CNF1-Jct_Wash-Final-2011-plans.pdf
PDF 4 MB Posted
- Attached to
- JUNCTION WASH BRIDGE REPLACEMENT Federal contract opportunity
- Solicitation number
- AG-94TZ-S-14-0015
About this file
Plans
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Final_Geotech_report.pdf | ||
| SF30.pdf | ||
| SF30.pdf | ||
| Solicitation.docx | DOCX document | |
| SF1442.pdf | ||
| Wage_Determination.docx | DOCX document | |
| CNF1-FSSS.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NO. DATEBYREVISION DESCRIPTION
SHEET NO.
SET NO.
PROJECT:
DATE:SHEET INDEX
SHEET 1 COVER
SHEET 2 TYPICAL SECTIONS & ESTIMATED QUANTITIES
SHEET 3 ROAD PLAN & PROFILE
SHEET 4 BRIDGE ELEVATION & ABUTMENT DETAILS
SHEET 5 FOUNDATION PLAN & PILING DETAILS
SHEET 6 BORING LOGS -- BORING NO. B-1
SHEET 7 BORING LOGS -- BORING NO. B-2
SHEET 8 ABUTMENT DETAILS
SHEET 9 SUPERSTRUCTURE PLAN & DETAILS
SHEET 10 SUPERSTRUCTURE DETAILS
SHEET 11 CONCRETE BRIDGE BARRIER DETAILS
SHEET 12 THRIE BEAM TRANSITION DETAILS
SHEET 13 W-BEAM GUARDRAIL END ANCHOR DETAILS
SHEET 14 ROADWAY CROSS-SECTIONS
APRIL 22, 2011
1-10152 engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
JUNCTION WASH BRIDGE REPLACEMENT
ROAD NO. 618 - M.P. 0.10
CONSTRUCTION PLANS FOR
SECTION 17, TOWNSHIP 15 NORTH, AND RANGE 6 EAST
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION THREE
PLANS PREPARED BY:
QA/QC BY:
DATE
DATE
DATE
-WASTE SITE
-RIPRAP SOURCE
-ROADWAY EMBANKMENT SOURCE
REVIEWED:
RECOMMENDED:
APPROVED:
THIS
PROJECT
NOTE:
DRAWING SCALE IS ONLY ACCURATE
WHEN PLANS ARE PLOTTED ON 11" X 17"
(TABLOID)-SIZED PAPER.
COCONINO NATIONAL FOREST
RED ROCK RANGER DISTRICT
YAVAPAI COUNTY, ARIZONA
BEAVER CREEK
CAMPGROUND
Yuma
Quartzsite
Lake Havasu City
Kingman
Gila Bend Casa Grande
Mesa Phoenix
Tucson
Green Valley
Benson
Wilcox
Holbrook
Flagstaff Ash Fork
Prescott
Grand Canyon Tuba City
Page
Kayenta
Littlefield
Show Low
MEXICO
C A
LI
F
O R
N
IA
N E
V A
D A
UTAH
N E
W M
E X
IC
O
JONATHAN WEAVER, E.I.
JEREMIAH THEYS, P.E.
WILLIAM B. LLOYD, P.E.
DATE
APPROVED:
PROJECT LOCATION
RED TANK PIT:
WASTE SITE, RIPRAP
SOURCE, AND ROADWAY
EMBANKMENT SOURCE
JUNCTION WASH BRIDGE REPLACEMENT
TYPICAL SECTIONS & ESTIMATED QUANTITIES
ROAD NO. 618 - M.P. 0.10
COCONINO NATIONAL FOREST
1-10152
APRIL 22, 2011
SHEET NO.
