AG-91T5-S-09-0019.doc

DOC document 694 KB Posted

Attached to
OAK FLAT SEPTIC TANK Federal contract opportunity
Solicitation number
AG-91T5-S-09-0019
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

SOLICITATION AG-91T5-S-09-0019

View the file

Other files for this federal contract opportunity

Other files attached to OAK FLAT SEPTIC TANK, newest first.
File Type Posted
TOPO 21map.jpg JPG image
AMENDMENT 1 - 2 of 3 Rev 1.pdf PDF
AMENDMENT 1 - Part C Rev 1.doc DOC document
OAK FLAT ALIGNMENT OF SEWER 3 of 3.pdf PDF
OAK FLAT ALIGNMENT OF SEWER 1 of 3.pdf PDF
OAK FLAT ALIGNMENT OF SEWER 2 of 3.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-91T5-S-09-0019

OAK FLAT SEPTIC TANK

19 JUN 09

REQUEST FOR QUOTATION

PAGE OF PAGES

(THIS IS NOT AN ORDER)
THIS RFQ
FORMCHECKBOX
IS
FORMCHECKBOX
IS NOT A SMALL BUSINESS SET- ASIDE
1. REQUEST NO.
2. DATE ISSUED
3. REQUISITION/PURCHASE REQUEST NO.
4. CERT. FOR NAT.DEF.
RATING
1
06/19/2009
286539
UNDER BDSA REG. 2

AND/OR DMS REG. 1

5a. ISSUED BY
6. DELIVER BY (Date)

SOUTHERN CALIFORNIA PROVINCE

701 N. SANTA ANITA AVENUE

ARCADIA, CA. 91006

45 DAYS AFTER NOTICE TO PROCEED

5b. FOR INFORMATION CALL (NO COLLECT CALLS)
7. DELIVERY
FORMCHECKBOX

FOB DESTINATION

NAME
TELEPHONE NUMBER
FORMCHECKBOX

OTHER (See Schedule)

AREA CODE
NUMBER
9. DESTINATION
MARY C. HOWELL
626
574-5241
a. NAME OF CONSIGNEE
8. TO:
a. NAME
b. COMPANY
b. STREET ADDRESS
c. STREET ADDRESS
c. CITY
d. CITY
e. STATE
f. ZIP CODE
d. STATE
e. ZIP CODE
10. PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5A ON OR BEFORE CLOSE OF BUSINESS
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5A. This request does not commit the Government to pay any costs incurred in the preparation of the
24 July 2009 1300 PST
submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NO.
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(a)
(b)
(c)
(d)
(e)
(f)
001
REMOVE AND REPLACE SEPTIC TANK
1
JOB
002
INSTALL SEWER PIPING AND SUBSURFACE DISPOSAL FIELD
1
JOB
a. 10 CALENDAR DAYS (%)
b. 20 CALENDAR DAYS
c. 30 CALENDAR DAYS
d. CALENDAR DAYS

12. DISCOUNT FOR PROMPT PAYMENT

NUMBER
PERCENTAGE
NOTE: Additional provisions and representations
FORMCHECKBOX
are
FORMCHECKBOX

are not attached.

13. NAME AND ADDRESS OF QUOTER
14. SIGNATURE OF PERSON AUTHORIZED TO
15. DATE OF
a. NAME OF QUOTER
SIGN QUOTATION
QUOTATION
b. STREET ADDRESS
16. SIGNER
a. NAME (Type or print)
b. TELEPHONE

c. COUNTY

AREA CODE

d. CITY
e. STATE
f. ZIP CODE
c. TITLE (Type or Print)
NUMBER

B-1.FAR 52.236-27 Site Visit (Construction) (FEB 1995) Alternate I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for 30 June 2009 at 1000 hours

(c) Participants will meet at 701 N. Santa Anita Avenue. Arcadia, Ca. 91006

DUNS #________________________

TIN #__________________________

Award will be made to one contractor.

To be considered for award, contractors must return completed sections A (Standard Page 33- Page 1), B Schedule of Items, K (REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS OR RESPONDENTS) and respond to the Evaluation Criteria listed in clause L.5.

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C-1 - SCOPE

Oak Flat is a resource sensitive location. Any excavation will be continuously monitored for any resource conflict. Should any resource be disturbed, excavation in that area will be temporarily halted at that location. In accordance with FAR 52.242-14 an unreasonable delay for this contract is more than one day. Excavation may be continued at another location until it is determined to have sensitive resources.

