CNF1-Jct_Wash-Final-2011-plans.pdf

PDF 4 MB Posted

Attached to
JUNCTION WASH BRIDGE REPLACEMENT Federal contract opportunity
Solicitation number
AG-94TZ-S-14-0015
Issued by
Department of Agriculture Forest Service R3-Southwestern Region

About this file

Plans

View the file

Other files for this federal contract opportunity

Other files attached to JUNCTION WASH BRIDGE REPLACEMENT, newest first.
File Type Posted
Final_Geotech_report.pdf PDF
SF30.pdf PDF
SF30.pdf PDF
Solicitation.docx DOCX document
SF1442.pdf PDF
Wage_Determination.docx DOCX document
CNF1-FSSS.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NO. DATEBYREVISION DESCRIPTION

SHEET NO.

SET NO.

PROJECT:

DATE:SHEET INDEX

SHEET 1 COVER

SHEET 2 TYPICAL SECTIONS & ESTIMATED QUANTITIES

SHEET 3 ROAD PLAN & PROFILE

SHEET 4 BRIDGE ELEVATION & ABUTMENT DETAILS

SHEET 5 FOUNDATION PLAN & PILING DETAILS

SHEET 6 BORING LOGS -- BORING NO. B-1

SHEET 7 BORING LOGS -- BORING NO. B-2

SHEET 8 ABUTMENT DETAILS

SHEET 9 SUPERSTRUCTURE PLAN & DETAILS

SHEET 10 SUPERSTRUCTURE DETAILS

SHEET 11 CONCRETE BRIDGE BARRIER DETAILS

SHEET 12 THRIE BEAM TRANSITION DETAILS

SHEET 13 W-BEAM GUARDRAIL END ANCHOR DETAILS

SHEET 14 ROADWAY CROSS-SECTIONS

APRIL 22, 2011

1-10152 engineering

2501 BELT VIEW DRIVE

HELENA, MT 59601

(406)449-8627

JUNCTION WASH BRIDGE REPLACEMENT

ROAD NO. 618 - M.P. 0.10

CONSTRUCTION PLANS FOR

SECTION 17, TOWNSHIP 15 NORTH, AND RANGE 6 EAST

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REGION THREE

PLANS PREPARED BY:

QA/QC BY:

DATE

DATE

DATE

-WASTE SITE

-RIPRAP SOURCE

-ROADWAY EMBANKMENT SOURCE

REVIEWED:

RECOMMENDED:

APPROVED:

THIS

PROJECT

NOTE:

DRAWING SCALE IS ONLY ACCURATE

WHEN PLANS ARE PLOTTED ON 11" X 17"

(TABLOID)-SIZED PAPER.

COCONINO NATIONAL FOREST

RED ROCK RANGER DISTRICT

YAVAPAI COUNTY, ARIZONA

BEAVER CREEK

CAMPGROUND

Yuma

Quartzsite

Lake Havasu City

Kingman

Gila Bend Casa Grande

Mesa Phoenix

Tucson

Green Valley

Benson

Wilcox

Holbrook

Flagstaff Ash Fork

Prescott

Grand Canyon Tuba City

Page

Kayenta

Littlefield

Show Low

MEXICO

C A

LI

F

O R

N

IA

N E

V A

D A

UTAH

N E

W M

E X

IC

O

JONATHAN WEAVER, E.I.

JEREMIAH THEYS, P.E.

WILLIAM B. LLOYD, P.E.

DATE

APPROVED:

PROJECT LOCATION

RED TANK PIT:

WASTE SITE, RIPRAP

SOURCE, AND ROADWAY

EMBANKMENT SOURCE

JUNCTION WASH BRIDGE REPLACEMENT

TYPICAL SECTIONS & ESTIMATED QUANTITIES

ROAD NO. 618 - M.P. 0.10

COCONINO NATIONAL FOREST

1-10152

APRIL 22, 2011

SHEET NO.

JRW

JRW

JJT

WBL

engineering

2501 BELT VIEW DRIVE

HELENA, MT 59601

(406)449-8627

REGION THREE

PREPARED BY:

PROJECT:

DESIGNED:

DRAWN:

DESIGN CHECKED:

DRAWING CHECKED:

DATE: NO. DATEBY

REVISION DESCRIPTION

GENERAL NOTES:

SPECIFICATIONS:

DESIGN SPECIFICATION:

HYDROLOGY & HYDRAULICS:

EROSION CONTROL:

DISPOSAL:

CLEARING AND GRUBBING:

CONCRETE FOR PILE CAPS, END DIAPHRAGMS, AND WINGWALLS :

