AG-91U4-S-14-0001_Mod_001.pdf

PDF 165 KB Posted

Attached to
CNF Mount Laguna and Pine Valley Community Defense & Healthy Forest Restoration
Solicitation number
AG-91U4-S-14-0001
Issued by

About this file

AG-91U4-S-14-0001 Modification 001

View the file

Other files

File Type Posted
Fire_Plan_-_Revised.pdf PDF
Q A.pdf PDF
Pine_Valley_Unit_52_Map.pdf PDF
AG-91U4-S-14-0001_RFQ_-_Corrected.pdf PDF
SCA_WD_San_Diego_County.txt TXT text file
Fire_Plan.pdf PDF
Fire_Plan_Check_List.pdf PDF
AG-91U4-S-14-0001_RFQ.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

AG-91U4-S-14-0001

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

9AB5

ARCADIA CA 91006

701 N SANTA ANITA AVE

R5 AQM SOCAL SERVICE AREA

USDA FOREST SERVICE

02/18/2014000001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/18/2014

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This amendment changes Schedule of Items, Statement of Work, Fire Plan and Additional Map.

Attached documents replaces the pages from the main solicitation for Schedule of Items

(Page 3), Statement of Work (Page 4) and List of Attachmentand (Page 12 for File Plan and

Map).

A revised offer in response to this amendment is due on March 17, 2014 at 17:00 PT

PLEASE FILL OUT BLOCK 15 AND SUBMIT THIS PAGE WITH YOUR REVISED OFFER.

Period of Performance: 03/21/2014 to 12/20/2014

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

KATHLEEN CARVAJAL

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

MODIFICATION #: 001 Page 2 of 4

SOLICITATION #: AG-91U4-S-14-0001 Page 3 of 31 PROJECT: Mount Laguna and Pine Valley Community Defense & Healthy Forest Restoration

**SCHEDULE OF ITEMS**

OFFERORS PLEASE NOTE: BEFORE PREPARING PROPOSAL, CAREFULLY READ THE CONTENTS OF THIS REQUEST FOR

QUOTE/SOLICITATION COMPLETELY.

ITEM NO. DESCRIPTION

METHODOF

MEA.

PAY

UNIT

EST.

QTY. UNIT PRICE AMOUNT BID

001 Mastication AC AC 110 $ $

002 Hand Cut/Piling Brush AC AC 10 $ $

002 Optional – Hand Cut/Piling Brush AC AC 40 $ $

TOTAL $

STATEMENT OF WORK/DESCRIPTION/SPECIFICATIONS

SCOPE

The purpose of this contract is to secure services for fuels reduction/modification through mastication and hand cut/pile for approximately 160 acres to be performed in compliance to the contract terms, specifications and provisions. The Contractor shall furnish all labor, equipment, supervision, transportation needs, operating supplies and incidentals. The fuels treatment in the Wildland Urban Interface WUI will aid in the protection of the community in the event of a wildfire.

The efforts of this project on Federal Land adjacent to the communities in conjunction with property owner’s clearance efforts on private land will complement each other to make a safer more defensible community. Work will be conducted as described below in the requirement section. Removal efforts will involve Item 1: Mastication and OPTIONAL Item 2:

Hand Cut/Piling Brush will be optional treatment. Item 1: Mastication biomass will be left on site followed up by broadcast burning. OPTIONAL Item 2: Hand cut/pile will be piled into burn piles by the contractor as specified in the requirements section. The contractor will not be responsible for burning after the action. All removal efforts will be recorded with a GPS and field notes. Contractor will only be paid for approved acres completed.

LOCATION

The project area is located within the boundaries of the Descanso Ranger District of the Cleveland National Forest.

Unit 49, 51, 52 and 53 are approximately 90 acres combined. These Units are located in Pine Valley Community Township 15S, R4E, Section 25, 26, 35 and 36. Unit 37 approximately 70 acres of Mastication is located on Mount Laguna Township 15S, R5E, Section 24, 25 and 26.