The purpose and intent of this contract is to replace the septic tank and if necessary install a new sewer line and subsurface disposal field at the Oak Flat Station. The Oak Flat Station is located on the Golden State Hwy about 3 miles north of the Templin Highway exit on Interstate 5.

Upon award of the Contract, the Contractor shall provide labor, materials, equipment, supervision, and incidentals necessary to perform the Statement of Work.

The Contractor shall assume all risk, loss, damage, or expense arising out of prosecution of the work, except as otherwise provided in the contract.

C-2 - PROJECT DESCRIPTION

The Contractor shall locate the existing septic tank inlet and outlet piping. Remove, sanitize, and dispose of the existing septic tank and purchase and install a new 2000 gallon concrete septic tank. The Contractor shall then connect the inlet and outlet piping to the septic tank and video monitor the discharge piping for damage. The damaged piping shall be restored to the existing subsurface disposal field.

The Contractor shall then video monitor the existing disposal field and provide a copy of the video to the Contracting Officer for review. The Contracting Officer shall then determine if the existing disposal field is to be abandoned and a new subsurface disposal field constructed. The Decision will be made within 7 days.

If the decision is to replace the existing subsurface disposal field, the Contractor shall install approximately 300 feet of 4 inch ABS drain line with 30 inches minimum cover, and new leach field with 18 inches minimum cover. Leachfield trench shall be 3 feet wide and 3 feet below perforated pipe. Trench to be filled with graded rock from 2 inches above the pipe to the bottom of the trench. Top of rock shall be covered to prevent backfill from penetrating the rock fill. Total leachfield length to be 400 feet in four legs complete with a distribution box.

Directions: A vicinity map is included to show the location of the Oak Flat Fire Station. From Interstate 5 take the Templin Hwy exit and turn west to the Golden State Hwy. Turn Right and proceed north about 3 miles to the entrance to the Oak Flat Fire Station on the left.

D-1 - SECTION D--PACKAGING AND MARKING

{For this Solicitation, there are NO clauses in this Section}

E-1 - SECTION E--INSPECTION AND ACCEPTANCE

E-2 - FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

E-3 - 52.246-1 Contractor Inspection Requirements (APR 1984)

52.246-12 Inspection of Construction (AUG 1996)

F-1 - SECTION F--DELIVERIES OR PERFORMANCE

F-2 - FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

F-3 - 52.242-14 Suspension of Work (APR 1984)

F-4 - FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 45 calendar days from Notice to Proceed. The time stated for completion shall include final cleanup of the premises.

F-5 - AGAR 452.236-75 Maximum Workweek – Construction Schedule (NOV 1996) Within 5 calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following information in writing for approval:

(a) A schedule as required by FAR clause 52.236-15, Schedules for Construction Contracts, and

(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposed to carry out the work.

The maximum workweek that will be approved is 40 hours.

G-1 - SECTION G--CONTRACT ADMINISTRATION DATA

G-2 - AGAR 452.215-73 Post Award Conference (NOV 1996) A post award conference with the successful offeror is required. It will be scheduled and held within 5 days after the date of contract award. The conference will be held at 701 N. Santa Anita Avenue, Arcaida, Ca. 91006.

H-1 - SECTION H-SPECIAL CONTRACT REQUIREMENTS

FIRE PLAN FOR CONSTRUCTION AND SERVICE CONTRACTS

12/05/07

(Ref: FSH 6309.32 and 6309.11)

H-2 - 1..SCOPE:

The provisions set forth below outline the responsibility for fire prevention and suppression activities and establish an attack procedure for fires within the contract area. The contract area is delineated by map in the contract. The provisions set forth below also specify conditions under which contract activities will be curtailed or shut down. See Section 5, Emergency Measures below.

H-3 - 2. RESPONSIBILITIES:

A. Contractor

(1) Shall abide by the requirements of this Fire Plan.

(2) Shall take all steps necessary to prevent his/her employees, subcontractors and their employees from setting fires not required in completion of the contract, shall be responsible for preventing the escape of fires set directly or indirectly as a result of contract operations, and shall extinguish all such fires which may escape.

(3) Shall complete the Contractor's Plan Regarding Personnel, Equipment and Organization (6.B) and shall furnish the Contracting Officer (CO) with a copy prior to commencing work at the site. Shall currently advise the CO of any changes in personnel, equipment and organization as the changes occur. Shall revise Section 6.B to reflect current activities upon request of the CO.