PRESTRESSED CONCRETE:

REINFORCING STEEL:

PRESTRESSING STEEL:

PRESTRESSED CONCRETE MEMBERS:

FINISHING CONCRETE MEMBERS:

BEAM SEALER:

FABRICATION, TRANSPORT, AND INSTALLATION OF PRESTRESSED CONCRETE BEAMS:

PAINTING OF WELD TIE CONNECTIONS, GUARD ANGLES, AND SPREADER PLATES:

HARDWARE AND STRUCTURAL STEEL:

ELASTOMERIC BEARING PADS:

EVAZOTE JOINT MATERIAL:

PRECAST PRESTRESSED CONCRETE SUPERSTRUCTURE ALTERNATIVES:

ITEM DESCRIPTION

METHOD OF

MEASUREMENT

UNIT

QUANTITY

15101 MOBILIZATION LSQ LS 1

15221 CONSTRUCTION SURVEY AND STAKING LSQ LS 1

15601 CONSTRUCTION BYPASS LSQ LS 1

15713 SOIL EROSION AND POLLUTION CONTROL LSQ LS 1

20303 REMOVAL OF EXISTING ASPHALT CQ SY 385

20304 REMOVAL OF EXISTING BRIDGE LSQ LS 1

20806 STRUCTURE EXCAVATION LSQ LS 1

25101

PLACED RIPRAP, CLASS 6 (GOV'T. FURNISHED SOURCE)

CQ CY 255

30809

CRUSHED AGGREGATE, COMPACTION METHOD 1

CQ CY 140

40301

HOT ASPHALT CONCRETE PAVEMENT, GRADING C, PG 70-10

AQ TON 70

55101

STEEL H PILES, HP 14 X 89, DRIVEN

AQ LF 342

55103 DYNAMIC PILE LOAD TEST AQ EA 2

55109

STEEL H PILES, HP 14 X 89, FURNISHED

CQ LF 360

55111 PILE SHOES CQ EA 12

55204

STRUCTURAL CONCRETE, CLASS C(AE) FOR PILE CAPS,

DIAPHRAGMS, AND WINGWALLS

AQ CY 37

55301

PRECAST PRESTRESSED CONCRETE STRUCTURAL

MEMBER, DOUBLE TEE BEAMS

LSQ LS 1

55403

REINFORCING STEEL FOR PILE CAPS, DIAPHRAGMS, AND

WINGWALLS

LSQ LS 1

61701

GUARDRAIL SYSTEM G4, TYPE IV, CLASS A CQ LF 75

61702

TERMINAL SECTION, TANGENT W-BEAM TERMINAL CQ EA 4

61708

THRIE BEAM TRANSITION, TYPE IV, CLASS A CQ EA 4

61801 CONCRETE BRIDGE BARRIER CQ LF 100.33

62201 HYDRAULIC EXCAVATOR WITH THUMB AQ HR 4

62501

SEEDING, DRY METHOD

CQ ACRE 0.25

*INFORMATIONAL ONLY - NOT FOR BIDDING PURPOSES - REFER TO BID SCHEDULE

ROAD PLAN & PROFILE

ROAD NO. 618 - M.P. 0.10

COCONINO NATIONAL FOREST

1-10152

APRIL 22, 2011

SHEET NO.

JRW

JRW

JJT

WBL

PROJECT:

DESIGNED:

DRAWN:

DESIGN CHECKED:

DRAWING CHECKED:

DATE: NO. DATEBY

REVISION DESCRIPTION

J

U

N

C

T

I

O

N

W

A

S

H

ROAD NO. 618

POINT NORTHING EASTING ELEVATION DESCRIPTION

CP1 5000.00 10000.00 1000.00 MAG. NAIL IN PAVEMENT

CP2 5133.10 9923.16 999.67 REBAR W/ RED CAP

CP3 4904.49 10102.03 1004.91 REBAR W/ RED CAP

CP4 4897.68 9869.31 997.40 REBAR W/ RED CAP

CP5 5034.06 9771.54 994.67 REBAR W/ RED CAP

NOTES:

engineering

2501 BELT VIEW DRIVE

HELENA, MT 59601

(406)449-8627

REGION THREE

PREPARED BY:

DESCRIPTION NORTHING EASTING ELEVATION

STA. 3+16.31 BEGIN GUARDRAIL RT. 5075.50 9851.53 N/A

STA. 3+42.00 BEGIN ROAD WORK 5063.82 9874.41 998.70

STA. 3+53.08 BEGIN GUARDRAIL LT. 5059.20 9884.49 998.59

STA. 3+70.00 5052.16 9899.87 998.42

STA. 3+83.29 CL BEARING 5046.62 9911.95 998.29

STA. 4+31.29 CL BEARING 5026.63 9955.59 998.29

STA. 4+45.00 5020.92 9968.05 998.57

STA. 4+61.51 END GUARDRAIL RT. 5014.04 9983.06 998.99

STA. 4+82.38 END PVMT. TAPER 5005.35 10002.04 999.63

STA. 4+99.01 END GUARDRAIL LT. 4998.42 10017.16 1000.23

STA. 5+26.00 END ROAD WORK 4987.18 10041.69 1001.36

PROJECT:

DESIGNED:

DRAWN:

DESIGN CHECKED:

DRAWING CHECKED:

DATE: NO. DATEBYREVISION DESCRIPTION

JUNCTION WASH BRIDGE REPLACEMENT

BRIDGE ELEVATION & ABUTMENT DETAILS

ROAD NO. 618 - M.P. 0.10

COCONINO NATIONAL FOREST

1-10152 APRIL 22, 2011

SHEET NO.

4 OF 14JRW

JRW

JJT

WBL

engineering

2501 BELT VIEW DRIVE

HELENA, MT 59601

(406)449-8627 REGION THREE

PREPARED BY:

NOTES:

DRAWN:

DESIGN CHECKED:

DRAWING CHECKED:

DATE: NO. DATEBYREVISION DESCRIPTION

JUNCTION WASH BRIDGE REPLACEMENT

FOUNDATION PLAN & PILING DETAILS

ROAD NO. 618 - M.P. 0.10

COCONINO NATIONAL FOREST

1-10152 APRIL 22, 2011

SHEET NO.

5 OF 14JRW

JRW

JJT

WBL

engineering

2501 BELT VIEW DRIVE

HELENA, MT 59601

(406)449-8627 REGION THREE

PREPARED BY:

JU

N

C T

IO

N

W A

S H

LOCATION DESIGN PILE TIP ELEVATION

MINIMUM ULTIMATE PILE

RESISTANCE (KIPS)

ESTIMATED DRIVEN PILE

LENGTH (FEET)

WEST ABUTMENT 963.67 165 28.5

EAST ABUTMENT 963.67 165 28.5

GENERAL NOTES:

DYNAMIC TESTING:

BORING LOGS -- BORING NO. B-1

ROAD NO. 618 - M.P. 0.10

COCONINO NATIONAL FOREST

1-10152 APRIL 22, 2011

SHEET NO.

6 OF 14JRW

JRW

JJT

WBL

engineering

2501 BELT VIEW DRIVE

HELENA, MT 59601

(406)449-8627

PREPARED BY:

REGION THREE

PROJECT:

DESIGNED:

DRAWN:

DESIGN CHECKED:

DRAWING CHECKED:

DATE: NO. DATEBYREVISION DESCRIPTION

BORING LOGS -- BORING NO. B-2

ROAD NO. 618 - M.P. 0.10

COCONINO NATIONAL FOREST

1-10152 APRIL 22, 2011

SHEET NO.

7 OF 14JRW

JRW

JJT

WBL

engineering

2501 BELT VIEW DRIVE

HELENA, MT 59601

(406)449-8627

PREPARED BY:

REGION THREE

PROJECT:

DESIGNED:

DRAWN:

DESIGN CHECKED:

DRAWING CHECKED:

DATE: NO. DATEBYREVISION DESCRIPTION

ALL DIMENSIONS ARE OUT-TO-OUT

LOCATION MARK SIZE NO. TYPE LENGTH A B C

PILE CAP

A1 #5 36 1 11'-3" 2'-7" 2'-8" 4 1/2"

A2 #6 12 STR 35'-8"

A3 #6 5 STR 5'-8"

A4 #5 6 3 7'-10" 2'-7" 2'-8"

D1 * 10 STR 3'-6"

END

DIAPHRAGM \

WINGWALL

BW1 #5 38 1 7'-2" 2'-8" 8" 3"

BW2 #6 2 STR 35'-8"

BW3 #5 15 STR 4'-2"

BW4 #5 12 STR 1'-2"

BW5 #5 3 STR 37'-2"

BW6 #5 1 STR 42'-7"

BW7 #5 2 STR 46'-8"

BW8 #5 16 STR 5'-1"

BW9 #5 4 STR 5'-8"

BW10 #5 4 STR 5'-5"

BW11 #5 4 STR 5'-0"

BW12 #5 4 STR 4'-9"

BW13 #5 4 STR 4'-4"

BW14 #5 4 STR 4'-1"

BW15 #5 2 STR 4'-4"

BW16 #5 4 STR 6'-5"

BW17 #5 4 2 8'-4" 1'-8" 1'-6" 4'-10"

PROJECT:

DESIGNED:

DRAWN:

DESIGN CHECKED:

DRAWING CHECKED:

DATE: NO. DATEBYREVISION DESCRIPTION

JUNCTION WASH BRIDGE REPLACEMENT

ABUTMENT DETAILS

ROAD NO. 618 - M.P. 0.10

COCONINO NATIONAL FOREST

1-10152 APRIL 22, 2011

SHEET NO.

