Attch 2 - Response to Vendor's Questions .docx
DOCX document 12 KB Posted
- Solicitation number
- AG-9702-S-09-0002
About this file
Attachment 2 - Response to Vendor's Questions
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solic Amendment3_S-10-0002_SIGNS.doc | DOC document | |
| Attachment 2_Questions_Answers.doc | DOC document | |
| Solic Amendment2_S-10-0002_SIGNS.doc | DOC document | |
| Solic Amendment_S-10-0002_SIGNS.doc | DOC document | |
| Attch_2_D3 sign order condensed.docx | DOCX document | |
| Attch_4_Plans_Drawings_Maps.docx | DOCX document | |
| Attach_1_D1 Sign order.docx | DOCX document | |
| Attach_3_D2 sign order.docx | DOCX document | |
| RFP.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fabrication of Lincoln National Forest Trail and ARRA Project Signs Solicitation Number: AG-9702-S-09-0002
Following the initial posting of the Fabrication of Lincoln National Forest Trail and ARRA Project Sign solicitation there has been some confusion in regards to the actual number and types of signs that are required. To avoid confusion and ensure that all bidders are basing their quotes on the same package, we request that all bids be in response to the items as they are listed in the Schedule of Items. Attachments 1-3 are to be used as a quick visual reference to give reviewers a general sense of how the signs will read.
Once the contract has been awarded the Lincoln National Forest will work with the contractor and provide revised documents showing the actual wording that will go on the signs. As the Forest is still working on their trail program it is possible that adjustments in sign quantities may be necessary before an actual contract is signed. Adjustments would be made to the contract accordingly.