JRW
JRW
JJT
WBL
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
REGION THREE
PREPARED BY:
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBY
REVISION DESCRIPTION
GENERAL NOTES:
SPECIFICATIONS:
DESIGN SPECIFICATION:
HYDROLOGY & HYDRAULICS:
EROSION CONTROL:
DISPOSAL:
CLEARING AND GRUBBING:
CONCRETE FOR PILE CAPS, END DIAPHRAGMS, AND WINGWALLS :
PRESTRESSED CONCRETE:
REINFORCING STEEL:
PRESTRESSING STEEL:
PRESTRESSED CONCRETE MEMBERS:
FINISHING CONCRETE MEMBERS:
BEAM SEALER:
FABRICATION, TRANSPORT, AND INSTALLATION OF PRESTRESSED CONCRETE BEAMS:
PAINTING OF WELD TIE CONNECTIONS, GUARD ANGLES, AND SPREADER PLATES:
HARDWARE AND STRUCTURAL STEEL:
ELASTOMERIC BEARING PADS:
EVAZOTE JOINT MATERIAL:
PRECAST PRESTRESSED CONCRETE SUPERSTRUCTURE ALTERNATIVES:
ITEM DESCRIPTION
METHOD OF
MEASUREMENT
UNIT
QUANTITY
15101 MOBILIZATION LSQ LS 1
15221 CONSTRUCTION SURVEY AND STAKING LSQ LS 1
15601 CONSTRUCTION BYPASS LSQ LS 1
15713 SOIL EROSION AND POLLUTION CONTROL LSQ LS 1
20303 REMOVAL OF EXISTING ASPHALT CQ SY 385
20304 REMOVAL OF EXISTING BRIDGE LSQ LS 1
20806 STRUCTURE EXCAVATION LSQ LS 1
25101
PLACED RIPRAP, CLASS 6 (GOV'T. FURNISHED SOURCE)
CQ CY 255
30809
CRUSHED AGGREGATE, COMPACTION METHOD 1
CQ CY 140
40301
HOT ASPHALT CONCRETE PAVEMENT, GRADING C, PG 70-10
AQ TON 70
55101
STEEL H PILES, HP 14 X 89, DRIVEN
AQ LF 342
55103 DYNAMIC PILE LOAD TEST AQ EA 2
55109
STEEL H PILES, HP 14 X 89, FURNISHED
CQ LF 360
55111 PILE SHOES CQ EA 12
55204
STRUCTURAL CONCRETE, CLASS C(AE) FOR PILE CAPS,
DIAPHRAGMS, AND WINGWALLS
AQ CY 37
55301
PRECAST PRESTRESSED CONCRETE STRUCTURAL
MEMBER, DOUBLE TEE BEAMS
LSQ LS 1
55403
REINFORCING STEEL FOR PILE CAPS, DIAPHRAGMS, AND
WINGWALLS
LSQ LS 1
61701
GUARDRAIL SYSTEM G4, TYPE IV, CLASS A CQ LF 75
61702
TERMINAL SECTION, TANGENT W-BEAM TERMINAL CQ EA 4
61708
THRIE BEAM TRANSITION, TYPE IV, CLASS A CQ EA 4
61801 CONCRETE BRIDGE BARRIER CQ LF 100.33
62201 HYDRAULIC EXCAVATOR WITH THUMB AQ HR 4
62501
SEEDING, DRY METHOD
CQ ACRE 0.25
*INFORMATIONAL ONLY - NOT FOR BIDDING PURPOSES - REFER TO BID SCHEDULE
ROAD PLAN & PROFILE
ROAD NO. 618 - M.P. 0.10
COCONINO NATIONAL FOREST
1-10152
APRIL 22, 2011
SHEET NO.
JRW
JRW
JJT
WBL
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBY
REVISION DESCRIPTION
J
U
N
C
T
I
O
N
W
A
S
H
ROAD NO. 618
POINT NORTHING EASTING ELEVATION DESCRIPTION
CP1 5000.00 10000.00 1000.00 MAG. NAIL IN PAVEMENT
CP2 5133.10 9923.16 999.67 REBAR W/ RED CAP
CP3 4904.49 10102.03 1004.91 REBAR W/ RED CAP
CP4 4897.68 9869.31 997.40 REBAR W/ RED CAP
CP5 5034.06 9771.54 994.67 REBAR W/ RED CAP
NOTES:
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
REGION THREE
PREPARED BY:
DESCRIPTION NORTHING EASTING ELEVATION
STA. 3+16.31 BEGIN GUARDRAIL RT. 5075.50 9851.53 N/A
STA. 3+42.00 BEGIN ROAD WORK 5063.82 9874.41 998.70
STA. 3+53.08 BEGIN GUARDRAIL LT. 5059.20 9884.49 998.59
STA. 3+70.00 5052.16 9899.87 998.42
STA. 3+83.29 CL BEARING 5046.62 9911.95 998.29
STA. 4+31.29 CL BEARING 5026.63 9955.59 998.29
STA. 4+45.00 5020.92 9968.05 998.57
STA. 4+61.51 END GUARDRAIL RT. 5014.04 9983.06 998.99
STA. 4+82.38 END PVMT. TAPER 5005.35 10002.04 999.63
STA. 4+99.01 END GUARDRAIL LT. 4998.42 10017.16 1000.23
STA. 5+26.00 END ROAD WORK 4987.18 10041.69 1001.36
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
JUNCTION WASH BRIDGE REPLACEMENT
BRIDGE ELEVATION & ABUTMENT DETAILS
ROAD NO. 618 - M.P. 0.10
COCONINO NATIONAL FOREST
1-10152 APRIL 22, 2011
SHEET NO.
4 OF 14JRW
JRW
JJT
WBL
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627 REGION THREE
PREPARED BY:
NOTES:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
JUNCTION WASH BRIDGE REPLACEMENT
FOUNDATION PLAN & PILING DETAILS
ROAD NO. 618 - M.P. 0.10
COCONINO NATIONAL FOREST
1-10152 APRIL 22, 2011
SHEET NO.