B. Forest Service

The Forest Service may conduct one or more inspections for compliance with the fire plan. The number, timing, and scope of such inspections will be committed at the discretion of agency employees responsible for contract administration. Such inspections do not relieve the Contractor of responsibility for correcting violations of the fire plan or for fire safety in general, as outlined in paragraph 2.A above.

H-4 - 3. TOOLS AND EQUIPMENT:

A. The Contractor shall comply with the following requirements:

Shall equip all diesel and/or gasoline-operated engines, both stationary and mobile, and all flues used in any contract and camp operations with spark arresters that meet Forest Service standards set forth in the National Coordinating Group publication for Multiposition Small Engines, #430-4, or General Purpose and Locomotive, #430-2. Spark arresters are not required on equipment powered by exhaust-driven turbo-charged engines or motor vehicles equipped with a maintained muffler as defined in California Public Resources Code (CPRC), Section 4442 and 4443.

Shall furnish and have available for emergency use on each piece of equipment used in conjunction with performance of the work as listed below, hand tools and/or equipment as follows (CPRC 4427, 4428 and 4431):

(a) One shovel, one axe (or pulaski) and a fully charged fire extinguisher U.L. rated at 2-A:10-B:C, or larger, on each truck, personnel vehicle, tractor, grader and other heavy equipment.

Contractor shall equip each mechanized harvesting machine with hydraulic systems, powered by an internal combustion engine (chipper, feller/buncher, harvester, forwarder, stroke delimber, etc), except tractors and skidders, with at least two 10 lb 4A/60 B-C fire extinguishers, or equivalent. In addition, concentrations of wood dust and debris shall be removed from such equipment daily.

(b) One shovel and one backpack 5 gallon water-filled tank with pump with each welder.

(c) One shovel and one pressurized chemical fire extinguisher for each gasoline-powered tool, including but not restricted to chain saws, soil augers, rock drills, etc. Fire extinguishers shall be of the type and size set forth in the California Public Resources Code Section 4431. Shovel must be kept within 100 feet from each chain saw when used off cleared landing areas.

All tools and equipment required in (1) and (2) above shall be in good workable condition and shall meet the following principle Forest Service specifications for fire tools:

(a) Shovels shall be size "O" or larger and be not less than 46 inches in overall length.

(b) Axes (or pulaskis) shall have 2-1/2 pound or larger heads and be not less than 28 inches in overall length.

Shall furnish a water tank truck or trailer, if so designated in Section 5.F. Tank truck or trailer shall be located on or immediately adjacent to the contract area and meet the following minimum specifications: contain at least 300 gallons of water; a combination straight stream-fog nozzle with 300 feet of one-inch fire hose, with no segment longer than 50 feet; fire hose with nozzle closed shall be capable of withstanding 200 psi pump pressure without leaking, slipping of couplings, distortions, or other failures; nozzle discharge rating of six to 20 gallons per minute; a pump capable of delivering 23 gallons per minute at 175 pounds psi at sea level; power unit for pump shall have fuel for at least two hours operation, with ample transport available for immediate and safe movement of tank over roads serving the contract area; and shall be in good working order; pump outlet shall be equipped with 1-1/2 inch National Standard Fire Hose thread.

Shall furnish two tractor headlights for each tractor dozer, if so designated in Section 5.G. Tractor headlights shall be attachable to each tractor and served by an adequate power source.

B. Forest Service Contracting Officer's Representative (COR) will deliver Government-furnished fire tool box to contract site and remove after completion and acceptance of the contract, if so designated in Section 5.C below.

H-5 - 4.

GENERAL

A. State Law. The Contractor shall comply with all applicable laws of the State of California. In particular, see California Public Resource Codes.

B. Permits Required. The Contractor must secure a special written permit from the District Ranger or designated representative before engaging in any of the activities listed below. The terms and conditions of any of the permits required for this contract are as shown on copies attached to the Fire Plan.

(1) Blasting and Storage of Explosives and Detonators. (Explosives Permit required by California Health & Safety Code, Section 12101.)

(2) Burning.

(3) Air Pollution. (Issued by local State or County Air Pollution Control Districts, as applicable.)

(4) Camp, Lunch and Warming Fires.

(5) Welding and Cutting.

C. Regulations for Burning. Before setting any fires whatsoever, the Contractor shall notify the CO of his/her intentions. Special care shall be taken to prevent scorching or causing any damage to adjacent structures, trees, and shrubbery. Piles of material to be burned shall be of such size and so placed that during burning no damage shall result to adjacent objects.