Units 49, 51, 52 and 53 are located adjacent to private property along the National Forest Boundary. In all mastication units the terrain is rough and broken, with a wide variety of slopes, along with occasional outcroppings of rock. Shrub types include Chamise, Ceanothus, Sagebrush, Manzanita, Scrub Oak, Red Shank, Buckwheat and other mixed Chaparral. Some units contain a very sparse shrub component, while in other units the shrub component is quite dense.

Shrub height is generally less than 4-8 feet. All Units are located between 3,500 and 5,500 feet elevation.

DESCRIPTION

General

The project includes fuels reduction/modification for approximately 160 acres to be performed in compliance to the contract terms, specifications and provisions. The project consists of 5 separate units, with 4 Units in Pine Valley. Unit 37 located on Mount Laguna near Morris Ranch Rd. (see attached map) is approximately 70 acres. Unit 37 is Mastication ONLY. Mastication will be done on all slopes less than 35% within all units excluding rock outcroppings and (flagged) areas of avoidance (sensitive plants/species). Vegetation is to be masticated to a total height of 4 inches above the ground. Pine Valley Units 49, 51, 52 and will be a combination of Mastication and Hand Cut/Pile treatments. Areas that cannot be Masticated (see Restrictions of Work and Limitations) will require Hand Cut/Pile treatment to be performed at a

MODIFICATION #: 001 Page 3 of 4

SOLICITATION #: AG-91U4-S-14-0001 Page 4 of 31 PROJECT: Mount Laguna and Pine Valley Community Defense & Healthy Forest Restoration later date (late Summer/early Fall). The Descanso District intends to conduct prescribed fire treatments in the fall of 2014 into 2015.

Due to resource issues involving endangered species habitat and contract timing, mastication will be limited in Unit 52. No mastication will be allowed in the eastern portion of Unit 52, which includes the entire unit footprint starting 1500 feet from the far eastern edge of the unit to the east boundary. In this area, only hand cutting and piling is permitted.

Item 1: Mastication

Masticator with articulating arm shall have a ground pressure rating of 8 PSI or less and be capable of reaching 15 feet. All equipment associated with the project will be washed and cleaned prior to entering the Cleveland National Forest.

a. Edges of treatment blocks shall be irregular, not linear.

b. b. Debris resulting from the Contractor’s brush treatment operation shall be flat on the ground, not exceed 3-5 inches in depth, well scattered, and not in concentrated patches or piles.

c. All individual pieces of cut vegetative debris, regardless of diameter, shall be less than 3 feet in total length and left within unit boundary. No cut material shall be left leaning against or suspended in a tree.

d. All roads and trails shall be left clear of material. Standing brush shall be reduced to an average of 80%, woody shrubs within 1 foot of large rocks or other obstacles shall not be treated.

e. Safety Measures will be in place to keep public out of the work area example: Signs should be in place warning of work being conducted in the area near road ways, trails, and structures. No mastication shall be conducted within 100 feet of structure to avoid damage to private property.

f. No mastication allowed within 50 feet of riparian areas (creeks, springs, drainages).

g. Soil Protection: Do not operate equipment when soils are wet. Prior to initiation work, a Forest

Service Contracting Officer’s representative or designated inspector will certify in writing that the soils are dry enough to support the equipment. After each rainfall or snow event, work shall stop until the Forest Service inspects the work area and certifies in writing the soils are sufficiently dry to avoid resource damage. No mastication will be performed when snow is on the ground or if the area is receiving significant precipitation.

h. After work is complete, smooth over machine trails and other soil disturbances, particularly if they are oriented up and down the slope. Construct water-bars as needed to divert water flow. When possible, operate machinery on existing roads, on level areas, and along contour of slopes.

i. Ground based equipment should be limited to less than 35 percent slope.

j. Ephemeral stream crossings shall not exceed 3 per mile. COR or Designated inspector will work with

Biologist and flagged designated crossings as needed.

