of your existing IDIQ contract 53-9SCP-05-____ and all modifications thereto, including the most recent incorporation of ARRA clauses. All terms and conditions included in the previously referenced contract are hereby incorporated and made a part of this solicitation and any resulting Task Order.** This is a REQUEST FOR QUOTES, as outlined in the existing IDIQ contract under Line Item 17 and 18.

11. The Contractor shall begin performance. SEE REMARKS STATED IN EACH INDIVIDUAL PROJECTS SCHEDULE OF ITEMS

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES,” indicate within how many calendar days after award in Item 12B.)

FORMCHECKBOX

YES

FORMCHECKBOX

NO See Schedule for specifics

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A.

Offers submitted via email to perform the work required are due at the place specified in Instructions, Conditions and Notices to Offerors or Respondents of this solicitation by 2:00pm local time 17 September 2009. Emails containing offers will clearly show the solicitation number, and the date and time offers are due in the subject line of the email.

B.

An offer guarantee

FORMCHECKBOX

is, FORMCHECKBOX is not required.

C.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D.

Offers providing less than N/A calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212

1442-101

STANDARD FORM 1442 (REV. 4-85)

Computer Generated

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE

FACILITY CODE

17.

The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each

AMENDMENT NO.
DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20B. SIGNATURE

20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

FORMCHECKBOX

10 U.S.C. 2304(c)( )

FORMCHECKBOX

41 U.S.C. 253(c)( )

26. ADMINISTERED BY

CODE

27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

FORMCHECKBOX

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.

FORMCHECKBOX

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE

30C. DATE

31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

Computer Generated

STANDARD FORM 1442 BACK (REV. 4-85)

PART I - SCHEDULE OF ITEMS

SECTION B – SERVICES AND PRICES

Eagle Lake Recreation Facilities Chipseal

Gallatin Marina Parking Lot

Eagle Lake District Lassen National Forest Lassen County

ITEM

NO.

DESCRIPTION

METHOD OF MEASUREMENT

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

15101

Mobilization

LS

Lump Sum All

40950

Chipseal, Designation 2A

CQ

Square Yard 19,900

41409

Crack Cleaning and Sealing
CQ
Linear

Foot 4,900

43004

Full Depth Patch Hot Asphalt Concrete Mixture

CQ

Ton

63406

Pavement Markings Type _K__

LS

Lump Sum All

Remarks: See Attachments for additional terms and conditions. The Period of

Performance for this project is 15 calendar days after issuance of the Notice to Proceed.

Total Price:

Swain Mountain Trailhead Chipseal

Almanor District

Plumas County

DESCRIPTION

METHOD OF MEASUREMENT

PAY

UNIT

EST.

QTY.

UNIT

PRICE

LS

Lump Sum All

41001

Slurry Seal, Type III
CQ

Square Yard 8,200

Crack Cleaning and Sealing
CQ
Linear

Foot

LS

Lump Sum All

Remarks: See Attachments for additional terms and conditions. The Period of

Performance for this project is 10 calendar days after issuance of the Notice to Proceed.

Total Price:

Eskimo Hill Parking Lot Chipseal

Hat Creek District

Shasta County

DESCRIPTION

METHOD OF MEASUREMENT

PAY

UNIT

EST.

QTY.

UNIT

PRICE

LS

Lump Sum All

Chipseal, Designation 2A
CQ

Square Yard 5,200

Crack Cleaning and Sealing
CQ
Linear

Foot 2,000

LS

Lump Sum All

Remarks: See Attachments for additional terms and conditions. The Period of

Total Price:

Morgan Summit Snowmobile Park Chipseal

Almanor District

Tehama County

DESCRIPTION

METHOD OF MEASUREMENT

PAY

UNIT

EST.

QTY.

UNIT

PRICE

LS

Lump Sum All

Chipseal, Designation 2A
CQ

Square Yard 4,100

43004

Full Depth Patch Hot Asphalt Concrete Mixture
CQ
Linear

Foot

LS

Lump Sum All

Remarks: See Attachments for additional terms and conditions. The Period of

Total Price:

Evaluation and award will be made on a project by project basis. Vendors can quote on any or all of the projects. Quoters who provide prices for two or more projects can qualify their offer to accepting one, two or all three projects.

Contract Time - If more then one project is awarded and accepted by contractor, contract time for each project will run cuncurently.

This Request for Quotes is being conducted under the terms of your existing IDIQ contract and all modifications thereto, including the most recent incorporation of ARRA clauses. All terms and conditions included in the previously referenced contract are hereby incorporated and made a part of this solicitation and any resulting Task Order.** ARRA clauses applicable to this RFQ and resulting Task Order Award are:

52.203-15 – Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 (Mar 2009)

52.204-11 – American Recovery and Reinvestment Act—Reporting Requirements (Mar 2009 FAR 52.225-21 - Required Use of American Iron, Steel, and Other Manufactured Goods--Buy American Act--Construction Materials (Mar 2009)

FAR 52.225-22 - Notice of Required Use of American Iron, Steel, and Other Manufactured Goods--Buy American Act--Construction Materials (Mar 2009)

FAR 52.215-2 Audit and Records – Negotiation with Alternate 1 Mar 2009)

BONDING REQUIREMENTS

Awards for less then $30,000 will not require bonding

Awards for $30,000 to $100,000 will require payment bond in the amount of 100% of the awarded amount

Awards for $100,000 and above will require both Payment and Performance bonds. The penal amount of each bond is 100% of the awarded amount.