D. Smoking and Fire Rules. Smoking shall not be permitted during fire season, except in a barren area or in an area cleared to mineral soil at least three feet in diameter (CPRC 4423.4). In areas closed to smoking, the CO may approve special areas to be used for smoking. Designated smoking areas shall be signed by the Contractor. Contractor shall post signs regarding smoking and fire rules in conspicuous places for all employees to see. Contractor's supervisory personnel shall require compliance with these rules. Under no circumstances shall smoking be permitted during fire season while employees are operating light or heavy equipment, or walking or working in grass and woodlands.

E. Storage and Parking Areas. Equipment service areas, parking areas, and gas and oil storage areas shall be cleared of all inflammable material for a radius of at least 50 feet. Small mobile or stationary engine sites shall be cleared of inflammable material for a radius of at least 15 feet from such engine. The Contracting Officer h areas must be approved, in writing, by the Contracting Officer.

F. Welding. Contractor shall confine welding activity to cleared areas having a minimum radius of ten feet measured from place of welding.

G. Blasting. Contractor shall use electric caps only. When blasting is necessary in slash areas, a watchperson equipped with shovel and a water-filled backpack can (5 gallon), with hand pump, shall remain in the immediate area for an hour after blasting has been completed.

H. Oil Filter and Glass Jugs. Contractor shall remove from National Forest land all oily rags and used oil filters. Contractor shall prohibit use of glass bottles and jugs on contract operations.

I.

Reporting Fires. As soon as feasible, after initial control action is taken, Contractor shall notify Forest Service of any fires along roads used by Contractor.

J. Communications. If required in Section 5.H below, Contractor shall furnish a serviceable telephone, radio-telephone, or radio system connecting each operation with the designated Forest Service Dispatch Center. A radio-equipped fire patrolperson vehicle will satisfy this requirement if in operation during the time required. The communication system shall provide prompt and reliable communications between the Contractor's operations and the Forest Service Dispatch Center. The communications system shall be operable during Contractor's operation in the fire precautionary period and at the time fire patrolperson service is required. The communications system shall be capable of contacting the designated Forest Service Dispatch Center within five (5) minutes of discovery of a fire in the Contractor’s operating area.

H-6 - 5. EMERGENCY MEASURES

The table set forth below establishes work restrictions and fire precautions that the Contractor must observe at each activity level.

Contractor shall conform to the limitations or requirements of Project Activity Level (PAL) obtained from Forest Service before starting work each day. If practicable, Forest Service will determine the following day’s activity level by 4:00 p.m. each afternoon. Activity level may be changed at any time if, in the judgment of the Forest Service, fire danger is higher or lower than predicted and such change is consistent with forest management objectives. The decision to change the activity level, and when, and how to take weather observations for that purpose, are within the discretion of Forest Service.

PAL applicable to this project shall be for Fuel Model G, National Fire Danger Rating System, and Remote Automated Weather Station (RAWS) or fire danger rating area stated in the legend of Project Area Map.

PROJECT ACTIVITY LEVELS

LEVEL

PROJECT ACTIVITY

A.

As required by Sections 1 through 4 above.

B.

Furnish Fire Patrol. The fire patrol must meet the requirements in 5.E below. When mechanized equipment with high-speed rotary head is utilized, the Fire Patrol shall remain in the operational area until 8:00 p.m., unless otherwise agreed in writing.

C.

The following operations are prohibited from 1 p.m. until 8 p.m. local time.

a. Dead tree felling, limbing, or bucking except recently dead trees.

b. Operating high speed rotary head equipment.

c. Blasting.

D.

The following operations are prohibited from 1 p.m. until 8 p.m. local time.

a. Tractor, skidder, feller-buncher (without high speed rotary head), forwarder, chipper or shovel logging operations.

b. Cable yarding with gravity operated logging systems employing non-motorized carriages when all blocks and moving lines are 10 feet or more above the ground, excluding the line between the carriage and the choker.

c. Mechanized loading and hauling, except log trucks already at the landing.

d. Hand felling green or recently dead material.

e. Power saw use at landings.

f. Welding or cutting of metal except by special permit.

g. Any other spark-emitting operation except by special permit.

The following operations are prohibited:

h. Blasting between hours of 10 a.m. and 8 p.m.

i. Cable yarding except as stated above.

j. Mechanized operations for felling (with high speed rotary head), bucking, and limbing.

k. Felling dead material.

l. Road clearing and pioneering in uncleared areas.

m. Mechanized slash disposal.

E.