8 OF 14JRW

JRW

JJT

WBL

engineering

2501 BELT VIEW DRIVE

HELENA, MT 59601

(406)449-8627 REGION THREE

DRAWN:

DESIGN CHECKED:

DRAWING CHECKED:

DATE: NO. DATEBYREVISION DESCRIPTION

JUNCTION WASH BRIDGE REPLACEMENT

SUPERSTRUCTURE PLAN & DETAILS

ROAD NO. 618 - M.P. 0.10

COCONINO NATIONAL FOREST

1-10152 APRIL 22, 2011

SHEET NO.

9 OF 14JRW

JRW

JJT

WBL

engineering

2501 BELT VIEW DRIVE

HELENA, MT 59601

(406)449-8627 REGION THREE

PREPARED BY:

NOTE:

NOTE:

PRESTRESSED BEAM NOTES:

PRESTRESSED CONCRETE BEAM DESIGN:

DESIGN NOTES AS FOLLOWS:

DRAWN:

DESIGN CHECKED:

DRAWING CHECKED:

DATE: NO. DATEBYREVISION DESCRIPTION

JUNCTION WASH BRIDGE REPLACEMENT

SUPERSTRUCTURE DETAILS

ROAD NO. 618 - M.P. 0.10

COCONINO NATIONAL FOREST

1-10152 APRIL 22, 2011

SHEET NO.

10 OF 14JRW

JRW

JJT

WBL

engineering

2501 BELT VIEW DRIVE

HELENA, MT 59601

(406)449-8627 REGION THREE

PREPARED BY:

NEAR

FACE

FILL

FACE

FILL

FACE

NEAR

FACE

DRAWN:

DESIGN CHECKED:

DRAWING CHECKED:

DATE: NO. DATEBYREVISION DESCRIPTION

JUNCTION WASH BRIDGE REPLACEMENT

CONCRETE BRIDGE BARRIER DETAILS

ROAD NO. 618 - M.P. 0.10

COCONINO NATIONAL FOREST

1-10152 APRIL 22, 2011

SHEET NO.

11 OF 14JRW

JRW

JJT

WBL

engineering

2501 BELT VIEW DRIVE

HELENA, MT 59601

(406)449-8627 REGION THREE

PREPARED BY:

A A

B B

DRAWN:

DESIGN CHECKED:

DRAWING CHECKED:

DATE: NO. DATEBYREVISION DESCRIPTION

JUNCTION WASH BRIDGE REPLACEMENT

THRIE BEAM TRANSITION DETAILS

ROAD NO. 618 - M.P. 0.10

COCONINO NATIONAL FOREST

1-10152 APRIL 22, 2011

SHEET NO.

12 OF 14JRW

JRW

JJT

WBL

engineering

2501 BELT VIEW DRIVE

HELENA, MT 59601

(406)449-8627 REGION THREE

PREPARED BY:

A A

B B

DRAWN:

DESIGN CHECKED:

DRAWING CHECKED:

DATE: NO. DATEBYREVISION DESCRIPTION

JUNCTION WASH BRIDGE REPLACEMENT

W-BEAM GUARDRAIL END ANCHOR DETAILS

ROAD NO. 618 - M.P. 0.10

COCONINO NATIONAL FOREST

1-10152 APRIL 22, 2011

SHEET NO.

13 OF 14JRW

JRW

JJT

WBL

engineering

2501 BELT VIEW DRIVE

HELENA, MT 59601

(406)449-8627 REGION THREE

ROADWAY CROSS-SECTIONS

ROAD NO. 618 - M.P. 0.10

COCONINO NATIONAL FOREST

1-10152

APRIL 22, 2011

SHEET NO.

JRW

JRW

JJT

WBL

engineering

2501 BELT VIEW DRIVE

HELENA, MT 59601

(406)449-8627

REGION THREE

PREPARED BY:

PROJECT:

DESIGNED:

DRAWN:

DESIGN CHECKED:

DRAWING CHECKED:

DATE: NO. DATEBY

REVISION DESCRIPTION

File details come from the government source that posted it. Updated .