Refer to the bonding clauses for additional information

Contractor: (Name and Signature)

Performance and Payment bond clauses for awards of $100,000 and above

52.228-15 - Performance and Payment Bonds -- Construction (Nov 2006)

(a) Definitions. As used in this clause --

“Original contract price” means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.

(b) Amount of required bonds. Unless the resulting contract price is $100,000 or less, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:

(1) Performance Bonds (Standard Form 25). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.

(2) Payment Bonds (Standard Form 25-A). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.

(3) Additional bond protection.

(i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.

(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.

(c) Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.

(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier’s check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the:

U.S. Department of Treasury Financial Management Service Surety Bond Branch 3700 East West Highway, Room 6F01 Hyattsville, MD 20782 Or via the internet at http://www.fms.treas.gov/c570/ .

(e) Notice of subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of the contract.

(End of Clause)

Payment bond clause for awards of $30,000 but less then $100,000

FAR 52.228-13 Alternative Payment Protections (JUL 2000) (Applicable to Contracts >$30,000 but< $100,000)

(a) The Contractor shall submit one of the following payment protections

(1) Payment Bond

(2) Irrevocable Letter of Credit

(b) The amount of the payment protection shall be 100 percent of the contract price.

(c) The submission of the payment protection is required within 10 calendar days of contract award.

(d) The payment protection shall provide protection for the full contract performance period plus a one year period.

(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.

(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.

1.

DESCRIPTION OF WORK: See Separate Attached Standard Specifications for all four projects, and the individual Project Table of Contents and Special Specifications.

2. PROJECT LOCATIONS: See Separate Attached Individual Project Location Maps.

3. PRICE RANGE:

The estimated price range is between $25,000 TO $100,000

4. SPECIFIC WORK REQUIREMENT: See typicals for specific work items and special specifications. The “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03” applies to this project.

5. COMMENCEMENT PROSECUTION, AND COMPLETION OF WORK (FAR 52.211-10) (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use within __30 days__. The time stated for completion shall include final cleanup of the premises. Work is estimated to begin September 20, 2009

6. GOVERNMENT PROVIDED MATERIAL SOURCES:

Description
Location
Remarks

NONE

STANDARD SPECIFICATIONS

FOR

CONSTRUCTION OF ROADS & BRIDGES

ON FEDERAL HIGHWAY PROJECTS (FP-03)

SPECIFICATION LIST

FOR ALL 4 PROJECTS

PROJECT NAME:
Eagle Lake Recreation Facilities Chipseal, Eskimo Hill Parking Lot Chipseal, Morgan Summit Snowmobile Park Chipseal, Swain Mountain Trailhead Chipseal
SECTION NO.
TITLE
DATE
101-109*
General Requirements
2003
SS-101**
Terms, Format, and Definitions
2009
SS-102
Bid, Award, and Execution of Contract
2005
SS-103
Scope of Work
2005
SS-104
Control of Work
2006
SS-105
Control of Material
2007
SS-106
Acceptance of Work
2007
SS-107
Legal Relations and Responsibility to the Public
2007
SS-108
Prosecution and Progress
2005
SS-109
Measurement and Payment
2006
151
Mobilization
2003
153
Contractor Quality Control
2003
SS-153
Contractor Quality Control
2007
155
Schedules for Construction Contracts
2003
SS-155
Schedules for Construction Contracts
2004
156
Public Traffic
2003
SS-156
Public Traffic
2004
157
Soil Erosion Control
2005
SS-171
Weed and Disease Prevention
2005
404
Minor Hot Asphalt Concrete
2003
SS-404
Minor Hot Asphalt Concrete
2005
409
Asphalt Surface Course
2003
SS-409
Asphalt Surface Course
2005

FIRE PLAN FOR CONSTRUCTION AND SERVICE CONTRACTS

6-14-2006

(Ref: FSH 6309.32 and 6309.11)

FOR ALL 4 PROJECTS

1. SCOPE:

The provisions set forth below outline the responsibility for fire prevention and suppression activities and establish a suppression plan for fires within the contract area. The contract area is delineated by map in the contract. The provisions set forth below also specify conditions under which contract activities will be curtailed or shut down.

2. RESPONSIBILITIES:

A. Contractor

(1) Shall abide by the requirements of this Fire Plan.