5 OF 14JRW
JRW
JJT
WBL
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627 REGION THREE
PREPARED BY:
JU
N
C T
IO
N
W A
S H
LOCATION DESIGN PILE TIP ELEVATION
MINIMUM ULTIMATE PILE
RESISTANCE (KIPS)
ESTIMATED DRIVEN PILE
LENGTH (FEET)
WEST ABUTMENT 963.67 165 28.5
EAST ABUTMENT 963.67 165 28.5
GENERAL NOTES:
DYNAMIC TESTING:
BORING LOGS -- BORING NO. B-1
ROAD NO. 618 - M.P. 0.10
COCONINO NATIONAL FOREST
1-10152 APRIL 22, 2011
SHEET NO.
6 OF 14JRW
JRW
JJT
WBL
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
PREPARED BY:
REGION THREE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
BORING LOGS -- BORING NO. B-2
ROAD NO. 618 - M.P. 0.10
COCONINO NATIONAL FOREST
1-10152 APRIL 22, 2011
SHEET NO.
7 OF 14JRW
JRW
JJT
WBL
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
PREPARED BY:
REGION THREE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
ALL DIMENSIONS ARE OUT-TO-OUT
LOCATION MARK SIZE NO. TYPE LENGTH A B C
PILE CAP
A1 #5 36 1 11'-3" 2'-7" 2'-8" 4 1/2"
A2 #6 12 STR 35'-8"
A3 #6 5 STR 5'-8"
A4 #5 6 3 7'-10" 2'-7" 2'-8"
D1 * 10 STR 3'-6"
END
DIAPHRAGM \
WINGWALL
BW1 #5 38 1 7'-2" 2'-8" 8" 3"
BW2 #6 2 STR 35'-8"
BW3 #5 15 STR 4'-2"
BW4 #5 12 STR 1'-2"
BW5 #5 3 STR 37'-2"
BW6 #5 1 STR 42'-7"
BW7 #5 2 STR 46'-8"
BW8 #5 16 STR 5'-1"
BW9 #5 4 STR 5'-8"
BW10 #5 4 STR 5'-5"
BW11 #5 4 STR 5'-0"
BW12 #5 4 STR 4'-9"
BW13 #5 4 STR 4'-4"
BW14 #5 4 STR 4'-1"
BW15 #5 2 STR 4'-4"
BW16 #5 4 STR 6'-5"
BW17 #5 4 2 8'-4" 1'-8" 1'-6" 4'-10"
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
JUNCTION WASH BRIDGE REPLACEMENT
ABUTMENT DETAILS
ROAD NO. 618 - M.P. 0.10
COCONINO NATIONAL FOREST
1-10152 APRIL 22, 2011
SHEET NO.
8 OF 14JRW
JRW
JJT
WBL
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627 REGION THREE
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
JUNCTION WASH BRIDGE REPLACEMENT
SUPERSTRUCTURE PLAN & DETAILS
ROAD NO. 618 - M.P. 0.10
COCONINO NATIONAL FOREST
1-10152 APRIL 22, 2011
SHEET NO.
9 OF 14JRW
JRW
JJT
WBL
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627 REGION THREE
PREPARED BY:
NOTE:
NOTE:
PRESTRESSED BEAM NOTES:
PRESTRESSED CONCRETE BEAM DESIGN:
DESIGN NOTES AS FOLLOWS:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
JUNCTION WASH BRIDGE REPLACEMENT
SUPERSTRUCTURE DETAILS
ROAD NO. 618 - M.P. 0.10
COCONINO NATIONAL FOREST
1-10152 APRIL 22, 2011
SHEET NO.
10 OF 14JRW
JRW
JJT
WBL
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627 REGION THREE
PREPARED BY:
NEAR
FACE
FILL
FACE
FILL
FACE
NEAR
FACE
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
JUNCTION WASH BRIDGE REPLACEMENT
CONCRETE BRIDGE BARRIER DETAILS
ROAD NO. 618 - M.P. 0.10
COCONINO NATIONAL FOREST
1-10152 APRIL 22, 2011
SHEET NO.
11 OF 14JRW
JRW
JJT
WBL
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627 REGION THREE
PREPARED BY:
A A
B B
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
JUNCTION WASH BRIDGE REPLACEMENT
THRIE BEAM TRANSITION DETAILS
ROAD NO. 618 - M.P. 0.10
COCONINO NATIONAL FOREST
1-10152 APRIL 22, 2011
SHEET NO.
12 OF 14JRW
JRW
JJT
WBL
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627 REGION THREE
PREPARED BY:
A A
B B
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
JUNCTION WASH BRIDGE REPLACEMENT
W-BEAM GUARDRAIL END ANCHOR DETAILS
ROAD NO. 618 - M.P. 0.10
COCONINO NATIONAL FOREST
1-10152 APRIL 22, 2011
SHEET NO.
13 OF 14JRW
JRW
JJT
WBL
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627 REGION THREE
ROADWAY CROSS-SECTIONS
ROAD NO. 618 - M.P. 0.10
COCONINO NATIONAL FOREST
1-10152
APRIL 22, 2011
SHEET NO.
JRW
JRW
JJT
WBL
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
REGION THREE
PREPARED BY:
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBY
REVISION DESCRIPTION
File details come from the government source that posted it. Updated .