Operations are prohibited except:

a. Trucks at landing may be loaded and can leave sale area.

b. Equipment at landings may be serviced.

c. Roads: dust abatement or rock/aggregate installation.

Ev.

Same as E with the exception that if site-specific conditions warrant a variance permitting operations, the CO or their representative will provide the specified emergency precautions needed.

All of the precautions listed above apply unless the Contracting Officer agrees to changes in writing. Such written agreement, or substitute precautions, shall prescribe measures to be taken by Purchaser to reduce the risk of ignition, and/or the spread of fire.

A.

The Contractor can obtain the Predicted Activity level for the following day at telephone number: 661-723-2752 B. The Contractor FORMCHECKBOX will FORMCHECKBOX will not be required to furnish a sealed box of fire fighting tools, to be located in the operating area, at a point accessible in the event of fire. This box shall contain: one 5-gallon, backpack pump-type fire extinguisher filled with water; two axes; two McCleod fire tools; one serviceable chain saw of three and one-half or more horsepower with a cutting bar 20 inches in length or longer; and enough shovels so that each employee at the operation can be equipped to fight fire. The box shall remain unlocked, but be sealed with a Forest Service seal to be broken for emergency use only.

C. The Forest Service FORMCHECKBOX will FORMCHECKBOX will not furnish box of fire fighting tools, the contents of which is within the discretion of agency employees at the district level. The Contractor shall ensure that the box remains unlocked but sealed with a Forest Service seal to be broken for emergency use only. The Contractor will be responsible for keeping the box in the operating area, at a point accessible in the event of fire, and will return it to the government upon completion of the work. The cost of replacing any shortage of tool inventory or loss or damage to the box will be withheld from the final contract payment due the Contractor.

D. The Contractor FORMCHECKBOX will FORMCHECKBOX will not be required to furnish a filled five gallon backpack pump at each work site at activity level C, or above.

E. The Contractor FORMCHECKBOX will FORMCHECKBOX will not be required to furnish a fire patrol with a filled 5-gallon backpack pump to prevent, detect, and suppress any fires in the contract area. The patrol shall remain on duty at least two hours after the close of work, at Activity Level B, or above. SUPPLEMENT: The fire patrol FORMCHECKBOX may FORMCHECKBOX may not perform other duties on the contract.

F. The Contractor FORMCHECKBOX will FORMCHECKBOX will not be required to furnish a water tank truck or trailer. Water tank truck or trailer FORMCHECKBOX may FORMCHECKBOX may not be used for other work on the contract.

G. The Contractor FORMCHECKBOX will FORMCHECKBOX will not be required to furnish tractor headlights.

H. The Contractor FORMCHECKBOX will FORMCHECKBOX will not be required to furnish communications equipment; specifically a cellular phone..

(SEE TABLE ON FOLLOWING PAGE)

6. REPORTING ALL WILD FIRES

A. Contractor's employees shall report all fires to any of the following Forest Service facilities and/or personnel listed below, but not necessarily in the order shown:

Name
Office Address and/or telephone
Home address and/or telephone

Dispatch Center

Forest Dispatch
Forest Dispatch
661-723-2704
Inspector
Wes Hoffmaster
626-574-5294
COR
Sonja Bergdhal
626-574-5292
District Ranger
L’Tanga Watson (San Gabriel River)

Mike McIntyre (L.A. River and Santa Clara-Mojave Rivers)

626-335-1251 x250

818-899-1900 x223

D.R. Designated Rep

When reporting a fire, provide the following information;

Your Name;

Call back telephone number;

Project name;

Location;

Legal description (Township, Range, Section); and

Descriptive location (Reference point);

Fire Information;

Acres;

Rate of Spread; and

Wind Conditions.

B. Contractor's Plan Regarding Personnel, Equipment and Organization. The Contractor shall, prior to commencing work, furnish the following information relating to key personnel, tools and equipment available for the purpose of fighting wild fires within and adjacent to the Contract Area:

(1) Key Personnel: (In order of call preferences)

Title
Name
Address and/or telephone

Fire Supervisor

Fire Patrolperson

(2) Personnel and Equipment

Number
Classification or Type, Make & Model

Fire Fighters:

Fallers:

Power Saws:

Other Equipment:

(3) Fire Suppression Plan:

Contractor's Signature Date ____________________________

Contracting Officer Date ____________________________

PART II--CONTRACT CLAUSES

I-1 - SECTION I--CONTRACT CLAUSES

I-2 - FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

I-3 – 52.209-6

Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (MAY 2008) I-3 - 52.211-18 Variation in Estimated Quantity (APR 1984) I-4 - 52.219-6 Notice of Total Small Business Set-Aside (JUN 2003) I-5 - 52.222-3 Convict Labor (JUN 2003) I-6 - 52.222-6

Davis-Bacon Act (JUL 2005) I-7 - 52.222-8

Payrolls and Basic Records (FEB 1988)

I-7 - 52.222-9

Apprentices and Trainees (JUL 2005)

I-8 - 52.222-10 Compliance with Copeland Act Requirements (FEB 1988)

I-9 - 52.222-11 Subcontracts (Labor Standards) (JUL 2005) I-10 - 52.222-12 Contract Termination - Debarment (FEB 1988)

I-11 - 52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988)

I-12 - 52.222-14 Disputes Concerning Labor Standards (FEB 1988)

I-13 - 52.222-15 Certification of Eligibility (FEB 1988)

I-14 - 52.222-20 Walsh-Healy Public Contracts Act (DEC 1996) I-15 - 52.222-21 Prohibition of Segregated Facilities (FEB 1999) I-16 - 52.222-26 Equal Opportunity (MAR 2007) I-17 - 52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999) I-18 - 52.222-36 Affirmative Action for Workers with Disabilities (JUN 1998) I-19 - 52.222-50 Combating Trafficking in Persons (SEP 2007) I-20 - 52.223-5 Pollution Prevention and Right-to-Know Information (AUG 2003)

I-21 - 52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007)

I-22 - 52.224-1 Privacy Act Notification (APR 1984)

I-23 - 52.224-2 Privacy Act (APR 1984)

I-24 - 52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008)

I-25 - 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007)

I-26 - 52.228-2 Additional Bond Security (OCT 1997) I-27 - 52.228-11 Pledges of Assets (FEB 1992) I-28 - 52.228-12 Prospective Subcontractor Requests for Bonds (OCT 1995) I-29 - 52.228-14 Irrevocable Letter of Credit (DEC 1999)

I-30 - 52.232-5 Payments Under Fixed-Price Construction Contracts (SEP 2002) I-31 - 52.232-23 Assignment of Claims (JAN 1986)

I-32 – 52.232-27 Payment for Construction Contracts (OCT 2008)

I-33 - 52.232-33 Payment by Electronic Funds Transfer – Central Contractor Registration (OCT 2003)

I-34 - 52.233-1 Disputes (JUL 2002) I-35 - 52.233-3 Protest After Award (AUG 1996) I-36 - 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)

I-37 - 52.236-2 Differing Site Conditions (APR 1984)

I-38 - 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984)

I-39 - 52.236-5 Material and Workmanship (APR 1984)

I-40 - 52.236-6 Superintendence by the Contractor (APR 1984)

I-41 – 52.236-7 Permits and Responsibilities (NOV 1991)

I-42 – 52.236-8 Other Contracts (APR 1984) I-43 – 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

(APR 1984)

I-44 – 52.236-10 Operations and Storage Areas (APR 1984)

I-45 – 52.236-11 Use and Possession Prior to Completion (APR 1984)

I-46 – 52.236-12 Cleaning Up (APR 1984)

I-47 - 52.236-13 Accident Prevention (NOV 1991)

I-48 - 52.236-14 Availability and Use of Utility Services (APR 1984) I-49 - 52.236-15 Schedules for Construction Contracts (APR 1984) I-50 - 52.236-17 Layout of Work (APR 1984)

I-51 - 52.236-21 Specifications and Drawings for Construction (FEB 1997)

I-52 - 52.236-27 Site Visit (Construction) (FEB 1995) Alternate I (FEB 1995 I-53 - 52.243-5 Changes and Changed Conditions (APR 1984)

I-54 - 52.244-6 Subcontracts for Commercial Items (MAR 2009) I-55 - 52.246-21 Warranty of Construction (MAR 1994) I-56 - 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short From) (APR 1984)

I-57 - 52.249-10 Default (Fixed-Price Construction) (APR 1984) I-58 - 52.253-1 Computer Generated Forms (JAN 1991)

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

I-59 - 452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996) I-60 - 452.236-72 Use of Premises (NOV 1996)

I-61 - 452.236-73 Archeological or Historic Sites (FEB 1988)

I-62 - 452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996)

I-63 - 452.236-76 Samples and Certificates (FEB 1988)

I-64 - 452.236-77 Emergency Response (NOV 1996)

I-65 - 52.204-7 Central Contractor Registration (APR 2008)

(a) Definitions. As used in this clause—

“Central Contractor Registration (CCR) database” means the primary Government repository for Contractor information required for the conduct of business with the Government.