(2) Shall take all steps necessary to prevent his/her employees, subcontractors and their employees from setting fires not required in completion of the contract, shall be responsible for preventing the escape of fires set directly or indirectly as a result of contract operations, and shall extinguish all such fires which may escape.

(3) Shall permit and assist in periodic testing and inspection of required fire equipment. Contractor shall certify compliance with specific fire precautionary measures in the fire plan, before beginning operations during Fire Precautionary Period and shall update such certification when operations change.

(4) Shall designate in the fire plan and furnish on Contract Area during operating hours a qualified fire supervisor authorized to act on behalf of Contractor in fire prevention and suppression matters.

Shall complete the Contractor's Plan Regarding Personnel and shall furnish the Contracting Officer (CO) with a copy prior to commencing work at the site. Shall currently advise the CO of any changes in personnel as the changes occur. Shall revise Section 6.B to reflect current activities upon request of the CO.

B. Forest Service

The Forest Service may conduct one or more inspections for compliance with the fire plan. The number, timing, and scope of such inspections will be at the discretion of agency employees responsible for contract administration. Such inspections do not relieve the Contractor of responsibility for correcting violations of the fire plan or for fire safety in general, as outlined in paragraph 2.A above.

3. TOOLS AND EQUIPMENT:

A. The Contractor shall comply with the following requirements during the fire precautionary period as defined by unit administering contracts unless waived in writing:

The Fire Precautionary Period is May 1 to Oct 31.

Contractor shall equip each operating tractor and any other internal combustion engine with a spark arrester, except for motor vehicles equipped with a maintained muffler as defined in C.P.R.C. Section 4442 or tractors with exhaust-operated turbochargers. Spark Arresters shall be a model tested and approved under Forest Service Standard 5100-1a as shown in the. National Wildlife Coordinating Group Spark Arrester Guide, Volumes 1 and 2, and shall be maintained in good operating condition.

Contractor shall meet minimum requirements of Sections 4427 and 4428 of the California Public Resources Code (C.P.R.C.). Fire tools kept at each operating landing shall be sufficient to equip all employees in the felling, yarding, loading, chipping, and material processing operations associated with each landing. Fire equipment shall include two tractor headlights for each tractor dozer used in Contractor's Operations. Tractor headlights shall be attachable to each tractor and served by an adequate power source.

Where cable yarding is used, Contractor shall provide a size 0 or larger shovel with an overall length of not less than 46 inches and a filled backpack can (4 or 5 gallon) with hand pump within 10 feet of each tail and corner block.

Trucks, tractors, pickups and other similar mobile equipment shall be equipped with and carry at all times a size 0 or larger shovel with an overall length of not less than 46 inches and a 2-1/2 pound axe or larger with an overall length of not less than 28 inches.

Contractor shall equip each internal combustion yarder, fuel truck, and loader with a fire extinguisher for oil and grease fires (4-A:60-B:C).

Contractor shall equip each mechanized harvesting machine with hydraulic systems, powered by an internal combustion engine (chipper, feller/buncher, harvester, forwarder, hot saws, stroke delimber, etc), except tractors and skidders, with at least two 4-A:60-B:C fire extinguishers or equivalent. In addition, concentrations of wood dust and debris shall be removed from such equipment daily. Additional extinguishers and sizes may be required at landings in accordance with Section 5.

Each power saw shall be equipped with a spark arrester approved according to C.P.R.C. Section 4442 or 4443 and shall be maintained in effective working order. One fire extinguisher meeting specifications of C.P.R.C. Section 4431 shall be kept with each operating power saw. A size 0 or larger shovel with an overall length of not less than 38 inches shall be kept with each gas can but not more than 300 feet from each power saw when used off cleared landing areas.

Contractor shall meet minimum requirements of Section 4430 of the California Public Resources Code (C.P.R.C.). Contractor shall provide a water tank truck or trailer on or in proximity to Contract Area during Contractor 's Operations hereunder during Fire Precautionary Period unless otherwise agreed. When Project Activity Level B or higher is in effect, a tank truck or trailer shall be on or immediately adjacent to each active landing unless otherwise excepted when hot saw technology is being used. See Section 5 for specific contract requirements.

The tank shall contain at least 300 gallons of water available for fire suppression. A water sprinkling tank truck will meet this requirement if provision is made to insure that the minimum of 300 gallons is available for fire suppression at all times. Ample power and hitch shall be readily available for promptly and safely moving tank over roads serving Contract Area. Tank truck or trailer shall be equipped with following:

(1) Pump, which at sea level, can deliver 23 gallons per minute at 175 pounds per square inch measured at the pump outlet. Pumps shall be tested on Contract Area using a 5/16 inch orifice in the Forester One Inch In-Line Gauge test kit. Pump shall meet or exceed the pressure value in the following table for nearest temperature and elevation:

Temp
Sea

Level

1000 Feet
2000 Feet
3000 Feet
4000 Feet
5000 Feet
6000 Feet
7000 Feet
8000 Feet
9000 Feet
10000 Feet
55
179
23
174
23
169
23
165
22
161
22
157
22
153
22
150
21
146
21
142
21
139
21
70
175
23
171
23
166
22
162
22
158
22
154
22
150
21
147
21
143
21
139
21
136
20
85
171
23
168
23
163
22
159
22
155
22
151
21
147
21
144
21
140
21
136
20
133
20
100
168
23
164
23
159
22
155
22
152
22
148
21
144
21
141
21
137
20
133
20
131
20
PSI
GPM
PSI
GPM
PSI
GPM
PSI
GPM
PSI
GPM
PSI
GPM
PSI
GPM
PSI
GPM
PSI
GPM
PSI
GPM
PSI
GPM

The pump outlet shall be equipped with 1-1/2 inch National Standard Fire Hose thread. A bypass or pressure relief valve shall be provided for other than centrifugal pumps.

(2) 300 feet of 3/4-inch inside diameter rubber-covered high-pressure hose mounted on live reel attached to pump with no segments longer than approximately 50 feet, when measured to the extreme ends of the couplings. Hose shall have reusable compression wedge type 1-inch brass or lightweight couplings (aluminum or plastic). One end of hose shall be equipped with a coupling female section and the other end with a coupling male section. The hose shall, with the nozzle closed, be capable of withstanding 200 PSI pump pressure without leaking, distortions, slipping of couplings, or other failures.

(3) A shut-off combination nozzle that meets the following minimum performance standards when measured at 100 P.S.I. at the nozzle:

G.P.M.
Horizontal Range
Straight Stream
10
38 feet
Fog Spray
6 - 20
N/A

(4) Sufficient fuel to run pump at least 2 hours and necessary service accessories to facilitate efficient operation of the pump.

When Contractor is using Hot Saw Technology, an additional 500 feet of not less than one (1) inch outside diameter serviceable hard rubber poly or rubber lined or fiber jacket rubber lined (FJRL) hose shall be immediately available for use and be capable of connecting to the 300 feet of hose and appurturances in (2) and (3) above. Synthetic hose may be used by agreement.

B Any additional fire plan requirements:

4.

GENERAL

A. State Law. The Contractor shall comply with all applicable laws of the State of California. In particular, see California Public Resource Codes.

B. Permits Required. The Contractor must secure a special written permit from the District Ranger or designated representative before engaging in any of the activities listed below. The terms and conditions of any of the permits required for this contract are as shown on copies attached to the Fire Plan.

(1) Blasting and Storage of Explosives and Detonators. (Explosives Permit required by California Health & Safety Code, Section 12101.)

(2) Burning.

(3) Air Pollution. (Issued by local State or County Air Pollution Control Districts, as applicable.)

(4) Camp, Lunch and Warming Fires.

(5) Welding and Cutting.

C. Regulations for Burning. Before setting any fires whatsoever, the Contractor shall notify the CO of his/her intentions. Special care shall be taken to prevent scorching or causing any damage to adjacent structures, trees, and shrubbery. Piles of material to be burned shall be of such size and so placed that during burning no damage shall result to adjacent objects.

D. Smoking and Fire Rules. Smoking shall not be permitted during fire season, except in a barren area or in an area cleared to mineral soil at least three feet in diameter (CPRC 4423.4). In areas closed to smoking, the CO may approve special areas to be used for smoking. The Contractor shall sign designated smoking areas. Contractor shall post signs regarding smoking and fire rules in conspicuous places for all employees to see. Contractor's supervisory personnel shall require compliance with these rules. Under no circumstances shall smoking be permitted during fire season while employees are operating light or heavy equipment, or walking or working in grass and woodlands.

E. Storage and Parking Areas. Equipment service areas, parking areas, and gas and oil storage areas shall be cleared of all flammable material for a radius of at least 10 feet unless otherwise specified by local administrative unit. Small mobile or stationary internal combustion engine sites shall be cleared of flammable material for a slope distance of at least 10 feet from such engine. The COR shall approve such sites in writing.

F. Welding. Contractor shall confine welding activity to cleared areas having a minimum radius of ten feet measured from place of welding.

G. Blasting. Contractor shall use electric caps only unless otherwise agreed in writing. When blasting is necessary in slash areas, a watchperson equipped with a size 0 or larger shovel with an overall length of not less than 46 inches and a filled backpack can (4 or 5 gallon) with hand pump shall remain in the immediate area for an hour after blasting has been completed.

H. Oil Filter and Glass Jugs. Contractor shall remove from National Forest lands oily rags and used oil filters and shall prohibit use of glass bottles and jugs in Contractor's Operations.

I. Reporting Fires. As soon as feasible but no later than 15 minutes after initial discovery, Contractor shall notify Forest Service of any fires on Contract Area or along roads used by Contractor.