Item 2: Hand Cut/Pile (OPTIONAL)

Piles must be created in a purposeful manner in order to increase the efficiency of pile burning operations.

Properly built piles tend to shed water and keep the interiors dry. This helps both the ignition and combustion phases of the burn.

a. Piles will be built in a vertical-conical arrangement, NOT in a flat/stacked manner. Piles will not obstruct roads, trails, or access points.

b. Place piles no less than 15 feet away from trees or any standing vegetation to minimize scorch during pile burning. Construct piles no closer than 100 feet from structures.

c. Create piles no larger than 10 feet in diameter and 6 feet in height.

d. Materials in piles will be no greater than 8” in diameter and 6 feet in length.

e. piles will not be arranged underneath the dripline (minimum 10 feet from the drip line of trees), will not be positioned under thick hanging canopies of live trees where burn scorch may occur.

MODIFICATION #: 001 Page 4 of 4

SOLICITATION #: AG-91U4-S-14-0001 Page 12 of 31 PROJECT: Mount Laguna and Pine Valley Community Defense & Healthy Forest Restoration

Section E – LIST OF ATTACHMENTS

1. Fire Plan (current 08/02/12) Revised

2. Fire Plan CHECKLIST for Construction and Service Contracts

3. SCA Wage

4. Pine Valley (Unit 52) Map

Instructions,Conditions, and Notices to Bidders

FAR 52.212-1 -- Instructions to Offerors -- Commercial Items (Jul 2013)

The RFQ Due date (closing date) for proposal is on or before 17:00 Pacific Time, March 17, 2013. Quotes may be submitted ONLY via e-mail to: Kathleen Carvajal at kcarvajal@fs.fed.us.

DELIVERY OF QUOTATIONS. It is the responsibility of each offeror to ensure that its offer is received at the designated location at or before the closing time for the receipt of proposals in response to this RFQ. Any proposals received after the scheduled closing time will not be accepted or considered for a contract award.

Offerors are cautioned that in no event shall failure to familiarize themselves with the requirements of this solicitation or to resolve ambiguous or inconsistent terms or conditions of this solicitation or proposed contract constitute grounds for a claim of any kind after contract award.

PERIOD OF PERFORMANCE:

Projected start date: Spring 2014-Fall 2014.

Item 1: Mastication work is within Pine Valley (Units 49, 51, and 52) and will start prior to March 15, 2014 (see work description limitations C.10). UNIT 37 IS MASTICATION ONLY, with no Cut/Pile allowed. Mastication of Mt. Laguna

(Morris Ranch Unit 37) will follow the PV Units.

OPTIONAL Item 2: Hand Cut/Pile will be completed by late fall (Oct.-Nov.) within project units (49, 51, 52, and 53) in areas where the masticator could not treat due to specifications addressed in the restriction of work. Startup date to be determined based on current and expected weather conditions with an expected start date of Sept 15, 2014.

Time for completion will be 60-days from the issuance of the “Notice to Proceed” for Mastication and 60-days for Hand

Cut/Pile.

ASSUMPTIONS, CONDITIONS, OR EXCEPTIONS:

The Offeror must submit, under separate cover, all (if any) assumptions, conditions, or exceptions with any of the terms and conditions of this solicitation including the Requirements Summary. If not noted in this section of your quote, it will be assumed that the offeror proposes no assumptions for award, and agrees to comply with all of the terms and conditions as set forth herein.

Offers which add to or otherwise change the terms and conditions of the solicitation will be rejected, unless there is a statement on the schedule allowing otherwise.

As a minimum, responses shall include the signed Standard Form 1449, the Schedule of Items, Technical Proposal/Approach the Capability Information sheet in any type of form that will show experience, past performance, current obligations, and available equipment & personnel).

The contractor is required fill out and submit AGAR 452.209 – 70 Representation by Corporations Regarding an

Unpaid Delinquent Tax Liability or a Felony Conviction (Deviation 2012-1) Alternate 1 (FEB 2012) with their offer. (This provision is on the last page(s) of this main document.)