“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.

“Data Universal Numbering System+4 (DUNS+4) number” means the DUNS number means the number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same concern.

“Registered in the CCR database” means that—

(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the CCR database; and

(2) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS), and has marked the record “Active”. The Contractor will be required to provide consent for TIN validation to the Government as a part of the CCR registration process.

(b)

(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the CCR database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS or DUNS+4 number that identifies the offeror’s name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the CCR database.

(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.

(1) An offeror may obtain a DUNS number—

(i) Via the internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or

(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.

(2) The offeror should be prepared to provide the following information:

(i) Company legal business name.

(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(iii) Company physical street address, city, state and Zip Code.

(iv) Company mailing address, city, state and Zip Code (if separate from physical).

(v) Company telephone number.

(vi) Date the company was started.

(vii) Number of employees at your location.

(viii) Chief executive officer/key manager.

(ix) Line of business (industry).

(x) Company Headquarters name and address (reporting relationship within your entity).

(d) If the Offeror does not become registered in the CCR database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.

(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.

(f) The Contractor is responsible for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(g)

(1)

(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to:

(A) Change the name in the CCR database;

(B) Comply with the requirements of Subpart 42.12 of the FAR;

(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (g)(1)(i) of this clause, or fails to perform the agreement at paragraph (g)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.

(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims (see FAR Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the CCR database. Information provided to the Contractor’s CCR record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.

(h) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the Internet at http://www.ccr.gov or by calling 1-888-227-2423, or 269-961-5757.

I-66 - FAR 52.225-9 Buy American Act-Construction Materials (FEB 2009)

(a) Definitions. As used in this clause--

“Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is—

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C. App. 1702), such as agricultural products and petroleum products.

“Component” means an article, material, or supply incorporated directly into a construction material.

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

“Domestic construction material” means—

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if—

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

“Foreign construction material” means a construction material other than a domestic construction material.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements the Buy American Act (41 U.S.C. 10a-10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to the construction material or components listed by the Government as follows: NONE

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American Act.

(1)

(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction material description
Unit of measure
Quantity
Price (dollars) *

Item 1

Foreign construction material

Domestic construction material

Item 2

Foreign construction material

Domestic construction material

[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]

[Include other applicable supporting information.]

[*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] I-67 - FAR 52.228-13 Alternative Payment Protections (JUL 2000)

(a) The Contractor shall submit one of the following payment protections

CASHIER CHECK_______________________________

MONEY ORDER________________________________

PAYMENT BOND_______________________________

(b) The amount of the payment protection shall be 100 percent of the contract price.

(c) The submission of the payment protection is required within 10 days of contract award.

(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.

(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.

(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.

I-68 - AGAR 452.228-70 Alternative Forms of Security (NOV 1996)

If furnished as security, money orders, drafts, cashier's checks, or certified checks shall be drawn payable to: USDA Forest Service.

Order of Precedence--Construction Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The Schedule (excluding the specifications)

(2) Representations and Other Instructions

(3) Contract Clauses

(4) Other Documents, Exhibits, and Attachments

(5) The Specifications

(6) Drawings

PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J--LIST OF ATTACHMENTS

ATTACHMENT #

ATTACHMENT NAME

PAGES

DATE

01010 - SUMMARY OF WORK

01060 – REGULATORY REQUIREMENTS

19 JUN 09

01300 – SHOP DWGS AND SUBMITTALS

19 JUN 09

01400 – QUALITY CONTROL AND

QUANTITY MEASUREMENT

01600 – USE OF GOVERNMENT FACILITIES

01710 – CLEAN-UP AND DISPOSAL

02220 – EXCAVATING, BACKFILLING, AND

COMPACTION FOR UTILITIES

02731 – GRAVITY SEWER LINES

02740 – SEPTIC TANK

02741 – SUBSURFACE DISPOSAL FIELDS

03300 – CAST-IN-PLACE CONCRETE

19 JUN 09

DAVIS-BACON WAGE – CA080033

05 JUN 09

VICINITY MAP – OAK FLAT FIRE STATION

19 JUN 09

OAK FLAT ALIGNMENT OF SEWER

OAK FLAT ALIGNMENT OF SEWER

OAK FLAT ALIGNMENT OF SEWER

19 JUN 09

ATTACHMENT 1

SUMMARY OF WORK

SECTION 01010

PART 1 - GENERAL

1.01 SCOPE: This project consists of removing and replacing an existing septic tank connecting the tank to the existing inlet and outlet piping, repairing existing discharge piping, video monitoring the existing discharge piping and disposal field to determine the condition of the disposal system. The Government will decide to proceed with the installation of a new discharge piping and disposal field based on the results of the video examination of the discharge lines. The Oak Flat Station is located on the Angeles National Forest.