J. Communications. Contractor shall furnish a serviceable telephone, radio-telephone or radio system connecting each operating side with Contractor's headquarters. When such headquarters is at a location which makes communication to it clearly impractical, Forest Service may accept a reasonable alternative location. The communication system shall provide prompt and reliable communications between Contractor's headquarters (or agreed to alternative) and Forest Service via commercial or Forest Service telephone. The communications system shall be operable during Contractor's Operations in Fire Precautionary Period described in Section 3 and during the time fire patrolperson service is required. A radio-equipped fire patrolperson vehicle will satisfy this requirement if in operation during the time required except during PAL levels “D” and “Ev”. See Section 5 for other communication requirements when operating on “D” and “Ev” days with hot saw technology. A CB is not acceptable communication because FCC Regulations prohibit commercial use.

K. Fire Patrol Person. Contractor shall furnish a qualified fire patrolperson each operating day when Project Activity Level B or higher is in effect. When on duty, sole responsibility of patrolperson shall be to patrol the operation for prevention and detection of fires, take suppression action where necessary and notify the Forest Service as required by Section 5.

By agreement, one patrolperson may provide patrol on this and adjacent projects or sales. No patrolperson shall be required on Specified Road construction jobs except during clearing operations unless otherwise specified.

L.

Time of Snag Felling. Unless the felling of dead trees would interfere with the felling, skidding or yarding of green timber or be a safety hazard, or be prevented under Section 5, required felling of dead trees shall be concurrent with the felling of live timber. There shall be reasonably timely felling of dead trees to facilitate utilization and protection from fire.

M.

Clearing of Fuels. Contractor shall clear away, and keep clear, fuels and logging debris as follows:

Welding equipment and stationary log loaders, yarders and other equipment listed in California State Law:
10 feet slope radius
Tail or corner haulback blocks:
5 feet slope radius
Lines near, between or above blocks:
Sufficient clearing to prevent line from rubbing on snags, down logs and other dead woody material

5. EMERGENCY MEASURES

The table set forth below establishes work restrictions and fire precautions that the Contractor must observe at each activity level. The restrictions are cumulative at each level.

The Forest Service, in its sole discretion, may change the predicted activity level if the current fire suppression situation, weather and vegetation conditions warrant additional restriction of activities. Contractor shall obtain the predicted Project Activity Level by calling the following phone number 1-800-847-7766 before starting work each day. If practicable, Forest Service will determine the following day’s activity level by 6:00 PM local time. If predictions made after 6:00 PM are significantly different than originally estimated, Forest Service will inform Contractor when changes in restrictions or industrial precautions are indicated.

The following definitions shall apply to these Project Activity Levels:

Cable Yarding Systems: A yarding system that takes logs from the stump area to a landing using an overhead system of winch-driven cables to which logs are attached with chokers or grapples.

Hot Saw Technology: A harvesting system that employs a high-speed (>1100 rpm) rotation felling heads (i.e., full rotation lateral tilt head).

Sunset: The time that sunset is reported in the local newspaper for that day.

Except for Project Activity Level days “Ev after 1:00 PM local time” and “E”, Forest Service may issue substitute precautions(s) of the requirements below. Such agreements shall prescribe measures to be taken by Contractor to reduce risk of ignition and/or spread of fire.

Forest Service may change the Project Activity Levels to other values upon revision of the National Fire Danger Rating System and may change the specific Project Activity Levels and/or requirements when such changes are necessary for the protection of the National Forest. When sent to Contractor, the revised Project Activity Levels will supersede the levels below.

PROJECT ACTIVITY LEVEL –EMERGENCY PRECAUTIONS

Table version 6/13/2006

PROJECT ACTIVITY LEVEL

Level
Project Activity Requirements
A
Minimum required by Section 3

1. PAL levels are cumulative, Ev level would include all preceding

PAL requirements.

B
1. A fire patrolperson is required for mechanical operations from cessation of operations until 2 hours after operations cease or sunset, which ever occurs first.

2. Tank truck or trailer shall be on or adjacent to each active landing.

3. When hot saw technology is being used, the tank truck or trailer (B2 above) may serve dual purpose as active landing tank truck provided it shall be kept readily available for use as follows:

a.Within one quarter mile of the operating hot saw technology; and b.Within 10 minutes of the active landing; and

c. Effective communications exist between hot saw technology and active landing.

Otherwise, there shall be a tank truck or trailer at both the active landing and within one quarter mile of the operating hot saw technology.

4. (Additional restrictions specified by the forest.)

C
1. The following operations are prohibited from 1:00 PM until 8:00 PM

local time:

a. Blasting

2. Operations using hot saw technology are prohibited between 1:00 PM and sunset local time. Hot saw technology operations may continue if Contractor provides a portable fire suppression system capable of extinguishing a 20-foot by 20-foot wild land fire within five (5) minutes of discovery. The following equipment will meet the requirements above:

a. Compressed Air Foam System with minimum requirements of 20 gallons stored energy, 100 feet of 1 inch hose and adjustable 1 inch nozzle, minimum discharge range of 60 feet and 1 spare air cylinder; or

b. All terrain tank truck or equivalent capable of traveling throughout the cutting unit, containing not less than 300 gallons of water and complies with all tank truck requirements of Section 3. All terrain tank truck or equivalent may serve dual purpose as active landing tank truck provided:

1) Tank truck or equivalent shall be kept readily available to extinguish a fire within 5 minutes of discovery of the operating hot saw technology,

2) Tank truck or equivalent shall be no further than 10 minutes travel time to the active landing,

3) A 4-A:80-B:C extinguisher is maintained at the landing fire tool box and,

4) Effective communications exist between the hot saw technology, active landing and all terrain tank truck or equivalent.

Otherwise there shall be a tank truck at the active landing and an all terrain tank truck or equivalent with the hot saw technology.

3. (Additional restrictions specified by the forest.)

D
1. The following restrictions apply:

a. No blasting after 10:00 AM

b. Welding or cutting of metal only by special permit

c. No Burning without a permit

2. The following activities may not operate after 1:00 PM local time unless fire patrolperson(s) walks all areas operated that day once per hour until sunset local time and has the capability of notifying the designated

Forest Service Dispatch Center within fifteen (15) minutes of discovery of a fire:

a. Track-laying equipment

b. Chipping outside of landings and roadbeds

c. Equipment using Hot Saw Technology

d. Chainsaw operations outside of landings and roadbeds

e. Tree felling operations

f. Ripping roads and landings

g. Mastication

h. Cable-yarding employing motorized carriages.

3. (Additional restrictions specified by the forest.)

Ev
1. The following operations are prohibited:

a. Blasting

b. Welding or cutting metal

c. Burning

2. Following activities may operate when fire patrolperson walks from 9:00 AM until local sunset all areas once per hour that were mechanically operated that day.

A. Activities that may operate all day:

1. Hauling and loading of logs decked at approved landings.

2. Hauling and loading of chips piled at approved landings.

3. Equipment servicing at approved sites.

4. Roads: Dust abatement or rock aggregate installation (does not include pit or quarry development)

5. Chainsaw or stroke delimber operation associated with loading at approved landing sites.

B. All other Operations are permitted until 1:00 PM local time subject to the following:

1. When hot saw technology is being used a tractor or other equipment with blade capable of constructing fire line, shall be on standby and immediately available. Tractor will have effective communications with hot saw technology and be within one quarter mile of hot saw technology to quickly reach and effectively attack a fire start.

C. (Additional restrictions specified by the forest.)

E
The following activities may operate subject to B1. and B2.

1. Hauling and loading of logs decked at approved landings.

2. Hauling and loading of chips piled at approved landings.

3. Equipment at approved sites may be serviced.

4 Roads: Dust abatement or rock aggregate installation (does not include pit development).

5. Chainsaw operation associated with loading at approved landings.

6. REPORTING ALL WILD FIRES

A. Contractor's employees shall report all fires as soon as possible but no later than 15 minutes after initial discovery to any of the following Forest Service facilities and/or personnel listed below, but not necessarily in the order shown:

Name
Office Address and/or telephone
Home address and/or telephone

Dispatch Center

530-283-7834

Nearest FS Station
Mohawk Ranger Station
530-836-2575
Inspector
Craig Kusener
530-283-7895
COR
Corky Lazzarino
530-283-7751
District Ranger
Deb Bumpus
530-836-7110

When reporting a fire, provide the following information;

Your Name;

Call back telephone number;

Project name;

Location;

Legal description (Township, Range, Section); and

Descriptive location (Reference point);

Fire Information;

Acres;

Rate of Spread; and

Wind Conditions.

B. Contractor's Plan Regarding Personnel. The Contractor shall, prior to commencing work, furnish the following information relating to key personnel

Title
Name
Address and/or telephone

Fire Supervisor

Fire Patrolperson

WAGE RATE FOR ALL 4 SITES

Decision No. CA20080009

updated as of 05/01/2009
Plumas County in Plumas National Forest

APPLICABILITY OF COMPLETE WAGE RATE DECISION: In addition to the wage rates in this solicitation, the complete decision of the Secretary of Labor contains wage rates for other classes of laborers and mechanics. Because it does not appear that the work called for by this solicitation will require the use of such other classes, the wage rates applicable to them have not been reprinted herein. However, if any such classes of laborers or mechanics actually are employed to perform work under the contract resulting from this solicitation, payment will be required as specified in this clause entitled "Davis-Bacon Act" at wage rates contained in the complete decision of the Secretary of Labor. Offerors desiring the complete decision may request it from the Contracting Officer.

PLUMAS COUNTY - SKILLED LABOR / TRADES
BASIC HOURLY RATES
FRINGE BENEFITS
TOTAL WAGES & BENEFITS
Asbestos Worker / Insulator (Area 2) applications of all insulating materials
39.08
15.21
54.29
Asbestos Removal / Laborer (Area B) (site prep-clean-up & removes asbestos from scraped structures only)
18.08
6.60
24.68
Bricklayer (Area 1) underground work, add $1.25/hr.
33.49
16.00
49.49
Mason Tender (Brick)
26.03
14.13
40.16
Carpenter (Area 4)
27.52
19.73
47.25
- Hardwood Floorlayer, Shingler, Scaffold & Shoring Erector
27.67
19.73
47.40
- Bridge Builder
34.75
19.73
54.48
- Millwright
30.02
19.95
49.97
Cement Mason, Concrete Finisher:
25.88
15.03
40.91
Drywall Installer/Lather (Area 4)
28.02
20.17
48.19
Drywall Finisher/Taper
34.83
13.48
48.31
Electrician:
38.43
3% + 11.40
48.63
Glazier
33.28
15.70
48.98

Ironworkers:

- Fence Erector
25.96
14.08
40.04
- Ornamental, Reinforcing, Structural
31.83
22.17
54.00
Plasterer (Area 295)
32.82
14.50
47.32
Plasterer Tender
26.17
12.68
38.85
Painter : (High Time) > 50' above ground or water add $2./hr.,100'-180' add $4./hr., > 180' add $6/hr.)
30.07
11.86
41.93
- Spray /Sandblast ($0.50 additional/hr.)
30.57
11.86
42.43
- Exotic Materials ($1.00 additional/hr.)
31.07
11.86
42.93
Plumber :
34.50
17.93
52.43
Roofer :
22.82
13.88
36.70

Sheet Metal Worker :

- Metal decking and siding only
32.84
15.20
48.04
- Mechanical jobs ($200,000 and under)
27.46
18.99
46.45
Soft Floor Layer :
29.46
12.77
42.23
Tile Layer : (Area 1)
35.95
10.42
46.37
Tile Finisher : (Area 1)
21.08
8.62
29.70
Underground Utility Worker / Landscape Fitter
26.75
6.45
33.20
HIGHWAY IMPROVEMENT
BASIC HOURLY RATES
FRINGE BENEFITS
TOTAL WAGES & BENEFITS

Parking Lot Striping / Highway Marking

GROUP 1: STRIPER: Layout & application of painted traffic stripes & marking; hot thermo plastic, tape, traffic stripes & markings
28.11
13.12
41.23
GROUP 2: GAME COURT AND PLAYGROUND INSTALLER:
22.90
13.12
36.02
GROUP 3: PROTECTIVE COATING, PAVEMENT SEALING:
22.18
13.12
35.30
TRAFFIC CONTROL / LANE CLOSURE (AREA B)
BASIC HOURLY RATES
FRINGE BENEFITS
TOTAL WAGES & BENEFITS
ESCORT DRIVER, FLAG PERSON
24.89
14.13
39.02
TRAFFIC CONTROL PERSON I, Layout of traffic control, crash cushiond, construction area & roadside signage
25.19
14.13
39.32
TRAFFIC CONTROL PERSON II, installation & removal of temporary/permanent signs, markers, delineators & crash cushions.
22.69
14.13
36.82
CONSTRUCTION CRAFT LABORERS (AREA B)
BASIC HOURLY RATES
FRINGE BENEFITS
TOTAL WAGES & BENEFITS
Construction Specialist Group: Asphalt Ironer and Raker / Chainsaw, Blaster, Diamond Driller
25.84
14.13
39.97
GROUP 1: Faller, Log Loader, Bucker / Jack Hammer, Compactors, Hydro Seeder, Pipe Layer, Post Hole Digger, Form Raiser, Asphalt Spreader Boxes, Kettle Tender
25.14
14.13
39.27
GROUP 1(a): Rock Drillers (All Types), Mech. Pipe Layer, All working/placing/and blasting of all powder and explosives
25.36
14.13
39.49

GROUP 1(b): Sewer Cleaner ($4.00 per day above GROUP 1 wages)

29.64
14.13
43.77
GROUP 1(c): Burning and Welding
25.19
14.13
39.32
GROUP 1(d): Maintenance and repair of track and roadbeds ($0.25/hr. above regular rate for work performed underground)
27.89
14.13
42.02
GROUP 1(e): Work on bell hole footings and shafts, and work on deep footings (15 ft. or more in depth)
25.69
14.13
39.82
GROUP 1(f): Wire winding machine in connection with guniting or shot crete
25.72
14.13
39.85
GROUP 2: Asphalt Shoveler,Cement Laborer, Chipper Feeder, Choker Setter & Rigger (clearing work), all pneumatic, air, gas, and eletric tools not in GROUPS 1 - 1(f)
24.99
14.13
39.12
GROUP 3: Construction Laborers, including, Dump Load Spotter, Flagman, Fire Watcher, Fence/Guardrail Erector, Brush Loader/Plier, Maintenance and repair of tract and roadbeds
24.89
14.13
39.02
GROUP 4: Cleanup Work of debris, grounds, and buildings
18.58
14.13
32.71
POWER EQUIPMENT OPERATORS
BASIC HOURLY RATES
FRINGE BENEFITS
TOTAL WAGES & BENEFITS

AREA 2

Eastern Plumas Co.

GROUP 1: Power Shovel, Excavator (> 7 CY), Helicopter Oper.erection work
38.77
20.89
59.66
GROUP 2: Power Blade Operator (finish), Power Shovels (1-7 CY), Hydralic Excavator (3 1/2 - 7 CY), Highline Cableway
37.24
20.89
58.13
GROUP 3: Excavator (up to 3 ½ CY), Loader (4 CY+), Combo Backhoe -Loader (> 3/4CY), Dozer / Multi. Engine Scraper (push-pull), Power Shovels (up to and incl.14CY), Asphalt Milling Machine, Wheel Excavator (up to 750 CY/hr.)
35.76
20.89
56.65
GROUP 4: Asphalt Plant Engineer, Combo. Backhoe-Loader (up to 3/4 CY), Concrete Batch Plant (wet/dry), Dozer and/or Push Cat, Timber Skidder, Loader (< 4 CY), Roller Operator (AC), Scraper, Track Loader (up to 4 CY), Welder, Lube & Service Engineer, Grade Setter & Grade Checker
34.38
20.89
55.27
GROUP 5: Cast-in-place Pipe Laying Machine, Drilling Equipment, Trenching Mach.(max.>5' in depth), Concrete Mixer/Finisher, Portable Crusher
33.11
20.89
54.00
GROUP 6: Self Loading Chipper/Chip Spreading Machine, Assist. Plant & Bridge Deck Engineer, Soils & Materials Tester
31.79
20.89
52.68
GROUP 7: Roller (except AC) Chip Seal Automatic Curing Machine, Self-Propelled Compactor (w/o Dozer), Boom Truck (under 15 Ton)
30.65
20.89
51.54
GROUP 8: Compressor Oper., Deckhand, Forklift Oper., Self-Propelled Power Sweeper, Tar Pot Firetender
29.51
20.89
50.40
GROUP 8-A: Mini-Excavator (backhoe, trencher (< 25 h.p.), Skidster Loader/Bobcat 743 series or smaller (w/o attachments), Tub Grinder, Wood Chipper
29.30
20.89
50.19
TRUCK DRIVERS
BASIC HOURLY RATES
FRINGE BENEFITS
TOTAL WAGES & BENEFITS
GROUP 1: Dump Truck (< 6 CY), Forklift, Comcrete Pump Truck, Fuel & Greese truck, Single Unit Flat Rack (2-Axle), Bus or Person-Haul Driver
26.48
17.94
44.42
GROUP 2: Dump Truck (6 CY & under 8 CY), Transit mixer (thru 10 CY), Water Trucksa < 7000 Gal.), Single Unit Flat Rack (3-axle), Highbed Heavy Duty Transit, Road Oil Truck or Bootman
26.78
17.94
44.72
GROUP 3: Dump truck (8-35 CY), Water Truck (> 7000 gal.), Lowbed Heavy Duty Transport, Self Loading truck, Boom Truck, Snow Plow
27.08
17.94
45.02
GROUP 4: Dump Truck (over 35-65 CY), Helicopter Pilot (when transporting men/materials), Lowboy Heavy Duty Transport (up to & incl. 7-axles)
27.43
17.94
45.37
GROUP 5: Dump Truck (65CY and over), Lowbed Trqnsport (> 7-axles)
27.78
17.94
45.72

LIST OF ATTACHMENTS POSTED SEPARATELY IN FBO -

The following attachments are made a part of this solicitation and any resultant contract.

Attachment
Title
Pages
1-0 – Morgan Summit
Attch 1-0_MorganSummitChipsealFinalPlansMaps.pdf
4
1-1– Morgan Summit
Attch 1-1_MorganSummitChipsealTblContentsSpecialSpecs.doc
35
Attachment
Title
Pages
2-0 – Eskimo Hill
Attch 2-0_EskimoHillChipsealFinalPlansMaps.pdf
3
2-1 – Eskimo Hill
Attch 2-1_EskimoHill ChipsealTblContentsSpecialSpecs.doc
35
Attachment
Title
Pages
3-0 – Eagle Lake
Attch 3-0_EagleLakeChipsealFinalPlansMaps.pdf
4
3-1 – Eagle Lake
Attch 3-1_EagleLakeChipsealTblContentsSpecial Spec's.doc
35
Attachment
Title
Pages
4-0 – Swain Mtn Trailhead
Attch 4-0_SwainChipseal Maps.pdf
4
4-1 – Swain Mtn Trailhead
Attch 4-1_SwainChipsealTbleContentsSepcialSpecs.doc
35

�Place Your IDIQ Contract Number Here

�Place Your Phone & FAX Here

�Place Your Company’s Name & Address Here

File details come from the government source that posted it. Updated .