About this file

Bid Bond provision in full text with accompanying explanation.

View the file

Other files

File Type Posted
A04.doc DOC document
S100001A4.pdf PDF
Amend03Salient.doc DOC document
07541 FL - POLYVINYL-CHLORIDE —
S100001A3.pdf PDF
S100001A2.pdf PDF
NFSPRC Roof Asbestos Survey.doc DOC document
S100001A1.doc DOC document
S100001A1.pdf PDF
Final Drawings Corvallis Roofs.pdf PDF
Final Specs Corvallis Roofs.pdf PDF
S100001.pdf PDF
GenDec11-6.docx DOCX document
S100001.doc DOC document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation. No. AG-95CV-S-10-0001, Amendment 004 RECOVERY – Roof replacements on 2 lab/office buildings (NCGR & NFSPRC) Corvallis, OR

52.228-1 BID GUARANTEE (SEPT 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be __20%_ percent of the bid price or $_3 million_, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of provision)

Since this bid could result in one of two contract amounts, either the total of Line Item No. 001 and Line Item No. 002 or the total of Line Item No. 001 and Line Item No. 003, the bid bond shall be 20% of the larger of the two.