A. Existing conditions should be verified by the Contractor. Contractor shall submit a work plan in their bid proposal.

B. The work will be split into two components. The first component is the removal and installation of the septic tank. The Second component is the installation of the sewer line and leachfield. Payment for the first component shall be made under Item 1 of the Schedule of Items and the Second Component of work shall be paid under Item 2 of the Schedule of Work.

C. The first component of this Contract shall consist of following items of work:

1.

Remove, sanitize and dispose of the existing septic tank.

2.

Purchase, excavate, prepare the site, and install the new septic tank. Perform any tests required.

3.

Connect the existing inlet piping and discharge piping to the septic tank.

4.

Video the discharge piping and repair as required.

5.

Video the discharge piping and disposal field to determine the condition of the existing piping.

6.

Based on the results of the video, the Contracting Officer will decide whether or not to proceed with the installation of the complete discharge piping and disposal field. The decision will be made within 7 calendar days of the receipt of the video.

D.

The second component of this contract shall consist of the following items of work:

1.

If the decision is to proceed, then the Contractor shall proceed with the installation of the discharge piping and disposal field. A sketch is provided for general orientation. The Discharge piping shall consist of approximately 300 feet of 4 inch ABS drain piping with 30 inches minimum cover. The new subsurface disposal field shall consist of 4 laterals each 100 feet long and a distribution box. The leach field detail is shown on the sketch. The ground is rocky at the station and may be difficult for excavation.

E.

Contract award will consist of items as shown in the Schedule of Items.

1.02 ACCESS: The sites are accessible by passenger vehicle.

1.03 HOURS OF OPERATION: The Contractor's hours of operation shall be restricted to 8:00 am to 4:30 pm, Monday through Friday. In addition the work shall be shut down during the following periods. Contract time has been adjusted to reflect these periods of shutdown.

A.

Work shall be shut down on Saturdays, Sundays and all holidays recognized by the Federal Government.

1.04 WORK SCHEDULES: The Contractor shall submit a work schedule showing date and duration of all work on the above table, to the Contracting Officer prior to work commencing. Contractor shall provide 48 hours notice to the Contracting Officer of any change to the schedule.

END OF SECTION

ATTACHMENT 2

REGULATORY REQUIREMENTS

SECTION 01060

PART 1 - GENERAL

1.01

SCOPE

A.

This section describes th codes and standards which apply to the work in this contract. Additional codes and standard may be cited in sections to which they apply.

1.02

CODES AND STANDARDS

A.

The following codes and standards shall apply to the work in this contract:

1.

Uniform Building Code (IBC), 2006 Edition with latest California Amendments

2.

Uniform Plumbing Code (UPC), 2006 Edition with latest California Amend.

3.

Uniform Mechanical Code (UMC), 2006 Edition with latest California Amend.

4.

National Electrical Code (NEC), 2005 Edition

5.

Americans with Disabilities Act and Architectural Barriers Act Accessibility Guidelines, 2006 Edition.

6.

American Institute of Steel Construction (AISC) 13th Edition.

7.

American Iron and Steel Institute (AISI) 1986 Edition.

8.

American Society for Testing and Materials (ASTM) latest edition.

9.

Metal Buildings Manufacturers Association (MBMA).

10.

Underwriter's Laboratories, (UL)

11.

Architectural Aluminum Manufacturers Association (AMMA)

12. Steel Door Institute, Standard 100

13. American Water Works Association (AWWA)

14. National Fire Protection Association (NFPA)

15. Uniform Fire Code (UFC) 1997 Edition

16. American Gas Association (AGA)

B.

Unless otherwise specified in this contract, reference to a specific standard or specification shall mean the latest edition or amendment in affect on the date of the invitation to bid.

1.03

DEFINITIONS

A.

Administrative Authority as used in the Uniform Mechanical Code, the Uniform Plumbing Code and the National Electrical Code will be the Contracting Officer.

B.

Building Official as used in the Uniform Fire Code, Uniform Building Code and the Uniform Building Code…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .